RELAY TEST REPORT

DATE 13/09/2017 PAGE 1

AMBIENT TEMP. F JOB #

SUBSTATION GTG-1 HUMIDITY % ASSET ID F34

POSITION TEST STATUS

EQUIPMENT LOCATION

Counter Clockwise Rotation 0-360 Lead


MANUFACTURER DATA
MANUFACTURER ABB MODEL RET316*4 SERIAL NUMBER HE701813-50/4
DEVICES OPERATED RK A PT RATIO 33 kV : 110 V

INSTRUCTION BOOKLET

34.5 kV 11 kV
45 MW
1,000 :1 A 3,200 :1 A

753.066 A 2,361.89 A
I0 elimination
YNd1 (disabled)
0.753 A 0.738 A

Single Phase Interposing CTs Single Phase


1.00 1.73
Pickup Factor Pickup Factor

Use I1,I2,I3 Use I4,I5,I6

Pickup 0.3 PU Pickup Tolerance 30 % Slope Through Origin

Trip Time 150 ms Trip Time Tolerance 30 % + 50 ms IBias Equation (|Ip| + |Is|)

Prefault Level 100 % Simulate Breaker NO Unrestrained Pickup 8

Prefault Time 500 ms Use Reference Voltage NO Slope IBias (p.u.) Gradient (%)
1 0.63 50
Off Delay 50 ms
2 1.5 50
Through Fault 100 % Harmonic Tolerance 30 %
2nd Harmonic Content 15 % Harmonic Ramp Mode Ramp To No Operate
Fault Duration 500 ms Nth Harmonic Content 30 % 5th
Nominal Current Protected Object
Nameplate Format IEC

TEST EQUIPMENT USED: FREJA406 (SN201304060032) TESTED BY:

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0


RELAY TEST REPORT

PAGE 2

Stabilization Test
Injected Currents Currents Observed From Relay
Phase

W1 W2 W1 W2
IBias IDiff
RMS (A) RMS (A) RMS (A) RMS (A)
0.753 0 0.738 150
R 0.000 0 0.000 0 0 0
753.06 0 2,361.8 150
0.753 240 0.738 30
Y 0.000 0 0.000 0 0 0
753.06 240 2,361.8 30
0.753 120 0.738 270
B 0.000 0 0.000 0 0 0
753.06 120 2,361.8 270

Stabilization Test Passed

Timing Test
Phase Fault Current Expected Maximum Trip Pass /
Tested % of Ibase Trip Time (s) Trip Time (s) Time (s) Fail

R 100.0 0.150 0.245 0.042 Pass

Y 100.0 0.150 0.245 0.045 Pass

B 100.0 0.150 0.245 0.042 Pass

RYB 100.0 0.150 0.245 0.039 Pass

Pickup Test
Primary Winding Secondary Winding
Phase

Pickup Percent Pickup Percent


Pickup Pickup Pass / Pickup Pickup Pass /
Setting Error Setting Error
(pu) (pu) (A) (%) Fail (pu) (pu) (A) (%) Fail

R 0.30 0.150 0.113 -50.0 Fail

Y 0.30 0.177 0.226 -41.0 Fail

B 0.30 0.354 0.400 18.0 Pass 0.30 0.171 0.219 -43.0 Fail

RYB 0.30 0.312 0.235 4.0 Pass 0.30 0.303 0.224 1.0 Pass

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0


RELAY TEST REPORT

PAGE 3

Slope Test (RYB)


Ibias Idiff W1 W2 Error Pass /
# (pu) (pu) (A) (A) (%) Fail

1 3.50 0.00 3.38 1.16 -100.0 Fail ...

Harmonic Block Test


Primary Winding Secondary Winding
Pickup = 0.113A , Tolerance = 30% Pickup = 0.111A , Tolerance = 30%
Phase

Funda- 2nd Percent Percent Funda- 2nd Percent Percent


mental Harmonic Harmonic Error Pass mental Harmonic Harmonic Error Pass
Fail Fail
(A) (A) (%) (%) (A) (A) (%) (%)

R 0.75 0.096 12.750 -15.0 Pass 0.74 0.094 12.750 -15.0 Pass

Y 0.75 0.096 12.750 -15.0 Pass 0.74 0.094 12.750 -15.0 Pass

B 0.75 0.096 12.750 -15.0 Pass 0.74 0.094 12.750 -15.0 Pass

RYB 0.75 0.096 12.750 -15.0 Pass 0.74 0.094 12.750 -15.0 Pass

Harmonic Shot Test


Harmonic Content for No Trip: 35 % Harmonic Content for Trip: 25 %

Primary Winding Secondary Winding


Fundamental Current = 0.753A Fundamental Current = 0.738A
Phase

5th 5th 5th 5th


Harmonic Harmonic Operate Harmonic Harmonic No Harmonic Harmonic Operate Harmonic Harmonic No
(A) (%) (A) (%) Operate (A) (%) (A) (%) Operate

R 0.188 25.00 Pass 0.264 35.00 Fail 0.185 25.00 Pass 0.258 35.00 Fail

Y 0.188 25.00 Pass 0.264 35.00 Fail 0.185 25.00 Pass 0.258 35.00 Fail

B 0.188 25.00 Pass 0.264 35.00 Fail 0.185 25.00 Pass 0.258 35.00 Fail

RYB 0.188 25.00 Pass 0.264 35.00 Fail 0.185 25.00 Pass 0.258 35.00 Fail