You are on page 1of 8

Coventry University, Performing Arts Centre

CODE SUITABILITY DESCRIPTION

STATUS PURPOSE OF ISSUE

www.autodesk.com/revit
PROJECT

Performing Arts Centre


TITLE

Renders
CLIENT

Owner
DRAWN BY CHECKED BY DATE
Author Checker 04/27/15

30/04/2015 12:17:37
SCALE (@ A1) PROJECT NUMBER
Project Number
DRAWING NUMBER REV

A111
-

UP

Rehearsal room Rehearsal changing Toilets small props Costume Technician


room room, WC room room room
Changing rooms

A116 2
Technical
store

Green room Workshop double


Stage height

A121 4

Auditorium

Dressing
room

UP UP

CODE SUITABILITY DESCRIPTION

Staircase
STATUS PURPOSE OF ISSUE

UP
Toilets

www.autodesk.com/revit
PROJECT

Bar Performing Arts Centre


Storage

TITLE

Administrator's
office
Ground Floor
CLIENT

Owner
DRAWN BY CHECKED BY DATE
Author Checker 04/24/15

30/04/2015 12:14:24
00 Ground floor SCALE (@ A1)
1 : 100
PROJECT NUMBER
Project Number
1 : 100 DRAWING NUMBER REV

A106
Dance studio Office Classroom Classroom Changing CR, Rehearsal
room WC room

3 DN
A120

Workshop- double
Toilets height Toilets

Dance
studio

DN

Sound & Lighting DN

CODE SUITABILITY DESCRIPTION


Stairs going down to lower
level of auditorium
STATUS PURPOSE OF ISSUE
Staircase

DN

www.autodesk.com/revit
Office PROJECT

Performing Arts Centre


Void TITLE
Office

First Floor
CLIENT

Owner
01 first floor DRAWN BY CHECKED BY DATE
Author Checker 04/27/15

30/04/2015 12:34:28
1 : 100
SCALE (@ A1) PROJECT NUMBER
1 : 100 Project Number
DRAWING NUMBER REV

A115
Aluminium cladding panels

Glazed panels

west elevation

Auditorium roofing
Glazed roofing

Hexagonal panels cladding

Fire exit
Below ground level Delivery access
auditorium seating
east elevation

CODE SUITABILITY DESCRIPTION

Glazed Curtain wall STATUS PURPOSE OF ISSUE

Entrance
www.autodesk.com/revit
south elevation PROJECT

Auditorium roof
Performing Arts Centre
TITLE

Rectangle cladding
panels Elevations
CLIENT

Owner
DRAWN BY CHECKED BY DATE
Author Checker 04/27/15

30/04/2015 12:17:01
SCALE (@ A1) PROJECT NUMBER
Project Number
DRAWING NUMBER REV
north elevation Copy 1 A110
When designing and constructing the
Coventry University , Performing Arts Centre- external walls for the theatre, there will
be more of a focus on the sound
insulation of the wall to reduce the
Technical Focus amount of sound entering the building
from the outside and also to reduce the
amount of sound leaving the building.
Doors, windows and types of HVAC
systems installed in the external wall will
also have a major effect of the acoustic
performance.

For the internal floors the method i will be using is the Jack-Up construction technique.
The advantages to this type of system is that it eradicates the need for permanent formwork as
well as being quick
and simple to install hence decreasing the cost.
The Jack-Up floating floor system is contained of a concrete slab which is poured on a damp
proof membrane
on the structural slab. The slab is then jacked up by way of units cast into the slab

. They are favoured by acoustic consultants


because of the certainty that the slab is
fully decoupled from the surrounding structure.
[Jack-up] floor slabs must be made from
concrete and reinforced using mesh rather
than fibres as the [Jack-up] mounts are
Stud wall
designed to link with the mesh to spread load
when the slab is lifted.

Rigid insulation

CODE SUITABILITY DESCRIPTION

Mesh Reinforcement STATUS PURPOSE OF ISSUE


Jack up Spring floating floor Air gap Acoustic wall tie

www.autodesk.com/revit
Farat jack up mount Perimeter Isolation
PROJECT

Performing Arts Centre


TITLE

POSTER 1
CLIENT

technical detail- floating floor Copy 1 Copy 1 Owner


1:5
technical detail- floating floor Copy 2 DRAWN BY
Author
CHECKED BY
Checker
DATE
04/29/15

30/04/2015 13:12:58
1 : 10
SCALE (@ A1) PROJECT NUMBER
As indicated Project Number
DRAWING NUMBER REV

A118
Block work fixed to 2 layer sof plasterboard at 25mm
steel structure
using proprietary
A pile foundation consists of two components: Pile cap steel fixings Rigid Insulation
and single or group of piles. Piles transfers the loads
Aluminium Mineral wool
from structures to the hard strata, rocks or soil with high cladding panels
bearing capacity. fixed to block work

Cavity fire Floor sheathing


Barrier Skirting board

Hardcore Concrete slab


Treated sill plate

DPM Sand

Rigid Gypsum wall board painted with a vapour barrier primer or paint
insulation
in external Structural sheathing
cavity
Small Gap with acoustic
sealant
Rigid insulation
in
external cavity

5
Cavity
(50mm
minimum) Platform floor Concrete slab
treatment

Pile head waterproofing solution

Pile Cap

Cavity
barrier to
floor /wall
junction
with cavity
tray over

Mineral
wool
wall to ground floor
packing
1 : 10
CODE SUITABILITY DESCRIPTION

Shallow STATUS PURPOSE OF ISSUE


decking

Separating wall insulation stops heat and noise from being moved
Mineral wool inserts
through the separating walls while providing a fire protection layer. These
Steel frame separating walls are often load- bearing and hence entail a greater www.autodesk.com/revit
inner leaf
amount of fire protection than internal walls. PROJECT
Joints sealed with tape or caulked with acoustic sealant
Concrete block cavity walls not only depend on the mass but also on
isolation that is given by the cavity.
Mass and airtightness is very important when concerning effective
Performing Arts Centre
Dense mineral wool and fire protection as required
insulation and the conduction of airborne sound and how practical it is for
separating walls. The weight of the wall is determined by the density and TITLE

Acoustic sealant
how thick the material is thats used. The design, details and the
construction is what makes the separating wall reach good acoustic
performance
Details 1
Deflection head
CLIENT

Owner
DRAWN BY CHECKED BY DATE
Author Checker 04/27/15

30/04/2015 12:16:27
SCALE (@ A1) PROJECT NUMBER
As indicated Project Number
wall to intermediate floor DRAWING NUMBER REV
1:5
A109
Rigid DPM Aluminium cladding panels Metal window frame Cavity Aluminium cladding panels
Insulation Closer

window
1:5

Block work Cavity Barrier Support bracket

Sloped metal coping cap

wood nailer with anchor bolts

Flashing Top coat

Gant
Brickwork Waterproof membrane

Approved fastners

Carrier membrane

Cavity
(50mm Rockwool insulation
minimum)

Vapour control layer

Profiled metal deck

CODE SUITABILITY DESCRIPTION

Angle cleats Sloted bolt fixing to provide


leveling adjustment
STATUS PURPOSE OF ISSUE

Mineral wool packing 25mm wide mild steel hangers


Slotted bolt fixing to provide leveling adjustment

www.autodesk.com/revit
Joints sealed with tape or caulked with acoustic sealant PROJECT
1 or 2 layers
of thick plasterboard
Perimeter channel screwed to ceiling sections
Performing Arts Centre
Cavity fire barrier
TITLE

Dense mineral wool Pressed steel ceiling sections

Details 2
Acoustic sealant

CLIENT
Steel frame inner leaf
Deflection head Owner
DRAWN BY CHECKED BY DATE
Author Checker 04/27/15

30/04/2015 12:25:23
SCALE (@ A1) PROJECT NUMBER
As indicated Project Number
wall to roof DRAWING NUMBER REV
1:5
A112
24 25 1 2 3 4 5 6 7 8 11 12

Auditorium roof
11200

render final 1
03 ROOF
1:1
04 GLAZED ROOF
8500 8000

Dance Studio Office Classroom Classroom Changing room Changing Rehearsal


room with WC
room Fire exit

01 first floor
4000

Auditorium higher
level Rehearsal room Rehearsal room Changing room Changing room Toilets Small props room
Costume room Technical room
2000
render final 3
00 Ground floor 1:1
0

section detail 2
1 : 100

Auditorium roof
11200

04 GLAZED ROOF
8500 03 ROOF
8000

Sound & Lighting


Dance Studio Toilets

Void looking down the foyer


Access to lower level to auditorium
01 first floor
4000

Auditorium higher
level
Green room Disabled access to and from stage
Corridor Foyer
2000

00 Ground floor
0

CODE SUITABILITY DESCRIPTION

STATUS PURPOSE OF ISSUE

section detail Copy 1 Copy 1


1 : 100

www.autodesk.com/revit
PROJECT

Performing Arts Centre


TITLE

Section Detail
CLIENT
{3D} Copy 2
Owner
DRAWN BY CHECKED BY DATE
Author Checker 04/25/15

30/04/2015 12:15:21
SCALE (@ A1) PROJECT NUMBER
As indicated Project Number
{3D} Copy 3 DRAWING NUMBER REV

A107

You might also like