Professional Documents
Culture Documents
B8 A28
/7
0
/7
0
70
BY DATE SEND TO ^ QUANTITY
0
11
0/
11
43
POLLACK - GOLDISH
3
M-Y-S ARCHITECTS
B8 D28=
G. CONTRACTOR
DORON SHAHAR
ISRAEL - DAVID
AFRICA ISRAEL
ROMEPROIECT
A29
BAR - AKIVA
70
DAGESH
30
LUSTIG
Chesling without
IMS
20 25 20 25
0
/7
Rebars cut
70
45 45 D28= 26
44
3
7
Section
2
B9
38
10 Section
6
5/7 1
0
30
70
Concrete cut line
-0.06 A28 Section Section Section A29 Section
2
59
2 1 2 2
70
45
/1
0
/9 23
30
60 8
Section
3 Chesling without
Rebars cut
19
8
63
2
30
0
/9
= HARDCOPY = HARDCOPY + CAD FILE = CAD FILE
60
14
59
45
Section
B9 B8
5
Section 4
5
No. DATE DESCRIPTION BY
0- - -
24.05.17 - DESIGN DEVELOPMENT
28
D28= 1 04.06.17 CONSTRUCTION
20 20
1 28.06.17 general,concrete c35/45
109
Section -0.06
25 238 25
A28 3
0
D=28
11
58
A30
0/
5
5
10
11
10
5/
70
Section
Section
B10 2
4 X
20
-0.06 Section
447 238 145 Section 5
Section D=28
5 Section Section
4
3 1
3
40
0
/9
70
Section
60
70
Section 3
/6
2
0
0.06-
70
1:25
/
70
20
25
0
/9
General Structural Notes:
60
50
20 15
70
2 12
30
50
60
50
1. The drawings are to be read in conjunction with
109
105 82 25 485 70
30
architects and all consultants.
2. This drawing is for construction in the following
7
conditions:
22
a. Architectural approval.
5
23
b. The drawing matches the building permit
20
(approved by the site eng.)
3. The building location and orientation will be set
20
according to the architectural plans only.
30
70
4. Concrete grade C35/45.
5. Reinforcement Grades:
B10 A30 B9 - Columns Rebar's - PC 52
See
6
- Stirrups - BST 500 - C
20
- Beams & Slabs - BST 500 - C
A29 updated A29
33
Chesling without
1
Section Section Section
plan Rebars cut
70
2 1 2
on
B8 ELEVATOR
PLAN
2
0.06-
25/129
NEW BEAM -0.06 Demolition plan
1:50
20
Section 1 B8
70
20
A28
0
/7
/7
0
70
1:25
129
25 238 25
-0.06 110
0/
11
43
3
D28= 0
77
70
Detail A
30
-0.06
0
/7
70
D28= 26
44
3
7
Section
2 Section
38 1
B9 10
5/
6
70
B9 B8
C35/45
30
70
-0.06
Section 4 D=28
2
59
SCHEMATIC DESIGN
25
Section
1:25
0
2
/9
Section
23
60
DESIGN DEVELOPMENT
8
3
70
AM
BE 29
/1
1
PERMIT SET
30
EW /
N 25
23
-1.15
63
30 BID SET
2
48
0
/9
X CONSTRUCTION 2 28.06.17
C35/45
60
105 592 70 -1.15
14
Section
5
25
D=20
90 15 592 15 55 4
Section NEW Slab
5
Project Name:
AM
BE 29
1
EW25/
Section
N
25 B
25
EW
3
/1 EA
N
Section
29 M
20 20 5
Section 20 20
COTROCENI MALL
82
4
-0.06 Section
-0.06
A28 D=20 3
CHANGES 2014
10
D=28
A30
/1
NEW Slab
5
35
0
58
10
11
A29
10
5
60
5/
70
Section
70
Section Section Section Section
2 1 2
20 B10 2
4 Client:
129
-0.06 Section
20 5
D=28
Section
59
40
3 1
AFI EUROPE ROMANIA
0
/9
70
Section
60
70
1
/6
2 Section
0
Section
B1
0.06- 0.06- /9
0 A Section
0
60
/7
Section A1
70
Consultant
B
20
50
D28=
20 20 70
60
50
Section
30
30
B1
25 238 25
109
22
2
5
23
Sheet Description
Section
70
238 145 B1
30
70
D=26
25/129 Section
NEW BEAM A29 B10 B A30 B9
24
Section 1
Section 2 56
6
See
7
B2
20
File Name Job No.
1:25 updated Section B28.06.17 miflas -0.06 0937-01
33
B1
1
Current Date: Scale
plan
70
Section
70
B2 04.06.17
Section 5 on Discipline eng
67
70
/1
STRUCTURE israel
ELEVATOR
44
1:25
PLAN -0.06
Section
A Section
A1
C35/45 dwg. no. drawn
benny
1:50
LEVEL -0.06 Revision No.