ZAPATAS, Seccin de 2m X 3m, F'c = 250 kg/cm3 Vol= 18 M3 32.

96 m2
Prop./M3 Vol/Lata Vol/Total Factor/M3 Cantidad
1.5 cemento 1 saco 0.075 1.04166667 0.5688713592
4 arena 0.018 0.072 13.8888889 1 0.5461165 0.5461165049
6 grava 0.018 0.108 1.5 0.8191747573
varilla 3/4 " 232.2 0.5870752427
varilla 5/8 " 180.6 0.4566140777
Cimbra Madera pino 2a de 1" x 12" x 10 f 39.3442623 1.1936972784

DADO,Seccin de 0.80 X0.60 m, FC =250 Kg/cm2 Vol= 4.32 M3 32.96 m2


Prop./M3 Vol/Lata Vol/Total Factor/M3 Cantidad
1.5 cemento 1 saco 0.075 1.04166667 0.1365291262
4 arena 0.018 0.072 13.8888889 1 0.13106796 0.1310679612
6 grava 0.018 0.108 1.5 0.1966019417
varilla 3/4 " 51.6 0.130461165
varilla 5/8 " 51.6 0.130461165
varilla 3/8 " 322.56 0.8155339806
Cimbra Madera pino 2a de 1" x 12" x 10 f 16.5245902 0.5013528569

TRABES,Seccin de 0.40 X0.70 m, FC =250 Kg/cm2 Vol= 10.64 M3 32.96 m2


Prop./M3 Vol/Lata Vol/Total Factor/M3 Cantidad
1.5 cemento 1 saco 0.075 1.04166667 0.3362661812
4 arena 0.018 0.072 13.8888889 1 0.32281553 0.322815534
6 grava 0.018 0.108 1.5 0.484223301
varilla 3/4 " 243.37 0.6153165453
varilla 1/2" 598.5 1.5131978155
Cimbra Madera pino 2a de 1" x 12" x 10 f 37.2459016 1.1300334235

PLANTILLA, Fc. = 100 Kg/cm2, Prop. 1:5:8 Vol= 2.862 M3 57.24 m2


Factor
Prop./M3 Vol/Lata Vol/Total Factor/M3 Cantidad Factor/M2 Rendimiento
1 Cemento Saco 0.050 0.2137 0.0107
5 Grava 0.018 0.09 0.3846 0.0500 0.0192
4
8 Arena 0.018 0.144 0.6154 0.0308
ANALISIS DE PRECIOS UNITARIOS

Descripcion: Elaboracin de cimentacin de zapata aislada de 2.00


mts x 3.00 mts x 0.50 mts de peralte, con concreto de fc.= 250 Kg/cm2
con un tamao de agregado de 3/4" acero transversal en la base con
varillas de 3/4" @ 15 cm y varillas longitudinales de 5/8" @ 15 cm,
incluye armado y cimbrado.

Clave CataDescripcion Concepto Unidad Cantidad y/o Rendimiento


Materiales:
Cemento Ton 0.5689
Grava M3 0.8192
Arena M3 0.5461
Vrilla 3/4" Ml 0.5871
Varilla 5/8" Ml 0.4566
Cimbra Madera pino 2a de 1" x 1.1936972784
12" x 10 f Pza
Complementarios (Clavos, Alamb Lote 0.1076

Subtotal_Materiales

Mano de Obra:
1 Cabo de Oficios Jor
1 Oficial Albail Jor
0.1666666667
2 Ayudantes Generales Jor
1 Fierrero Jor

Subtotal_Mano de Obra

Equipo y/o Herramienta:

Herramienta Diversas Lote 0.000

Subtotal_Eqpo y/o Herrmta.

TOTAL_COSTO DIRECTO

Costo de Operacin 12%


Subtotal
Financiamiento 0.003
Subtotal
Utilidad 10%
Subtotal
SECODAM 2%
Subtotal

TOTAL_COSTO INDIRECTO

GRAN TOTAL COSTOS (DIRECTOS + INDIRECTOS)


S UNITARIOS
Unidad: M3
Cantidad: 32.96
P.U. $3,158.03

Importe Total: $104,088.78

Precio y/o CostPrecio Unitario Observaciones

2,400 1365.29 45000.00 375.000


500 409.59 13500.00 27.000
200 109.22 3600.00 18.000
27 15.73
19 8.50

140 167.12
28 3.01

$2,078.47 $62,100.00

733.29
557.95 $14,052.72 5
426.36
730.7
536.2

$2,558.14
$426.36 $14,052.72 5.42

29.88 0.01

$0.01 $0.47 0.02

$2,504.84

$2,504.84 300.58
$2,805.42
$2,805.42 9.22
$2,814.65
$2,814.65 281.46
$3,096.11
$3,096.11 61.92
$3,158.03

$653.19

$3,158.03 $104,088.78 0.16


ANALISIS DE PRECIOS UNITARIOS

Descripcion: Elaboracin de dado de desplante de seccin de


0.60 mts x 0.80 mts con 4 varillas de 3/4" de fy = 4200 Kg/cm2,
4 varillas de 5/8" de fy = 4200 Kg/cm2 y estribos de 3/8" @ 10
cm, con espesor de 2.5 cm de concreto de fc.=250Kg/cm2 con
Clave Catalogo Descripcion Concepto Unidad Cantidad y/o Rendimient
Materiales:
Cemento Ton 0.1365
Grava M3 0.1966
Arena M3 0.1311
Varillas 3/4" Ml 0.1305
Varillas 5/8" Ml 0.1305
Varillas 3/8" Ml 0.8155
Cimbra Madera pino 2a de 1" x 0.5014
12" x 10 f Pza
Complementarios (Clavos, Alamb Lote 0.1076

Subtotal_Materiales

Mano de Obra:
1 Cabo de Oficios Jor
1 Oficial Albail Jor
0.1666666667
2 Ayudantes Generales Jor
1 FIERRERO Jor

Subtotal_Mano de Obra

Equipo y/o Herramienta:

Herramienta Diversas Lote 0.002

Subtotal_Eqpo y/o Herrmta.

TOTAL_COSTO DIRECTO

Costo de Operacin 12%


Subtotal
Financiamiento 0.003
Subtotal
Utilidad 10%
Subtotal
SECODAM 2%
Subtotal
TOTAL_COSTO INDIRECTO

GRAN TOTAL COSTOS (DIRECTOS + INDIRECTOS)


OS UNITARIOS
Unidad: M3
Cantidad: 32.96
P.U. $1,214.38
Importe Total: $40,025.91
Precio y/o Costo Precio Unitario Observaciones

2,400 327.67 10800.00 90.000


500 98.30 3240.00 6.480
200 26.21 864.00 4.320
27 3.50
19 2.43
7 5.48

140 70.19
28 3.01

$536.79 $14,904.00

733.29
557.95 $14,052.72 5
426.36
730.7
536.2

$2,558.14
$426.36 $14,052.72 2.06

27.76 0.05

$0.05 $1.70 0.06

$963.20

$963.20 115.58
$1,078.79
$1,078.79 3.55
$1,082.33
$1,082.33 108.23
$1,190.57
$1,190.57 23.81
$1,214.38
$251.18

$1,214.38 $40,025.91 0.54


ANALISIS DE PRECIOS UNITARIOS

Descripcion: Elaboracin de 1 m de dala de cerramiento de seccin


de 40cm x 70cm con 5 varillas de 3/8" de fy = 4200 Kg/cm2 y estribos
de 1/4" @ 20 cm, con concreto de fc. =200Kg/cm2 revenimiento
normal de 12cm-15cm agregado mximo de 3/4" hecho en obra
Clave Catalogo Descripcion Concepto Unidad Cantidad y/o Rendimiento
Materiales:
Cemento Ton 0.3363
Grava M3 0.4842
Arena M3 0.3228
Varillas 3/4" Ml 0.6153
Varillas 1/2" Ml 1.5132
Cimbra Madera pino 2a de 1" x 1.1300
12" x 10 f Pza
Complementarios (Clavos, Alamb Lote 0.1076

Subtotal_Materiales

Mano de Obra:
1 Cabo de Oficios Jor
1 Oficial Albail Jor
0.1666666667
2 Ayudantes Generales Jor
1 FIERRERO Jor

Subtotal_Mano de Obra

Equipo y/o Herramienta:

Herramienta Diversas Lote 0.001

Subtotal_Eqpo y/o Herrmta.

TOTAL_COSTO DIRECTO

Costo de Operacin 12%


Subtotal
Financiamiento 0.003
Subtotal
Utilidad 10%
Subtotal
SECODAM 2%
Subtotal
TOTAL_COSTO INDIRECTO

GRAN TOTAL COSTOS (DIRECTOS + INDIRECTOS)


UNITARIOS
Unidad: M3
Cantidad: 32.96
P.U. $2,188.51
Importe Total: $72,133.30
Precio y/o Costo Precio Unitario Observaciones

2,400 807.04 26600.00 221.667


500 242.11 7980.00 15.960
200 64.56 2128.00 10.640
27 16.49
12 18.05

140 158.20
28 3.01

$1,309.47 $36,708.00

733.29
557.95 $14,052.72 5
426.36
730.7
536.2

$2,558.14
$426.36 $14,052.72 3.61

28.03 0.02

$0.02 $0.71 0.03

$1,735.85

$1,735.85 208.30
$1,944.15
$1,944.15 6.39
$1,950.54
$1,950.54 195.05
$2,145.60
$2,145.60 42.91
$2,188.51
$452.66

$2,188.51 $72,133.30 0.24


ANALISIS DE PRECIOS UNITARIOS

Descripcion: Elaboracin de plantilla o firme de concreto hecho en


obra de Fc. = 100 Kg/cm2 de 5 cm de espesor, incluye: suministro
afine de terreno, vaciado, tendido nivelado y acarreo hasta 20 cm de
distancia.
Clave Catalogo Descripcion Concepto Unidad Cantidad y/o Rendimiento
Materiales:
Cemento Ton 0.2137
Grava M3 0.3846
Arena M3 0.6154

Subtotal_Materiales

Mano de Obra:
1 Cabo de Oficios Jor
1 Oficial Albail Jor 0.25
1 Ayudantes Generales Jor

Subtotal_Mano de Obra

Equipo y/o Herramienta:

Herramienta Diversas Lote 0.001

Subtotal_Eqpo y/o Herrmta.

TOTAL_COSTO DIRECTO

Costo de Operacin 12%


Subtotal
Financiamiento 0.003
Subtotal
Utilidad 10%
Subtotal
SECODAM 2%
Subtotal

TOTAL_COSTO INDIRECTO

GRAN TOTAL COSTOS (DIRECTOS + INDIRECTOS)


NITARIOS
Unidad: M2
Cantidad: 57.24
P.U. $1,375.22
Importe Total: $78,717.42
Precio y/o Costo Precio Unitari Observaciones

2,400 512.82 29353.85 244.615


500 192.31 11007.69 22.015
200 123.08 7044.92 35.225

$828.21 $47,406.46

450
350 262.50 $15,025.50 14
250
$1,050.00
$262.50 $15,025.50 4.16

57.24 0.07

$0.07 $3.96 0.07

$1,090.77

$1,090.77 130.89
$1,221.67
$1,221.67 4.02
$1,225.68
$1,225.68 122.57
$1,348.25
$1,348.25 26.97
$1,375.22

$284.44

$1,375.22 $78,717.42 0.24