You are on page 1of 6

Capstone Project Rating Sheet

Polytechnic University of the Philippines


MOCK 3 DEFENSE
San Juan Campus
Rating Sheet
Date: Time: Year and Section:

System Name:
Subsystem #1: Subsystem #2:

Group Members
Name Grade Name Grade

Grading System:
1. Individual Grade: Expressed in percentage (e.g. 95, 90, 85, 80, ) based on presentation and Q&A
2. Group Grade: Accumulated Points based on the Evaluation Criteria
5 Strongly Agree 4 Agree 3 Disagree 2 Strongly Disagree
Presentation Quality (15pts)
5 4 3 2
Information presented is logically arranged and visual aids are readable and organized.
Members can easily grasp question content and answers to questions are clear, precise,
consistent, and complete.
The group shows unity and coordination in answering questions.
System Quality (55pts)
Functionality (30pts) 5 4 3 2
The system has all the modules and features that addresses the business
need/s
The System features work according to normal flow of business
The system features work according to alternative course of actions
The system features provide correct results
The system is able to catch and notify errors on the users interaction with the
system
The system provides an end-to-end user experience in respect to business
need
Usability (25pts) 5 4 3 2
The user interface design is intuitive and user-friendly
The user interface design demonstrates easy understanding of the system
features
The system is easy to operate and control
The system facilitates the users data entry and retrieval
The system provides the information needed to boost user productivity
Project Scoping and Documentation (30pts)
5 4 3 2
The group demonstrates full understanding of the problem (All constraints and contexts are
relevant and clearly stated)
The group clearly specified the solution definition (Solution definition clearly related to needs)
The documentation is complete and correct AND presented in suitable
technical format
Documentation diagrams completely represents necessary system needs or functions
The documentation is clear, concise, meets needs of technical audience
The documentation reflects thorough understanding of the group in their study of the
current and proposed system
PANELIST: TOTAL GRADE:

____________________________ _____________________
Signature over Printed Name Date
Comments and Suggestions:
Polytechnic University of the Philippines
College Of Computer Management and Information Technology
Sta. Mesa, Manila

Capstone Project Pre-Final Defense

Objective
Evaluate the quality of software/system developed as solutions in an organization/company using the
criteria on the rating sheet: Note: The evaluation of the system/software will focus on maintenance
and transactions only
Evaluate the knowledge and understanding of the students on the system of the study
Evaluate the technical writing skills of the students

Panel Guidelines
1. Strictly follow the specified schedule. Questions shall be entertained after the presentation.
(Clarifications maybe asked during presentation.)

Setup . 5 mins
Presentation . 25 mins (10 mins PPT and 15 mins System Walkthrough)
Q&A 40 mins
Deliberation & Wrap-up... 5 mins
TOTAL 75 mins

2. Follow carefully the evaluation instrument.


Note: Please check the appropriate evaluation: 5 Strongly Agree; 4 Agree;
3 Disagree; 2 Strongly Disagree

3. Excess setup time shall be deducted from the presentation time. Unconsumed presentation time shall
be added to the Q&A.

4. Summary of Findings/Results/Recommendations in the deliberation shall be discussed with the


students.

5. NUMERIC GRADE IS REQUIRED for each group.


Group Grade: Accumulated Points based on the Evaluation Criteria

6. The panelist will also give grade to each member of the group based on presentation and Q&A.
Individual Grade: Expressed in percentage (e.g. 85, 80, 75, 70)

7. NO REDEFENSE (requirements of the panelist must be delivered by the group on the Final Defense).
8. The grades given by the panelists shall be final.
9. Panel members shall submit fully accomplished and signed rating sheet to the DIT Chairperson right
after the defense session.
BREAKDOWN OF POINTS (1 copy for the whole class)

1. PRESENTATION QUALITY (15 POINTS)

Points given will be based on how the group presents their system, reply to questions and the overall
presentation skills of each members of the group.

2. SYSTEM QUALITY (55 POINTS)


FUNCTIONALITY
The system has all the modules and features that addresses the business need/s
Business needs can be found in the following:
- Fishbone Diagram
- Problem and Requirements
System features can be found in the following:
- Traceability Matrix
- System Use Case Diagram
- Detailed Use Case Diagram
The System features work according to normal flow of business
The normal flow of the business refers to the items listed in their System Use Case Diagram and the Use
Case Descriptions.
For Example:
Use Case: Enroll Student
Normal Flow: Search Student -> Enroll Student Process -> Receive Output
The system features work according to alternative course of actions
The alternative flow of the business refers to the items listed in the Use Case Descriptions as Alternative
Flow.

The system features provide correct results


The system outputs correct results based on the following:
- Computations
- Search Results
- Report Output
The system is able to catch and notify errors on the users interaction with the system
The system is able to:
- display error messages to user
- display save, edit, search pop up messages to notify users
- Insertion of data is done using the system ONLY.
The system provides an end-to-end user experience in respect to business need
The system provides:
- can complete transactions with output
- program does not terminate

USABILITY
Please refer to the GUI of the application to determine the points to be given.

3. PROJECT SCOPING AND DOCUMENTATION(30 POINTS)


Please refer to the documentation to determine the points to be given.
PPT Presentation
Introduction
System Descriptions
Lists of Forms and Reports
Context Diagram and DFD
Fishbone Diagram
USE Case Diagram (both System and Detailed USE Cases)

Document Needed

Table of Contents
List of Tables
List of Figures
CHAPTER 1: PROJECT DEFINITION
1.1 Introduction
1.2 Business Case
1.2.1 Background of the Organization
1.2.2 Project Overview
1.2.3 Project Constraint
1.2.4 Project Assumptions
1.3. Scope and Limitation
1.4. Methods Used in the Study (show the figure and how did you implement in your study)

CHAPTER 2: FUNCTIONAL SPECIFICATION REPORT


2.1 Data Requirements
2.1.1 Forms
2.1.1.1 List of Forms
2.1.1.2 Layout of Forms
2.1.2 Reports
2.1.2.1 List of Reports
2.1.2.2 Layout of Reports
2.2 Policies and Procedures
2.2.1 Procedures
2.2.1.1 Context Diagram
2.2.1.2 Level 1 DFD
2.2.2 Policies
2.2.2.1 Business Requirements
2.2.2.2 Business Policies
2.3 Problem Analysis
2.3.1 Fishbone
2.3.2 Problems and Requirements
2.3.3 Conclusion
2.3.4 Recommendation

CHAPTER 3: PROPOSED SYSTEM DEFINITION


3.1 Requirements-Features Matrix Traceability Matrix based on REQ documentation
3.2 Functional Specification
3.2.1 System Boundaries
3.2.2 System Use Case Diagram
3.2.3 Detailed per Use Case
3.3.4 Use Case Description
3.3 Technical Specification - This section identifies the design of different technical
components used in financial monitoring system from database to report forms.

3.3.1. Class Diagram


3.3.1.1 List of Classes
3.3.1.2 Class Diagrams (per Use Case by System)
3.3.2. Activity Diagram
3.3.3. Database Design
3.3.2.1 Database Schema
3.3.2.2 Data Dictionary (Landscape orientation)

Appendices
Sample of Forms
Sample of Reports
Sample Questionnaire
Likert Scale

Note:
Attire: Semi-formal with Name Tag
Clear Projector for Presentation
Reserve the ComLab3
2 copies of Documents and Rating Sheet
The Support Group will MONITOR the TIME for the whole presentation and SERVE
the food/s
Provide FOOD/S for the panelist/s

Schedule:

BSIT 4 2 (September 20, 2017)


TIME GROUP PRESENTER SUPPORT GROUP
8:15 9:30 GastoBox Khanzu
9:30 10:45 Cheddar Burst Gym
10:45 12:00 Blue Alpha Research
12:00 1:15 Khanzu GastroBox
1:15 2:30 Gym Cheddar Burst
2:30 3:45 Research Blue Alpha

BSIT 4 1 (September 23, 2017)


2:00 3:15 Co/Op Persan
3:15 4:30 ANC Group Pasig City
4:30 5:45 Persan Co/Op
5:45 7:00 Pasig City ANC Group

You might also like