RELAY TEST REPORT

DATE 14/09/2017 PAGE 1

AMBIENT TEMP. F JOB #

SUBSTATION GTG-1 HUMIDITY % ASSET ID F34

POSITION TEST STATUS

EQUIPMENT LOCATION

Counter Clockwise Rotation 0-360 Lag


MANUFACTURER DATA
MANUFACTURER ABB MODEL REG316*4 SERIAL NUMBER HE701813-10/1
DEVICES OPERATED RK A PT RATIO 11 kV : 110 V

INSTRUCTION BOOKLET

3,200 :1 A 31.15 MW 11 kV 3,200 :1 A

1,634.95 A 1,634.95 A

0.511 A
0.511 A

Interposing CTs

Use I1,I2,I3 Use I4,I5,I6

Pickup 0.1 PU Pickup Tolerance 30 % Slope Through Origin

Trip Time 150 ms Trip Time Tolerance 30 % + 50 ms IBias Equation (|Ip| + |Is|)

Prefault Level 100 % Simulate Breaker NO Unrestrained Pickup 8

Prefault Time 500 ms Use Reference Voltage NO Slope IBias (p.u.) Gradient (%)
1 0.63 25
Off Delay 50 ms
2 1.5 25
Through Fault 100 %

Fault Duration 500 ms

Nominal Current Protected Object


Nameplate Format IEC

TEST EQUIPMENT USED: FREJA406 (SN201304060032) TESTED BY:

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0, REVISED 06/07/2015


RELAY TEST REPORT

PAGE 2

Stabilization Test
Injected Currents Currents Observed From Relay
Phase

W1 W2 W1 W2
IBias IDiff
RMS (A) RMS (A) RMS (A) RMS (A)
0.511 0 0.511 180
R 0.000 0 0.000 0 0 0
1,634.9 0 1,634.9 180
0.511 120 0.511 300
Y 0.000 0 0.000 0 0 0
1,634.9 120 1,634.9 300
0.511 240 0.511 60
B 0.000 0 0.000 0 0 0
1,634.9 240 1,634.9 60

Stabilization Test Passed

Timing Test
Phase Fault Current Expected Maximum Trip Pass /
Tested % of Ibase Trip Time (s) Trip Time (s) Time (s) Fail

R 100.0 0.150 0.245 0.037 Pass

Y 100.0 0.150 0.245 0.033 Pass

B 100.0 0.150 0.245 0.038 Pass

RYB 100.0 0.150 0.245 0.033 Pass

Pickup Test
Primary Winding Secondary Winding
Phase

Pickup Percent Pickup Percent


Pickup Pickup Pass / Pickup Pickup Pass /
Setting Error Setting Error
(pu) (pu) (A) (%) Fail (pu) (pu) (A) (%) Fail

R 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

Y 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

B 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

RYB 0.10 0.119 0.061 19.0 Pass 0.10 0.119 0.061 19.0 Pass

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0, REVISED 06/07/2015


RELAY TEST REPORT

PAGE 3

Slope Test (RYB)


Ibias Idiff W1 W2 Error Pass /
# (pu) (pu) (A) (A) (%) Fail

1 5.80 1.07 1.76 1.21 -26.0 Pass ...

COPYRIGHT 2002-2017 POWERDB, INC. www.powerdb.com Form Schema 0, REVISED 06/07/2015