LNG Containment Designs

CONCH1

Technigaz 1

Technigaz II
Gaz Transport II
Moss Rosenberg I
Carriage of LNG Cargos

This deals mainly with the carriage of LNG cargoes although some reference is given to
other types,

Cycle of Operations
Typically, the sequence starting from drydock and containing one loaded voyage
and then returning to drydock would be;
o Inerting
o Drying
o Cooldown
o Loading
o Loaded passage
o Discharge
o Warm up
o Inerting
o Gas freeing
This pattern differs from normal trading in that once cooldown has been achieved it is
normal to maintain tank temperatures as low as practical by keeping a 'heel' or small
quantity of liquid in the tank. This quantity is normally initially purchased by the ship
owner or charterer.

Inerting
This involves the reduction of oxygen in the atmosphere within the tank sufficiently to
prevent combustion.
There are two main methods of inerting;
o Displacement of atmosphere with nitrogen
o Displacement of atmosphere with inert gas supled from inert gas generator

Nitrogen
Requires supply from a shore facility of tender vessel. Liquid nitrogen is passed first
through a vaporizer then through a heater.
The gas is passed through the liquid header to the bottom of the tanks. The upward flow
exits through the vapour line to atmosphere.

The vaporizer takes the form of a steam heated matrix heater. a gas detector may be fitted
to the condensate drains from this heater to check for leaks. Alternately manual
measurements may be taken on a routine basis.

The nitrogen is maintained at a temperature 10 to 15'C below the temperature of the


atmosphere in the tank. This gives good stratification and reduces mixing allowing for a
much more efficient inerting process

The tank pressure is adjusted by control of the liquid header isolating valves to the tank.

Inert gas
May be from boiler uptake, from onboard IG generator or from tender vessel. The former
is the least favorable due to the poor quality of the gas.

Drying
The gas used for inerting contains moisture. Large drying plants may be used to dry this
gas, alternately, warmed methane may be used.

The methane is pumped from shore facility to the vessels liquid header then via the
bypass line to the spray line and on to the vaporizer.
The gas is heated and sent to the tanks via the vapour header.

The gas in the tanks is drawn out via the liquid loading lie by the compressors and return
to shore via the vapour return or to the for'd mast riser. The latter is frowned upon due to
atmospheric and safety concerns.

The limit for the temperature of the gas is governed by the tank insulation.
The dew point of the exit gas is checked and drying stopped when desired dew point and
100% CH4 is achieved.

Cooldown
The cooldown process is required to ensure that excessive boil off, thus over
pressurisation, is prevented during cargo loading. This procedure is performed before
each loading operation.

Cooldown is achieved by supplying liquid CH4 to the spray headers. The spray enters the
tank via distribution grids and may be directed to various levels as required. Boil off
vapour is passes to the high duty compressors back to shore via the vapour line.

Boil off occurs during loading of LPG cargos, whether this is passed to shore via the
vapour line or must be liquified on board is very much dependent on the shore facility.
Generally shore facilities much prefer it to be done on board ship therefore the
liquifaction plant must be maintained in top condition.

Heat must be extracted from both the primary barrier and the insulation. Cooldown rates
of 30 - 40'c per hour correspond to an overall rate of 8-10'C including the insulation and
secondary barrier.

When a liquid level is detected in the bottom of the tank then the cooldown process is
considered to be complete. Primary insulation and secondary barrier temperatures should
be measured at -80 to -100'C

Tank pressure is maintained by use of the compressors and by varying the flow of liquid
to the spray headers.

Cooling the tanks will lead to a drop in pressure in the inter barrier space. Nitrogen
should be introduced as required. Test for methane in the barrier gas should be
carried out during this procedure to ensure no leakage.

Loading
Before commencing loading the flow from shore used for cooldown is initially reduced.

The liquid loading line to each tank is opened, the spray shut down. As the liquid
vaporisers in the header it is drawn out via the vapor line and return to shore.

Depending of the lie of the liquid in the header the tanks are isolated in sequence to
ensure each loading line is cooled.

Loading takes place using normal safe working practices. That is,slow start building up
gradually to full rate. Tank pressures are monitored, the capacity of the compressors to
return vapour to shore governs the maximum load rate.
Ballasting takes place with loading. Great care must be taken with some designs of LNG
carriers due to the 'L' shape of the ballast tank.The vertical section (sometime called the
'pipe') empties vary rapidly and has a large effect on the metacentric height.

Emergency Shut Down Systems-A formal of shut down is agreed with shore side
facility sometimes taking the form of a remote stop placed on the vessel. Due to the
potential damage caused by shutting a valve against a flow of liquid the shut down this
takes the form of programmed sequence of events with timed parameters.

On completion of loading, the high duty compressors are stopped and the vapour line is
disconnected. Once the tank pressure starts to rise it will be necessary to commence gas
burning in the boilers, starting the low duty compressor and bringing into the use the
steam dump system as required until the vessel sails.

Loaded passage
During the loaded passage a quantity of the Cargo will boil off removing heat that has
leached past the insulation. This gas is used in the propulsion plant as fuel. Although
progress has been made with fitting gas burning gear to large diesel plants , the vast
majority of LNG tankers are steam powered.

The boil off gas is fed to the propulsion plant by a low duty compressor via a heater. The
gas pipe entering the engineroom is surrounded by a gas tight enclosure whose
atmosphere is monitored for hydrocarbons. The spaces around the burner platform are
positively ventilated and again monitored for hydrocarbons.

The gas flame in the boiler is extremely clean reducing sootblowing from a daily to a
fortnightly requirement. However, the flame is clear blue requiring either a special type
of flame detector or for a small quantity of fuel to be burnt which can be seen by normal
flame detectors.

The gas burner normally takes the form of a simple open ended pipe.

Cold spot inspection It is possible to check the integrity of the insulation during the
loaded passage by entering the cargo and cofferdam spaces and look for cold spots were
ice has formed. The ice is a very good thermal insulator and this causes the metal
underneath to cool to levels which may allow damage to occur.
For severe cold spots then warming of the metal is required. This can take the form of
wetting the surface or steam heating of the ballast.

Interbarrier spaces The inert gas in the interbarrier space is tested for hydrocarbons and
moisture. The pressure in the space is slightly below the head pressure in the tank in
membrane systems.

A test for membrane tanks during drydocking is to apply a small vacuum to the
interbarrier space and then monitoring it over a period thereby checking for leaks.
On completion nitrogen is reintroduced slowly. I know one case were this gas was
allowed to build up to an extent that the membrane 'blew' off the wall at huge cost. The
C/E, a recipient of an MBE became known as the Membrane Busting Engineer

Inducing Boil off -When the LNG cargo is first loaded generally it is supercooled. On
sailing very little boil off is experienced for a period which may extend to a few days. It
is in the operators, though obviously not the charters, interest to bring on the amount of
boil off as this will drastically reduce fuel oil consumption. The author has sailed on liner
trade vessels which are capable of operating from discharge to next discharge only
burning fuel oil when gas burning is ceased during cargo operations.

There are practices, although not good ones, available to the Marine Engineer to induce
the boil off of the gasses. Two of which are;
On first sailing the ships is run at flat out creating hull vibrations. This shakes the cargo
and frees gas bubbles trapped within.
Reducing the LP compressor suction pressure below the minimum set by the charterer.
This can have the effect of creating a stable supercooled layer on the cargo. Therefore it
may be necessary to give the cargo a little 'shake'.

There are other methods but these two are the most common and simplest to carry out,
the author can vouch for there efficacy having seen them in action many times. It should
be noted that inducing boil off is severely frowned upon by charter parties.

Entering Port

Before entering ports it will be necessary to resume fuel oil burning. In addition the
propulsive load will be reduced. This may cause tank pressures to begin to rise due to
insufficient boil off gas being burnt. Steam vessels are fitted with large steam dump
facilities which allow steam to be dumped to a condenser increasing boiler load.

It should be noted that the majority of countries and/or port authorities will not allow
venting with port limits for obvious reasons.

Discharge
The Liquid header is cooled down before arrival whilst still gas burning. To do this a
spray pump is started filling the spray line then the liquid header via the cross-over. Boil
off and excess liquid flow back to the tank via the branch pipe.

Cargo Pumps-Before starting the cargo pumps and electrical cables are megger tested.

The pumps are started sequentially against shut discharge valve. After starting the valves
are slowly opened to prevent surging.

Rollover
Rollover is a major concern for shore based installations. The constant motion of a vessel
plus the relatively high cargo turnover rate means that this is less of a problem.

The upper layer of the cargo remain cool due to evaporation. The lower layers gradually
warm by heat transfer.

Rollover may occur withe lighter more bouyant lower layer rapidly moving to the top
replacing the heavier cooler layer whcih falls to the bottom. This warm layer is now
exposed to lower pressure and rapid boiling occurs which can lead to over pressurisation
and extensive damage. This a very serious occurrence.

When loading mixed LPG cargo the warmer cargo should be loaded first which reduces
the amount of evaporation.

Liquified Gas Cargoes

The following are petroleum and Chemical products which are gases at normal
temperatures and pressures but carried as a liquid by means of Refrigeration,
pressurisation or a combination of both.
Saturated Hydrocarbons(Alkanes)- stable and unreactive, tend to
come in unpure state with some degree of contamination
Methane CH4 -161.6'C
LNG
Ethane C2H6 -88.6'C
Propane C3H8 -42'C
LPG
Butane C4H10 -0.5'C
Unsaturated Hydrocarbons-reactive and unstable. Polymerise
(solidify) when come into contact with air
Ethylene C2H2 -103.7'C
Propylene C3H6 -47.7'C
Butylene C4H8 -6.9'C
Butadiene C4H6 -4.5'C Highly reactive, a
chemical inhibitor
must be added to
allow it to be
transferred
Chemical Cargoes- very reactive,made very pure
COnsidered to be
Ammonia NH3 -33.4'C inflammable
although it will burn
VInyl Chloride Monomer This is the basis of
C2H3Cl -13.8'C
VCM) PVC
Extremely
Ethylene Oxide C2H4O +10.7'C
Flammable

Alkanes
These are saturated hydrocarbons with the formula CnH2n+2. All above are gasses at
normal temperatures and pressures, Pentane, Hexane etc are liquid under normal
conditions. Butane and above may occur as isomers

(look for the longest chain then count the number of Methane [methyl] like pairs

Odorisers
Ethyl-Mercapton C2H5SH is one of the additives added to normally odourless methane
and others before it is distributed to make detection easier

Alkenes
These are unsaturated hydrocarbons with the formula CnH2n. There is no equivalvent to
methane.
Inhibitors
alkenes can react when you don't want them to . They polymerise to form one single long
molecule. Inhibitors are put in to prevent the double bond acting

Gas Vapours
If a liquid is placed in a vacuated container,then high energy molecules will leave the
liquid. These molecules, traveling at high speed (600- 700 km/h) will strike the surfaces
of the container and exert a measurable pressure.

At some point the amount of molecules leaving the liquid should exactly equal the
number returning. This is called the vapour pressure. If the liquid is heated the number of
molecules with sufficient energy to break free is increased and hence a greater presure is
exerted.

it can be seen that very little temperature rise is required to increase the pressure. As
vapour and liquid are carried, the cargo must be carried on the vapour pressure line

LNG reliquifaction
Traditionally, LNG carriers have used the boil off from cargo as fuel for the propulsion.
This led to the use of steam plant as the preferred method as the combustion of this gas is
simpler. In addition the steam plant gives the option to safely deal wih excess boil off of
gas during pasage or arrival in port without the need to resort to venting.

The use of duel fuel burning diesel engines is becoming more in favour thus requiring
alternative methods to deal with the excess boil off.

One method is reliquifaction commonlu seen in LPG shps but previously not sen in LNG
due to the very low saturation temperatures of LNG

Reliquifaction process

This generally takes the form of seperate reliquifaction and refrigeration units. The
system uses Nitrogen as the refrigerant in the reverse Brayton cycle; a version of the
cascae system in which several stages ( normally 4) operate in series with the LNG. The
final stage is a turbo expander in which the energy of the Nitrogen is used to power the
expander stage. Thus with the removal of energy from the nitrogen in the form of work
the temperature is low enough to liquify the LNG.

The entire asembly my be either totally enclosed in insulation with repairs only to be
carried out at predetermined times. Or it may be enclosed in an insulated work house

It should be noted that hgh levels of nitrogen in the cargo can have a serious effect on the
viability of reliquifaction

The power absorbed by this unit is high thus ony recent increases in cargo prices has
made it economically viable. A high voltage distribution system is required