You are on page 1of 1

GROUP B CONSTRUCTION COMPLETION

REPORT FORM

In accordance with LCC 8.55.100(4), a Construction Completion Report is required for all new or expanding Group B projects.
Purveyors must submit a Construction Completion Report to the department within sixty (60) days of completion and before use
of any water system facility.

Please type or print legibly in ink:


DOH System ID No.:
Name of Water System
Lewis County Project
Name of Purveyor (Owner or System Contact)

Date Group B Design Report Workbook/Project


Approved by Lewis County:
Mailing Address

City State Zip

PROJECT NAME AND DESCRIPTIVE TITLE:

PROFESSIONAL ENGINEERS ACKNOWLEDGMENT (Complete items belowAttach additional sheets as needed)

The undersigned professional engineer (PE), or their authorized agent, has inspected the above-described project which, as to
layout, size, type of pipe, valves, materials, reservoir, and other designed physical facilities, has been constructed and is
substantially completed in accordance with the Group B Design Workbook approved by Lewis County. In the opinion of the
undersigned engineer, the installation, physical testing procedures, water quality tests, and disinfection practices were carried out in
accordance with local and state regulations and principles of standard engineering practice.

__________________________________________________
Date Signed

__________________________________________________
Name of Engineering Firm

__________________________________________________
Name of PE Acknowledging Construction Completion
P.E.s Seal
__________________________________________________
Mailing Address

__________________________________________________
City State Zip

________________________________________________________
Engineers Signature

Please return completed form to Lewis County Public Health and Social Services at:
2025 NE Kresky Ave. Chehalis, WA 98532.

Form #XX

You might also like