Alcatel-Lucent 9130
BSC Evolution | B12
Maintenance Handbook
9YZ-03803-1240-PCZZA
Issue 5 | July 2012
Legal notice

Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.

The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright 2012 Alcatel-Lucent. All rights reserved.

Note:

Not to be used or disclosed except in accordance with applicable agreements.


Contents

About this document


Purpose .......................................................................................................................................................................................... xiii
xiii

Reason for reissue ...................................................................................................................................................................... xiii


xiii

New in this release .................................................................................................................................................................... xiii


xiii

Intended audience ...................................................................................................................................................................... xiv


xiv

Supported systems ..................................................................................................................................................................... xiv


xiv

How to use this document ....................................................................................................................................................... xiv


xiv

Safety information ..................................................................................................................................................................... xiv


xiv

Prerequisites ................................................................................................................................................................................. xiv


xiv

Conventions used ....................................................................................................................................................................... xiv


xiv

Related information .................................................................................................................................................................... xv


xv

Document support ....................................................................................................................................................................... xv


xv

Technical support ......................................................................................................................................................................... xv


xv

How to order .................................................................................................................................................................................. xv


xv

How to comment .......................................................................................................................................................................... xv


xv

1 Safety Information

Structure of safety statements ............................................................................................................................................... 1-1


1-1

2 Hardware Presentation

Overview ...................................................................................................................................................................................... 2-1


2-1

9130 BSC Evolution Front and Rear Views ................................................................................................................... 2-1


2-1

9130 BSC Evolution Interconnections .............................................................................................................................. 2-5


2-5

Board/Area/Slot/SBL Mapping ........................................................................................................................................... 2-6


2-6

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC iii
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Contents

....................................................................................................................................................................................................................................
3 Safety Rules and Precautions

Overview ...................................................................................................................................................................................... 3-1


3-1

Safety Rules for Equipment Under Power ....................................................................................................................... 3-1


3-1

Electrostatic Precautions ........................................................................................................................................................ 3-2


3-2

4 Maintain ATCA Subrack

Overview ...................................................................................................................................................................................... 4-1


4-1

Before You Start

Checks ........................................................................................................................................................................................... 4-4


4-4

ATCA Subrack Description

ATCA Subrack Presentation ................................................................................................................................................. 4-5


4-5

Fan Tray

Manage Fan Tray ...................................................................................................................................................................... 4-9


4-9

Prerequisites ................................................................................................................................................................................ 4-9


4-9

Replace Fan Tray .................................................................................................................................................................... 4-11


4-11

Air Filter

Manage Air Filter ................................................................................................................................................................... 4-19


4-19

Air Filter Cleaning ................................................................................................................................................................. 4-19


4-19

Air Filter Replacement ......................................................................................................................................................... 4-20


4-20

Front RITs

Manage Front RITs ................................................................................................................................................................ 4-24


4-24

Tips for Inserting ATCA Front RITs ................................................................................................................................ 4-25


4-25

Replace JBXTP/JBXTP3 ..................................................................................................................................................... 4-32


4-32

Replace JBXTP3I ................................................................................................................................................................... 4-35


4-35

Replace JBXTP with JBXTP3 ........................................................................................................................................... 4-40


4-40

Replace JBXTP/JBXTP3 with JBXTP3I ....................................................................................................................... 4-43


4-43

Replace SFP Module from JBXTP3/JBXTP3I Board .............................................................................................. 4-47


4-47

....................................................................................................................................................................................................................................
iv Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Contents

....................................................................................................................................................................................................................................
Remove SFP Module ............................................................................................................................................................ 4-48
4-48

Insert SFP Module .................................................................................................................................................................. 4-49


4-49

Replace JBXOMCP ............................................................................................................................................................... 4-52


4-52

Replace JBXCCP ................................................................................................................................................................... 4-58


4-58

Remove JBXCCP ................................................................................................................................................................... 4-59


4-59

Insert JBXCCP ........................................................................................................................................................................ 4-60


4-60

Replace JBXSSW ................................................................................................................................................................... 4-63


4-63

Remove / Insert JBXFILL ................................................................................................................................................... 4-69


4-69

Remove JBXFILL .................................................................................................................................................................. 4-70


4-70

Insert JBXFILL ....................................................................................................................................................................... 4-71


4-71

Rear RITs

Manage Rear RITs ................................................................................................................................................................. 4-72


4-72

Replace JAXPC ...................................................................................................................................................................... 4-72


4-72

Replace JAXSSW .................................................................................................................................................................. 4-81


4-81

Replace JAXSMM ................................................................................................................................................................. 4-87


4-87

Replace JBXPS ....................................................................................................................................................................... 4-92


4-92

Replace JAXFILL .................................................................................................................................................................. 4-99


4-99

Replace Battery on JBXOMCP/JBXCCP

How to Replace Battery on JBXOMCP/JBXCCP ................................................................................................... 4-100


4-100

Board Takeover ..................................................................................................................................................................... 4-101


4-101

Remove Board ...................................................................................................................................................................... 4-102


4-102

Replace Battery ..................................................................................................................................................................... 4-103


4-103

Insert Board ............................................................................................................................................................................ 4-104


4-104

5 Maintain LIU Subrack

Overview ...................................................................................................................................................................................... 5-1


5-1

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC v
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Contents

....................................................................................................................................................................................................................................
Before You Start

Checks ........................................................................................................................................................................................... 5-3


5-3

Replace LIU Board

How to Replace LIU Board .................................................................................................................................................. 5-4


5-4

Remove LIU Board .................................................................................................................................................................. 5-7


5-7

Insert LIU Board ....................................................................................................................................................................... 5-8


5-8

Replace JBXMUX Board

How to Replace JBXMUX Board ...................................................................................................................................... 5-9


5-9

Remove JBXMUX ................................................................................................................................................................. 5-11


5-11

Insert JBXMUX ...................................................................................................................................................................... 5-12


5-12

Replace JBXPEM

How to Replace JBXPEM ................................................................................................................................................... 5-14


5-14

Remove JBXPEM .................................................................................................................................................................. 5-15


5-15

Insert JBXPEM ....................................................................................................................................................................... 5-17


5-17

Replace LIU Front Filler

How to Replace LIU Front Filler ..................................................................................................................................... 5-19


5-19

Remove JBXDUM ................................................................................................................................................................. 5-21


5-21

Replace JBXDUM ................................................................................................................................................................. 5-22


5-22

6 9130 BSC Evolution Cables

Overview ...................................................................................................................................................................................... 6-1


6-1

Intervention Levels ................................................................................................................................................................... 6-1


6-1

ATCA Subrack Cables ............................................................................................................................................................ 6-6


6-6

LIU Subrack Cables ................................................................................................................................................................. 6-7


6-7

7 Software Procedures

Overview ...................................................................................................................................................................................... 7-1


7-1

....................................................................................................................................................................................................................................
vi Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Contents

....................................................................................................................................................................................................................................
Modify Community String Name

How to Modify Community String Name ....................................................................................................................... 7-3


7-3

Perform a Software and Hardware Diagnosis

How to Perform a Software and Hardware Diagnosis ................................................................................................ 7-5


7-5

Reset BSC

How to Reset BSC .................................................................................................................................................................... 7-6


7-6

Modify BSC IP External Configuration

how to Modify BSC IP External Configuration ............................................................................................................ 7-7


7-7

Modify 9130 BSC Evolution IP Configuration

General Information .............................................................................................................................................................. 7-12


7-12

Modify BSC IP Subnetwork Address ............................................................................................................................. 7-15


7-15

Modify BSC IP Configuration from 1 LAN to 2 LANs ........................................................................................... 7-17


7-17

Modify BSC IP Configuration from Two LANs to One LAN ............................................................................... 7-19
7-19

Tool Collecting On-Demand Traces/Logs

Description ................................................................................................................................................................................ 7-21


7-21

Emergency Mode .................................................................................................................................................................... 7-22


7-22

Normal Mode ........................................................................................................................................................................... 7-24


7-24

File Transfer to 9153 OMC-R ............................................................................................................................................ 7-26


7-26

8 Upgrade Firmware

Overview ...................................................................................................................................................................................... 8-1


8-1

How to Upgrade Firmware and Payloads

Description .................................................................................................................................................................................. 8-3


8-3

Upgrade Shelf Manager Firmware

How to Upgrade Shelf Manager Firmware ..................................................................................................................... 8-5


8-5

SSW Firmware Upgrade

How to SSW Firmware Upgrade ........................................................................................................................................ 8-9


8-9

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC vii
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Contents

....................................................................................................................................................................................................................................
Upgrade MUX and TP Firmware

How to Upgrade MUX and TP Firmware ..................................................................................................................... 8-12


8-12

Upgrade MUX Firmware .................................................................................................................................................... 8-13


8-13

Upgrade TP Firmware

How to Upgrade TP Firmware .......................................................................................................................................... 8-14


8-14

Upgrade OMCP Firmware

How to Upgrade OMCP Firmware .................................................................................................................................. 8-16


8-16

Upgrade CCP Firmware

How to Upgrade CCP Firmware ....................................................................................................................................... 8-18


8-18

Upgrade PEM, FAN, PC Firmware

How to Upgrade PEM, FAN, PC Firmware ................................................................................................................. 8-21


8-21

Upgrade PEM, FAN and PC Firmware .......................................................................................................................... 8-22


8-22

Upgrade PEM Firmware ...................................................................................................................................................... 8-24


8-24

Upgrade FAN Firmware ...................................................................................................................................................... 8-26


8-26

Upgrade PC(A100) Firmware ............................................................................................................................................ 8-28


8-28

....................................................................................................................................................................................................................................
viii Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
List of tables

2-1 ATCA Shelf Front View Board-Area-Slot-SBL Mapping .......................................................................... 2-6

2-2 ATCA Shelf Rear View Board-Area-Slot-SBL Mapping ........................................................................... 2-7

2-3 LIU Shelf Board-Slot-SBL Mapping ................................................................................................................. 2-7

4-1 JAXSSW Ethernet Connections ........................................................................................................................ 4-81

6-1 ATCA Configuration ................................................................................................................................................ 6-6


6-6

6-2 Power Cords for ATCA ........................................................................................................................................... 6-6

6-3 Cable List for GE Links between LIU and ATCA ......................................................................................... 6-7

7-1 IP Assignment in 9130 BSC Evolution External Subnet A ..................................................................... 7-12

7-2 IP Assignment in 9130 BSC Evolution External Subnet B ..................................................................... 7-12

7-3 IP Assignment in 9130 BSC Evolution External Subnet C ..................................................................... 7-13

7-4 IP Assignment in 9130 BSC Evolution External Subnet A ..................................................................... 7-13

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC ix
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
List of tables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
x Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
List of figures

2-1 Front View of a Standalone 9130 BSC Evolution ......................................................................................... 2-2

2-2 Rear View of a Standalone 9130 BSC Evolution .......................................................................................... 2-4

2-3 9130 BSC Evolution Interconnections .............................................................................................................. 2-5

4-1 ATCA Subrack, Rear View .................................................................................................................................... 4-6

4-2 ATCA Subrack, Rear View .................................................................................................................................... 4-7

4-3 Front Fan Unit .......................................................................................................................................................... 4-10


4-10

4-4 Fan Unit Cover for ATCA Shelf Variants Before 3BK 27291 ABxx ................................................... 4-12

4-5 Fan Unit Cover fromr ATCA Shelf Variant 3BK 27291 ABxx On ....................................................... 4-13

4-6 Fan Unit Cover for ATCA Shelf Variants Before 3BK 27291 ABxx ................................................... 4-16

4-7 Fan Unit Cover from ATCA Shelf Variant 3BK 27291 ABxx On ......................................................... 4-17

4-8 ATCA Front Board Handles - First Step to Remove a Board ................................................................. 4-26

4-9 ATCA Front Board Handles - Second Step to Remove a Board ............................................................ 4-27

4-10 Board Handle - Remove or Insert Board ........................................................................................................ 4-28

4-11 Guides for Board Insertion .................................................................................................................................. 4-29

4-12 Align Holes with Needles .................................................................................................................................... 4-30

4-13 Protect EMI Stripes when Inserting / Removing Boards ......................................................................... 4-31

4-14 JBXSSW Board Variants ...................................................................................................................................... 4-64

4-15 Extraction of Front Fillers .................................................................................................................................... 4-70

4-16 JAXPC Board Front View ................................................................................................................................... 4-73

4-17 JAXPC: Shelf Geographic Address Rotary Switches for Board Variant Before 3BK 27226 AACA
............................................................................................................................................................................ 4-744-74
4-74

4-18 JAXPC: Shelf Geographic Address Rotary Switches from Board Variant 3BK 27226 AACA On
............................................................................................................................................................................ 4-754-75
4-75

4-19 JAXSSW Rear Transition Module Front Plate ............................................................................................. 4-82

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC xi
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
List of figures

....................................................................................................................................................................................................................................
4-20 Shelf Manager Board ............................................................................................................................................. 4-87

4-21 JAXSMM - Handle Switch Positions .............................................................................................................. 4-89

4-22 Power Entry Module for Variants Before 3BK 27342 AACA ............................................................... 4-93

4-23 Power Entry Module from Variant 3BK 27342 AACA On ..................................................................... 4-94

5-1 Front View of LIU Subrack ................................................................................................................................... 5-3

5-2 LIU Board .................................................................................................................................................................... 5-5


5-5

5-3 JBXMUX Board ........................................................................................................................................................ 5-9


5-9

5-4 JBXPEM Board ....................................................................................................................................................... 5-14


5-14

5-5 JBXDUM Filler ....................................................................................................................................................... 5-20


5-20

6-1 9130 BSC Evolution Rack Intervention Levels ............................................................................................. 6-2

6-2 ATCA Front View (with Cable Positions) ........................................................................................................ 6-4

6-3 ATCA Rear View (with Cable Positions) .......................................................................................................... 6-5

....................................................................................................................................................................................................................................
xii Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
About this document
About this document

Purpose
This handbook describes how to replace units and cables in the subracks and how to
install, configure and change 9130 BSC Evolution software.

Reason for reissue

Issue number Reason for reissue


5 Following sections were updated:
Replace JBXTP/JBXTP3 with JBXTP3I (p. 4-43)
Replace JBXTP3I (p. 4-35)
Board/Area/Slot/SBL Mapping (p. 2-6)

4 Section Insert JBXTP3I (p. 4-36) was updated


3 Section how to Modify BSC IP External
Configuration (p. 7-7) was updated
2 Section Upgrade TP Firmware (p. 8-14) was updated.
1 The first official release of the document.

New in this release


This section contains information about changes to the current document.
New features
None.
Other changes
None.

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC xiii
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
About this document

....................................................................................................................................................................................................................................
Intended audience
This Maintenance Handbook is intended for:
Maintenance engineers
System support engineers
Network technicians
Network operators.

Supported systems
This document applies to Release B12 of the BSS.

How to use this document


No specific recommendation applies regarding the way readers should read this
document.

Safety information
For your safety, this document contains safety statements. Safety statements are given at
points where risks of damage to personnel, equipment, and operation may exist. Failure to
follow the directions in a safety statement may result in serious consequences.

Prerequisites
You must have a basic understanding of the following:
Alcatel-Lucent operations and maintenance (O&M) concepts for the BSC
BSC hardware configurations
Telecommunications engineering
Anti-static procedures
Windows environment
Linux environment.

Conventions used
This section gives information on conventions.
Vocabulary conventions
None.

....................................................................................................................................................................................................................................
xiv Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
About this document

....................................................................................................................................................................................................................................
Typographical conventions
The following typographical conventions are used in this document:

Appearance Description
Italicized text Emphasized information.
graphical user interface text Text that is displayed in a graphical user interface or in a
hardware label.
Document reference, reference Related document that is referenced in the document.
number

Related information
None.

Document support
For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at
one of the following telephone numbers:
1-888-582-3688 (for the United States)
1-317-377-8618 (for all other countries)

Technical support
For technical support, contact your local Alcatel-Lucent customer support team. See the
Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact
information.

How to order
To order Alcatel-Lucent documents, contact your local sales representative or use Online
Customer Support (OLCS) (http://support.alcatel-lucent.com)

How to comment
To comment on this document, go to the Online Comment Form (http://infodoc.alcatel-
lucent.com/comments/) or e-mail your comments to the Comments Hotline
(comments@alcatel-lucent.com).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC xv
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
About this document

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
xvi Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
1 Safety Information
1

Structure of safety statements


Overview
This topic describes the components of safety statements that appear in this document.

General structure
Safety statements include the following structural elements:

B C D
CAUTION

M P L E
Lifting hazard E F

SA
Lifting this equipment by yourself can result in injury
due to the size and weight of the equipment.
G
Always use three people or a lifting device to transport
and position this equipment. [ABC123]
H
Item Structure element Purpose
1 Safety alert symbol Indicates the potential for personal injury
(optional)
2 Safety symbol Indicates hazard type (optional)
3 Signal word Indicates the severity of the hazard
4 Hazard type Describes the source of the risk of damage or
injury
5 Safety message Consequences if protective measures fail
6 Avoidance message Protective measures to take to avoid the hazard
...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 1-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Safety Information Structure of safety statements

....................................................................................................................................................................................................................................

Item Structure element Purpose


7 Identifier The reference ID of the safety statement
(optional)

Signal words
The signal words identify the hazard severity levels as follows:

Signal word Meaning


DANGER Indicates an extremely hazardous situation which, if not avoided, will
result in death or serious injury.
WARNING Indicates a hazardous situation which, if not avoided, could result in
death or serious injury.
CAUTION Indicates a hazardous situation which, if not avoided, could result in
minor or moderate injury.
NOTICE Indicates a hazardous situation not related to personal injury.

....................................................................................................................................................................................................................................
1-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
2 Hardware Presentation
2

Overview
Purpose
This section provides an overview of equipment and interconnections.

Contents

9130 BSC Evolution Front and Rear Views 2-1


9130 BSC Evolution Interconnections 2-5
Board/Area/Slot/SBL Mapping 2-6

9130 BSC Evolution Front and Rear Views


Overview
The following figure shows the front view for a standalone 9130 BSC Evolution.

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 2-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation 9130 BSC Evolution Front and Rear Views

....................................................................................................................................................................................................................................

Figure 2-1 Front View of a Standalone 9130 BSC Evolution

....................................................................................................................................................................................................................................
2-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation 9130 BSC Evolution Front and Rear Views

....................................................................................................................................................................................................................................

The following figure shows the rear view for a standalone 9130 BSC Evolution.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 2-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation 9130 BSC Evolution Front and Rear Views

....................................................................................................................................................................................................................................

Figure 2-2 Rear View of a Standalone 9130 BSC Evolution

....................................................................................................................................................................................................................................
2-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation 9130 BSC Evolution Front and Rear Views

....................................................................................................................................................................................................................................

9130 BSC Evolution Interconnections


Overview

Figure 2-3 9130 BSC Evolution Interconnections

The BSC is connected with the following network elements for telecom functions:
MFS, TC: Ater Mux interface
MSC: A interface
BTS: Abis interface.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 2-5
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation Board/Area/Slot/SBL Mapping

....................................................................................................................................................................................................................................

Board/Area/Slot/SBL Mapping
Overview
The following tables give the board/area/slot/SBL mapping for the modules used in the
9130 BSC Evolution.
Table 2-1 ATCA Shelf Front View Board-Area-Slot-SBL Mapping

JBXFAN area
Board JBXFAN1 JBXFAN2
Slot number 81 82
SBL FAN1 FAN2
Board JBXFAN3 JBXFAN4
Slot number 83 84
SBL FAN3 FAN4
Slot area
Board J J J J J J J J J J J J J J
B B B B B B B B B B B B B B
X X X X X X X X X X X X X X
T T C C C O S S O C C C C C
P P C C C M S S M C C C C C
1 2 P P P C W W C P P P P P
* * 6 4 1 P 1 2 P 2 3 5 7 8
1 2
Physical slot 1 2 3 4 5 6 7 8 9 10 11 12 13 14
number
Logical slot 13 11 9 7 5 3 1 2 4 6 8 10 12 14
number
SBL T T C C C C S S C C C C C C
P P P P P P S S P P P P P P
- - - - - - W W - - - - - -
H H H H H H - - H H H H H H
W W W W W W H H W W W W W W
1 2 8 6 3 1 W W 2 4 5 7 9 10
1 2

....................................................................................................................................................................................................................................
2-6 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation Board/Area/Slot/SBL Mapping

....................................................................................................................................................................................................................................
Notes:
1. * JBXTP3I for IPoverE1 mode
2. * JBXTP3I4 for AUPoIP mode

Table 2-2 ATCA Shelf Rear View Board-Area-Slot-SBL Mapping

Rear area
Board ... JAXSSW2 JAXSSW1 ...
Physical slot 14 ... 8 7 ... 1
number
Logical slot number 30 ... 24 23 ... 17
SBL SSW-HW2 SSW-HW1

JBXPS area JAXSMM area JAXPC area


Board JBXPS1 JBXPS2 JBXPS3 JBXPS4 JAX- JAX- JAXPC2 JAXPC1
SMM2 SMM1
Physical slot 1 2 3 4 1 2 1 2
number
Logical slot number 33 34 35 36 66 65 50 49
SBL PEM1 PEM2 PEM3 PEM4 SMM2 SMM1 BSC BSC
ENV3 ENV2

Table 2-3 LIU Shelf Board-Slot-SBL Mapping

LIU Shelf Board-Slot-SBL Mapping


Board J J J J J J J J J J J J J J J J J J J J
B B B B B B B B B B B B B B B B B B B B
X X X X X X X X X X X X X X X X X X X X
P L L L L L L L L M M L L L L L L L L P
E I I I I I I I I U U I I I I I I I I E
M U U U U U U U U X X U U U U U U U U M
1 1 2 3 4 5 6 7 8 1 2 9 10 11 12 13 14 15 16 2
Slot Nb. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 2-7
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Hardware Presentation Board/Area/Slot/SBL Mapping

....................................................................................................................................................................................................................................
Table 2-3 LIU Shelf Board-Slot-SBL Mapping (continued)

LIU Shelf Board-Slot-SBL Mapping


SBL P E E E E E E E E E E E E E E E E E E P
E T T T T T T T T C C T T T T T T T T E
M U U U U U U U U U U U U U U U U U U M
5 1 2 3 4 5 6 7 8 1 2 9 10 11 12 13 14 15 16 6

....................................................................................................................................................................................................................................
2-8 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
3 S3afety Rules and
Precautions

Overview
Purpose
This section contains the following information:
This section contains the following information:
Safety rules for equipment under power
Electrostatic precautions.

Contents

Safety Rules for Equipment Under Power 3-1


Electrostatic Precautions 3-2

Safety Rules for Equipment Under Power


Important information

DANGER
Electric-shock hazard
Possible death or serious physical harm to personnel and damage to equipment may
result from mishandling the equipment.
While performing any maintenance tasks or procedures, you must follow any local safety
requirements, and in particular, those mentioned in this section.

For maintenance purposes, field operators may have to work on equipment under power
(-48 VDC or -60 VDC). This means that it is possible to touch some parts under power
that are only protected by heavy fuses. Maintenance activities must be carried out
carefully to avoid short circuits and to prevent serious personal injury.
...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 3-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Safety Rules and Precautions Safety Rules for Equipment Under Power

....................................................................................................................................................................................................................................
Injury from working with optical power
The laser beam used in optical communication is invisible and can seriously damage the
eyes, therefore:
Never look into a fiber with a laser coupled on it
If eyes are accidentally exposed to the laser beam, immediately call for medical
assistance.
Conductive Objects: Remove all conductive objects from hands and arms such as rings,
bracelets, metallic wrist watches or similar. Use appropriate insulated tools for
maintenance activities.
Mobile Telephone: Do not use a mobile telephone when the BSC doors are open. It can
interfere with the operation of the BSC.
Uncommon Replacements: Alcatel-Lucent will perform a case-by-case study and, if
necessary, prepare a special replacement procedure. Any such procedure is handled solely
by Alcatel-Lucent.

Electrostatic Precautions
Environment
You must observe the following electrostatic precautions:
Ensure that work benches, tools, and floor mats have a conducting surface connected
to ground. Before handling static-sensitive components and assemblies, ground
yourself to the conducting surface by using an anti-static wrist strap.
When handling static-sensitive components and assemblies, do not wear or use
clothes made of wool, nylon or any other synthetic material. Such fabrics are major
sources of static build-up.
When handling static-sensitive components and assemblies, do not use gloves and
finger covers, unless they are made of cotton.

Tools
You need the following tools to perform the procedures described in this handbook:
An anti-static wrist strap
A serviceable replacement unit
A Torx screwdriver
A Flathead screwdriver
A Philips crosshead screwdriver.

....................................................................................................................................................................................................................................
3-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Safety Rules and Precautions Electrostatic Precautions

....................................................................................................................................................................................................................................
You must respect the following rules:
Ensure that all the tools which come into contact with static-sensitive components are
at the same voltage level as the conducting work surfaces and floor mats.
These tools include soldering irons, oscilloscopes, power supplies, and metal parts of
tools and fixtures that are used to hold, assemble or test PBAs.
Do not use rough cleaners or erasers to clean the gold-plated contacts on PBAs
Do not mark a PBA with a lead pencil or any other writing instrument
Do not use synthetic brushes to clean equipment, and do not use dry cleaning
methods.

Transportation and Storage


You must respect the following rules:
Pack all containers used to transport and store static-sensitive components, and use
aluminum container tubes if possible. If not, insert the component terminations into
electrically conductive foam
Before shipping a PBA, wrap it in a conducting synthetic bag or in aluminum foil.
Also pack the PBA in a polyethylene transport box
Before shipping a PBA which has metal oxide semiconductor components, ensure that
an appropriate warning symbol is displayed on the package
Store spare PBAs in their appropriate polyethylene boxes. Keep the boxes closed
except when access to their contents is required
Do not store PBAs in an area where the air is polluted with smoke, dust, dangerous
gases or other airborne particles that may cause damage
Do not stack PBAs side-by-side or on top of each other with the board surfaces or
components in contact with one another
Before cleaning a PBA, remove or disconnect the damage protection, such as
protective foam, to allow the PBA to be cleaned thoroughly. Replace the damage
protection upon completion of the task.

Components and PBAs


You must respect the following rules:
Components and PBAs not in protective containers must only be handled by trained
personnel in static-controlled work areas
Before removing a PBA from an equipment rack, discharge any static by touching the
metal frame of the rack with your hand
Always handle a PBA by the edges
Do not handle or carry a PBA by any of the mounted components
Do not handle a PBA by the gold-plated contact terminals and do not apply direct
pressure to the components

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 3-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Safety Rules and Precautions Electrostatic Precautions

....................................................................................................................................................................................................................................
Do not touch PBA connection pins or conductor paths
Do not touch PBAs with wet hands
Place PBAs that have been removed during maintenance with the soldered side
downwards on a conductive surface
Do not scratch or rub the soldered side of a PBA with a sharp or rough object
Do not repair PBAs in the switch room
Do not handle components and assemblies by their leads
Do not use excessive force when inserting connection boards.

....................................................................................................................................................................................................................................
3-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
4 Maintain ATCA Subrack
4

Overview
Purpose
This section covers replacement of the following ATCA subrack RITs:
Fan Unit
Replace the:
Upper Fan Tray
Lower Fan Tray.
Front RITs:
Replace the:
JBXOMCP - O&M control board
JBXSSW - Gigabit Ethernet Switch board
JBXTP - GPRS radio processing board
JBXTP3I - GPRS radio processing board for IP mode
JBXFILL - Front filler
Air Filter.
Replace the:
JBXOMCP - O&M control board
JBXSSW - Gigabit Ethernet Switch board
JBXTP - GPRS radio processing board
JBXFILL - Front filler
Air Filter.
Rear RITs:
Replace the:
JAXPC - Personality card
JAXSSW - Gigabit Ethernet Switch Rear Transition Module
JBXPEM - Power Entry Module
...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Overview

....................................................................................................................................................................................................................................
JAXSMM - Shelf manager
JAXFILL - Rear filler.
In addition to the RIT replacements, this section describes how to perform an ATCA
subrack extension in order to increase the BSC capacity.

Contents

Before You Start 4-4


Checks 4-4
ATCA Subrack Description 4-5
ATCA Subrack Presentation 4-5
Fan Tray 4-9
Manage Fan Tray 4-9
Prerequisites 4-9
Replace Fan Tray 4-11
Air Filter 4-19
Manage Air Filter 4-19
Air Filter Cleaning 4-19
Air Filter Replacement 4-20
Front RITs 4-24
Manage Front RITs 4-24
Tips for Inserting ATCA Front RITs 4-25
Replace JBXTP/JBXTP3 4-32
Replace JBXTP3I 4-35
Replace JBXTP with JBXTP3 4-40
Replace JBXTP/JBXTP3 with JBXTP3I 4-43
Replace SFP Module from JBXTP3/JBXTP3I Board 4-47
Remove SFP Module 4-48
Insert SFP Module 4-49
Replace JBXOMCP 4-52
Replace JBXCCP 4-58
Remove JBXCCP 4-59
Insert JBXCCP 4-60
Replace JBXSSW 4-63

....................................................................................................................................................................................................................................
4-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Overview

....................................................................................................................................................................................................................................

Remove / Insert JBXFILL 4-69


Remove JBXFILL 4-70
Insert JBXFILL 4-71
Rear RITs 4-72
Manage Rear RITs 4-72
Replace JAXPC 4-72
Replace JAXSSW 4-81
Replace JAXSMM 4-87
Replace JBXPS 4-92
Replace JAXFILL 4-99
Replace Battery on JBXOMCP/JBXCCP 4-100
How to Replace Battery on JBXOMCP/JBXCCP 4-100
Board Takeover 4-101
Remove Board 4-102
Replace Battery 4-103
Insert Board 4-104

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Checks
Before You Start
....................................................................................................................................................................................................................................

Before You Start

Checks
Checklist
You must check the following:
System impact
As long as only one unit is removed and replaced at any one time, there is no impact
on the system. This is because redundancy is built into the components of the ATCA
Subrack.
In a standard configuration, the upper ATCA Subrack is empty. In a pre-equipped
configuration, the lower subrack contains a full set of units. The procedures described
here apply to both subracks.
For preventive maintenance.
Only replace RITs on the ATCA Subrack, if the BSC terminal displays alarm signals
for them.

....................................................................................................................................................................................................................................
4-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack ATCA Subrack Presentation
ATCA Subrack Description
....................................................................................................................................................................................................................................

ATCA Subrack Description

ATCA Subrack Presentation


Overview
The following figure shows the ATCA subrack front view in the case of a 9130 BSC
Evolution 1400 TRX configuration.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-5
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack ATCA Subrack Presentation
ATCA Subrack Description
....................................................................................................................................................................................................................................

Figure 4-1 ATCA Subrack, Rear View

....................................................................................................................................................................................................................................
4-6 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack ATCA Subrack Presentation
ATCA Subrack Description
....................................................................................................................................................................................................................................

The following figure shows the ATCA subrack rear view in the case of a 9130 BSC
Evolution for any configuration.

Figure 4-2 ATCA Subrack, Rear View

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-7
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack ATCA Subrack Presentation
ATCA Subrack Description
....................................................................................................................................................................................................................................
Important information

CAUTION
Damage to Equipment
Operating the system without fillers causes overheating of system components.
Unused slots, front and rear, must be equipped with fillers.

The fillers are used to create the appropriate air flow within the subrack.

....................................................................................................................................................................................................................................
4-8 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Manage Fan Tray
Fan Tray
....................................................................................................................................................................................................................................

Fan Tray

Manage Fan Tray


Overview
An alarm is sent to the OMC-R if a fan unit fails. Although the traffic is not interrupted,
you must replace the fan as soon as possible, to prevent the system from overheating.
Important information

CAUTION
Damage to Equipment
Running the system longer than 30 seconds with less than three blowers damages the
system.
If you exchange a fan tray in a running system ensure that the exchange procedure is
finished within 1 minute.
A fan cover in a running system can not be removed more than 1 minute.

Operating the system without cooling causes overheating of system components.

Prerequisites
Important information

DANGER
Laceration hazard
Inserting tools or fingers into operational fans may cause injuries.
When removing a fan tray, pay attention to rotating fans. Fans become exposed when the
fan tray is pulled. Keep clear of the fans as long as they are rotating.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-9
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Prerequisites
Fan Tray
....................................................................................................................................................................................................................................

Figure 4-3 Front Fan Unit

Note: If the system overheats:


Telecommunication functions are affected
There could be a station switchover.
The system is equipped with four fan trays:
Two front fan trays
Two back fan trays with handle.
A fan replacement procedure may be necessary if:
The fan is faulty
A maintenance operation must be performed.

....................................................................................................................................................................................................................................
4-10 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................

Replace Fan Tray


Replace Fan Tray for Variants Before 3BK 27352 AACA
Replace the fan tray:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

3 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

4 Remove the top front cover.


For ATCA shelf variants before 3BK 27291 ABxx, in the case of ATCA shelf 4, remove
the cover as shown in the following figure.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-11
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................

Figure 4-4 Fan Unit Cover for ATCA Shelf Variants Before 3BK 27291 ABxx

From ATCA shelf variant 3BK 27291 ABxx on, pull the clips on the left and right-hand
side of the cover up then pull the cover down and hold it down during the exchange
procedure.

....................................................................................................................................................................................................................................
4-12 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................

Figure 4-5 Fan Unit Cover fromr ATCA Shelf Variant 3BK 27291 ABxx On

...................................................................................................................................................................................................

5 If it is the case, identify the faulty fan tray.


It is indicated by:
The OOS LED is lit red, or
The exhaust flap is closed (visible at the rear of the chassis).
...................................................................................................................................................................................................

6 Switch the toggle switch of the faulty fan tray to OPEN.


Result: The blue H/S LED will blink and then remain lit steadily.
...................................................................................................................................................................................................

7 Unplug the faulty fan tray from its location.


...................................................................................................................................................................................................

8 If the replacement fan should be installed in rear position, fix the appropriate handle to
the fan unit with the four screws.
...................................................................................................................................................................................................

9 Plug the replacement fan tray into its location.


Result: The OOS LED is lit red for a short time.
The blue H/S LED is lit steadily.
After 15 seconds the blower will automatically start and go to 70% speed.
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-13
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................
Fans speed will be decreased by several minutes depending on configuration and
ambient temperature.
...................................................................................................................................................................................................

10 Check that the exhaust flap is open (visible at the rear of the chassis).
...................................................................................................................................................................................................

11 Check that the OOS LED is switched OFF.


...................................................................................................................................................................................................

12 Switch the HANDLE switch to CLOSED.


Result: The blue H/S LED will blink and then turn OFF.
...................................................................................................................................................................................................

13 Close the fan tray cover.


To do so:
For ATCA shelf variants before 3BK 27291 ABxx, close the top front cover and
secure it with the side screws
From ATCA shelf variant 3BK 27291 ABxx on, release the cover and fasten the clips
on both sides.
...................................................................................................................................................................................................

14 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

15 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary.
You must:
From a local terminal open a telnet session on the active OMCP:
telnet 172.17.y.x
Where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1 (ATCA physical slot 6)
x is 40 for JBXOMCP2( ATCA physical slot 9).
Type the username and the password:
root

....................................................................................................................................................................................................................................
4-14 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................
alcatel
Perform Step 2 to Step 3 from Upgrade FAN Firmware (p. 8-26).
The FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after the blade is IT/FIT, it means firmware level is up to
date.
...................................................................................................................................................................................................

16 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

Replace Fan Tray from Variant 3BK 27352 AACA On


Replace the fan tray:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Remove the top front cover.


For ATCA shelf variants before 3BK 27291 ABxx, in the case of ATCA shelf 4, remove
the cover as shown in the following figure.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-15
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................

Figure 4-6 Fan Unit Cover for ATCA Shelf Variants Before 3BK 27291 ABxx

From ATCA shelf variant 3BK 27291 ABxx on, pull the clips on the left and right-hand
side of the cover up, then pull the cover down and hold it down during the exchange
procedure.

....................................................................................................................................................................................................................................
4-16 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................

Figure 4-7 Fan Unit Cover from ATCA Shelf Variant 3BK 27291 ABxx On

...................................................................................................................................................................................................

5 If it is the case, identify the faulty fan tray.


It is identified by:
The OOS LED is lit red, or
The exhaust flap is closed (visible at the rear of the chassis).
...................................................................................................................................................................................................

6 Unplug the faulty fan tray from its location.


...................................................................................................................................................................................................

7 If the replacement fan should be installed in rear position, fix the appropriate handle to
the fan unit with the four screws.
...................................................................................................................................................................................................

8 Plug the replacement fan tray into its location.


Result: The OOS and H/S LEDs blink twice then switch OFF.
Fans speed will be decreased in several minutes depending on configuration and
ambient temperature.
...................................................................................................................................................................................................

9 Check that the exhaust flap is open (visible at the rear of the chassis).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-17
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Fan Tray
Fan Tray
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

10 Close the fan tray cover.


You must:
For ATCA shelf variants before 3BK 27291 ABxx, close the top front cover and
secure it with the side screws
From ATCA shelf variant 3BK 27291 ABxx on, release the cover and fasten the clips
on both sides.
...................................................................................................................................................................................................

11 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

12 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary:
You must:
From a local terminal, open a telnet session on the active OMCP:
telnet 172.17.y.x
where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1 (ATCA physical slot 6)
x is 40 for JBXOMCP2( ATCA physical slot 9).
Type the username and the password:
root
alcatel
Perform Step 2 to Step 3 from Upgrade FAN Firmware (p. 8-26).
The alarm FIRMWARE-INCOMPATIBILITY is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after blade is IT/FIT, it means firmware level is up to date.
...................................................................................................................................................................................................

13 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-18 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Manage Air Filter

....................................................................................................................................................................................................................................

Air Filter

Manage Air Filter


Overview
The air filter is located in the lower part of the shelf and it guarantees that the system
operates in good condition.
The following maintenance operations can be performed:
Air Filter Cleaning (p. 4-19)
Air Filter Replacement (p. 4-20).
Note: Pay attention when handling the filter.
Do not damage the filter during replacement or maintenance.

Air Filter Cleaning


Overview
The air filter must be removed before cleaning.
There are four ways to clean the air filter:
Vacuum clean
A few passes of a vacuum cleaner can remove accumulated dust and dirt.
Oil free compressor air
Point the compressed air nozzle in the opposite direction of the filter's operating
airflow.
Cold water rinse
Collected dirt is washed away using just a standard hose nozzle with plain water. Let
stand until completely dry before returning to service.
Immersion in warm soapy water.
Dip the filter in a solution of warm water and mild detergent. Then rinse the filter in
clear water and let stand until completely dry before returning to service.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-19
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Air Filter Replacement
Air Filter
....................................................................................................................................................................................................................................

Air Filter Replacement


Overview
When replacing a filter, take into account that:
ATCA shelf variants 3BK 27291 AAxx use the air filter with part number 1AF 04446
AAAA
ATCA shelf variants 3BK 27291 ABxx or newer use the air filter with part number
1AF 12518 BAAA.
This part number corresponds to four filter pads but only one pad is used for an ATCA
shelf.
Ensure that the correct filter is used for replacement.

Air Filter Replacement for ATCA Shelf Variants 3BK 27291 AAxx
Replace the air filter:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

3 Locate the two tabs on the lower front of the filter frame.
The two tabs are symmetric to the center of the shelf.

....................................................................................................................................................................................................................................
4-20 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Air Filter Replacement
Air Filter
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

4 Push the tabs to rear of the shelf and pull the filter down.
...................................................................................................................................................................................................

5 Pull the filter to the front of the shelf to remove it.


...................................................................................................................................................................................................

6 Insert the new filter (with filter frame tabs in forward position and pointing down).
...................................................................................................................................................................................................

7 Using the tabs, push the filter into the shelf.


...................................................................................................................................................................................................

8 Raise the filter up and into the lower card guide tray and release.
...................................................................................................................................................................................................

9 Disconnect the anti-static wrist strap.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-21
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Air Filter Replacement
Air Filter
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

10 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

Air Filter Replacement for ATCA Shelf Variants 3BK 27291 ABxx or Newer
Replace the air filter:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Locate the filter frame at the lower part of the shelf.

...................................................................................................................................................................................................

3 Push the frame of the filter to rear of the shelf and pull the filter down.
...................................................................................................................................................................................................

4 Pull the filter to the front of the shelf to remove it.

....................................................................................................................................................................................................................................
4-22 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Air Filter Replacement
Air Filter
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

5 Replace the filter pad.


...................................................................................................................................................................................................

6 Push the filter into the shelf.


...................................................................................................................................................................................................

7 Raise the filter up and into the lower card guide tray and release.
...................................................................................................................................................................................................

8 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

9 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-23
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Manage Front RITs
Front RITs
....................................................................................................................................................................................................................................

Front RITs

Manage Front RITs


Overview
This section covers the replacement of the following RITs:
JBXTP
JBXOMCP/JBXCCP
JBXSSW.
Note: Two handles secure the Front RITs in place.

....................................................................................................................................................................................................................................
4-24 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................

Tips for Inserting ATCA Front RITs


Overview
The following sections contain figures showing how to insert ATCA front RITs.

First Step to Remove a Board


Remove a board:
...................................................................................................................................................................................................

1 Unfasten screws of front plate until board is detached from shelf.


...................................................................................................................................................................................................

2 Move the ejector handles outwards. The blue LED blinks indicating that the board power
OFF process is ongoing.
The following figure shows the first step to perform when removing a board.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-25
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................

Figure 4-8 ATCA Front Board Handles - First Step to Remove a Board

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-26 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................
Second Step to Remove a Board
The following figure shows the second step to perform when removing a board.

Figure 4-9 ATCA Front Board Handles - Second Step to Remove a Board

Remove or Insert Board


Attention: During board insertion/removal, do not push/pull strongly on handles,
but on the front plate.
The following figure shows how to open or close the handle.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-27
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................

Figure 4-10 Board Handle - Remove or Insert Board

Guides for Board Insertion


The following figure shows the guides for board insertion.

....................................................................................................................................................................................................................................
4-28 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................

Figure 4-11 Guides for Board Insertion

Align Holes with Needles


The following figure shows how to align the holes with the needles.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-29
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................

Figure 4-12 Align Holes with Needles

Protect EMI Stripes


The following figure shows how to protect the EMI stripes when inserting or removing
boards.

....................................................................................................................................................................................................................................
4-30 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Tips for Inserting ATCA Front RITs
Front RITs
....................................................................................................................................................................................................................................

Figure 4-13 Protect EMI Stripes when Inserting / Removing Boards

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-31
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3
Front RITs
....................................................................................................................................................................................................................................

Replace JBXTP/JBXTP3
Overview
Attention: This procedure applies for replacement of:
JBXTP with JBXTP
JBXTP3 with JBXTP3.
Do not apply this procedure to replace JBXTP with JBXTP3. For this case, refer to
Replace JBXTP with JBXTP3 (p. 4-40).
Replacement of JBXTP3 with JBXTP is not allowed.
When inserting/removing the JBXTP/JBXTP3, wait at least 30 seconds before
another insert/remove operation.

Remove JBXTP/JBXTP3
Remove a JBXTP board:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6) for
more information.
...................................................................................................................................................................................................

4 From the BSC terminal or OMC-R, lock the JBXTP board.


Wait until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Perform this step only when JBXTP3 is equipped with a working SFP module.
You must:
Carefully remove the optical cable from the SFP module. Pay attention since the
optical cable is fragile
Open the SFP hinged face to approximately ninety degrees and then grasp the hinged
face and carefully pull the SFP straight out of the slot.
....................................................................................................................................................................................................................................
4-32 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

7 Unfasten the screws of front plate.


...................................................................................................................................................................................................

8 Move slowly the ejector handles outwards until you feel resistance.
...................................................................................................................................................................................................

9 By moving the ejector handles outwards, remove board from shelf.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JBXTP/JBXTP3
Insert a JBXTP board:
...................................................................................................................................................................................................

1 Ensure that the top and bottom ejector handles are in the outward position.
...................................................................................................................................................................................................

2 Insert board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

3 Slide the board into the shelf until you feel resistance. The blue LED is illuminated.
...................................................................................................................................................................................................

4 Simultaneously move the top and bottom ejector handles to the inward position to lock
the board to the shelf.
Wait one minute until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Perform this task only when JBXTP3 is equipped with a working SFP module.
You must:
Insert the SFP module straight into the slot until the module clicks firmly into place.
When inserting the SFP, be sure that the hinged face is closed
Connect the optical cable on the SFP module.
...................................................................................................................................................................................................

6 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

7 Disconnect the anti-static wrist strap.


....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-33
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

8 From the BSC terminal or OMC-R, unlock the JBXTP board; the blue LED is switched
OFF.
...................................................................................................................................................................................................

9 From the BSC terminal or OMC-R, check the report to see if the board is operational.
...................................................................................................................................................................................................

10 Using the BSC terminal, check if the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-


UP-TO-DATE alarm is raised for the replacement board.
If:
This alarm is present, it means that a newer NE1oE/IPMI firmware version is
available.
You must:
Also check that the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-
DATE alarm is cleared.
It means that the firmware upgrade already started. As a confirmation, the
FIRMWARE-UPGRADE alarm is raised.
Wait for the firmware upgrade process to finish. It takes about 15 minutes.
After the FIRMWARE-UPGRADE alarm is cleared, wait another three minutes
during which the board is in MSD state and performs a reset.
Using the BSC terminal, check that the board is operational.
NOTE: If the FIRMWARE-INCOMPATIBILITY alarm is raised, refer to [99,9]
FIRMWARE-INCOMPATIBILITY.
The alarm is not present, continue with the next step.
...................................................................................................................................................................................................

11 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
...................................................................................................................................................................................................

12 Close the front door of the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-34 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP3I
Front RITs
....................................................................................................................................................................................................................................

Replace JBXTP3I
Overview
Attention: This procedure applies for replacement of JBXTP3I with JBXTP3I and
JBXTP3I4 with JBXTP3I4.
Replacement of JBXTP3I with JBXTP/JBXTP3 is not allowed.
When inserting/removing JBXTP3I, wait at least 30 seconds before another
insert/remove operation.
For BSC platform of B12.1 with AUPoIP feature enabled, before JBXTP3I4 delivered
to filed and inserted into platform, make sure version of TPIP FPGA is not H'D01D,
otherwise the JBXTP3I4 will reboot in loop. The only way to recover it is to contact
ALU support, get patch from R&D, and perform TPIP firmware upgrade with the
patch. FPGA H'401B is strongly recommended to be writen into TPIP before going to
the field.
For BSC platform of B12.1Ed2 or later version with AUPoIP feature enabled, FPGA
H'4023 is recommended to be writen into TPIP of JBXTP3I4 before going to the field.
Otherwise, TPIP firmware upgrade must be performed to support stable CS traffic.

Remove JBXTP3I
Remove a JBXTP3I board:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6) for
more information.
...................................................................................................................................................................................................

4 From the BSC terminal or OMC-R, lock the JBXTP3I board.


Wait until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Perform this step only when JBXTP3I is equipped with a working SFP module.
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-35
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
You must:
Carefully remove the optical cable from the SFP module. Pay attention since the
optical cable is fragile
Open the SFP hinged face to approximately ninety degrees and then grasp the hinged
face and carefully pull the SFP straight out of the slot.
...................................................................................................................................................................................................

7 Unfasten the screws of the front plate.


...................................................................................................................................................................................................

8 Move slowly the ejector handles outwards until you feel resistance.
...................................................................................................................................................................................................

9 By moving the ejector handles outwards, remove board from shelf.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JBXTP3I
Insert a JBXTP3I board:
...................................................................................................................................................................................................

1 Ensure that the top and bottom ejector handles are in the outward position.
...................................................................................................................................................................................................

2 Insert board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

3 Slide the board into the shelf until you feel resistance.
Result: The blue LED is illuminated.
...................................................................................................................................................................................................

4 Simultaneously move the top and bottom ejector handles to the inward position to lock
the board to the shelf.
Wait one minute until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Perform this step only when JBXTP3I is equipped with a working SFP module.

....................................................................................................................................................................................................................................
4-36 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
You must:
Insert the SFP module straight into the slot until the module clicks firmly into place.
When inserting the SFP, be sure that the hinged face is closed
Connect the optical cable on the SFP module.
...................................................................................................................................................................................................

6 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

7 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

8 From the BSC terminal or OMC-R, unlock the JBXTP board; the blue LED is switched
OFF.
...................................................................................................................................................................................................

9 Using the BSC terminal, check if the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-


UP-TO-DATE/TPIP-FW-NOT-UP-TO-DATE alarm is raised for the replacement board.
If:
This alarm is present, it means that a newer NE1oE/IPMI/TPIP firmware version is
available.
You must:
Also check that the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-
DATE/TPIP-FW-NOT-UP-TO-DATE alarm is cleared.
It means that the firmware upgrade already started. As a confirmation, the
FIRMWARE-UPGRADE alarm is raised.
Wait for the firmware upgrade process to finish. If the firmware version for
NE1oE, IPMI and TPIP need to be upgraded, the process can take up to 35
minutes.
After the FIRMWARE-UPGRADE alarm is cleared, wait another three minutes
during which the board is in MSD and performs a reset.
Using the BSC terminal, check that the board is operational.
NOTE: If the FIRMWARE-INCOMPATIBILITY alarm is raised, refer to [99,9]
FIRMWARE-INCOMPATIBILITY.
The alarm is not present, continue with the next step.
...................................................................................................................................................................................................

10 From the BSC terminal or OMC-R, check the report to see if the board is operational.
...................................................................................................................................................................................................

11 Check the JAXIP MAC address.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-37
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
If the MAC addrees is wrong, update it:
Connect on the active OMCP:
telnet 172.17.33.1
Type the username and the password
In a telnet window session, connect on the target JBXTP3I board:
telnet 172.16.3.x where x is 110 for TP2 and 130 for TP1
Type the username and the password
On JBXTP3I, go under tux by typing /usr/local/tpgsm/tools/tux and perform
the following commands:
ipmc info
If the displayed JAXIP MAC address is not the correct one (for example, it is
inverted):
ipmc mac3= <new MAC address>
rri FIA_MX
ipmc info
Close all telnet connections.
...................................................................................................................................................................................................

12 Check that both the JAXIP and JGXEOE MAC address are not the same.
To do so:
To check the JAXIP MAC address, connect on the active OMCP:
telnet 172.17.33.1
Type the username and the password
In the telnet window session, connect on the target JBXTP3I board:
telnet 172.16.3.x where x is 110 for TP2 and 130 for TP1
On JBXTP3I, go under tux by typing /usr/local/tpgsm/tools/tux and perform
the following commands:
ipmc info
MAC address 3 for JAXIP Ethernet : xx:xx:xx:xx:xx:xx
Close all telnet connections.
To check the JGXEOE MAC address, connect on the active OMCP:
telnet 172.17.33.1
Type the username and the password
In telnet window session, connect on the target nE1oE module of the JBXTP3I board:
telnet 172.16.35.x where x is 110 for TP2 and 130 for TP1
Type the username and the password
On nE1oE module of the JBXTP3I, perform the following commands:
ri JBXTPGSM r 0x1AC
ri - Read : xx xx xx xx xx zt FF FF FF FF FF FF FF FF FF FF

....................................................................................................................................................................................................................................
4-38 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
If the JGXEOE MAC address is same as the JAXIP MAC address:
Change the JGXEOE MAC address to JAXIP MAC@ - 1
ri JBXTPGSM w 0x1B1 0xvw where 0xvw=0xzt-1
ri - Write at address B1 : vw
ri - Write OK
Check the new address:
ri JBXTPGSM r 0x1AC
ri - Read : xx xx xx xx xx vw FF FF FF FF FF FF FF FF FF FF
Close all telnet connections.
...................................................................................................................................................................................................

13 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
...................................................................................................................................................................................................

14 Close the front door of the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-39
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP with JBXTP3
Front RITs
....................................................................................................................................................................................................................................

Replace JBXTP with JBXTP3


Overview
Attention: This procedure applies in the case of replacing JBXTP with JBXTP3.
Do not apply this procedure to replace JBXTP with JBXTP or JBXTP3 with JBXTP3.
For this case, refer to Replace JBXTP/JBXTP3 (p. 4-32).
In the case of a JBXTP faulty board and if there is no spare JBXTP board for
replacement, the JBXTP can be replaced by JBXTP3. In this case, both JBXTP boards
must be replaced by JBXTP3 boards.
It is not allowed to mix JBXTP and JBXTP3 boards in a BSC rack.
When inserting/removing the JBXTP, wait at least 30 seconds before another
insert/remove operation.

Procedure
Replace a JBXTP board by a JBXTP3 board:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6) for
more information.
...................................................................................................................................................................................................

4 From BSC terminal or OMC-R, lock the JBXTP board.


Wait until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Unfasten screws of front plate.


...................................................................................................................................................................................................

7 Move slowly the ejector handles outwards until you feel resistance.

....................................................................................................................................................................................................................................
4-40 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP with JBXTP3
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

8 By moving the ejector handles outwards, remove the JBXTP board from shelf.
...................................................................................................................................................................................................

9 Ensure that the top and bottom ejector handles of the new JBXTP3 board are in the
outward position.
...................................................................................................................................................................................................

10 Insert the JBXTP3 board into the shelf by placing the top and bottom edges of the board
in the card guides of the shelf. Ensure that the guiding module of shelf and board are
aligned properly.
...................................................................................................................................................................................................

11 Slide the board into the shelf until you feel resistance.
Result: The blue LED is illuminated.
...................................................................................................................................................................................................

12 Simultaneously move the top and bottom ejector handles to the inward position to lock
the board to the shelf.
Wait one minute until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

13 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

14 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

15 From the BSC terminal or OMC-R, unlock the JBXTP3 board.


...................................................................................................................................................................................................

16 Wait until the blue LED is switched OFF. The switched OFF blue LED indicates that the
board is operational.
...................................................................................................................................................................................................

17 Using the BSC terminal, check if the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-


UP-TO-DATE alarm is raised for the replacement board.
If:
This alarm is present, it means that a newer NE1oE/IPMI firmware version is
available.
You must:
Also check that the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-
DATE alarm is cleared.
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-41
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP with JBXTP3
Front RITs
....................................................................................................................................................................................................................................
It means that the firmware upgrade already started. As a confirmation, the
FIRMWARE-UPGRADE alarm is raised.
Wait for the firmware upgrade process to finish. It takes about 15 minutes.
After the FIRMWARE-UPGRADE alarm is cleared, wait another three minutes
during which the board is in MSD and performs a reset.
Using the BSC terminal, check that the board is operational.
NOTE: If the FIRMWARE-INCOMPATIBILITY alarm is raised, refer to [99,9]
FIRMWARE-INCOMPATIBILITY.
The alarm is not present, continue with the next step.
...................................................................................................................................................................................................

18 Repeat Step 3 to Step 17 for the second board replacement.


...................................................................................................................................................................................................

19 Perform Audit BSC Hardware.


...................................................................................................................................................................................................

20 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
...................................................................................................................................................................................................

21 Close the front door of the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-42 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3 with JBXTP3I
Front RITs
....................................................................................................................................................................................................................................

Replace JBXTP/JBXTP3 with JBXTP3I


Overview
Attention: This procedure applies in the case of replacing JBXTP/JBXTP3 with
JBXTP3I or JBXTP/JBXTP3 with JBXTP3I4.
Do not apply this procedure to replace JBXTP by JBXTP, JBXTP3 with JBXTP3,
JBXTP3I with JBXTP3I or JBXTP3I4 with JBXTP3I4.
In the case of a JBXTP/JBXTP3 faulty board and if there is no spare JBXTP/JBXTP3
board for replacement, the JBXTP/JBXTP3 can be replaced with JBXTP3I or
JBXTP3I4. In this case, both JBXTP/JBXTP3 boards must be replaced with JBXTP3I
or JBXTP3I4 boards.
It is not allowed to mix JBXTP, JBXTP3, JBXTP3I or JBXTP3I4 boards in a
BSC rack.
When inserting/removing the JBXTP/JBXTP3/JBXTP3I, wait at least 30 seconds
before another insert/remove operation.
For BSC platform of B12.1 with AUPoIP feature enabled, before JBXTP3I4 delivered
to filed and inserted into platform, make sure version of TPIP FPGA is not H'D01D,
otherwise the JBXTP3I4 will reboot in loop. The only way to recover it is to contact
ALU support, get patch from R&D, and perform TPIP firmware upgrade with the
patch. FPGA H'401B is strongly recommended to be writen into TPIP before going to
the field.
For BSC platform of B12.1Ed2 or later version with AUPoIP feature enabled, FPGA
H'4023 is recommended to be writen into TPIP of JBXTP3I4 before going to the field.
Otherwise, TPIP firmware upgrade must be performed to support stable CS traffic.

Procedure
Replace a JBXTPJ/BXTP3 board with a JBXTP3I board:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6) for
more information.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-43
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3 with JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

4 From BSC terminal or OMC-R, lock the JBXTP/JBXTP3 board.


Wait until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Unfasten screws of front plate.


...................................................................................................................................................................................................

7 Perform this step only when JBXTP3I is equipped with working SFP module.
You must:
Carefully remove the optical cable from the SFP module. Pay attention since the
optical cable is fragile
Open the SFP hinged face to approximately ninety degrees and then grasp the hinged
face and carefully pull the SFP straight out of the slot.
...................................................................................................................................................................................................

8 Move slowly the ejector handles outwards until you feel resistance.
...................................................................................................................................................................................................

9 By moving the ejector handles outwards, remove the JBXTP/JBXTP3 board from shelf.
...................................................................................................................................................................................................

10 Ensure that the top and bottom ejector handles of the new JBXTP3I board are in the
outward position.
...................................................................................................................................................................................................

11 Insert the JBXTP3I board into the shelf by placing the top and bottom edges of the board
in the card guides of the shelf. Ensure that the guiding module of shelf and board are
aligned properly.
...................................................................................................................................................................................................

12 Slide the board into the shelf until you feel resistance.
Result: The blue LED is illuminated.
...................................................................................................................................................................................................

13 Simultaneously move the top and bottom ejector handles to the inward position to lock
the board to the shelf.
Wait one minute until the blue LED is illuminated permanently.

....................................................................................................................................................................................................................................
4-44 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3 with JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

14 Perform this step only when JBXTP3I is equipped with a working SFP module.
You must:
Insert the SFP module straight into the slot until the module clicks firmly into place.
When inserting the SFP, be sure that the hinged face is closed
Connect the optical cable on the SFP module.
...................................................................................................................................................................................................

15 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

16 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

17 From the BSC terminal or OMC-R, unlock the JBXTP board, the blue LED is switched
OFF.
...................................................................................................................................................................................................

18 Using the BSC terminal, check if the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-


UP-TO-DATE/TPIP-FW-NOT-UP-TO-DATE alarm is raised for the replacement board.
If:
This alarm is present, it means that a newer NE1oE/IPMI/TPIP firmware version is
available.
You must:
Also check that the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-
DATE/TPIP-FW-NOT-UP-TO-DATE alarm is cleared.
It means that the firmware upgrade already started. As a confirmation, the
FIRMWARE-UPGRADE alarm is raised.
Wait for the firmware upgrade process to finish. If the firmware version for
NE1oE, IPMI and TPIP need to be upgraded, the process can take up to 35
minutes.
After the FIRMWARE-UPGRADE alarm is cleared, wait another three minutes
during which the board is in MSD and performs a reset.
Using the BSC terminal, check that the board is operational.
NOTE: If the FIRMWARE-INCOMPATIBILITY alarm is raised, refer to [99,9]
FIRMWARE-INCOMPATIBILITY.
The alarm is not present, continue with the next step.
...................................................................................................................................................................................................

19 From the BSC terminal or OMC-R, check the report to see if the board is operational.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-45
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3 with JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

20 Check the JAXIP MAC address.


If the MAC addrees is wrong, update it:
Connect on the active OMCP:
telnet 172.17.33.1
Type the username and the password
Into telnet window session, connect on the target JBXTP3I board:
telnet 172.16.3.x where x is 110 for TP2 and 130 for TP1
Type the username and the password:
On JBXTP3I, go under tux by typing /usr/local/tpgsm/tools/tux and perform
the following commands:
ipmc info
If the displayed JAXIP MAC address is not the correct one (for example, it is
inverted):
ipmc mac3= <new MAC address>
rri FIA_MX
ipmc info
Close all telnet connections.
...................................................................................................................................................................................................

21 Check the both JAXIP and JGXEOE MAC address are not the same.
To do so:
To check the JAXIP MAC address, connect on the active OMCP:
telnet 172.17.33.1
Type the username and the password
In the telnet window session, connect on the target JBXTP3I board:
telnet 172.16.3.x where x is 110 for TP2 and 130 for TP1
On JBXTP3I, go under tux by typing /usr/local/tpgsm/tools/tux and perform
the following commands:
ipmc info
MAC address 3 for JAXIP Ethernet : xx:xx:xx:xx:xx:xx
Close all telnet connections.
To check the JGXEOE MAC address, connect on the active OMCP:
telnet 172.17.33.1
Type the username and the password
In telnet window session, connect on the target nE1oE module of the JBXTP3I board:
telnet 172.16.35.x where x is 110 for TP2 and 130 for TP1
Type the username and the password
On nE1oE module of the JBXTP3I, perform the following commands:
....................................................................................................................................................................................................................................
4-46 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXTP/JBXTP3 with JBXTP3I
Front RITs
....................................................................................................................................................................................................................................
ri JBXTPGSM r 0x1AC
ri - Read : xx xx xx xx xx zt FF FF FF FF FF FF FF FF FF FF
If the JGXEOE MAC address is the same as the JAXIP MAC address:
Change the JGXEOE MAC address to JAXIP MAC@ - 1
ri JBXTPGSM w 0x1B1 0xvw where 0xvw=0xzt-1
ri - Write at address B1 : vw
ri - Write OK
Check the new address:
ri JBXTPGSM r 0x1AC
ri - Read : xx xx xx xx xx vw FF FF FF FF FF FF FF FF FF FF
Close all telnet connections.
...................................................................................................................................................................................................

22 Repeat Step 3 to Step 21 for the second board replacement.


...................................................................................................................................................................................................

23 Perform Audit BSC Hardware.


...................................................................................................................................................................................................

24 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
...................................................................................................................................................................................................

25 Close the front door of the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

Replace SFP Module from JBXTP3/JBXTP3I Board


Overview
Note: The Small Form Factor-Pluggable (SFP) replacement module must accomplish
the characteristics described in External Physical Interfaces from 9130 BSC
Evolution Hardware Description.
This section is designed to show you how to:
Remove SFP Module (p. 4-48)
Insert SFP Module (p. 4-49)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-47
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Remove SFP Module
Front RITs
....................................................................................................................................................................................................................................

Remove SFP Module


Remove SFP Module
Remove a SFP Module:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Identify the SFP module (STM1-TTP) to be replaced.


...................................................................................................................................................................................................

5 From the BSC Terminal or OMC-R, lock the SFP module. The SBL associated to SFP
module is STM1-TTP (from 1 to 8).
The SFP modules from 1 to 4 are on the first JBXTP board and 5 to 8 to the second
JBXTP board.
Result: The fibre is switched off.
...................................................................................................................................................................................................

6 Carefully remove the optical cable from the SFP module. Be attentive, do not harm it.
...................................................................................................................................................................................................

7 Open the SFP hinged face to approximately ninety degrees and then grasp the hinged face
and carefully pull the SFP straight out of the slot.
...................................................................................................................................................................................................

8 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

9 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
...................................................................................................................................................................................................

10 Close the front door of the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-48 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert SFP Module
Front RITs
....................................................................................................................................................................................................................................

Insert SFP Module


Insert SFP Module
Insert a SFP Module:
...................................................................................................................................................................................................

1 Open the front door of the BSC.


...................................................................................................................................................................................................

2 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Replace the protective rubber from the new SFP module and insert straight into the slot
until the module clicks firmly into place. When inserting the SFP, ensure that the hinged
face is closed.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-49
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert SFP Module
Front RITs
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

5 Insert the optical cable with caution.


...................................................................................................................................................................................................

6 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

7 From the BSC Terminal or OMC-R, unlock the SFP module. The SBL associated to SFP
module is STM1-TTP (from 1 to 8).
The SFP modules from 1 to 4 are on the first JBXTP board and 5 to 8 to the second
JBXTP board.

....................................................................................................................................................................................................................................
4-50 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert SFP Module
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

8 From the BSC Terminal, perform a Display Section and Path Trace to check link
connections.
...................................................................................................................................................................................................

9 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
...................................................................................................................................................................................................

10 Close the front door of the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-51
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................

Replace JBXOMCP
Remove JBXOMCP
If the replacement of the board is not done due to a board hardware malfunction,
and the board telnet connection is possible, then before Remove Board (p. 4-54),
perform:
JBXOMCP Takeover (p. 4-52), ONLY if the board to be replaced is the active one
Erase HDD (p. 4-53).
Tip: The active OMCP is the one with the ACT or USR2 LED ON.
Attention: Before replacing the JBXOMCP board, check and write down the status of
the system. Ensure that the status for all degraded SBLs and functions and all alarms
is available before starting the action.

JBXOMCP Takeover
Perform a JBXOMCP takeover ONLY if the board to be replaced is the active one:
...................................................................................................................................................................................................

1 Start the 9130 BSC Evolution Terminal software. Refer to Start the Terminal Software
from the 9130 BSC Evolution Terminal User Guide.
...................................................................................................................................................................................................

2 Switch to master user mode.


...................................................................................................................................................................................................

3 Reset the SBL corresponding to the active OMCP.


For information about the SBL resetting procedure, refer to Reset SBL from the 9130
BSC Evolution Terminal User Guide.
To identify the corresponding SBL, refer to Board/Area/Slot/SBL Mapping (p. 2-6).
The reset of the active OMCP will trigger an OMCP takeover.
Wait 5 minutes, until the takeover is complete.
...................................................................................................................................................................................................

4 After the takeover is done, check the ACT or USR2 LED status on the OMCPs front
panel.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-52 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................
Erase HDD
Erase the HDD of the board:
...................................................................................................................................................................................................

1 From a local terminal, open a telnet session on the standby OMCP:


telnet 172.17.y.x
Where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1 (ATCA physical slot 6)
x is 40 for JBXOMCP2( ATCA physical slot 9).
...................................................................................................................................................................................................

2 Type the username:


root
Type the password:
alcatel
...................................................................................................................................................................................................

3 Cleanup the HDD:


cd /usr/local/bin
./clean-disk-before-reuse.sh
1+0 records in
1+0 records out
MBR has been cleaned up.
This blade is ready to be re-used.
Please use LOCK operation from OMC to power off the blade and
extract it for further use!
...................................................................................................................................................................................................

4 From the BSC terminal or from the OMC-R, disable/lock the JBXOMCP board.
When the command is completed, the blue LED switches ON and the board can be
removed.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-53
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................
Remove Board
Remove a JBXOMCP board:
...................................................................................................................................................................................................

1 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6) for
more information.
...................................................................................................................................................................................................

2 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

3 Unfasten screws of front plate until the board is detached from the shelf.
...................................................................................................................................................................................................

4 Move the ejector handles outwards


...................................................................................................................................................................................................

5 Remove the board from the shelf.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JBXOMCP
Insert a JBXOMCP board:
...................................................................................................................................................................................................

1 Ensure that the top and bottom ejector handles are in the outward position.
...................................................................................................................................................................................................

2 Insert board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

3 Slide the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

4 Wait until the blue LED is illuminated.


...................................................................................................................................................................................................

5 Simultaneously move the top and bottom ejector handles to the inward position.

....................................................................................................................................................................................................................................
4-54 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................
Result: The blue LED blinks. After some seconds, the blue LED is switched OFF.
...................................................................................................................................................................................................

6 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

7 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

8 If the disable/lock operation was successful during the JBXOMCP board removal, wait
until the blue LED is illuminated again then continue with next step.
If the disable/lock operation was unsuccessful during JBXOMCP board removal, move
the bottom ejector handle to outward position, wait until the blue LED is illuminated
again, and then continue with next step.
...................................................................................................................................................................................................

9 Connect the Ethernet cable from the Local PC to the JAXSSW1 port ETH 8 in
corresponding ATCA shelf.
...................................................................................................................................................................................................

10 Open a DOS console window. Connect to the new JBXOMCP board through SHMC as
follows.
To do so:
Under Windows 2000, the connection is done as follows:
telnet
set term vt100
open 172.17.y.8 450x
Under Windows XP/Vista/Windows 7, the connection is done as follows:
NOTE: The support for Windows 7 is available starting with MR3Ed1.3.
telnet 172.17.y.8 450x
Where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 3 for JBXOMCP1
x is 4 for JBXOMCP2.
...................................................................................................................................................................................................

11 If the disable/lock operation was successful during JBXOMCP board removal, from the
BSC terminal or OMC-R, initialize/unlock the corresponding JBXOMCP board.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-55
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................
Result: The blue LED is switched OFF.
If the disable/lock operation was unsuccessful during JBXOMCP board removal,
move the bottom ejector handle to the inward position.
The blue LED is switched OFF.
...................................................................................................................................................................................................

12 With the new OMCP terminal window connection through SHMC selected, press F12
several times from the Local PC keyboard. This action will force the new JBXOMCP
board to boot from the existing JBXOMCP board and it must be done during the new
JBXOMCP board booting sequence.
Note: If this forced boot by pressing F12 does not work, you have to enter in the
BIOS settings of the new JBXOMCP board.
To enter in the BIOS settings, press ESC + F2 several times from the keyboard during
the new JBXOMCP booting sequence.
To force the new JBXOMCP board to boot from the existing JBXOMCP board:
From the BIOS Setup Utility window, use the arrow keys to navigate to the Boot
menu.
From Boot menu, use the arrow keys to select Hard Drive then press ! to disable
hard disk drive option.
Press F10 and then press Enter to save the changes you made and exit the BIOS.
When the new JBXOMCP board is starting to boot up from the existing JBXOMCP
board, the following message should appear:
CLIENT IP: 172.17.3.x MASK: 255.255.0.0 DHCP IP: 172.17.3.y
PXELINUX 2.05 2003-07-16 Copyright <C> 1994-2003 H. Peter Anvin
When the new JBXOMCP board is JBXOMCP1:
x is 160
y is 40.
When the new JBXOMCP board is JBXOMCP2:
x is 161
y is 30.
Hard disk Installation will take approximately 10 minutes.
...................................................................................................................................................................................................

13 In the terminal window connection through SHMC, the following messages should
appear:
Harddisk Installation Complete.
The Blade is going to reboot.
....................................................................................................................................................................................................................................
4-56 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................
Do not forget to disable the Network boot Option in the BIOS
settings if needed.
Type "go" and press "return" key to continue.
The Blade will reset after X seconds.
It shows this output seven times when X is 30, 25, 20, 15, 10, 5, 0 seconds.
Until X is 0 seconds, type go then press Enter to reboot the JBXOMCP board.
If X is 0 seconds, then the JBXOMCP board is automatically rebooting.
Note: The new JBXOMCP board is rebooting. If the boot sequence was modified,
remember to restore it.
To enter in the BIOS settings, press ESC + F2 several times from the keyboard during
the new JBXOMCP rebooting sequence.
To restore the boot sequence for the new JBXOMCP board:
From the BIOS Setup Utility window, navigate to Boot menu
From the Boot menu, select Hard Drive then press ! to enable hard disk drive
option
Press F10 and then press Enter to save the changes you made and exit the BIOS.
The new JBXOMCP board reboots from its disk. This sequence will take approximately
five minutes.
...................................................................................................................................................................................................

14 In the terminal window connection through SHMC, press Enter, then:


Type the username:
root
Type the password:
alcatel
The following message should appear:
Installation successful.
...................................................................................................................................................................................................

15 Enter the following command to synchronize the rpm files on the JBXOMCP boards:
/usr/local/bin/post-Replace-OMCP.sh
Status ------------------------ OK
...................................................................................................................................................................................................

16 Close the terminal window connection through SHMC.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-57
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXOMCP
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

17 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary. Open a telnet session on the active OMCP and perform Step 1 to
Step 2.
The FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after the blade is IT/FIT, it means the firmware level is up
to date.
...................................................................................................................................................................................................

18 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

Replace JBXCCP
Overview
This section is designed to show you how to:
Remove JBXCCP (p. 4-59)
Insert JBXCCP (p. 4-60)

....................................................................................................................................................................................................................................
4-58 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Remove JBXCCP
Front RITs
....................................................................................................................................................................................................................................

Remove JBXCCP
Remove JBXCCP
Note: This task is also performed during a 9130 BSC Evolution shelf reduction.
Remove a JBXCCP board:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

3 If the board to be replaced is the active one, from the BSC terminal or OMC-R, reset the
JBXCCP.
The board will become standby.
...................................................................................................................................................................................................

4 From the BSC terminal or OMC-R, lock the board to be replaced.


Wait until the blue LED is illuminated permanently.
...................................................................................................................................................................................................

5 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Unfasten screws of front plate until board is detached from shelf.


...................................................................................................................................................................................................

7 Move the ejector handles outwards.


...................................................................................................................................................................................................

8 Remove the board from the shelf.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-59
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert JBXCCP
Front RITs
....................................................................................................................................................................................................................................

Insert JBXCCP
Insert JBXCCP
Note: This task is also performed during a 9130 BSC Evolution shelf extension.
Insert a JBXCCP board:
...................................................................................................................................................................................................

1 Ensure that the top and bottom ejector handles are in the outward position.
...................................................................................................................................................................................................

2 Insert the board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

3 Slide the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

4 Wait until the blue LED is illuminated.


...................................................................................................................................................................................................

5 Simultaneously move the top and bottom ejector handles to the inward position to lock
the board to the shelf
...................................................................................................................................................................................................

6 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

7 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

8 From the BSC terminal or OMC-R, unlock the JBXCCP board.


...................................................................................................................................................................................................

9 Wait until the blue LED is switched OFF.


...................................................................................................................................................................................................

10 The switched OFF blue LED indicates that the board is operational.
...................................................................................................................................................................................................

11 Connect the local terminal to the JAXSSW1 (port8) through an Ethernet cable.
...................................................................................................................................................................................................

12 From a local terminal open a telnet session on the active OMCP:

....................................................................................................................................................................................................................................
4-60 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert JBXCCP
Front RITs
....................................................................................................................................................................................................................................
telnet 172.17.33.1
...................................................................................................................................................................................................

13 Type the username:


root
Type the password:
alcatel
...................................................................................................................................................................................................

14 Enter the following command for the newly replaced JBXCCP board to verify that the
onboard memory is bigger than 2 Mb:
/usr/local/bin/post-Replace-CCP.sh x
Where:
x is 50 for CCP1 (ATCA logical slot 5)
x is 60 for CCP2 (ATCA logical slot 6)
x is 70 for CCP3 (ATCA logical slot 7)
x is 80 for CCP4 (ATCA logical slot 8)
x is 90 for CCP5 (ATCA logical slot 9)
x is 100 for CCP6 (ATCA logical slot 10)
x is 120 for CCP7 (ATCA logical slot 12)
x is 140 for CCP8 (ATCA logical slot 14).
The following message appears in case that the onboard memory is bigger than 2 Mb:
Status ------------------------ OK
In case that the on board free memory is less than 2 Mb, the following error message
appears, preceded by an error code and by the value of the total current available board
memory:
Total memory is 1075768 less than 2000000, this board must be
replaced with a new one
Status ------------------------ NOK
Note: If the NOK message appears, the JBXCCP board have to be replaced with a
new one.
...................................................................................................................................................................................................

15 Close the telnet session.


...................................................................................................................................................................................................

16 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-61
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert JBXCCP
Front RITs
....................................................................................................................................................................................................................................
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that the firmware
upgrade is necessary. Open a telnet session on the active OMCP and perform Steps 1
to 2 from CCP Firmware Upgrade from Upgrade CCP Firmware (p. 8-18) chapter.
The FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after the blade is IT/FIT, it means the firmware level is up
to date.
...................................................................................................................................................................................................

17 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-62 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................

Replace JBXSSW
Overview
The following figure shows the JBXSSW front view for different board variants.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-63
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................

Figure 4-14 JBXSSW Board Variants

....................................................................................................................................................................................................................................
4-64 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................

Remove JBXSSW
Remove a JBXSSW board:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

3 Depending on the JBXSSW to be replaced, perform one of the following.


If:
JBXSSW1 must be replaced:
You must:
Reset the JAXSMM1 from BSC terminal (or OMC-R)
Disable (lock) the JBXSSW1 from BSC terminal (or OMC-R)
Wait for the end of the disable process (blue LED lit).
JBXSSW2 must be replaced:
You must:
Reset the JAXSMM2 from BSC terminal (or OMC-R)
Disable (lock) the JBXSSW2 from BSC terminal (or OMC-R)
Wait for the end of the disable process (blue LED lit).
...................................................................................................................................................................................................

4 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

5 Remove front plate cable, if applicable


...................................................................................................................................................................................................

6 Unfasten screws of front plate until board is detached from shelf


...................................................................................................................................................................................................

7 Move the ejector handles outwards


...................................................................................................................................................................................................

8 Remove board from shelf.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-65
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................
Insert JBXSSW
Insert a JBXSSW board:
...................................................................................................................................................................................................

1 Connect the Ethernet cable between LMT to the operational JAXSSW on port 8.
The IP address for LMT is 172.x.0.251 and subnet mask is 255.255.0.0
Where:
x is 17 if the replaced JBXSSW is JBXSSW2
x is 18 if the replaced JBXSSW is JBXSSW1.
...................................................................................................................................................................................................

2 Open a telnet session on the active JBXOMCP:


telnet 172.t.y.x
Where:
t is 17 if the replaced JBXSSW is JBXSSW2
t is 18 if replaced JBXSSW is JBXSSW1
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for OMCP1
x is 40 for OMCP2.
...................................................................................................................................................................................................

3 Enter the username and password.


Enter:
Username:
root
Password:
alcatel
...................................................................................................................................................................................................

4 Enter the following command to perform an automatic board synchronization:


/usr/local/bin/pre-Replace-FontSSW.sh x
Where xis:
1 if the SSW1 was replaced
2 if the SSW2 was replaced.
The following message appears in case of successful automatic board synchronization:
Status ------------------------ OK

....................................................................................................................................................................................................................................
4-66 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

5 Close the connection on the active JBXOMCP.


...................................................................................................................................................................................................

6 Remove all the cables from the corresponding JAXSSW.


...................................................................................................................................................................................................

7 Ensure that the top and bottom ejector handles are in the outward position.
...................................................................................................................................................................................................

8 Insert board into one of the hub slots of the shelf by placing the top and bottom edges of
the board in the card guides of the shelf. Ensure that the guiding module of shelf and
board are aligned properly.
...................................................................................................................................................................................................

9 Slide the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

10 Simultaneously move the top and bottom ejector handles to the inward position to lock
the board to the shelf.
...................................................................................................................................................................................................

11 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

12 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

13 Wait for the blue LED to remain ON.


...................................................................................................................................................................................................

14 Power ON (unlock) the JBXSSW from BSC terminal (or OMC-R).


...................................................................................................................................................................................................

15 Open a telnet session on the active JBXOMCP


telnet 172.t.y.x
where:
t is 17 if the replaced JBXSSW is JBXSSW2
t is 18 if the replaced JBXSSW is JBXSSW1
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1
x is 40 for JBXOMCP2.
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-67
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

16 Enter the username and password:


Username:
root
Password:
alcatel
...................................................................................................................................................................................................

17 Enter the following command to perform an automatic VLAN configuration for the newly
installed JBXSSW board:
/usr/local/bin/post-Replace-FontSSW.sh x
Where xis :
1 if SSW1 was replaced
2 if SSW2 was replaced.
The following message appears in case of successful automatic VLAN configuration:
Status ------------------------ OK
The VLAN configuration is also displayed.
...................................................................................................................................................................................................

18 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary. Open a telnet session on the active OMCP and perform Step 5 to
Step 1 .
The the FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective
action from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after blade is IT/FIT, it means the firmware level is up to
date.
...................................................................................................................................................................................................

19 Close the telnet session.


...................................................................................................................................................................................................

20 Connect all the cables to the JAXSSW in the initial position.

....................................................................................................................................................................................................................................
4-68 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXSSW
Front RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

21 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

Remove / Insert JBXFILL


Overview
Attention: Unused slots (front and rear) must be equipped with fillers.
The ATCA front fillers are used to create the appropriate air flow within the subrack.
This section is designed to show you how to:
Remove JBXFILL (p. 4-70)
Insert JBXFILL (p. 4-71)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-69
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Remove JBXFILL
Front RITs
....................................................................................................................................................................................................................................

Remove JBXFILL
Remove JBXFILL
Remove the ATCA front filler (JBXFILL):
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Unfasten screws of front plate until board is detached from the shelf.
...................................................................................................................................................................................................

3 Remove the JBXFILL from the shelf.


Note: Fillers do not have handles. Use a metallic blade or a flat head screwdriver for
extracting fillers, as shown in the following figure.

Figure 4-15 Extraction of Front Fillers

...................................................................................................................................................................................................

4 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-70 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert JBXFILL
Front RITs
....................................................................................................................................................................................................................................

Insert JBXFILL
Insert JBXFILL
Insert the ATCA front filler (JBXFILL):
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Slide the JBXFILL into the shelf until you feel resistance.
...................................................................................................................................................................................................

3 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

4 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-71
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Manage Rear RITs
Rear RITs
....................................................................................................................................................................................................................................

Rear RITs

Manage Rear RITs


Overview
This section covers the replacement of the following ATCA Subrack Rear RITs:
JAXPC: Personality Card
JAXSSW: Rear Transition Module
JAXSMM : Shelf Management Controller
JBXPS: Power Entry Modules
Attention: A large number of cables run at the rear of the BSC. While working on a
RIT, ensure you do not accidentally disconnect cables from other RITs.

Replace JAXPC
Overview
Note: The JAXPC used for replacement must be at level ICS 04 or higher.
The JAXPC stores ATCA Shelf remote inventory information therefore only one
JAXPC card replacement is allowed at the same time.
The two JAXPC boards slots, located on the right side of the JAXSMMs, are numbered
from 1 on the right to 2 on the left, on the back side of each side of the subrack chassis.
The following figure shows the front view for JAXPC board.

....................................................................................................................................................................................................................................
4-72 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................

Figure 4-16 JAXPC Board Front View

The following figure shows the location of the rotary switches on JAXPC board.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-73
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................

Figure 4-17 JAXPC: Shelf Geographic Address Rotary Switches for Board Variant
Before 3BK 27226 AACA

....................................................................................................................................................................................................................................
4-74 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................
Figure 4-18 JAXPC: Shelf Geographic Address Rotary Switches from Board Variant
3BK 27226 AACA On

Remove JAXPC
Perform the following tasks.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-75
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................
For Board Variant Before 3BK 27226 AACA
Remove the JAXPC:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

3 Set the handle toggle switch to the OPEN position.


The blue H/S LED will flash and then turn on steadily.
Wait until the blue LED is permanently lit.
...................................................................................................................................................................................................

4 Unfasten the front plate screws.


...................................................................................................................................................................................................

5 Remove the board from the shelf using the ejector ring.
E...................................................................................................................................................................................................
N D O F S T E P S

From Board Variant 3BK 27226 AACA On


Remove the JAXPC:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

3 Unfasten the screws of the front plate until the handle switch is detached from the front
plate of the board.
The handle switch activator releases the blinking of the blue LED. The blue H/S LED will
flash and then turn on steadily.
Wait until the blue LED is permanently lit.

....................................................................................................................................................................................................................................
4-76 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

4 Remove the board from the shelf using the ejector ring.
E...................................................................................................................................................................................................
N D O F S T E P S

Insert JAXPC
Perform the following tasks.
Set Rotary Switches
Insert the JAXPC:
...................................................................................................................................................................................................

1 Set the rotary switches according to your requirements (Figure 4-17, JAXPC: Shelf
Geographic Address Rotary Switches for Board Variant Before 3BK 27226 AACA
(p. 4-74)).
Select the following:
S1 (for board variants before 3BK 27226 AACA) or LS (from board variant 3BK
27226 AACA on):
Select the required option:
On the shelf 3 (bottom ATCA) set S1 to 3
On the shelf 4 (top ATCA) set S1 to 4.
S2 (for board variants before 3BK 27226 AACA) or MS (from board variant 3BK
27226 AACA on): always set to "0".
Note: Two JAXPC boards in the same shelf must always be set to the same SGA
(Shelf Geographic Address).
Two JAXPC in different shelves must always be set to different SGAs.
...................................................................................................................................................................................................

2 Back out the two screws until they engage the threads in the front panel.
This makes the insertion easier.

E...................................................................................................................................................................................................
N D O F S T E P S

Insert JAXPC Board Before Variant 3BK 27226 AACA


...................................................................................................................................................................................................

1 Set the handle toggle switch to the OPEN position.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-77
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

2 Insert board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

3 Wait until the blue H/S LED is lit. The red OOS LED is blinking.
...................................................................................................................................................................................................

4 Set the handle toggle switch to the CLOSED position.


The blue H/S LED starts flashing and then turns OFF.
...................................................................................................................................................................................................

5 Wait until the blue H/S LED is switched OFF. The switched OFF blue H/S LED indicates
that the board is running. The red OOS LED is blinking.
...................................................................................................................................................................................................

6 Fasten the two front panel screws.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JAXPC Board from Variant 3BK 27226 AACA


...................................................................................................................................................................................................

1 Insert board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

2 Slide the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

3 Wait until the blue H/S LED is illuminated and the red OOS LED turns OFF.
...................................................................................................................................................................................................

4 Tighten the screws at the top and the bottom of the board.
In this way the ejector handle is closed and the board can be powered. The blue LED
blinks.
...................................................................................................................................................................................................

5 Wait until the blue H/S LED is switched OFF.

....................................................................................................................................................................................................................................
4-78 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................
The switched OFF blue H/S LED indicates that the board is activated.
E...................................................................................................................................................................................................
N D O F S T E P S

Perform an automatic post JAXPC board replace procedure


...................................................................................................................................................................................................

1 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Connect the Ethernet cable to the JAXSSW1 (port ETH8)


...................................................................................................................................................................................................

3 Open a telnet session on the active JBXOMCP:


# telnet 172.17.y.x
where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1
x is 40 for JBXOMCP2.
...................................................................................................................................................................................................

4 Enter the username and password:


Username:
root
Password:
alcatel
...................................................................................................................................................................................................

5 Enter the following command to perform an automatic post JAXPC board replace
procedure:
/usr/local/bin/post-Replace-PC.sh
Status ------------------------ OK
...................................................................................................................................................................................................

6 Close the telnet session.

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-79
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXPC
Rear RITs
....................................................................................................................................................................................................................................
Check If Firmware Is Up to Date
...................................................................................................................................................................................................

1 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary. Perform Step 2 to Step 3 .
The FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after blade is IT/FIT, it means firmware level is up to date.
...................................................................................................................................................................................................

2 Close the telnet session on the JBXOMCP.


...................................................................................................................................................................................................

3 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-80 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSSW
Rear RITs
....................................................................................................................................................................................................................................

Replace JAXSSW
Overview
The following table gives the JAXSSW port allocations.

Table 4-1 JAXSSW Ethernet Connections

Ethernet port ATCA shelf


1 Not used
2 LIU shelf
3 OMC-R + CBC
4 Telecom flow (if used)*
5 EAB
6 Telecom flow (if used)*
7 Telecom flow (if used)*
8 NEM

Notes:
1. * Depends of the value of the VLAN_CONF _INDEX parameter. For more information
about flows and switch ports to be used, see Several Subnets for Separate O&M and
Telecom from the BSS Telecom Routing Configuration

The following figure shows the JAXSSW front view.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-81
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSSW
Rear RITs
....................................................................................................................................................................................................................................

Figure 4-19 JAXSSW Rear Transition Module Front Plate

....................................................................................................................................................................................................................................
4-82 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSSW
Rear RITs
....................................................................................................................................................................................................................................

Note: The shelf management controller in the shelf where the JAXSSW is to be
installed, treats the JBXSSW and the JAXSSW as one single unit. For this reason, it is
not possible to install the JAXSSW while the JBXSSW is powered ON. Instead, the
JAXSSW must be installed while the JBXSSW is powered OFF and then both the
JBXSSW and the JAXSSW have to be powered up together.

Remove JAXSSW
Remove a JAXSSW:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs, functions and alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

3 Perform steps from Step 2 to Step 4 listed in Remove JBXSSW (p. 4-65) for the related
JBXSSW board. Do not unplug the corresponding JBXSSW.
...................................................................................................................................................................................................

4 Verify the cable labels and note the position for each cable.
...................................................................................................................................................................................................

5 Remove interface cables from the front plate ports.


...................................................................................................................................................................................................

6 Loosen the two front plate screws.


...................................................................................................................................................................................................

7 Open the handles of the JAXSSW.


...................................................................................................................................................................................................

8 Remove the JAXSSW from the rails of the slot.


...................................................................................................................................................................................................

9 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-83
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSSW
Rear RITs
....................................................................................................................................................................................................................................
Insert JAXSSW
Insert a JAXSSW:
...................................................................................................................................................................................................

1 Locate the slot in the shelf's rear where the JAXSSW needs to be installed.
...................................................................................................................................................................................................

2 Ensure that the related JBXSSW is powered OFF.


...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Ensure that the top and the bottom handles of the JAXSSW are in outward position.
...................................................................................................................................................................................................

5 Insert the JAXSSW into the shelf by placing the top and bottom edges in the rails of the
slot. When plugging the JAXSSW in or removing it, do not press on the front plate, but
use the handles.
...................................................................................................................................................................................................

6 Slide the JAXSSW into the slot.


...................................................................................................................................................................................................

7 Hook the lower and the upper handle into the shelf rail recesses.
...................................................................................................................................................................................................

8 Fully insert the JAXSSW and lock it to the shelf by pressing the two components of the
lower and the upper handles together and turning the handles towards the front plate.
During initialization, the blue hot swap LED switches OFF. Wait around 2 minutes until
the blue hot swap LED is switched ON again and only then continue with the next step.
...................................................................................................................................................................................................

9 Tighten both face plate screws on the JAXSSW.


...................................................................................................................................................................................................

10 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

11 Initialize (unlock) the corresponding SSW_HW (JBXSSW) from BSC terminal or


OMC-R.
The blue LEDs of both the JBXSSW and the JAXSSW start to flash. This indicates that
the JBXSSW is informing the shelf manager about its desire to power up the payload of
both the JBXSSW and the JAXSSW.

....................................................................................................................................................................................................................................
4-84 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSSW
Rear RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

12 Wait until the blue LEDs of both the JBXSSW and the JAXSSW are OFF.
A switched OFF blue LED indicates that the payload of the respective JBXSSW or
JAXSSW has been powered up and is operational.
...................................................................................................................................................................................................

13 Connect the Ethernet cable between LMT to the operational JAXSSW on port 8.
The IP address for LMT is 172.x.0.251 where:
x is 17 if the replaced JAXSSW is JAXSSW2
x is 18 if the replaced JAXSSW is JAXSSW1.
...................................................................................................................................................................................................

14 Open a telnet session on the active JBXOMCP


# telnet 172.t.y.x
where:
t is 17 if the replaced JAXSSW is JAXSSW2
t is 18 if the replaced JAXSSW is JAXSSW1
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1
x is 40 for JBXOMCP2.
...................................................................................................................................................................................................

15 Type the username:


root
Type the password:
alcatel
...................................................................................................................................................................................................

16 Enter the following command to perform an automatic VLAN configuration for the newly
installed JAXSSW board:
/usr/local/bin/post-Replace-RearSSW.sh x
where x is:
1 if SSW1 was replaced
2 if SSW2 was replaced.
The following message appears in case of successful automatic VLAN configuration:
Status ------------------------ OK
The VLAN configuration is also displayed.
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-85
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSSW
Rear RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

17 Connect all the cables to the JAXSSW in the initial position.


...................................................................................................................................................................................................

18 Close the terminal window.


...................................................................................................................................................................................................

19 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary. Open a telnet session on the active OMCP and perform Step 5 to
Step 1 from How to SSW Firmware Upgrade (p. 8-9).
Tthe FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after the board is IT/FIT, the firmware level is up to date.
...................................................................................................................................................................................................

20 Check the status of the system. Check the status of the system. Ensure that the status for
all impacted SBLs, functions and alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-86 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSMM
Rear RITs
....................................................................................................................................................................................................................................

Replace JAXSMM
Overview
The following prerequisites must be available in order to perform the scenario:
Screwdriver
Wrist strap.
The two Shelf Manager Cards slots, located on the right side of the PEMs, are numbered
from 1 on the right to 2 on the left on the back side of each side of the subrack chassis.

Figure 4-20 Shelf Manager Board

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-87
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSMM
Rear RITs
....................................................................................................................................................................................................................................
Remove JAXSMM
Remove a JAXSMM card:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

3 Lock the JAXSMM to be removed.


Result: The blue LED blinks, indicating that the board power down process is
ongoing.
...................................................................................................................................................................................................

4 Wait until the blue LED is ON permanently.


...................................................................................................................................................................................................

5 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Unfasten screws of front plate until handle switch is detached from front plate of the
board.
...................................................................................................................................................................................................

7 Remove board from shelf using the ejector ring.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JAXSMM
Attention: When inserting the board, ensure that the handle switch is in the correct
position (see Figure Figure 4-21, JAXSMM - Handle Switch Positions (p. 4-89)).

....................................................................................................................................................................................................................................
4-88 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSMM
Rear RITs
....................................................................................................................................................................................................................................

Figure 4-21 JAXSMM - Handle Switch Positions

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-89
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSMM
Rear RITs
....................................................................................................................................................................................................................................
Insert the JAXSMM:
...................................................................................................................................................................................................

1 Insert the board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly. The alignment protrusion facilitates the insertion and prevents bent pins.
...................................................................................................................................................................................................

2 Slide the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

3 Wait until the blue LED is lit.


...................................................................................................................................................................................................

4 Tighten the screws at the top and the bottom of the board. In this way, the ejector handle
is closed and the board can be powered. The blue LED blinks twice, and then it stays lit.
...................................................................................................................................................................................................

5 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Unlock the JAXSMM board.


...................................................................................................................................................................................................

7 Wait until the blue LED is switched OFF. The switched OFF blue LED indicates that the
board is operational.
...................................................................................................................................................................................................

8 Connect the Ethernet cable to the JAXSSW1 (port ETH8).


...................................................................................................................................................................................................

9 Open a telnet session on the active JBXOMCP:


# telnet 172.17.y.x
where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 if JBXOMCP1 is active
x is 40 if JBXOMCP2 is active.
...................................................................................................................................................................................................

10 Enter the username and password:


Username:
root

....................................................................................................................................................................................................................................
4-90 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXSMM
Rear RITs
....................................................................................................................................................................................................................................
Password:
alcatel
...................................................................................................................................................................................................

11 Enter the following command to perform an automatic post JAXSMM board replace
procedure:
/usr/local/bin/post-Replace-SMM.sh x
where x is:
1 for JAXSMM1
2 for JAXSMM2.
The following message appears in case of successful automatic post JAXSMM board
replace procedure:
Status ------------------------ OK
...................................................................................................................................................................................................

12 Close the telnet session on the JBXOMCP.


...................................................................................................................................................................................................

13 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that the firmware
upgrade is necessary. Perform Step 1 to Step 1 from How to Upgrade Shelf Manager
Firmware (p. 8-5).
The FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective action
from [99,9] FIRMWARE-INCOMPATIBILITY
There is no firmware alarm after blade is IT/FIT, it means firmware level is up to date.
...................................................................................................................................................................................................

14 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-91
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................

Replace JBXPS
Important information

DANGER
Electric-shock hazard
If any JBXPS for which alarms or other issues are reported has the power breaker in
OFF position, do not switch the power breaker to ON.
Replace the module following the appropriate method in order to avoid physical danger
and equipment danger.

....................................................................................................................................................................................................................................
4-92 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................

Figure 4-22 Power Entry Module for Variants Before 3BK 27342 AACA

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-93
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................
Figure 4-23 Power Entry Module from Variant 3BK 27342 AACA On

The Power Entry Modules are numbered from 1 on the left to 4 on the right of the rear
view of the subrack chassis.

Disconnect Power Supply from JBXPS


Disconnect the power supply from JBXPS:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.

....................................................................................................................................................................................................................................
4-94 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

2 DANGER
Electric-shock hazard
If any JBXPS for which alarms or other issues are reported has the power breaker in
OFF position, do not switch the power breaker to ON.
Replace the module following the appropriate method in order to avoid physical danger
and equipment danger.

Identify the JBXPS to be switched OFF. Refer to Board/Area/Slot/SBL Mapping


(p. 2-6).
...................................................................................................................................................................................................

3 Switch OFF the breaker on the Power Distribution Unit (PDU) corresponding to the
JBXPS to be switched OFF.
The following table gives the breaker on the PDU corresponding to each JBXPS in
JSXATCA shelves.

JBXPS1 (left) JBXPS2 JBXPS3 JBXPS4 (right)


Shelf 3 A3 B3 A3 B3
Shelf 4 A1 B1 A1 B1

...................................................................................................................................................................................................

4 Switch OFF the breaker on JBXPS.


...................................................................................................................................................................................................

5 DANGER
Risk of electrocution
To avoid short circuits and electric shock, the power lugs must not be energized before
removing the screws.
Using a multimeter, ensure that the power lugs are not energized before loosening the
screws.
Be careful when using tools in order to prevent a short circuit.

Remove the rubber protection on the power cables to access the studs.
...................................................................................................................................................................................................

6 Unfasten the power cables (POWER, then RETURN) from the JBXPS studs
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-95
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................
Remove JBXPS
Remove the JBXPS:
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 On the JBXPS (realization variants before 3BK 27342 AACA), switch the H/S handle to
OPEN.
The blue H/S LED will blink (short intervals) and then remain steadily lit.
...................................................................................................................................................................................................

3 Unfasten the four JBXPS screws.


Since the JBXPS can be hot, let it cool down before pulling it out with bare hands.
...................................................................................................................................................................................................

4 Unplug the JBXPS from its location.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JBXPS
Insert a JBXPS:
...................................................................................................................................................................................................

1 On the JBXPS (realization variants before 3BK 27342 AACA), ensure that H/S handle of
the new JBXPS is OPEN.
...................................................................................................................................................................................................

2 Ensure that the breaker of the new JBXPS is OFF.


...................................................................................................................................................................................................

3 Plug the replacement JBXPS into its location.


On the JBXPS realization variants before 3BK 27342 AACA, the blue H/S LED will
remain steadily lit.
On the JBXPS starting with realization variants 3BK 27342 AACA, the blue H/S LED
will blink (long intervals) and then turn OFF.
...................................................................................................................................................................................................

4 Fasten the 4 JBXPS screws.

....................................................................................................................................................................................................................................
4-96 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

5 On the JBXPS (realization variants before 3BK 27342 AACA), switch the H/S handle to
CLOSED.
The blue H/S LED will blink (long intervals) and then turn OFF.
...................................................................................................................................................................................................

6 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

Reconnect Power Supply to JBXPS


Reconnect the power supply to JBXPS:
...................................................................................................................................................................................................

1 Fasten the power cables (RETURN and POWER) to the JBXPS studs.
...................................................................................................................................................................................................

2 Slip the isolation sleeves over the 2-hole lugs.


...................................................................................................................................................................................................

3 Turn ON the power distribution feeding the JBXPS with the breaker located on the PDU.
...................................................................................................................................................................................................

4 Check that the Rev. Power LED is OFF.


Attention: Do not switch ON the breaker of the new JBXPS if the Rev. Power LED is
ON.
If Rev. Power LED is ON, switch OFF the corresponding breakers and check power
polarity on JBXPS terminals.
...................................................................................................................................................................................................

5 Switch the breaker of the new JBXPS to ON.


...................................................................................................................................................................................................

6 Check that the OK LED is ON.


...................................................................................................................................................................................................

7 Using the BSC terminal, check if any alarm related to firmware is raised for the
replacement board.
If:
The FIRMWARE-NOT-UP-TO-DATE alarm is present, it means that firmware
upgrade is necessary:
....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-97
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JBXPS
Rear RITs
....................................................................................................................................................................................................................................
To do so:
From a local terminal, open a telnet session on the active OMCP:
telnet 172.17.y.x
where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
x is 30 for JBXOMCP1 (ATCA physical slot 6)
x is 40 for JBXOMCP2( ATCA physical slot 9).
Type the username and the password:
root
alcatel
Perform Step 2 to Step 3 from Upgrade PEM Firmware (p. 8-24)
Close the telnet session on the JBXOMCP.
If the FIRMWARE-INCOMPATIBILITY alarm is raised, perform the corrective
action from [99,9] FIRMWARE-INCOMPATIBILITY
If there is no firmware alarm after blade is IT/FIT, it means firmware level is up to
date.
...................................................................................................................................................................................................

8 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-98 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace JAXFILL
Rear RITs
....................................................................................................................................................................................................................................

Replace JAXFILL
Overview
Unused slots, front and rear, must be equipped with fillers.
The JAXFILL are used to create the appropriate air flow within the subrack.

Remove JAXFILL
Remove an ATCA rear filler:
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Unfasten screws of front plate until board is detached from shelf.


...................................................................................................................................................................................................

3 Remove JAXFILL from shelf.


...................................................................................................................................................................................................

4 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

Insert JAXFILL
Insert an JAXFILL:
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Slide JAXFILL into the shelf until you feel resistance.


...................................................................................................................................................................................................

3 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

4 Disconnect the anti-static wrist strap.

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-99
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Overview

....................................................................................................................................................................................................................................

Replace Battery on JBXOMCP/JBXCCP

How to Replace Battery on JBXOMCP/JBXCCP


Overview
Note: If the impacted board is the active one, start with Board Takeover (p. 4-101),
otherwise go to Remove Board (p. 4-102).
Before replacing the battery on JBXOMCP/JBXCCP, check and write down the status
of the system. Ensure that the status for all degraded SBLs and functions and all
alarms is available before starting the action.

....................................................................................................................................................................................................................................
4-100 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Board Takeover
Replace Battery on JBXOMCP/JBXCCP
....................................................................................................................................................................................................................................

Board Takeover
Procedure
To perform a board takeover, only if the impacted board is the active one:
...................................................................................................................................................................................................

1 Start the 9130 BSC Evolution Terminal software. Refer to Start the Terminal Software
from the 9130 BSC Evolution Terminal User Guide.
...................................................................................................................................................................................................

2 Reset the SBL corresponding to the active board.


For SBL reset procedure refer to Reset SBL from the 9130 BSC Evolution Terminal User
Guide.
For identifying the corresponding SBL refer to Board/Area/Slot/SBL Mapping (p. 2-6).
The reset of the active board will trigger a board takeover.
Wait 5 minutes, until the takeover is complete.
...................................................................................................................................................................................................

3 After the takeover is done, check the ACT or USR2 LED status on the boards front panel.
...................................................................................................................................................................................................

4 Remove Board (p. 4-54).


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-101
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Remove Board
Replace Battery on JBXOMCP/JBXCCP
....................................................................................................................................................................................................................................

Remove Board
Procedure
Remove a board:
...................................................................................................................................................................................................

1 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

2 From the BSC terminal or OMC-R, disable/lock the corresponding board.


...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Unfasten screws of front plate until the board is detached from the shelf.
...................................................................................................................................................................................................

5 Move the ejector handles outwards.


...................................................................................................................................................................................................

6 Remove the board from the shelf.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-102 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Replace Battery
Replace Battery on JBXOMCP/JBXCCP
....................................................................................................................................................................................................................................

Replace Battery
Procedure
Replace the battery:
...................................................................................................................................................................................................

1 Remove the board from its slot.


...................................................................................................................................................................................................

2 CAUTION
PCB and battery holder damage
Removing the battery with a screwdriver may damage the PCB or the battery holder.
To prevent this damage, do not use a screwdriver to remove the battery from its holder.

Remove the old battery.


...................................................................................................................................................................................................

3 Locate the + sign on the new battery. It indicates the positive terminal of the battery.
...................................................................................................................................................................................................

4 Insert the battery into the blade's battery holder in such a way that the+ on top of the
battery is face up.
...................................................................................................................................................................................................

5 Insert the board in the initial slot.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-103
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert Board
Replace Battery on JBXOMCP/JBXCCP
....................................................................................................................................................................................................................................

Insert Board
Procedure
Insert a board:
...................................................................................................................................................................................................

1 Ensure that the top and bottom ejector handles are in the outward position.
...................................................................................................................................................................................................

2 Insert board into the shelf by placing the top and bottom edges of the board in the card
guides of the shelf. Ensure that the guiding module of shelf and board are aligned
properly.
...................................................................................................................................................................................................

3 Slide the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

4 Wait until the blue LED is illuminated.


...................................................................................................................................................................................................

5 Simultaneously move the top and bottom ejector handles to the inward position.
Result: The blue LED blinks.
After some seconds the blue LED is switched OFF.
...................................................................................................................................................................................................

6 Wait until the blue LED is illuminated again.


...................................................................................................................................................................................................

7 Tighten the front plate screws which secure the board to the shelf.
...................................................................................................................................................................................................

8 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

9 From BSC terminal or OMC-R initialize/unlock the corresponding board.


Result: The blue LED is switched OFF.
...................................................................................................................................................................................................

10 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
4-104 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert Board

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 4-105
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain ATCA Subrack Insert Board

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
4-106 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
5 Maintain LIU Subrack
5

Overview
Purpose
This section describes how to replace the following LIU subrack RITs:
This section describes how to replace the following LIU subrack RITs:
JBXLIU boards
JBXMUX boards
JBXPEM modules
JBXDUM fillers.

Contents

Before You Start 5-3


Checks 5-3
Replace LIU Board 5-4
How to Replace LIU Board 5-4
Remove LIU Board 5-7
Insert LIU Board 5-8
Replace JBXMUX Board 5-9
How to Replace JBXMUX Board 5-9
Remove JBXMUX 5-11
Insert JBXMUX 5-12
Replace JBXPEM 5-14
How to Replace JBXPEM 5-14
Remove JBXPEM 5-15
Insert JBXPEM 5-17

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Overview

....................................................................................................................................................................................................................................

Replace LIU Front Filler 5-19


How to Replace LIU Front Filler 5-19
Remove JBXDUM 5-21
Replace JBXDUM 5-22

....................................................................................................................................................................................................................................
5-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Checks
Before You Start
....................................................................................................................................................................................................................................

Before You Start

Checks
Overview
Impact on System
As long as only one JBXPEM or JBXMUX is removed and replaced at any one time,
there is no impact on the system. This is because the RITs work in hot-standby mode. If a
RIT fails, the standby RIT takes over the tasks of faulty one. In case of failure, a
replacement must be organized as soon as possible to prevent traffic interruption.
When the LIU board is replaced there is a traffic outage. In case of failure, a replacement
must be organized as soon as possible to minimize traffic interruption.
The LIU subrack is equipped with:
Line Interface Unit boards (JBXLIU)
Power Entry Modules (JBXPEM)
Multiplexing boards (JBXMUX).
The following figure shows the front view of the LIU subrack.

Figure 5-1 Front View of LIU Subrack

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace LIU Board
Replace LIU Board
....................................................................................................................................................................................................................................

Replace LIU Board

How to Replace LIU Board


Overview
The following figure shows the 120 Ohm and 75 Ohm LIU boards.

....................................................................................................................................................................................................................................
5-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace LIU Board
Replace LIU Board
....................................................................................................................................................................................................................................

Figure 5-2 LIU Board

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-5
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace LIU Board
Replace LIU Board
....................................................................................................................................................................................................................................
Important information

WARNING
Traffic reduction
When the LIU board is replaced there is a traffic reduction for about 4 minutes.
In the case of failure, a replacement must be organized as soon as possible to minimize
traffic interruption.
When replacing a LIU board, the replacement board must support the same impedance as
the replaced one.

Note the following impact on the system:


In the case of the LIU board connected to the Abis interface:
The telecommunications links for coresponding BTS connected to the replaced board
are lost.
In the case of the LIU board connected to Ater Mux interface:
The telecomunication links are reduced.

....................................................................................................................................................................................................................................
5-6 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Remove LIU Board
Replace LIU Board
....................................................................................................................................................................................................................................

Remove LIU Board


Procedure
Remove the LIU board:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Unplug the cable connector.


...................................................................................................................................................................................................

5 Unfasten the top screw with the screwdriver.


...................................................................................................................................................................................................

6 Unfasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
...................................................................................................................................................................................................

7 Remove the board from the shelf using the board handle.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-7
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Insert LIU Board
Replace LIU Board
....................................................................................................................................................................................................................................

Insert LIU Board


Procedure
Insert the LIU board:
...................................................................................................................................................................................................

1 Use the handle to insert the board into the shelf until you feel resistance.
...................................................................................................................................................................................................

2 Fasten the top screw with the screwdriver.


...................................................................................................................................................................................................

3 Fasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
...................................................................................................................................................................................................

4 Plug in the cable connector.


...................................................................................................................................................................................................

5 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

Important information
Attention: In the LIU shelf, each slot unused by a board must be closed by a filler
front panel.

....................................................................................................................................................................................................................................
5-8 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace JBXMUX Board
Replace JBXMUX Board
....................................................................................................................................................................................................................................

Replace JBXMUX Board

How to Replace JBXMUX Board


Overview
The following figure shows the JBXMUX board.

Figure 5-3 JBXMUX Board

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-9
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace JBXMUX Board
Replace JBXMUX Board
....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
5-10 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Remove JBXMUX
Replace JBXMUX Board
....................................................................................................................................................................................................................................

Remove JBXMUX
Note: When removing the active board, reset the board before removing it either from
the BSC terminal or from the OMC-R.

Procedure
Remove the JBXMUX:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


...................................................................................................................................................................................................

3 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

4 Disconnect the Ethernet cable.


...................................................................................................................................................................................................

5 Unfasten the top screw with the screwdriver.


...................................................................................................................................................................................................

6 Unfasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
Attention: Removing the JBXMUX with the Ethernet cable connected leads to loss of
the telecom traffic for up to 10 minutes.
...................................................................................................................................................................................................

7 Remove the board from the shelf using the board handle.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-11
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Insert JBXMUX
Replace JBXMUX Board
....................................................................................................................................................................................................................................

Insert JBXMUX
Procedure
Insert the JBXMUX:
...................................................................................................................................................................................................

1 Insert the board, using the handle, into the shelf until you feel resistance.
...................................................................................................................................................................................................

2 Fasten the top screw with the screwdriver.


...................................................................................................................................................................................................

3 Fasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
...................................................................................................................................................................................................

4 Connect the Ethernet cable from the corresponding JBXSSW.


To do so:
JBXMUX1 is connected to JBXSSW1
JBXMUX2 is connected to JBXSSW2.
...................................................................................................................................................................................................

5 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

6 Using the BSC terminal check if the FIRMWARE-NOT-UP-TO-DATE alarm is raised for
the replacement board.
If this alarm is present, it means that a newer NE1oE firmware version is available.
To do so:
Also check that the FIRMWARE-NOT-UP-TO-DATE alarm is cleared.
It means that the firmware upgrade already started. As a confirmation, the
FIRMWARE-UPGRADE alarm is raised.
Wait for the firmware upgrade process to finish. It takes approximately 10 minutes.
The process is finished when the FIRMWARE-UPGRADE alarm is cleared.
Note: If the FIRMWARE-INCOMPATIBILITY alarm is raised, refer to [100,9]
FIRMWARE-INCOMPATIBILITY.
If the alarm is not present, continue with the next step.

....................................................................................................................................................................................................................................
5-12 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Insert JBXMUX
Replace JBXMUX Board
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

7 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-13
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace JBXPEM
Replace JBXPEM
....................................................................................................................................................................................................................................

Replace JBXPEM

How to Replace JBXPEM


Overview
The following figure shows the JBXPEM.

Figure 5-4 JBXPEM Board

....................................................................................................................................................................................................................................
5-14 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Remove JBXPEM
Replace JBXPEM
....................................................................................................................................................................................................................................

Remove JBXPEM
Procedure
Remove JBXPEM:
...................................................................................................................................................................................................

1 Check and write down the status of the system. Ensure that the status for all degraded
SBLs and functions and all alarms is available before starting the action.
...................................................................................................................................................................................................

2 Identify the board to be replaced. Refer to Board/Area/Slot/SBL Mapping (p. 2-6).


Note: Ensure that the following actions are performed for the board to be replaced.
...................................................................................................................................................................................................

3 Switch OFF the corresponding breaker on Power Distribution Unit (PDU).


The LED on both JBXPEM boards turns to orange.
The following table gives the breaker on PDU corresponding to each JBXPEM in
JSXLIU shelves.

JBXPEM A (left) JBXPEM B (right)


Shelf JSXLIU1 A4 B4
Shelf JSXLIU2 A2 B2

...................................................................................................................................................................................................

4 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

5 Unfasten the top screw with the screwdriver.


...................................................................................................................................................................................................

6 Unfasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
...................................................................................................................................................................................................

7 If necessary, cut the cable ties used for power cable fixation.
Attention: Ensure that the power cable to be disconnected is the one attached to the
JBXPEM board to be replaced and for which the related power breaker on PDU was
switched OFF.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-15
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Remove JBXPEM
Replace JBXPEM
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

8 Disconnect the power cable.


...................................................................................................................................................................................................

9 Remove the board from the shelf using the board handle.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
5-16 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Insert JBXPEM
Replace JBXPEM
....................................................................................................................................................................................................................................

Insert JBXPEM
Attention: Before inserting the new JBXPEM check the new board ICS.
Depending on new board ICS, apply the appropriate case:
Insert JBXPEM in Case of ICS 01 (p. 5-17)
Insert JBXPEM in Case of ICS 02 or Newer (p. 5-17).

Insert JBXPEM in Case of ICS 01


Insert the LIU PEM:
...................................................................................................................................................................................................

1 Connect the power cable to the board.


...................................................................................................................................................................................................

2 Insert using handle the board with the power cable attached into the shelf until you feel
resistance.
...................................................................................................................................................................................................

3 Fasten the top screw with the screwdriver.


...................................................................................................................................................................................................

4 Fasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
...................................................................................................................................................................................................

5 Switch ON the corresponding breaker on PDU.


...................................................................................................................................................................................................

6 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

7 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

Insert JBXPEM in Case of ICS 02 or Newer


Insert the LIU PEM:
...................................................................................................................................................................................................

1 Partially insert the board into slot rails, back connectors are not reached yet.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-17
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Insert JBXPEM
Replace JBXPEM
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

2 Connect the power cable to the board.


...................................................................................................................................................................................................

3 Switch ON the corresponding breaker on PDU.


...................................................................................................................................................................................................

4 Insert using handle the board with the power cable attached into the shelf until you feel
resistance.
...................................................................................................................................................................................................

5 Fasten the top screw with the screwdriver.


...................................................................................................................................................................................................

6 Fasten the bottom screw with the screwdriver.


The bottom screw is located under the handle.
...................................................................................................................................................................................................

7 Disconnect the anti-static wrist strap.


...................................................................................................................................................................................................

8 Check the status of the system. Ensure that the status for all impacted SBLs and functions
and all alarms is cleared and no new alarms occurred.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
5-18 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Overview
Replace LIU Front Filler
....................................................................................................................................................................................................................................

Replace LIU Front Filler

How to Replace LIU Front Filler


Overview
The following figure shows the JBXDUM filler.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-19
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack How to Replace LIU Front Filler
Replace LIU Front Filler
....................................................................................................................................................................................................................................

Figure 5-5 JBXDUM Filler

....................................................................................................................................................................................................................................
5-20 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Remove JBXDUM
Replace LIU Front Filler
....................................................................................................................................................................................................................................

Remove JBXDUM
Procedure
Remove the JBXDUM filler:
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Unfasten the top screw with the screwdriver.


...................................................................................................................................................................................................

3 Unfasten the bottom screw with the screwdriver.


...................................................................................................................................................................................................

4 Remove the JBXDUM filler.


...................................................................................................................................................................................................

5 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 5-21
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Maintain LIU Subrack Replace JBXDUM
Replace LIU Front Filler
....................................................................................................................................................................................................................................

Replace JBXDUM
Procedure
Replace JBXDUM filler:
...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

2 Fit the filler into position.


...................................................................................................................................................................................................

3 Fasten the top screw with the screwdriver.


...................................................................................................................................................................................................

4 Fasten the bottom screw with the screwdriver.


...................................................................................................................................................................................................

5 Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
5-22 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
6 9130 BSC Evolution Cables
6

Overview
Purpose
This section lists all cables used in the BSC. It includes cable lists and connector position
schematics for:
This section lists all cables used in the BSC. It includes cable lists and connector position
schematics for:
Telecommunications Subrack
Control Station Server.

Contents

Intervention Levels 6-1


ATCA Subrack Cables 6-6
LIU Subrack Cables 6-7

Intervention Levels
Overview
The following figure shows the 9130 BSC Evolution rack intervention levels.

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 6-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables Intervention Levels

....................................................................................................................................................................................................................................

Figure 6-1 9130 BSC Evolution Rack Intervention Levels

....................................................................................................................................................................................................................................
6-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables Intervention Levels

....................................................................................................................................................................................................................................

There are some cables with the ends marked with labels accordingly to the place where
this end should be placed. Consequently, pay attention to this labels when connect the
cables.
For example, for cables interconnecting 2 different subracks, each end (may have) a label
on which is written:
Subrack's corresponding intervention level, or/and
Board's slot number, or/and
Board's connector related information.
The following figure gives the intervention level for the front RITs.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 6-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables Intervention Levels

....................................................................................................................................................................................................................................

Figure 6-2 ATCA Front View (with Cable Positions)

The following figure gives the intervention level for the rear RITs.

....................................................................................................................................................................................................................................
6-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables Intervention Levels

....................................................................................................................................................................................................................................

Figure 6-3 ATCA Rear View (with Cable Positions)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 6-5
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables Intervention Levels

....................................................................................................................................................................................................................................
There are some cables with the ends marked with labels accordingly to the place where
this end should be placed. Consequently, pay attention to this labels when connect the
cables.
The following table gives the boards position in the ATCA shelf and part numbers.

Table 6-1 ATCA Configuration

Description of the Alcatel-Lucent


platform Position part numbers
Shelf (chassis) 1AF 04442 AD
Switches Board M07 & M08 3BK 27237 AA
ARTM M67 & M68 1AF 04448 AA
JBXOMCP boards Board M06 & M09 1AF 04452 AC
ARTM M66 & M69 1AF 04451 AA
JBXCCP boards Board M61 - M65 & 3BK 27231 AA
M70 - M72
JBXTP Board M01 & M02 3BK 26859 AA

ATCA Subrack Cables


Overview

Table 6-2 Power Cords for ATCA

Cable Mnemo Item Cord From (device, To (device,


Reference connector) connector)
JL16H2M6 (CJ) blue (-48V) AB, M83/P01 Z (A), P11
blue-black (0V) AB, M83/P02 Z (A), P21
JL16H2M6 (CJ) blue (-48V) AB, M82/P01 Z (B), P15
blue-black (0V) AB, M82/P02 Z (B), P25
JL16H2M6 (CJ) blue (-48V) AB, M81/P01 Z (A), P12
blue-black (0V) AB, M81/P02 Z (A), P22
JL16H2M6 (CJ) blue (-48V) AB, M80/P01 Z (B), P26
blue-black (0V) AB, M80/P02 Z (B), P16

....................................................................................................................................................................................................................................
6-6 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables LIU Subrack Cables

....................................................................................................................................................................................................................................

LIU Subrack Cables


Overview

Table 6-3 Cable List for GE Links between LIU and ATCA

Cable Mnemo Item Reference From (rack, To (rack, device,


device, connector) connector)
ALETHC (CL) LIU / MUX1 ATCA, M67 / X02
ALETHC (CL) LIU / MUX2 ATCA, M68 / X02

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 6-7
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
9130 BSC Evolution Cables LIU Subrack Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
6-8 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
7 Software Procedures
7

Overview
Purpose
This section describes how to:
Modify Community String Name
Software and Hardware Diagnosis
Modify BSC IP Subnetwork Address
Tool collecting on-demand traces/logs

Contents

Modify Community String Name 7-3


How to Modify Community String Name 7-3
Perform a Software and Hardware Diagnosis 7-5
How to Perform a Software and Hardware Diagnosis 7-5
Reset BSC 7-6
How to Reset BSC 7-6
Modify BSC IP External Configuration 7-7
how to Modify BSC IP External Configuration 7-7
Modify 9130 BSC Evolution IP Configuration 7-12
General Information 7-12
Modify BSC IP Subnetwork Address 7-15
Modify BSC IP Configuration from 1 LAN to 2 LANs 7-17
Modify BSC IP Configuration from Two LANs to One LAN 7-19
Tool Collecting On-Demand Traces/Logs 7-21
Description 7-21

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Overview

....................................................................................................................................................................................................................................

Emergency Mode 7-22


Normal Mode 7-24
File Transfer to 9153 OMC-R 7-26

....................................................................................................................................................................................................................................
7-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures How to Modify Community String Name
Modify Community String Name
....................................................................................................................................................................................................................................

Modify Community String Name

How to Modify Community String Name


Procedure
Modify the Community String name:
...................................................................................................................................................................................................

1 Connect on the active OMCP using the terminal:


telnet 172.17.y.x
Where:
y is 3 for Shelf 3
y is 4 for Shelf 4
x is 30 for OMCP1
x is 40 for OMCP2
...................................................................................................................................................................................................

2 Type the username:


root
Type the password:
alcatel
...................................................................................................................................................................................................

3 In the terminal window 172.17.y.x corresponding to the active OMCP, type the following
command:
cd /usr/local/bin/
./mpRumSetSnmpPasswd <OLD SNMP PASSWD> <NEW SNMP PASSWD 1> <NEW
SNMP PASSWD 2>
This command modifies the community string name in the snmpd.local.conf
configuration file.
The <OLD SNMP PASSWD> must be known.
The <NEW SNMP PASSWD 1> must be egual to <NEW SNMP PASSWD 2>.
Note: The SNMP Password is also known as the Community String.
The Community String must be the same as the one defined at OMCR side.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures How to Modify Community String Name
Modify Community String Name
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

4 Close the terminal window 172.17.y.x.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
7-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures How to Perform a Software and Hardware Diagnosis
Perform a Software and Hardware Diagnosis
....................................................................................................................................................................................................................................

Perform a Software and Hardware Diagnosis

How to Perform a Software and Hardware Diagnosis


Procedure
Note: It is recommended that this task be performed for each OMCP board.
Perform a software and hardware diagnosis:
...................................................................................................................................................................................................

1 Connect on the active OMCP board using the terminal


telnet 172.17.33.1
...................................................................................................................................................................................................

2 Type the username:


root
Type the password:
alcatel
...................................................................................................................................................................................................

3 To start audit shelf script, type:


cd /usr/local/bin
./mx_chkSanity
Wait until the prompter is active.
...................................................................................................................................................................................................

4 Open the generated AuditMxBSC.log file from the /var/log/MX/logs/ directory.


**** CONCLUSION ****
**** Number of Errors : 0 ****
**** Number of TraceWarning : 0 ****
**** Log File : /var/log/MX/logs/AuditMxBSC.log ****
**** Trace File : /var/log/MX/trace/files/AuditMxBSC.trace
****
Check that there are NO errors.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-5
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures How to Reset BSC

....................................................................................................................................................................................................................................

Reset BSC

How to Reset BSC


Procedure
Reset the BSC:
...................................................................................................................................................................................................

1 Check the status of the BSC.


Perform the How to Perform a Software and Hardware Diagnosis (p. 7-5) before any
BSC reset.
...................................................................................................................................................................................................

2 From BSC terminal, select:


Commands -> Equipment Handling -> SBL Reset
Result: The SBL Reset window appears.
...................................................................................................................................................................................................

3 In the Object Class field, select SBL.


...................................................................................................................................................................................................

4 In the Unit Type field, select BSC.


...................................................................................................................................................................................................

5 In the SBL Type field, select BSC.


...................................................................................................................................................................................................

6 In the Unit Number field, enter the unit number.


...................................................................................................................................................................................................

7 In the Nbr field, enter the SBL number.


...................................................................................................................................................................................................

8 In the SubNbr field, enter the SBL sub-number.


...................................................................................................................................................................................................

9 Click on OK to reset the BSC.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
7-6 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures how to Modify BSC IP External Configuration

....................................................................................................................................................................................................................................

Modify BSC IP External Configuration

how to Modify BSC IP External Configuration


Procedure
Modify the IP external configuration with the BSC terminal:
...................................................................................................................................................................................................

1 Open the BSC terminal


From the Windows desktop, click on Start->Programs->WinBSC-
>9130>B12>Windows 9130 BSC Terminal B12, and enter the Virtual IP address of the
BSC.
The Virtual IP address is 172.17.33.1
...................................................................................................................................................................................................

2 Switch to master user mode.


...................................................................................................................................................................................................

3 From the BSC Terminal menu bar, select Commands->BSS Operations->Display IP


Parameters.
The Display IP Parameters window opens.
...................................................................................................................................................................................................

4 Complete the following fields.


In:
Object Class, select BSC
Unit Type, select BSC
Unit Number, enter 1.
Check the Get and Modify box and click on OK.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-7
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures how to Modify BSC IP External Configuration
Modify BSC IP External Configuration
....................................................................................................................................................................................................................................
Result: The Modify IP Parameters window opens.
...................................................................................................................................................................................................

5 Click on the IP Parameters tab and complete the following fields as required:

Name Description Comment


BSC Start O&M IP This parameter gives the O&M -
Address IP starting address of the BSC.
The IP addresses of all O&M
hosts (OMCP active, OMCP1,
OMCP2, External alarm box)
of the BSC are deduced from
this starting address
BSC O&M IP Subnet This parameter gives the -
Mask external IP O&M subnet mask
of the BSC
IP Ethernet Protocol This parameter indicates if two -
LAN topology (with RIP
protocol) or one LAN topology
(without RIP protocol) is used
by the BSC in IP over Ethernet
case. This parameter can not be
set to two LAN topology if the
A Signalling over IP feature is
enabled
O&M Reachability Test IP The IP address to be used by In order to have an efficient
Address the BSC for testing the access test, the reachability address
to the external network for shall be the first address
O&M needs. This parameter encountered out of the BSC for
has to be in the same subnet as the O&M flow.
BSC Start O&M IP Address
REACHABILITY_TEST_ The IP address to be used by In order to have an efficient
1_ADDR_ASIG the BSC for testing the access test, the reachability address
to the external network for Asig shall be the first address
over IP telecom needs. It has to encountered out of the BSC for
be in the same subnet as the the Asig over IP flow.
START_ASIG_IP_ADDRESS_ This address is mandatory for
1_BSC and it cannot be the Asig over IP feature
configured when
START_ASIG_IP_ADDRESS_
1_BSC is not configured

....................................................................................................................................................................................................................................
7-8 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures how to Modify BSC IP External Configuration
Modify BSC IP External Configuration
....................................................................................................................................................................................................................................

Name Description Comment


REACHABILITY_TEST_ The IP address to be used by In order to have an efficient
2_ADDR_ASIG the BSC for testing the access test, the reachability address
to the external network for Asig shall be the first address
over IP telecom needs. It has to encountered out of the BSC for
be in the same subnet as the the Asig over IP flow.
START_ASIG_IP_ADDRESS_ This address is mandatory for
2_BSC and it cannot be he Multi-homing feature for
configured when ASIGoIP flow
START_ASIG_IP_ADDRESS_
2_BSC is not configured
Ext Router Subnet B This parameter gives the router This parameter is valid for
IP address to be used by the TDM only
BSC for the subnet B
Ext Router Subnet C This parameter gives the router This parameter is valid for
IP address to be used by the TDM only
BSC for the subnet C
Subnet-B- This parameter gives the IP This parameter is valid for
Start-IP-Address subnet address (B) that uses the TDM only
left switching plan of the BSC
Evolution
Subnet-C- This parameter gives the IP This parameter is valid for
Start-IP-Address subnet address (C) that uses the TDM only
right switching plan of the BSC
Evolution
Subnet B&C Mask This parameter gives the IP This parameter is valid for
subnet mask that uses the left TDM only
switching plan or the right
switching plan of the BSC
Evolution
START_ASIG_IP_ADDRESS_
First IP address for the range of This address is mandatory for
1_BSC telecom addresses shown to the the "Asig over IP" feature
external world for the "A
signalling over IP" feature
ASIG_IP_SUBNET_MASK_Mask of the subnet where is This address is mandatory for
1_BSC allocated the range of BSC the "Asig over IP" feature
addresses used for telecom
protocols for the "A signalling
over IP" feature

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-9
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures how to Modify BSC IP External Configuration
Modify BSC IP External Configuration
....................................................................................................................................................................................................................................

Name Description Comment


START_ASIG_IP_ADDRESS_
First IP address for the range of This address is mandatory for
2_BSC telecom addresses shown to the the "Asig over IP" and the
external world for the "A Multi-homing features
signalling over IP" feature and
the Multi-homing features for
ASIGoIP flow
ASIG_IP_SUBNET_MASK_Mask of the subnet where is This address is mandatory for
2_BSC allocated the range of BSC the "Asig over IP" and the
addresses used for telecom Multi-homing features
protocols for the "A signalling
over IP" feature and the
Multi-homing features for
ASIGoIP flow
Extraction Point This parameter indicates -
whether the IP link for OMC
and CBC is extracted/inserted
directly at SSW board (BSC), at
the TCADAPT (IP over Ater) or
at the MSC (IP over Ater)
IP Bandwidth This parameter gives the -
number of E1 on which one
timeslot is used for IP if the
extraction point is on TC or
MSC
DHCP-Server-IP-Address This parameter specifies the -
DHCP server IP address that is
used by TPGSM for DHCP
relay
BSS Transport Mode IP Transport mode for Ater -
level signalling links (TDM, IP)
VLAN Conf Index This parameter allows the -
selection of the appropriate
internal VLAN tags
configuration, either the one for
O&M/telecom common router
(L2 network) or the one for
O&M/telecom distinct routers
(L2 network) or the one for
O&M/AoIP/BSSoIP distinct
routers (L2 network)

....................................................................................................................................................................................................................................
7-10 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures how to Modify BSC IP External Configuration
Modify BSC IP External Configuration
....................................................................................................................................................................................................................................

Name Description Comment


BSC Start BSS IP Address First IP address for the range of This address is mandatory for
telecom addresses shown to the the "BSS over IP" feature
external world for the feature
"Ip transport in the BSS". The
BSC deduces every telecom
address of its associated
endpoints (OMCP, TPGSM and
CCP) from this base address
BSC BSS IP Subnet Mask Mask of the subnet where is This address is mandatory for
allocated the range of BSC the "BSS over IP" feature
addresses used for telecom
protocols for the "BSS over IP"
feature
BSS Reachability Test IP The IP address to be used by In order to have an efficient
Address the BSC for testing the access test, the reachability address
to the external network for BSS shall be the first address
over IP telecom needs. encountered out of the BSC for
the BSS over IP flow.
This address is mandatory for
the "BSS over IP" feature

...................................................................................................................................................................................................

6 Click on OK to save the changes.


...................................................................................................................................................................................................

7 Close BSC terminal.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-11
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures General Information
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................

Modify 9130 BSC Evolution IP Configuration

General Information
IP Assignment Rules in 9130 BSC Evolution with Two LAN Solution

Table 7-1 IP Assignment in 9130 BSC Evolution External Subnet A

Short IP Address Assigned to


Name
A1 Start_OAM_IP_addr_A 9130 BSC Evolution OMCP1 (for O&M
traffic)
A2 Start_OAM_IP_addr_A + 1 9130 BSC Evolution OMCP2 (for O&M
traffic)
A3 Start_OAM_IP_addr_A + 2 9130 BSC Evolution active OMCP (for
O&M traffic)
A4 Start_OAM_IP_addr_A + 3 9130 MFS Evolution active OMCP (for
O&M traffic)
A5 Start_OAM_IP_addr_A + 4 Reserved for spare
A6 Start_OAM_IP_addr_A + 5 External Alarm Box
A7 Start_OAM_IP_addr_A + 6 Reserved for spare

Table 7-2 IP Assignment in 9130 BSC Evolution External Subnet B

Short IP Address Assigned to


Name
B1 Start_IP_addr_B 9130 BSC Evolution OMCP1 ETH0
B2 Start_IP_addr_B + 1 9130 BSC Evolution OMCP2 ETH0
B3 Start_IP_addr_B + 2 Reserved for spare
B4 Start_IP_addr_B + 3 9130 MFS Evolution active OMCP ETH0
B5 Start_IP_addr_B + 4 Reserved for spare
B6 Start_IP_addr_B + 5 External Router 1 or active TPGSM
ETH0
B7 Start_IP_addr_B + 6 Reserved for spare

....................................................................................................................................................................................................................................
7-12 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures General Information
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................

Table 7-3 IP Assignment in 9130 BSC Evolution External Subnet C

Short IP Address Assigned to


Name
C1 Start_IP_addr_C 9130 BSC Evolution OMCP1 ETH1
C2 Start_IP_addr_C + 1 9130 BSC Evolution OMCP2 ETH1
C3 Start_IP_addr_C + 2 Reserved for spare
C4 Start_IP_addr_C + 3 9130 MFS Evolution active OMCP ETH1
C5 Start_IP_addr_C + 4 Reserved for spare
C6 Start_IP_addr_C + 5 External Router 2 or active TPGSM
ETH1
C7 Start_IP_addr_C + 6 Reserved for spare

In the two LAN configuration, SubnetB +5 and SubnetC +5 are used as external router
address.

IP Assignment Rules in 9130 BSC Evolution with One LAN Solution


In the case where the one LAN solution is chosen, Subnets B and C are no longer used.
The boards can be directly accessed through an IP address in Subnets A.
No MLPPP on Ater is used in the case of one LAN.

Table 7-4 IP Assignment in 9130 BSC Evolution External Subnet A

Short IP Address Assigned to


Name
A1-OAM1Start_OAM_IP_addr_A 9130 BSC Evolution OMCP1 (for O&M
traffic)
A2-OAM2Start_OAM_IP_addr_A + 1 9130 BSC Evolution OMCP2 (for O&M
traffic)
A3-OAM3Start_OAM_IP_addr_A + 2 9130 BSC Evolution active OMCP (for
O&M traffic)
A4-OAM4Start_OAM_IP_addr_A + 3 9130 MFS Evolution active OMCP (in
case the 9130 MFS Evolution does share
the O&M link with the 9130 BSC
Evolution)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-13
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures General Information
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................
Table 7-4 IP Assignment in 9130 BSC Evolution External Subnet A (continued)

Short IP Address Assigned to


Name
A4-OAM4Start_OAM_IP_addr_A + 3 9130 BSC Evolution IP address used for
reachability test on the stand-by switch
side (in case the 9130 MFS Evolution
does not share the O&M link with the
9130 BSC Evolution)
A6-OAM6Start_OAM_IP_addr_A + 5 External Alarm Box

Note: The recommended connection for the External Alarm Box is direct to the edge
Switch / Router.

....................................................................................................................................................................................................................................
7-14 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Modify BSC IP Subnetwork Address
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................

Modify BSC IP Subnetwork Address


Procedure
Note: The corresponding router must be reconfigured according to the new IP subnets
addresses.
Modify IP subnets address with BSC terminal:
...................................................................................................................................................................................................

1 Open the BSC terminal


From the Windows desktop, click on Start -> Programs -> WinBSC -> 9130 BSC -> B12
-> Windows 9130 BSC Terminal B12, and enter the Virtual IP address of the BSC.
The Virtual IP address is 172.17.33.1
...................................................................................................................................................................................................

2 Switch to master user mode.


...................................................................................................................................................................................................

3 From the BSC tTerminal menu bar, select:


Commands -> BSS Operations -> Display IP Parameters
The Display IP Parameters window opens.
...................................................................................................................................................................................................

4 Complete the following fields.


In:
Object Class, select BSC
Unit Type, select BSC
Unit Number, type 1.
...................................................................................................................................................................................................

5 Select the Get and Modify option.


...................................................................................................................................................................................................

6 Click on OK.
The Modify IP Parameters window opens.
...................................................................................................................................................................................................

7 Select the IP Parameters tab.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-15
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Modify BSC IP Subnetwork Address
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................
In the:
Ext Router Subnet B:, type the new IP address for External Router interface
connected to Subnet B
Ext Router Subnet C:, type the new IP address for External Router interface
connected to Subnet C
Subnet-B-Start-IP-Address, type the new start IP address of the BSC subnet B
Subnet-C-Start-IP-Address, type the new start IP address of the BSC subnet C
Subnet B&C Mask, type the new mask value for subnet B and C addresses of the BSC.
...................................................................................................................................................................................................

8 Click on OK to save the changes.


Wait for a MOD IP PARAMETERS successful message in the Compressed Report View
window.
...................................................................................................................................................................................................

9 Close the BSC terminal.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
7-16 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Modify BSC IP Configuration from 1 LAN to 2 LANs
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................

Modify BSC IP Configuration from 1 LAN to 2 LANs


Procedure
Note: The corresponding router must be configured according to final situation.
Modify the BSC IP configuration from one LAN to two LANs with the BSC terminal:
...................................................................................................................................................................................................

1 Open the BSC terminal from the Windows desktop. Click on Start -> Programs ->
WinBSC -> 9130 BSC -> B12 -> Windows 9130 BSC Terminal B12.
...................................................................................................................................................................................................

2 Type 172.17.33.1 as the Virtual IP address of the BSC.


...................................................................................................................................................................................................

3 To switch to master user mode, from the BSC Terminal menu bar, select Utilities-
>Switch User Mode or press F6.
...................................................................................................................................................................................................

4 From the BSC terminal menu bar, select:


Commands -> BSS Operations -> Display IP Parameters
Result: The Display IP Parameters window opens.
...................................................................................................................................................................................................

5 Complete the following fields:


In:
Object Class, select BSC
Unit Type, select BSC
Unit Number, type 1.
...................................................................................................................................................................................................

6 Select the Get and Modify option.


...................................................................................................................................................................................................

7 Click on OK.
The Modify IP Parameters window opens.
...................................................................................................................................................................................................

8 Select the Static Route Address tab, and in the Static Route Table, fill with the 0.0.0.0
address default values.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-17
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Modify BSC IP Configuration from 1 LAN to 2 LANs
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

9 Select the IP Parameters tab.


...................................................................................................................................................................................................

10 In the O&M Reachability Test IP Address field, fill with the IP default 0.0.0.0 address
value.
...................................................................................................................................................................................................

11 In the IP Ethernet Protocol field, select E_2 LAN


Type the IP addresses of the external router in the following fields :
Ext Router Subnet B:
Ext Router Subnet C:
...................................................................................................................................................................................................

12 Click on OK to save the changes.


Wait for the MODIFY IP PARAMETERS successful message in the Compressed
Report View window.
An automatic BSC reset takes place. Wait for the System Initialization message
and BSC state change.
Note: During the BSC reset, there is a traffic outage.
...................................................................................................................................................................................................

13 Close the BSC terminal.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
7-18 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Modify BSC IP Configuration from Two LANs to One LAN
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................

Modify BSC IP Configuration from Two LANs to One LAN


Procedure
Note: The corresponding router must be configured according to final situation.
Modify the BSC IP configuration from two LANs to one LAN with the BSC terminal:
...................................................................................................................................................................................................

1 Open the BSC terminal from the Windows desktop. Click on Start -> Programs ->
WinBSC -> 9130 BSC -> B12 ->Windows 9130 BSC Terminal B12.
...................................................................................................................................................................................................

2 Type 172.17.33.1 as the Virtual IP address of the BSC.


...................................................................................................................................................................................................

3 To switch to master user mode, from the BSC Terminal menu bar, select Utilities-
>Switch User Mode or press F6.
...................................................................................................................................................................................................

4 From the BSC Terminal menu bar, select:


Commands -> BSS Operations -> Display IP Parameters
Result: The Display IP Parameters window opens.
...................................................................................................................................................................................................

5 Complete the following fields:


In:
Object Class, select BSC
Unit Type, select BSC
Unit Number, type 1.
...................................................................................................................................................................................................

6 Select the Get and Modify option.


...................................................................................................................................................................................................

7 Click on OK.
Result: The Modify IP Parameters window opens.
...................................................................................................................................................................................................

8 Select the IP Parameters tab and complete the following fields accordingly:
BSC Start O&M IP Address
BSC O&M IP Subnet Mask

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-19
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Modify BSC IP Configuration from Two LANs to One LAN
Modify 9130 BSC Evolution IP Configuration
....................................................................................................................................................................................................................................
In the IP Ethernet Protocol field select 'E_1 LAN'
O&M Reachability Test IP Address
...................................................................................................................................................................................................

9 In selected IP Parameters tab set to the value 0.0.0.0 the following fields:
Ext Router Subnet B
Ext Router Subnet C
Subnet-B-Start- IP-Address
Subnet-C-Start- IP-Address
BSC O&M IP Subnet Mask
...................................................................................................................................................................................................

10 Select the Static Route Address tab and add the static route for OMC connection.
...................................................................................................................................................................................................

11 Click on OK to save the changes.


Wait for the MODIFY IP PARAMETERS successful message in the Compressed
Report View window.
An automatic BSC reset takes place. Wait for the System Initialization message
and BSC state change.
Note: During the BSC reset, there is a traffic outage.
...................................................................................................................................................................................................

12 Close the BSC terminal.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
7-20 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Overview
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................

Tool Collecting On-Demand Traces/Logs

Description
Overview
The script is under /common/bsc/SCPRDISK/, named TCKN????.??? (the ????.??? is
according to the package release). Only the script on the active OMCP can be launched.
The OAM and Telecom traces are collected into the /var/log/secured/ directory on both
OMCP boards.
The trace data includes:
Realtime Trace
MXPF Trace/logs
DLS
Core files
BSC Version
MXPF Version
Patch Names
The folder structure in trace secure is as follows:
Save BSC, MXPF version and patch names: /var/log/secured/BSC-General.txt
Save the total data size in a secure folder: /var/log/secured/secure-size.txt
Save DLS file: /var/log/secured/DLS/
Save core files: /var/log/secured/core
Save mxpf common trace files: /var/log/secured/mxpf/common
Save mxpf common trace files that have not been merged yet: /var/log/secured/mxpf/
common/nomerged/
Save mxpf log files: /var/log/secured/mxpf/logs
Save mxpf log files that have not been merged yet: /var/log/secured/mxpf/logs/
nomerged
Save mxpf srp files: /var/log/secured/mxpf/srp
Save mxpf srp files that have not been merged yet: /var/log/secured/mxpf/srp/
nomerged
Save real time trace files: /var/log/secured/realtime/
Save real time trace files that have not been merged yet: /var/log/secured/realtime/
nomerged/

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-21
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Description
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................
The script can be launched in two modes:
Emergency Mode (p. 7-22) to collect Telcom traces
Normal Mode (p. 7-24) to collect corresponding O&M traces.

Emergency Mode
Overview
The script prompts a message for the operator to make a selection:
Tool for Trace Collection, please choose:
e for emergency Trace Collection => TEL/DLS/BSC General Info.
n for normal Trace Collection => OAM/CORE/DLS/BSC General Info.
q for Quit.
1.[e/n/q]
To continue to emergency mode trace collection, select:
e
The script prompts:
2.Do you want to collect Telecom trace? [y/n]
y
3.Enter the telecom problem type [CS|PS|ATRUNK]:
Enter CS, PS or ATRUNK, according to the related problem.
4.Please enter the duration time in seconds of telecom trace
collection [120]:
Enter the required duration.
For CS/PS problems, two cell-ids are requested:
5.Enter the first LAC,CI .e.g. 1,2:
6.Enter the second LAC,CI e.g. 1,2:
For Atrunk problem, two Atrunk numbers are requested:
5.Enter the first Atrunk Number e.g. 1:
6.Enter the second Atrunk Number e.g. 1:
The script waits according to the duration set in Step 4 for the trace collection to end.
Wait 120 seconds for creating telecom trace. Press B, if you
want to stop creating.
....................................................................................................................................................................................................................................
7-22 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Emergency Mode
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................
............
Wait 60 seconds for Trace Collection. ............
Start time and end time are displayed:
Start time: yyyymmdd hhmmss
End time: yyyymmdd hhmmss
Confirm backup Telecom traces:
7.Do you confirm to backup Telecom trace? [y/n]
y
If older traces are already present in /var/log/secured, the script prompts:
8.You already have trace saved under, please
y: I have transferred previous trace to OMC, I want delete and
continue.
n: I want quit and transfer previous trace firstly.
[y/n]
y
Delete previous trace now!
Backup realtime trace for telecom!
To end the Telecom trace collection when prompted:
9.Do you want any more Telecom trace?[y/n]
Select:
n
The script ends with the following output:
Backup DLS now!
You can recover BSC now.
Complete!

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-23
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Normal Mode
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................

Normal Mode
Overview
If older traces are already present in /var/log/secured, the script prompts:
1.If it has trace saved under /var/log/secured, please
y: I have transferred previous trace to OMC, I want delete and
continue.
n: I want quit and transfer previous trace firstly.
[y/n]
y
Delete previous trace now!
The script prompts a message for the operator to make a selection:
Tool for Trace Collection, please choose:
e for emergency Trace Collection => TEL/DLS/BSC General Info.
n for normal Trace Collection => OAM/CORE/DLS/BSC General Info.
q for Quit.
2.[e/n/q]
To continue to normal mode trace collection, select:
n
The script prompts the user to insert the start and end time of trace collection:
Please Input Trace [StartTime, EndTime], in BSC Time.
Current BSC Time: <date> <time>
3.Input StartTime [YYYYMMDDHHMM], e.g. 200901012300
<yyyymmddhhmm>
YEAR=yyyy MONTH=mm DAY=dd HOUR=hh MINUTE=mm
4.Input EndTime [YYYYMMDDHHMM], e.g. 200901012359
<yyyymmddhhmm>
YEAR=yyyy MONTH=mm DAY=dd HOUR=hh MINUTE=mm
Waiting for Trace Collection.
............
Backup OAM trace!
- Backup realtime trace!
- Backup MXPF trace!
....................................................................................................................................................................................................................................
7-24 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures Normal Mode
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................
- Backup all the TPDUMP and TpConf files
- Backup core files
- Backup linux general info!
Backup DLS now!
Receive command BACKUP from current OMCP. Now SSH to another
OMCP to backup trace!
Backup OAM trace!
- Backup realtime trace!
- Backup MXPF trace!
- Backup all the TPDUMP and TpConf files
- Backup core files
- Backup linux general info!
Backup DLS now!
Connection to <IP address of active OMCP board> closed.
Complete!

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-25
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures File Transfer to 9153 OMC-R
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................

File Transfer to 9153 OMC-R


Overview
For 9153 OMC-R file transfers, due to the 9153 OMC-R security policy, the collecting is
done on the 9153 OMC-R and put in the /alcatel/var/maintenance/failure/ directory from
the /var/log/secured/ directory on both OMCP boards.
Attention: Create two subdirectories, one for each OMCP board, in the
/alcatel/var/maintenance/failure/ directory, because the names of the trace files are the
same for both OMCP boards.

Run gftp on OMC-R


...................................................................................................................................................................................................

1 Connect to the 9153 OMC-R as axadmin user.


...................................................................................................................................................................................................

2 At the UNIX command prompt, enter:


gftp
The gftp window opens.
E...................................................................................................................................................................................................
N D O F S T E P S

File transfer from first OMCP board


...................................................................................................................................................................................................

1 In Host, type the external IP address of the first OMCP board.


...................................................................................................................................................................................................

2 In User, type mxadmin and in Pass, type the corresponding password.


...................................................................................................................................................................................................

3 In Port, type 22.


...................................................................................................................................................................................................

4 Select SSH2 as the file transfer protocol.


...................................................................................................................................................................................................

5 From the toolbar, click on to connect to the first OMCP board.


...................................................................................................................................................................................................

6 Select the /alcatel/var/maintenance/failure/ directory for the OMC-R and the


/var/log/secured/ directory for the OMCP board.
....................................................................................................................................................................................................................................
7-26 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures File Transfer to 9153 OMC-R
Tool Collecting On-Demand Traces/Logs
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

7 To transfer specified files, drag the files from the OMCP board side and drop them on the
OMC-R side.
...................................................................................................................................................................................................

8 From the toolbar, click on to disconnect from the first OMCP board.
E...................................................................................................................................................................................................
N D O F S T E P S

File transfer from second OMCP board


...................................................................................................................................................................................................

1 In Host, type the external IP address of the second OMCP board.


...................................................................................................................................................................................................

2 In User, type mxadmin and in Pass, type the corresponding password.


...................................................................................................................................................................................................

3 In Port, type 22.


...................................................................................................................................................................................................

4 Select SSH2 as the file transfer protocol.


...................................................................................................................................................................................................

5 From the toolbar, click on to connect to the second OMCP board.


...................................................................................................................................................................................................

6 Select the /alcatel/var/maintenance/failure/ directory for the OMC-R and the


/var/log/secured/ directory for the OMCP board.
...................................................................................................................................................................................................

7 To transfer specified files, drag the files from the OMCP board side and drop them on the
OMC-R side.
...................................................................................................................................................................................................

8 From the toolbar, click on to disconnect from the second OMCP board.

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 7-27
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Software Procedures File Transfer to 9153 OMC-R

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
7-28 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
8 Upgrade Firmware
8

Overview
Purpose
This section describes all the necessary operations for remote, online and from the BSC
terminal to perform firmware upgrades for the 9130 BSC Evolution.

Contents

How to Upgrade Firmware and Payloads 8-3


Description 8-3
Upgrade Shelf Manager Firmware 8-5
How to Upgrade Shelf Manager Firmware 8-5
SSW Firmware Upgrade 8-9
How to SSW Firmware Upgrade 8-9
Upgrade MUX and TP Firmware 8-12
How to Upgrade MUX and TP Firmware 8-12
Upgrade MUX Firmware 8-13
Upgrade TP Firmware 8-14
How to Upgrade TP Firmware 8-14
Upgrade OMCP Firmware 8-16
How to Upgrade OMCP Firmware 8-16
Upgrade CCP Firmware 8-18
How to Upgrade CCP Firmware 8-18
Upgrade PEM, FAN, PC Firmware 8-21
How to Upgrade PEM, FAN, PC Firmware 8-21
Upgrade PEM, FAN and PC Firmware 8-22

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-1
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Overview

....................................................................................................................................................................................................................................

Upgrade PEM Firmware 8-24


Upgrade FAN Firmware 8-26
Upgrade PC(A100) Firmware 8-28

....................................................................................................................................................................................................................................
8-2 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Description
How to Upgrade Firmware and Payloads
....................................................................................................................................................................................................................................

How to Upgrade Firmware and Payloads

Description
Overview
Use this scenario to upgrade to different firmware and payloads for a 9130 BSC
Evolution.
Firmware upgrade procedure is simple and easy, is triggered by operator upon reception
of alarms "FIRMWARE-NOT-UP-TO-DATE". This is possible because the firmware
packages are part of the BSS package.
Note: The Power Entry Module (PEM) defines the SBL mapped on the JBXPS
module from the ATCA shelf.
The following table lists the types of boards and the firmware to be upgraded.

Firmware on FRU IPMC FW Payload BIOS NE1oE


(IPMI SW)
SMM (M100) Yes Yes No No
SSW (F300) Yes Yes No No
OMCP/CCP (F715) Yes No Yes No
PEM Yes No No No
FAN Tray Yes No No No
PC (A100) Yes No No No
TP Yes No No Yes
MUX No No No Yes

There are two methods to upgrade the firmware for the BSC boards listed above:
From the BSC Terminal; for more information, see Check / Upgrade Firmware from
the 9130 BSC Evolution Terminal User Guide.
From the OMC-R / PC NEM
Firmware upgrade action is executed manually by the operator, one by one, and more
than one upgrade action in parallel is forbidden.
The standby board is upgraded first, followed by the active one. Firmware upgrades
are performed only when the BSC is stable (under IT).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-3
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Description
How to Upgrade Firmware and Payloads
....................................................................................................................................................................................................................................
FAN, PEM and PC are exceptions, and can be upgraded in one of the following ways:
Individually, board by board
All PEM or all FAN or all PC
All PEM and all FAN and all PC.
If the following actions are ongoing, firmware upgrades are forbidden:
SWR is ongoing
Other board is under firmware upgrade; this also includes the TP/NE1OE
firmware upgrade
BSC reset is ongoing
IPMB has some problems (FATAL-HW-FAILURE alarm is reported on the
OMC/BSC terminal).
Attention: Shelf manager (SMM) must be the first boards to be upgraded, followed
by (SSW), and then automatically by the MUX boards. When the SMM, SSW, and
MUX are upgraded, the firmware upgrade for the remaining boards (TP, OMCP, CCP,
PEM, FAN, PC) can be performed.

....................................................................................................................................................................................................................................
8-4 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade Shelf Manager Firmware
Upgrade Shelf Manager Firmware
....................................................................................................................................................................................................................................

Upgrade Shelf Manager Firmware

How to Upgrade Shelf Manager Firmware


Overview
The firmware upgrade procedure can be performed only if the board is in IT or FIT. From
the OMC-R or BSC terminal, check board status.

Check Shelf Manager Status


Check SMM status and upgrade:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Open a telnet session on the shelf manager.


To do so:
Access SHMC1 by:
telnet 172.17.y.8
Access SHMC2 by:
telnet 172.18.y.9

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-5
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade Shelf Manager Firmware
Upgrade Shelf Manager Firmware
....................................................................................................................................................................................................................................
Where:
y is 3 for ATCA shelf 3
y is 4 for ATCA shelf 4
...................................................................................................................................................................................................

3 Enter the username and password.


Enter:
Username:
root
Password:
root
...................................................................................................................................................................................................

4 Check the SMM status:


sv_status
If the SMM is standby, the output is as follows:
get status-> openhpid on (localhost:5566)
openhpid is standby
If the SMM is active, the output is as follows:
get status-> openhpid on (localhost:5566)
openhpid is active
If the SMM is running and the other one is unavailable, the output is as follows:
get status-> openhpid on (localhost:5566)
openhpid is running alone
Write down the current status of the SHMC1 and SHMC2, which is needed at the next
step.
...................................................................................................................................................................................................

5 Disconnect from the SHMC and connect on the active OMCP with the root account:
exit
su
<root password>
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
8-6 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade Shelf Manager Firmware
Upgrade Shelf Manager Firmware
....................................................................................................................................................................................................................................
Upgrade Shelf Manager
...................................................................................................................................................................................................

1 Locate to the firmware upgrade directory:


cd /usr/local/fw_upgrade/script
...................................................................................................................................................................................................

2 Upgrade the current standby shelf manager:


./fw_upgrade.sh -t m100 s y
Where y is:
1 if standby SHMC is SHMC1
2 if standby SHMC is SHMC2
The firmware upgrade script finishes with following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen; correct errors
accordingly.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will automatically reset
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately five minutes until it becomes IT/FIT.
E...................................................................................................................................................................................................
N D O F S T E P S

Check Firmware Upgrade Result


...................................................................................................................................................................................................

1 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
the firmware upgrade is OK.
...................................................................................................................................................................................................

2 Upgrade firmware for the second SMM. Perform a SMM takeover.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-7
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade Shelf Manager Firmware
Upgrade Shelf Manager Firmware
....................................................................................................................................................................................................................................
Use one of the following methods:
From the active OMCP:
cd /usr/local/fw_upgrade/script/
./mx_shelfmanagerTakeOver.sh
From the OMC-R/BSC terminal, reset the active shelf manager.
...................................................................................................................................................................................................

3 Wait until the takeover action is finished and perform Step 2 to Step 1 for the new
standby board.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
8-8 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to SSW Firmware Upgrade
SSW Firmware Upgrade
....................................................................................................................................................................................................................................

SSW Firmware Upgrade

How to SSW Firmware Upgrade


Overview
The firmware upgrade procedure can be performed only if the board is in IT or FIT. From
OMC-R or BSC Terminal, check board status.
To upgrade the standby SSW, a remote connection for firmware upgrade must be
performed via the active SSW. Ensure that the SSW under upgrade is the standby board.

Check Shelf Manager Status


Check SSW status and upgrade:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Check remote connection to determinate which SSW is active from O&M point of view,
which SSW is carrying MXBSC O&M IP address:
ifconfig

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-9
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to SSW Firmware Upgrade
SSW Firmware Upgrade
....................................................................................................................................................................................................................................
A list of IP addresses is displayed:
If the active OMCP virtual IP address 172.16.33.1 is linked with eth0:5, it means
remote SSW1 is active from O&M point of view
If the active OMCP virtual IP address 172.16.33.1 is linked with eth1:5, it means
remote SSW2 is active from O&M point of view.
...................................................................................................................................................................................................

3 Determine if the SSW carries internal NE1oE traffic.


Use one of the following methods:
From OMC-R->BSSUSM, check which MUX is active.
To do so:
If MUX1 is active(a), the corresponding SSW1 is active from the telecom point of
view
If MUX2 is active(a), the correspondent SSW2 is active from the telecom point of
view.
From the local BSC site (if the OMC-R is not available), check which MUX has the
ACT LED started. The corresponding SSW is active from a telecom point of view.
...................................................................................................................................................................................................

4 If the following conditions are fulfilled:


You must:
SSW1 O&M active, SSW1 Telecom Active => perform firmware upgrade on SSW2;
see Step 5
SSW1 O&M active, SSW2 Telecom active => reset SSW2 and then perform firmware
upgrade on SSW2; see Step 5
SSW2 O&M active, SSW2 Telecom active => perform firmware upgrade on SSW1;
see Step 5
SSW2 O&M active, SSW1 Telecom active => reset SSW1 and then perform firmware
upgrade on SSW1; see Step 5.
...................................................................................................................................................................................................

5 Perform a firmware upgrade on the standby board:


cd /usr/local/fw_upgrade/script
./fw_upgrade.sh -t f300comp s y
Where y is:
1 if the active SSW is SSW2
2 if the active SSW is SSW1
The firmware upgrade script finishes with the following messages:
The firmware upgrade is successful if the following message is displayed:

....................................................................................................................................................................................................................................
8-10 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to SSW Firmware Upgrade
SSW Firmware Upgrade
....................................................................................................................................................................................................................................
whole firmware upgrade success!
The firmware upgrade failed if the following message is displayed:
whole firmware upgrade fail!
In the second case, the system prints the error description on the screen. Please follow
the instructions.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will automatically reset
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately five minutes until it becomes IT/FIT.
E...................................................................................................................................................................................................
N D O F S T E P S

Check Firmware Upgrade Result


...................................................................................................................................................................................................

1 Check if the new firmware is activated.


From the BSC terminal or the OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE
alarm is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the board is IT/FIT, the
firmware upgrade is OK.
...................................................................................................................................................................................................

2 Perform a firmware upgrade for the second SSW.


From the OMC-R or BSC terminal, reset the active SSW (Telecom and O&M active SSW
is known from previous tasks).
...................................................................................................................................................................................................

3 Wait until the takeover action is finished and perform Step 5 to Step 1 for the new
standby board.

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-11
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade MUX and TP Firmware
Upgrade MUX and TP Firmware
....................................................................................................................................................................................................................................

Upgrade MUX and TP Firmware

How to Upgrade MUX and TP Firmware


Overview
If a firmware upgrade is necessary, perform MUX Firmware Upgrade and then TP
Firmware Upgrade or TP Firmware Upgrade and then MUX Firmware Upgrade (the
order does not matter).

....................................................................................................................................................................................................................................
8-12 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade MUX Firmware
Upgrade MUX and TP Firmware
....................................................................................................................................................................................................................................

Upgrade MUX Firmware


Procedure
If the FIRMWARE-NOT-UP-TO-DATE is displayed for a MUX board, it is necessary to
perform the MUX firmware upgrade. The MUX firmware upgrade is performed
automatically when the board is reset. The firmware upgrade can be performed only on
one board at a time.
...................................................................................................................................................................................................

1 If the FIRMWARE-NOT-UP-TO-DATE alarm is displayed for the standby MUX board,


reset it.
The FIRMWARE-NOT-UP-TO-DATE alarm is cleared for the board under reset.
The FIRMWARE-UPGRADE alarm is raised to confirm the firmware upgrade process.
Wait approximately 10 minutes for the firmware upgrade process to finish.
The FIRMWARE-UPGRADE alarm is cleared when the process is finished.
...................................................................................................................................................................................................

2 If the FIRMWARE-NOT-UP-TO-DATE alarm is displayed for the active MUX board,


reset it only if the standby MUX board is in traffic.
The FIRMWARE-NOT-UP-TO-DATE alarm is cleared for the board under reset.
The FIRMWARE-UPGRADE alarm is raised to confirm the firmware upgrade process.
Wait approximately 10 minutes for the firmware upgrade process to finish.
The FIRMWARE-UPGRADE alarm is cleared when the process is finished.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-13
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade TP Firmware
Upgrade TP Firmware
....................................................................................................................................................................................................................................

Upgrade TP Firmware

How to Upgrade TP Firmware


Procedure
If the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-DATE/TPIP-FW-NOT-
UP-TO-DATE alarm is displayed for a TP board, it is necessary to perform the TP
firmware upgrade. The TP firmware upgrade is automatically performed when the board
is reset. The firmware upgrade can be performed only on one board at a time.
...................................................................................................................................................................................................

1 If the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-DATE/TPIP-FW-NOT-
UP-TO-DATE alarm is displayed for the standby TP board, reset it.
The FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-DATE/TPIP-FW-NOT-
UP-TO-DATE alarm is cleared for the board under reset.
The FIRMWARE-UPGRADE alarm is raised to confirm the firmware upgrade process.
Wait for the firmware upgrade process to finish. If the firmware version for NE1oE, IPMI
and TPIP need to be upgraded, the process can take up to 35 minutes.
The FIRMWARE-UPGRADE alarm is cleared when the process is finished.
...................................................................................................................................................................................................

2 If the FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-DATE/TPIP-FW-NOT-
UP-TO-DATE alarm is displayed for the active TP board, reset it only if the standby TP
board is in traffic.
The FIRMWARE-NOT-UP-TO-DATE/IPMI-FW-NOT-UP-TO-DATE/TPIP-FW-NOT-
UP-TO-DATE alarm is cleared for the board under reset.
The FIRMWARE-UPGRADE alarm is raised to confirm the firmware upgrade process.
Wait for the firmware upgrade process to finish. If the firmware version for NE1oE, IPMI
and TPIP need to be upgraded, the process can take up to 35 minutes.
The FIRMWARE-UPGRADE alarm is cleared when the process is finished.
...................................................................................................................................................................................................

3 If the Firmware upgrade was not perform successfully, follow the steps below:
Check FW Upgrade Info in the Alcatel-Lucent 9130 BSC Evolution - NEM User
Guide to view the latest firmware upgrade log
Perform the necessary tasks indcated in the View Firmware Upgrade Log window.

....................................................................................................................................................................................................................................
8-14 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade TP Firmware
Upgrade TP Firmware
....................................................................................................................................................................................................................................
Note: If the firmware upgrade also fails after this workaround, contact the
Alcatel-Lucent support team.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-15
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade OMCP Firmware
Upgrade OMCP Firmware
....................................................................................................................................................................................................................................

Upgrade OMCP Firmware

How to Upgrade OMCP Firmware


Overview
The firmware upgrade procedure can be performed only if the board is in IT or FIT. From
the OMC-R or BSC terminal, check the board status.
The firmware upgrade procedure is performed on the standby board and all commands
are given from the active OMCP.

Check OMCP Status


Check OMCP status and upgrade:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Check the OMCP status:


ps eaf |grep dhcp
The active station is the one on which the dhcp process is running.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
8-16 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade OMCP Firmware
Upgrade OMCP Firmware
....................................................................................................................................................................................................................................
OMCP Firmware Upgrade
...................................................................................................................................................................................................

1 Perform the firmware upgrade for the standby board:


cd /usr/local/fw_upgrade/script
./fw_upgrade.sh t 715 s y
Where y is:
6 if active OMCP is OMCP2 and standby OMCP is OMCP1
9 if active OMCP is OMCP1 and standby OMCP is OMCP2.
The firmware upgrade script finishes with the following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen; correct errors
accordingly.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will automatically reset
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately five minutes until it becomes IT/FIT.
...................................................................................................................................................................................................

2 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
the firmware upgrade is OK.
...................................................................................................................................................................................................

3 Upgrade firmware for the second OMCP. Perform an OMCP takeover.


Use one of the following methods:
From the OMC-R, reset the active OMCP
From the BSC terminal, reset the active OMCP.
...................................................................................................................................................................................................

4 Wait until the takeover action is finished and perform Step 1 to Step 2 for the new
standby board.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-17
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade CCP Firmware

....................................................................................................................................................................................................................................

Upgrade CCP Firmware

How to Upgrade CCP Firmware


Procedure
Attention: Firmware upgrade must be performed only on the standby CCP board.
Ugrade the CCP firmware:
...................................................................................................................................................................................................

1 From the BSC terminal or OMC-R, check the CCP status (active/standby).
...................................................................................................................................................................................................

2 Connect to the active OMCP.


You must:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locall, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel

E...................................................................................................................................................................................................
N D O F S T E P S

CCP Firmware Upgrade


...................................................................................................................................................................................................

1 Perform the firmware upgrade:


cd /usr/local/fw_upgrade/script
./fw_upgrade.sh t 715 s y

....................................................................................................................................................................................................................................
8-18 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade CCP Firmware
Upgrade CCP Firmware
....................................................................................................................................................................................................................................
Where y is the physical slot number:
5 if standby CCP is CCP5
10 if standby CCP is CCP10
4 if standby CCP is CCP4
11 if standby CCP is CCP11
3 if standby CCP is CCP3
12 if standby CCP is CCP12
13 if standby CCP is CCP13
14 if standby CCP is CCP14
The firmware upgrade script finishes with following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen. Correct errors
accordingly.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will automatically reset
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately five minutes until it becomes IT/FIT.
...................................................................................................................................................................................................

2 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
the firmware upgrade is OK.
...................................................................................................................................................................................................

3 Upgrade the firmware for the next CCP. Perform a CCP takeover.
Use one of the following methods:
From the OMC-R, reset the active CCP
From the BSC terminal, reset the active CCP.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-19
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade CCP Firmware
Upgrade CCP Firmware
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

4 Wait until the takeover action is finished and perform Step 1 to Step 2 for the new
standby board.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
8-20 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware How to Upgrade PEM, FAN, PC Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................

Upgrade PEM, FAN, PC Firmware

How to Upgrade PEM, FAN, PC Firmware


Overview
Note: The Power Entry Module (PEM) defines the SBL mapped on the JBXPS
module from the ATCA shelf.
The PEM, FAN, PC can be upgraded as follows:
The PEM, FAN and PC are upgraded together; refer to Upgrade PEM, FAN and PC
Firmware (p. 8-22)
Note: This procedure only works if the BSC is equipped with four FANs, four PEMs
and two PCs.
OR
PEM upgraded individually or together; refer to Upgrade PEM Firmware (p. 8-24)
FAN upgraded individually or together; refer to Upgrade FAN Firmware (p. 8-26)
PC upgraded individually or together; refer to Upgrade PC(A100) Firmware
(p. 8-28).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-21
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade PEM, FAN and PC Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................

Upgrade PEM, FAN and PC Firmware


Procedure
Upgrade the PEM, FAN and PC firmware:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Upgrade firmware for all PEM, FAN and PC boards:


cd /usr/local/fw_upgrade/script
./fw_upgrade.sh -t pemfana100 -s all
The firmware upgrade script finishes with following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen. Correct errors
accordingly..
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
The firmware upgrade takes approximately 35 minutes to complete.

....................................................................................................................................................................................................................................
8-22 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade PEM, FAN and PC Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

3 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
the firmware upgrade is OK.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-23
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade PEM Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................

Upgrade PEM Firmware


Procedure
Note: The Power Entry Module (PEM) defines the SBL mapped on the JBXPS
module from the ATCA shelf.
Upgrade the PEM firmware:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Perform the firmware upgrade.


Use one of the following methods:
Board by board:
cd /usr/local/fw_upgrade/script
./fw_upgrade.sh t pem s y
Where y is:
1 for PEM 1
2 for PEM 2
3 for PEM 3
4 for PEM 4
All boards:
cd /usr/local/fw_upgrade/script
./fw_upgrade.sh -t pem -s all

....................................................................................................................................................................................................................................
8-24 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade PEM Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................
The firmware upgrade script finishes with following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen. Correct the errors
accordingly.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will reset automatically
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately five minutes until it becomes IT/FIT.
...................................................................................................................................................................................................

3 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
the firmware upgrade is OK.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-25
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade FAN Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................

Upgrade FAN Firmware


Procedure
Upgrade FAN firmware:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Perform the firmware upgrade.


Use one of the following methods:
Board by board:
cd /usr/local/fw_upgrade/script
./fw_upgrade.sh t fan s y
Where y is:
1 for FAN 1
2 for FAN2
3 for FAN 3
4 for FAN4
All boards:
cd /usr/local/fw_upgrade/script
./fw_upgrade.sh -t fan -s all

....................................................................................................................................................................................................................................
8-26 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade FAN Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................
The firmware upgrade script finishes with following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen. Correct the errors
accordingly.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will automatically reset
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately one minute until it becomes IT/FIT.
...................................................................................................................................................................................................

3 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
firmware upgrade is OK.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-27
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade PC(A100) Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................

Upgrade PC(A100) Firmware


Procedure
Upgrade the PC(A100) firmware:
...................................................................................................................................................................................................

1 Connect to the active OMCP.


To do so:
From the OMC-R:
ssh <BSCIP> l mxadmin
Password:
mxadmin
Change to the account:
root
su
<root password>
Locally, from the NEM PC, open a telnet session on the active OMCP:
telnet 172.17.33.1
Type the username:
root
Type the password:
alcatel
...................................................................................................................................................................................................

2 Perform the firmware upgrade.


Use one of the following methods:
Board by board:
cd /usr/local/fw_upgrade/script
./fw_upgrade.sh t a100 s y
Where y is:
1 for A100 number 1
2 for A100 number 2
All boards:
cd /usr/local/fw_upgrade/script
./fw_upgrade.sh -t a100 -s all
The firmware upgrade script finishes with the following contents:
Firmware upgrade is successful if:
whole firmware upgrade success!
Firmware upgrade failed if:

....................................................................................................................................................................................................................................
8-28 Alcatel-Lucent 9130 BSC
9YZ-03803-1240-PCZZA B12
Issue 5 July 2012
Upgrade Firmware Upgrade PC(A100) Firmware
Upgrade PEM, FAN, PC Firmware
....................................................................................................................................................................................................................................
whole firmware upgrade fail!
In this case, the system prints the error descriptions on the screen. Correct the errors
accordingly.
Note: If the firmware upgrade also fails after this workaround, contact Alcatel-Lucent
team support.
If the firmware upgrade process was launched, the target board will automatically reset
after the firmware upgrade finishes, regardless of success or failure.
Wait approximately five minutes until it becomes IT/FIT.
...................................................................................................................................................................................................

3 Check if the new firmware is activated.


From the BSC terminal or OMC-R, check if the FIRMWARE-NOT-UP-TO-DATE alarm
is still present on the upgraded board.
If there is no FIRMWARE-NOT-UP-TO-DATE alarm after the blade is IT/FIT, it means
the firmware upgrade is OK.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC 8-29