SREX POWER INDIA PVT. LTD.

PRE-COMMISSIONING REPORT OF
CURRENT TRANSFORMER

1.0 EQUIPMENT DETAILS:

MAKE :

TYPE :

RATING :

HSV :

STC :

YEAR OF MFG :

SR. No. R - PHASE :


Y - PHASE :
B - PHASE :

2.0 SECONDARY DATA

CORE RATIO BURDEN CLASS


CORE-1
CORE-1

3.0 CHECK LIST BEFORE ELECTRICAL TESTING

Sr. No. DESCRIPTION

Page 1 of 8
SREX POWER INDIA PVT. LTD.

PRE-COMMISSIONING REPORT OF
CURRENT TRANSFORMER

EQUPIMENT IS CLEANED AND FREE FROM DUST / DIRT FOREI


1 MATERIALS ETC.

EQUIPMENT IS FREE FROM ALL VISIBLE DEFECTS ON PHY


2 INSPECTION

CHECK CT TANK HAS BEEN PROVIDED WITH DOUBLE EARTH


3 TANK CT's)

4 CHECK THAT CT JUNCTION BOX IS EARTHED


5 ALL NUTS AND BOLTS ARE TIGHTENED
6 CHECK TIGHTNESS OF TERMINAL CONNECTOR
7 ALL FITTINGS AS PER OUT LINE GENERAL ARRANGEMENT
8 LEVELLING AND ALIGNMENT OF STRUCTURE IS CHECKED
CHECK PRIMARY POLARITY OF CT,S ERECTED AS PER REL
9 DRAWING.

CHECK THE OIL LEVEL AND LEAKAGE THROUGH ANY JOIN


10 TERMINALS

11 CHECK OIL LEVEL IS PROPER ON TOP CHAMBER GAUGE GL


ALL THE CABLE IDENTIFICATION TAGS PROVIDED AND ALL C
12 PROVIDED WITH IDENTIFICATION FERRULES AT M.B.

WIRING CONTINUTI CHECKED FROM ALL CT,S TO CT MB AND


13 RELAY PANEL

4.0 PRIMARY INSULATION RESISTANCE MEASUREMENT

BETWEEN TERMINALS
R-PH
PRIMARY TO EARTH
PRIMARY TO CORE-1

Page 2 of 8
SREX POWER INDIA PVT. LTD.

PRE-COMMISSIONING REPORT OF
CURRENT TRANSFORMER

5.0 SECONDARY INSULATION RESISTANCE MEASUREMENT

BETWEEN TERMINALS
R-PH
CORE-1 TO EARTH

6.0 SECONDARY WINDING RESISTANCE MEASUREMENT

SECONDARY TERMINALS
R-PH

CORE-1 1S1 and 1S2 ]

7.0 POLARITY TEST


USE 9V BATTERY ( P1 Positive and P2 Negative)
Check for Positive deflection in secondary
CORE BETWEEN R-PH
CORE-1 1S1 (+VE) 1S2 (-VE)

8.0 CURRENT RATIO TEST

PRIMARY INJECTION THROUGH PRIMARY INJECTION KIT AT PRIMARY TERM


MEASURE CURRENT ON THE SECONDARY TERMINALS

CURRENT RATIO/ TAPPING TERMINALS USED


INJECTED IN
PRIMARY (A) R-PH

Page 3 of 8
SREX POWER INDIA PVT. LTD.

PRE-COMMISSIONING REPORT OF
CURRENT TRANSFORMER

25 1S1 TO 1S2
50 1S1 TO 1S2

9.0 REMARKS

TESTED BY
SIGNATURE :
NAME :
ORGANISATION : SREX POWER INDIA PVT.LTD.

Page 4 of 8
DOC NO. :
PROJECT :
PLANT/AREA :
CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :

ALF/ISF V k(min) Rct at 75*c Iex at Vk/4

STATUS REMARK
YES NO RECORD DEFICIENCIES, IF ANY
Page 5 of 8
DOC NO. :
PROJECT :
PLANT/AREA :
CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :

T / DIRT FOREIGN

ECTS ON PHYSICAL

OUBLE EARTHING (DEAD

RANGEMENT DRAWING
S CHECKED
D AS PER RELEVANT

UGH ANY JOINTS / SEC.

ER GAUGE GLASS
ED AND ALL CORES ARE
M.B.

O CT MB AND UP CONTROL

VALUES MEASURED IN MEGA OHMS


R-PH Y-PH B-PH

Page 6 of 8
DOC NO. :
PROJECT :
PLANT/AREA :
CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :

VALUES MEASURED IN MEGA OHMS


R-PH Y-PH B-PH

Atm. Temp. :

VALUES MEASURED IN OHMS

R-PH Y-PH B-PH

R-PH Y-PH B-PH

IMARY TERMINAL P1 - P2

CURRENT MEASURED IN SECONDARY (A)

R-PH Y-PH B-PH

Page 7 of 8
DOC NO. :
PROJECT :
PLANT/AREA :
CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :

APPROVED BY
SIGNATURE :
NAME :
ORGANISATION :

Page 8 of 8