You are on page 1of 6

CIVIL & STRUCTURE

CONTRACT NO: DOCUMENT NO:


16 Pages
758/F15400/2016-S0 TJW-TT20-CIV-RPT-002

PEMBANGUNAN TANGKI TIMBUN 1 UNIT KAPASITAS 20.000 KL LENGKAP


DENGAN ASESORIS DAN JALUR PERPIPAAN DI TBBM TANJUNG WANGI

REPORT PDA & ANALISA

0 21 Augus 2017 Issued for Reviewed WWA IMK GN

Prepared Checked Approved Approved


Rev Date Description
PT PATRA BADAK ARUN SOLUSI PERTAMINA
PEKERJAAN PEMBANGUNAN TANGKI
TIMBUN 1 UNIT KAPASITAS 20000 MT
DI TBBM TANJUNG WANGI
Date : 21/08/2017
TJW-TT20-CIV-RPT-002 Rev. 0 REPORT PDA & ANALISA
Page 2 of 7

REVISION TABLE

REVISION REVISION REVISION


Page Page Hal.
0 1 2 3 0 1 2 3 0 1 2 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
PEKERJAAN PEMBANGUNAN TANGKI
TIMBUN 1 UNIT KAPASITAS 20000 MT
DI TBBM TANJUNG WANGI
Date : 21/08/2017
TJW-TT20-CIV-RPT-002 Rev. 0 REPORT PDA & ANALISA
Page 3 of 7

REVISION RECORD

Implemented
Rev. Page Comment Explanation
(Y/N)
PEKERJAAN PEMBANGUNAN TANGKI
TIMBUN 1 UNIT KAPASITAS 20000 MT
DI TBBM TANJUNG WANGI
Date : 21/08/2017
TJW-TT20-CIV-RPT-002 Rev. 0 REPORT PDA & ANALISA
Page 4 of 7

DAFTAR ISI

1. JUDUL DOKUMEN .............................................................. (1)

2. TABEL REVISI ..................................................... ...(2)

3. REVISION RECORD.. ..............................................(3)

4. DAFTAR ISI .............................................. (4)

5. PENDAHULUAN........ ......................................... ...(5)

5.1 Latar Belakang................................................... ...(5)


5.2 Definisi.... ........................................... ....(5)

6. REFERENSI.................................................. ..(6)

7. KAPASITAS DAYA DUKUNG TIANG PANCANG...... . .(6)

8. PONDASI.. ................................................ ..(10)

9. DRAIN SUMP..... .................................................................. ...(10)

10.ANNULAR PLATE... .................................................................................... ..(10)

11. BOTTOM PLATE .............................................................. (11)

12. TEMPORARY SUPPORT BEAM..... ...............................................................................(12)

13. SHELL RING # 5... ..................................................................................(12)

14. SHELL RING # 6 ............................................................(13)

15. TOP ANGLE . ...................................................(14)

16. PEMERIKSAAN ROUNDNESS DAN PLUMBNESS .................................(14)

17. WIND GIRDER . ..................................................................................(15)

18. PEMASANGAN JACK (16)

19. SHELL RING # 4............................................................................................................................ (16)

20. SHELL RING # 3....................................................................................................................(16)

21. SHELL RING # 2............................................................................................................... ..(16)


PEKERJAAN PEMBANGUNAN TANGKI
TIMBUN 1 UNIT KAPASITAS 20000 MT
DI TBBM TANJUNG WANGI
Date : 21/08/2017
TJW-TT20-CIV-RPT-002 Rev. 0 REPORT PDA & ANALISA
Page 5 of 7

5. PENDAHULUAN
5.1 Latar Belakang
Pondasi tiang pancang digunakan untuk mendukung suatu konstruksi yang memiliki lapisan
tanah keras terletak didalam lapisan tanah. Pondasi tiang memiliki dua cara untuk
mendukung beban yaitu tiang dukung ujung ( end bearing pile ) dan tiang gesek ( friction
pile ). Tiang dukung ujung adalah tiang yang kapasitas dukungnya lebih ditentukan oleh
tahanan ujung tiang. Umumnya, tiang dukung ujung berada dalam zona tanah yang lunak
yang didasari tanah keras. Tiang tiang dipancang sampai mencapai lapisan tanah keras.
Sedangkan tiang gesek adalah tiang yang kapasitas dukungnya lebih ditentukan oleh
perlawanan gesek.

5.2 Definisi
Proyek : Pembangunan Tangki Ttimbun Kapasitas 5000MT di Bitumen Plant Gresik

Client : PT PERTAMINA Marketing Operation region V

Kontraktor : PT PATRA BADAK ARUN SOLUSI ( Referred as PBAS)

6. REFERENSI

Kode dan spesifikasi yang digunakan sebagai berikut:


Standart Perusahaan (Standard PERTAMINA )
Civil Engineering CODE of Practice No.4 (1954) U.D.C 624.15
ASTM D-4945 Standard Test method for High-Strain Dynamic Testing Of Deep Foundation

7. KAPASITAS DAYA DUKUNG TIANG PANCANG

7.1 Kapastas Daya Dukung Tiang Pancang dari Hasil PDA

Daya Dukung Teraktifkan Tiang CAPWPAP


No. Tiang
Qb (ton) Qs (ton) Qu (ton) Qall (ton)

2 38.0 43.3 81.4 40.7

10 84.1 51.0 135.2 67.6

11 20.5 66.8 87.3 43.6

21 83.8 78.7 162.5 81.2


PEKERJAAN PEMBANGUNAN TANGKI
TIMBUN 1 UNIT KAPASITAS 20000 MT
DI TBBM TANJUNG WANGI
Date : 21/08/2017
TJW-TT20-CIV-RPT-002 Rev. 0 REPORT PDA & ANALISA
Page 6 of 7

24 - - - -

79 22.3 72.1 94.4 47.2

154 39.6 56.6 96.2 48.1

247 83.7 100.0 183.7 91.8

272 99.2 28.3 127.5 63.7

302 250.8 32.9 283.7 141.8

7.2 Kapasitas Daya Dukung Tiang Pancang dari Hasil Kalendering

No. Tiang Qu (ton) Qall (ton)

2 - -

10 396.4 132.1

11 235.6 78.5

21 368.2 122.7

24 220.2 73.4

79 255.2 85.0

154 240.6 80.2

247 327.1 109.0

272 331.9 110.6

302 362.3 120.7

You might also like