WEST QURNA I - (IRAQ) IR INSPECTION REQUEST

IR No. : CE-C0876 PROJECT SPECIFICATION: IQWQ-FT-NSPDS-00-040101 REV.0 CONCRETE


Contractor Project DESIGN AND CONSTRUCTION

Description: PROCEDURE: IQWQ-CE1092-CPZZZ-00-0003_0 -CIVIL WORK


CONSTRUCTION PROCEDURE
Produced Water ITP: IQWQ-CE1092-CPQAC-00-0001 REV. 1 CIVIL INSPECTION AND TEST
PLAN
Treatment M109 DRWG NO: IQWQ-CE1091-CDFND-D7-009/28/ 26/30 REV.1
Rev No: 1
- AWQ0109 Sht No: /

Civil NDE Instrumentation Material Inspection


Structural Painting Pre Hydrotest Walk down Any Others (mention Below)
HDPE Mechanical Equipment Hydrotest
Welding Piping Reinstatement
PWHT Electrical Mechanical Completions
MONTHS DAYS
JAN FEB MAR APR MAY JUN 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1
JUL AUG SEP OCT NOV DEC 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

No ITEM/TAG Number AREA Time of


Inspection Execution Result
Description LOCATION Inspection
Loading Dry concrete for PSV tower columns, pipe BR batch 4:00
Accepted
supports (PS-D7PW-221) (PS-D7PW-286) (PS-D7PW-287) plant
(PS-D7PW-265) columns, shelter columns (train 2), and Accepted with Comments
jib crane columns in DS7. (fill the comments below)
Rejected
Rescheduled
Follow up

TICK THIS BOX IF NO EMIL / SOC and if it is a WITNESS as per ITP,


(by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
Comments for this QA activity: (include any Handmade drawing)

SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT


Construction Subcontractor CPECC QC representative EMIL Construction EMIL QC representative
NAME: NAME: NAME NAME
Signature: Signature: Signature: Signature:

Date: Date: Date: Date:


CPECC to Produce ITP, Procedure, Method Statement, Drawings, Plot Plans, Material Certificates, and all other related documents
as per the requirement of this particular IR for which this has been raised, Document compliance for IR is a must