SLZ

Bill of Quantities
Package Name: Construction of Boundary wall 214.5m Type(B boys+Gate) and Garbage collection point for Hazrat Omar Farooq Primary School in Jaghatu District of Wardak
province.

Package ID/Code: S-M-NCB9.2 Location (Province): WARDAK


Lot Name and Lot #2-Construction of Boundary wall 214.5m Type(B boys+Gate) and Garbage collection point for Hazrat Omar Farooq Primary School in Jaghatu District of Wardak province
Description:

Unit Rate Amount


Serial Analysis Code Description of Work Unit Quantity Remarks
(USD) (USD)

Typical Local Materials' Boundary Wall


Component A: Boundary Wall Sub Category: (Type B - Male) Revised
No. of Multiplier 214.5

Serial Analysis Code Description of Work Unit Quantity Unit Rate Amount Remarks
1 C-002 Excavation of foundation in Grade Cu.m 120.12
3 land with all requiments.

2 C-007 Stone Masonry of foundation with Cu.m 120.12


1:6 mortar with high quality 1:6
granite stone with all requiments.

3 C-008 Supper stone masonry wall with Cu.m 199.49


1:6 mortar with high quality 1:6
granite stone with all requiments.

4 C-003 PCC on the top of stone masonry Cu.m 12.87


and walls1:2:4 with all 1:2:4
requirments.
5 C-010 Pointing with 1:3 mortar on the Sq.m 664.95
wall and Kursi including the cleaing
with all requiments. 1:3
SUBTOTAL - Boundary Wall (Typical Local Materials' Boundary Wall (Type B - Male) Revised): - US Dollar

Component B: Gate Sub Category: Typical Steel Gate - Revised No. of Multiplier 1

Serial Analysis Code Description of Work Unit Quantity Unit Rate Amount Remarks
1 C-002 Excavation of footing in Grade3 Cum 5.00
land all Necessassry Requirment.
2 C-004 Rcc concrete mix 1:1,5:3 in Cum 2.80
columns & footing work all 1:1,5:3
necessary requirment
3 C-003 pcc concrete mix 1:2:4 in Cum 0.39
shefti(tihck=10cm) & parapet wall 1:2:4
work all necessary requirment 10cm

4 C-113 prepare of steel doors one way & sqm 11.00


tow way withe all necessary
requirment
5 C-075 palastring of columns Mix 1:3 all 1:3 sqm 11.55
necessary requirment
6 C-061 panting withe 100% plastic of sqm 12.00
columns) all Requirmements 100%

7 C-053 oil pantung for doors 3 coats all sqm 22.54


Necessassry Requirment.

8 C-114 light on colum from water prof all Ea 3.00
Necessary Requirements
SUBTOTAL - Gate (Typical Steel Gate - Revised): - US Dollar

Component C: Garbage Collection Point Sub Category: Typical Garbage Collection Point- Revised No. of Multiplier 1

Serial Analysis Code Description of Work Unit Quantity Unit Rate Amount Remarks
1 C-115 Prepare plastic garbage collection Ea 2.00
point bucket size (201/240)lit best 201/240Lit
quality according to the drawing
with all Necessary Requirements

2 C-116 prepare and Insulation RCC well Ea 3.00


(dia=90)cm according to the 90
drawing with all Necessary
Requirements
3 C-117 prepare and Insulation cover of M2 1.00
well from GI sheet 24 gage 24
according to the drawing with all
Necessary Requirements
4 C-118 prepare and Insulation sieve from M2 1.00
steel bar 16mm according to the 16
drawing with all Necessary
Requirements

Page 1 of 2
Bill of Quantities
Package Name: Construction of Boundary wall 214.5m Type(B boys+Gate) and Garbage collection point for Hazrat Omar Farooq Primary School in Jaghatu District of Wardak
province.

Package ID/Code: S-M-NCB9.2 Location (Province): WARDAK


Lot Name and Lot #2-Construction of Boundary wall 214.5m Type(B boys+Gate) and Garbage collection point for Hazrat Omar Farooq Primary School in Jaghatu District of Wardak province
Description:

Unit Rate Amount


Serial Analysis Code Description of Work Unit Quantity Remarks
(USD) (USD)
5 C-119 prepare and Insulation steel bar M/L
Typical Local4.00
Materials' Boundary Wall
18mm under the sieve according to 18 (Type B - Male) Revised
the drawing with all Necessary
Requirements
6 C-120 prepare and Insulation spaceheater 0.12 M/L 1.00
pipe (dia=12cm inclding the elbow 24
from GI sheet 24 gage according
to the drawing with all Necessary
Requirements

SUBTOTAL - Garbage Collection Point (Typical Garbage Collection Point- Revised): - US Dollar

SUBTOTAL 1 (M+L+E): [including all 3 components]: - US Dollar

A Mobilization works @ ( )% of SUBTOTAL 1 (M+E+L)


B Demobilization works @ ( )% of SUBTOTAL 1 (M+E+L)

SUBTOTAL 2 (A+B+C+SUBTOTAL 1):

E Government Tax @ ( )% of SUBTOTAL 2


SUBTOTAL 3 (E+SUBTOTAL 2):

GRAND TOTAL (F+SUBTOTAL 3)