HYDROTEST SCHEMATIC DIAGRAM STAGE-2

(FROM VALVE STATION-2 TO VALVE STATION-1)

PG/TG Recorder RELIEF


TG PG
VALVE
0-6000# PSIG
VENT

1" 4" ISOLATION FLANGE ISOLATION FLANGE 4" 1"


3/4" 3/4" 3/4" 30" AB-PIPELINE
2500# 4" Contd... A
2500# 2500# 2500# 1" 2" 2" 2"
VALVE VALVE VALVE VALVE

WATER
TANK 257-D-0002
2"
CHECK ISOLATION 1"
VALVE VALVE 2500# 1"
HYDRO TEST
2", 600# 2", 600# DRAIN 4" 4"
PUMP TEMPORARY 6"
PIG LAUNCHER PERMANENT 20"
AT VALVE STATION-2 PIG RECEIVER
AT VALVE STATION-1
(TO MOVE FROM BAPCO
REFINERY FOR HYDROTEST)

RELIEF PG/TG Recorder


PG TG
VALVE
0-6000# PSIG
VENT

3
4" 3
4"
3
4"
3
4"
2500# 2500# 2500# 2500#
VALVE VALVE VALVE VALVE

Contd... A

1" ISOLATION ISOLATION


2500# VALVE VALVE
DRAIN 6", 600# 6", 600#