You are on page 1of 20

LONG TERM AGREEMENT FOR

OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

MATERIAL REQUISITION

OF

CORROSION INHIBITOR INJECTION UNIT

CRPO#
BI-10-00909-XXXXX

SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER DECKS,


PIPELINES, & CABLES ASSOCIATED TO SFNY

9COM MATERIAL #: 6000015731

SAUDI ARAMCO APPROVAL


Signature:

Name:

Date:

Engineer Lead Engineer Technical Manager Project Manager


X1 30.10.2016 Issued for Quotation
Aymen Ammar Rashid Maqbool Andrea Baldelli Edoardo Martinelli

Rev. Date Description of Prepared Checked Approved Approved


Revision

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 1 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

INDEX

INDEX..................................................................................................................................................... 2

AMENDMENTS AND REVISIONS......................................................................................................... 4

1. SCOPE OF SUPPLY.................................................................................................................... 5

2. REFERENCE DOCUMENTS....................................................................................................... 5
2.1 TECHNICAL SPECIFICATION...............................................................................................5
2.2 EQUIPMENT DATA SHEETS.................................................................................................. 6
2.3 PROJECT SPECIFICATION AND DRAWINGS......................................................................7
2.4 COMPANY ENGINEERING STANDARDS (SAES)................................................................8
2.5 COMPANY MATERIAL SYSTEM SPECIFICATIONS (SAMSS).............................................9
2.6 COMPANY ENGINEERING PROCEDURES (SAEP)...........................................................10
2.7 COMPANY INSPECTION REQUIREMENTS........................................................................10
2.8 COMPANY NON MATERIAL REQUIREMENTS (NMR).......................................................12
2.9 COMPANY STANDARD DRAWINGS...................................................................................12

3. GENERAL REQUIREMENTS.................................................................................................... 12
3.1 DEFINITIONS........................................................................................................................ 12
3.2 ABBREVIATIONS................................................................................................................. 13

4. TECHNICAL REQUIREMENTS................................................................................................. 13
4.1 CONSTRAINTS..................................................................................................................... 13

5. APPROVED MANUFACTURER LIST.......................................................................................13

6. QA/QC REQUIREMENTS.......................................................................................................... 14
6.1 QUALITY ASSURANCE REQUIREMENTS.........................................................................14
6.2 QUALITY CONTROL REQUIREMENTS..............................................................................14
6.2.1 INSPECTION LEVEL.................................................................................................. 15

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 2 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

6.2.2 INSPECTION & TEST PLAN (ITP)..............................................................................15

7. HSE REQUIREMENTS.............................................................................................................. 15

8. SUPPLIER PROPOSAL............................................................................................................. 17
8.1 SUPPLIER RESPONSIBILITY.............................................................................................. 18
8.2 CONFLICT AND DEVIATIONS............................................................................................. 19
8.3 CONFLICTS.......................................................................................................................... 19
8.3.1 DEVIATIONS............................................................................................................... 19
8.4 COMPLIANCE STATEMENT................................................................................................ 19

9. WARRANTY............................................................................................................................... 19

10. SUPPLIER DOCUMENTATION REQUIREMENTS....................................................................20


10.1 LANGUAGE.......................................................................................................................... 20
10.2 NON-MATERIAL REQUIREMENTS (NMR)..........................................................................20

11. LIST OF ATTACHMENTS.......................................................................................................... 20

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 3 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

AMENDMENTS AND REVISIONS

Revision Date Page Description Project Manager

X1 30.10.2016 --- Issued For Quotation Edoardo Martinelli

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 4 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

1. SCOPE OF SUPPLY

This document applies to the supply of the following items:


SFNY PRODUCTION DECK MODULES

Tag No. Equipment Quantity


385-5A-U-0004 Corrosion Inhibitor Injection Unit (SFNY 184/189,1226/1232) 1
385-5X-U-0004 Corrosion Inhibitor Injection Unit (SFNY 110, 157, 190/193, 1280/1286) 1
385-1J-U-0004 Corrosion Inhibitor Injection Unit (SFNY 17,1216/1221) 1
385-1M-U-0004 Corrosion Inhibitor Injection Unit (SFNY 20, 498,519,1215, 1330/1332) 1
385-1N-U-0004 Corrosion Inhibitor Injection Unit (SFNY 21, 479/481, 1333/1335) 1
385-1O-U-0004 Corrosion Inhibitor Injection Unit (SFNY 22, 486/487, 1211/214) 1
Corrosion Inhibitor Injection Unit (SFNY 29, 490/491, 1222/1223,
385-1V-U-0004
1287/1288)
1

385-5N-U-0004 Corrosion Inhibitor Injection Unit (SFNY 287/292,1244/1250) 1


385-5S-U-0004 Corrosion Inhibitor Injection Unit (SFNY 324/329,1233/1239) 1

All quality, technical and fabrication requirements shall be performed in accordance with
applicable codes, standards, COMPANY and CONTRACTORs Specifications listed in the
present document and in Technical Specification of Corrosion Inhibitor Injection Unit (20-C-
D-10-SM-S-PK-06-106).
Refer Appendix 2 of Technical Specification of Corrosion Inhibitor Injection Unit (20-C-D-10-
SM-S-PK-06-106) for detailed Scope of Supply.

2. REFERENCE DOCUMENTS

2.1 TECHNICAL SPECIFICATION

Doc No. Rev Description


Technical Specification of Corrosion Inhibitor
20-C-D-10-SM-S-PK-06-106 X1
Injection Unit

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 5 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

2.2 EQUIPMENT DATA SHEETS

Doc No. Rev Description


RE-776001 00 Mechanical Data Sheet of Corrosion Inhibitor Tank
RE-776009 00 Mechanical Data Sheet of Corrosion Inhibitor Injection Pumps
RE-776399 00 Data Sheet Chemical Injection Pump Motor
RA-776005 00 Assembly Details of Corrosion Inhibitor Injection Unit
RE-776124 00 Data Sheet Ball Valves 1-1/2 & Smaller Class 1500
RE-776125 00 Data Sheet Check Valves 1-1/2 & Smaller Class 1500
RE-776126 00 Data Sheet Globe Valves 1-1/2 & Smaller Class 1500
RE-776127 00 Data Sheet Gate Valves 1-1/2 & Smaller Class 1500 SW
RE-776128 00 Data Sheet Gate Valves 1-1/2 & Smaller Class 1500 THRD
RE-776129 00 Data Sheet Ball Valves 2 & Larger Class 150
RE-776130 00 Data Sheet Ball Valves 1-1/2 & Smaller Class 800
RE-776131 00 Data Sheet Check Valves 2 Class 150
RE-776132 00 Data Sheet Gate Valves 1-1/2 & Smaller Class 800 THRD
RE-776133 00 Data Sheet Gate Valves 1-1/2 & Smaller Class 800 SW
RE-776134 00 Data Sheet Y-Type Strainer 1 Class 150
RE-776643 00 Data Sheet Flow Transmitter
RE-776641 00 Data Sheet Flow Switch
RE-776642 00 Data Sheet Flow Switch
RE-776637 00 Data Sheet Flow Gauge
RE-776638 00 Data Sheet Flow Gauge
RE-776707 00 Data Sheet Pressure Gauge
RE-776708 00 Data Sheet Pressure Gauge
RE-776773 00 Data Sheet Pressure Switch
RE-776775 00 Data Sheet Pressure Switch
RE-776819 00 Data Sheet Safety Relief Valve

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 6 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Doc No. Rev Description


RE-776820 00 Data Sheet Safety Relief Valve
RE-776671 00 Data Sheet Level Transmitter
RE-776657 00 Data Sheet Level Gauge
RE-776666 00 Data Sheet Level Switches
RE-776667 00 Data Sheet Level Switches
RE-776654 00 Data Sheet Annunciators

2.3 PROJECT SPECIFICATION AND DRAWINGS

Doc No. Rev Description


RA-775937-017 00 P&ID Corrosion Inhibitor Injection Skid
RA-775936-001 00 Symbols and Legends
RD-776506-001 00 RTU I/O Loading
RD-776506-004 00 RTU I/O Loading
RD-776506-007 00 RTU I/O Loading
RA-776481-001 00 Block Diagram-Analog Instrument Cabling
RA-776481-002 00 Block Diagram-Digital Instrument Cabling
RA-776315-001 00 Electrical Wiring Diagram Corrosion Inhibitor Injection Unit
RA-776352 00 Electrical Detail Corrosion Inhibitor Injection Unit
LATER 00 Specification for Painting & Coating
RA-776248 00 Equipment Support Details- Main Deck
RA-776256 00 Penetration Plan- Main Deck
RA-776259 00 Penetration Details-Main Deck
RA-776492-002 00 Misc Instrument Details Tubing & Instrument Supports
00-C-C-CO-PQA-
00 Project Quality Plan
00-001
00-C-C-00-COP-
00 Procurement QA/ QC Plan
QA-00-002

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 7 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Doc No. Rev Description


19-A-D-10-SM-S-
00 Piping Material Specification
TB-05-002

2.4 COMPANY ENGINEERING STANDARDS (SAES)

Company No. Issue Date Description


SAES-A-105 07-Apr-15 Noise Control
SAES-A-202 25-May-14 Saudi Aramco Engineering Drawing Preparation
SAES-A-206 30-Apr-11 Positive Material Identification
SAES-B-054 29-Aug-10 Access, Egress and Material Handling for Plant Facilities
SAES-B-067 11-Mar-15 Safety Identification and Safety Colours
SAES-D-109 15-Jul-14 Design of Small Metallic Storage Tanks
SAES-G-006 12-Nov-13 Positive Displacement Pumps Controlled Volume
10-Apr-11 Coating Selection & Application Requirements for
SAES-H-001
Industrial Plants and Equipment
02-Jun-12 Internal and External Coatings for Steel Pipelines and
SAES-H-002
Piping
15-Dec-15 Protective Coating Selection & Application Requirements
SAES-H-004
for Offshore Structures and Facilities
09-Oct-12 Approved Saudi Aramco Data Sheets Paints and
SAES-H-101V
Coatings
SAES-H-102 24-Oct-12 Safety Requirements for Coating Applications
SAES-J-002 29-Jun-15 Technically Acceptable Instrument Manufacturers
SAES-J-003 14-May-15 Instrumentation - Basic Design Criteria
SAES-J-004 07-Nov-13 Instrumentation symbols and Identification
SAES-J-100 14-Sep-14 Process Flow Metering
SAES-J-200 22-May-13 Pressure
SAES-J-300 09-Nov-15 Level
SAES-J-600 20-Feb-13 Pressure Relief Devices

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 8 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Company No. Issue Date Description


SAES-J-902 17-May-15 Electrical Systems for Instrumentation
SAES-L-108 11-Oct-10 Selection of Valves
SAES-L-109 12-Jan-15 Selection of Flanges, Stud Bolt and Gasket
SAES-P-100 18-Mar-15 Basic Power System Design Criteria
SAES-P-104 24-Feb-14 Wiring Methods and Materials
SAES-P-111 25-Dec-12 Grounding
SAES-P-113 07-Sep-15 Motors and Generators
SAES-P-114 05-Dec-12 Power System Protection and Control
SAES-W-011 24-Sep-14 Welding Requirements for On-Plot Piping
SAES-W-017 13-Dec-11 Welding Requirements for API Tanks

2.5 COMPANY MATERIAL SYSTEM SPECIFICATIONS (SAMSS)

Company No. Issue Date Description


01-SAMSS-017 13-Oct-10 Auxiliary Piping for Mechanical Equipment
01-SAMSS-091 17-Apr-13 Oil Field Chemical Injection Skid System
02-SAMSS-005 17-Apr-14 Butt Welding Pipe Fittings
02-SAMSS-011 15-Jun-13 Forged Steel and Alloy Flanges
04-SAMSS-001 31-Dec-15 Gate Valves
04-SAMSS-002 11-Oct-10 Globe Valves
04-SAMSS-005 02-Sep-14 Check Valves, Swing Type
04-SAMSS-035 11-Sep-13 General Requirements for Valves
04-SAMSS-048 28-Aug-13 Valves Inspection & Testing Requirements
04-SAMSS-051 11-Oct-10 Ball Valves, API 6D
09-SAMSS-107 22-May-11 Qualification requirements and Application of Composite
Fluoropolymer/Ceramic Coatings to Fasteners
12-SAMSS-007 17-May-11 Fabrication of Structural and Miscellaneous Steel

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 9 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Company No. Issue Date Description


16-SAMSS-512 05-Mar-15 Outdoor Switch rack-Low Voltage (Section-9)
16-SAMSS-518 16-Jun-13 Low Voltage Panel Boards
17-SAMSS-503 26-Oct-15 Severe-Duty, Totally Enclosed, Squirrel Cage Induction
Motors to 500 HP
17-SAMSS-515 06-Oct-13 Auxiliary Electrical Systems for Skid-Mounted Equipment
31-SAMSS-009 12-Nov-13 Positive Displacement Pumps-Controlled Volume
32-SAMSS-030 15-Jul-14 Manufacture of Small Metallic Atmospheric Storage Tanks
32-SAMSS-038 02-Jan-14 Manufacture of Skid Mounted Units
34-SAMSS-815 02-July-13 Annunciators
34-SAMSS-820 17-Jun-15 Instrument Control Panels - Indoor
34-SAMSS-821 12-Feb-15 Instrument Control Panels - Outdoor
34-SAMSS-831 07-Nov-13 Instrumentation for Packaged Units
34-SAMSS-913 24-Jan-12 Instrumentation and Thermocouple Cable

2.6 COMPANY ENGINEERING PROCEDURES (SAEP)

Company No. Issue Date Description


SAEP-103 19-Jan-10 Metric Units of Weights and Measures
SAEP-347 24-Nov-14 Supplying Material from Stockiest
SAEP-352 24-Sep-14 Welding Procedures Review and Approval
Inspection Requirements for Contractor Procured
SAEP-1151 18-Nov-12
Materials and Equipment
Equipment and Spare Parts Data Requirements for
SAEP-3101 31-Mar-14
CONTRACTOR Procured Equipment

2.7 COMPANY INSPECTION REQUIREMENTS

Company No. Issue Date Description


Form 175
A Corrosion Inhibitor Injection Unit
Special-001
Form 175 11-Sep-09 Low Voltage Panel Board

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 10 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Company No. Issue Date Description


Special-007
175-019800 12-May-15 Piping: Auxiliary; For Mechanical Equipment
Flanges: Socket weld and Threaded, All material
175-022503 13-Feb-13
covered by ASME B16.5
Fittings: Alloy steel, applicable to Low alloy, Stainless
175-026500 03-Nov-15
steel and Nickel alloy
175-043000 Aug-06 Valve Material Certification Requirements
175-043600 09-Apr-12 Valves - Metallic
Coating: Shop Applied; for Tanks, Piping, Pipelines (and
Associated Appurtenances & Fittings), Structures,
175-091900 22-May-11
Process Equipment; Internal & External; Onshore,
Offshore and/or Subsea
Coating: Shop Applied; Application of Composite
175-092100 26-Oct-11
Fluoropolymer / Ceramic Coatings to Fasteners
Motors Electric: Severe Duty Totally Enclosed Squirrel
175-170200 04-Dec-15 Cage Induction Motors to 500 HP, 4000 V, or Below and
Explosion Proof Motors
Auxiliary Electrical Systems: As provided on Custom-
175-173700 22-Jun-11 Engineered, Factory-Assembled, and Pre-Wired
Equipment Skids
Pumps: Positive Displacement, Controlled Volume,
175-311500 19-Feb-11
Diaphragm & Packed Plunger Types
175-320300 29-Jan-13 Positive Material Identification (PMI)
175-325100 14-Jul-12 Tanks, Inspection and Testing Requirements
Manufacture of Skid Mounted Process Packaged
175-324400 10-Feb-14
Equipment Units
175-340200 22-Jun-11 Instrumentation for Packaged Units
175-343100 8-Dec-11 Instrument Control Panels
Electrical Annunciators: Solid state Plug-in Module type,
175-343300 14-July-12
Suitable for Indoor and/or Outdoor Application

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 11 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

2.8 COMPANY NON MATERIAL REQUIREMENTS (NMR)

Company No. Issue Date Description


NMR 7930-1 24-Apr-16 Corrosion Inhibitor Injection Unit (Sheet-1)
NMR 7930-2 24-Apr-16 Corrosion Inhibitor Injection Unit (Sheet-2)

2.9 COMPANY STANDARD DRAWINGS

Company No. Issue Date Description


AB-036386-001 Jan-90 Hardness Testing for Welding Procedures Qualifications

3. GENERAL REQUIREMENTS

3.1 DEFINITIONS

Certifying Authority : Nominated Third Party Verifying Body


Company : SAUDI ARAMCO OVERSEAS COMPANY B.V.
Contractor : Saipem S.p.A.
Inspector : Nominated Third Party Inspection Agency
Project Specifications : Governing technical documents for the specific item(s)
for purchase
Project Drawings : Reference drawings for the specific item(s) for purchase
Buyer : Refers to SAUDI ARAMCO OVERSEA COMPANY B.V.
or nominated representative placing an order for the
materials and services
Supplier : The party that supplies equipment, technical documents,
drawings and services to perform the duties specified by
COMPANY and CONTRACTOR
Sub-Supplier : The party contracted by SUPPLIER to supply equipment
and materials (included relevant services) according to sub-
order requirements.

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 12 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Sub-Contractor : The party involved in execution of prescribed work


under a contract with CONTRACTOR.

3.2 ABBREVIATIONS

NMR : Non Material Requirements


RVL : COMPANY Regulated Vendor List

4. TECHNICAL REQUIREMENTS

Refer to Technical Specifications of Corrosion Inhibitor Injection Unit (20-C-D-10-SM-S-PK-


06-106) for the technical requirements.
Corrosion Inhibitor Injection Unit shall be supplied complete as shown in data sheet and
requirement mentioned in technical specification. However, it is SUPPLIERs responsibility to
ensure complete supply of equipment as a whole, which can deliver its guaranteed operation
under COMPANY Standards, International Codes and Standards listed under Appendix 3 of
Technical Specification of Corrosion Inhibitor Injection Unit (20-C-D-10-SM-S-PK-06-106).

4.1 CONSTRAINTS

SUPPLIER shall consider following constraints while preparing the technical proposal:

Skid Foot Prints:


Since the unit shall be installed on an offshore platform where space is a major constraint in
designing the deck layout, therefore, SUPPLIER shall restrict the skid footprints to the
following dimensions:
L: 5000 x W: 2800 x H: 3,058 mm (Maximum)

5. APPROVED MANUFACTURER LIST

Refer to the Attachment 7 for the regulated vendor list for the items described below:

Subject SKID;CHEMICAL INJECTION;WELL TIE-INS APP

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 13 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

9COM Number 6000015731


Technical Specification 20-C-D-10-SM-S-PK-06-106
Commodity Codes M03230005
Material type Permanent
Refer to Section 6 of Technical Specifications of Corrosion Inhibitor Injection Unit (20-C-D-
10-SM-S-PK-06-106) for details of 9COMs associated with major sub-components of the skid.

6. QA/QC REQUIREMENTS

6.1 QUALITY ASSURANCE REQUIREMENTS

ISO 9001 Quality Management System Requirements:


SUPPLIER shall set up and maintain a Quality Management System (QMS) to ensure the
required level of Quality Assurance/Quality Control (QA/QC) for the equipment and materials
included in Scope of Work, in accordance with the requirements of this specification and
those stated by CONTRACTOR and COMPANY.
SUPPLIERs Quality Management System shall meet the applicable ISO 9001 system
requirements as well as COMPANY Saudi Aramco Schedule Q requirements.
SUPPLIER shall be evaluated, approved and listed as accepted SUPPLIERs by
CONTRACTOR and COMPANY prior to placing the purchase order.
SUPPLIER shall ensure that all its sub supplier(s) set up and maintain equivalent QA/QC and
Inspection systems, and shall provide the last version of the relevant ISO 9001 certificate.
CONTRACTOR, or appointed representative, reserves the right to carry out Quality Audits at
the SUPPLIER / SUB-SUPPLIER office and works, to verify that the Quality System is being
met.

6.2 QUALITY CONTROL REQUIREMENTS

SUPPLIER shall be in compliance with Quality requirements as per COMPANY Saudi Aramco
Schedule Q requirements.

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 14 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

6.2.1 INSPECTION LEVEL

Inspection Level 3 for 9COM : 6000015731


As per SAEP-1151, Inspection Level 3 includes, as a minimum, pre inspection meeting, one
or more unspecified regular basis (daily, weekly or biweekly) surveillance visit/s , all witness
and hold points, final inspection and release for shipment.

6.2.2 INSPECTION & TEST PLAN (ITP)

SUPPLIER shall be in compliance with SAUDI ARAMCO Quality Requirements (Schedule


Q.). ITP shall be submitted based on the criticality of the CONTRACTOR procuring material.
As a minimum, ITP shall include the following information:
Process description
Quality control requirements
Notification requirements for SUPPLIER inspection witness and hold points (minimum 5
working days)
Responsibilities for inspection / test
Applicable procedures
Acceptance criteria (COMPANY and International Industry Standards)
Verifying documents
Inspection points (Hold, Witness & Review) by CONTRACTOR
Reference to sub-supplier ITP (as applicable)
COMPANY Dummy PO number

7. HSE REQUIREMENTS

In line with Saipem Corporate Standard on HSE Management of SUPPLIERs and


Subcontractors (STD-COR-HSE-108), SUPPLIERs and Sub-contractor who carry out works in
their own premises shall follow Level 3 stewardship in implementation of HSE Management
System.
Under this Level 3 stewardship, all SUPPLIERs and Sub-contractor shall apply their own HSE

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 15 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Management System. SAIPEM (here after referred as Contractor) shall control the SUPPLIERs
and Sub-contractors HSE management system through specific audits both in the bid and
project implementation stages based per the risk criteria.
However, the following shall be considered as minimum HSE requirements anticipated by the
Contractor from SUPPLIERs and Sub-contractors working in the project:
In line with Company & Contractor HSE Policies, and on the basis that all accidents are
preventable, SUPPLIERs and Sub-contractors must be committed to manage their business in a
manner that prevents injuries and occupational illnesses, and avoids damage to property and to
the environment.
SUPPLIERs and Sub-contractors HSE Management System shall be planned, developed and
implemented in full compliance with all applicable Local and International laws and regulations,
codes, guidelines and standards provided by International Organizations (e.g. ISO 14001 &
OHSAS 18001, etc.) and with industry-accepted best HSE practices applicable to its activities
and copies of these third party certificates are required to provide upon a request.
SUPPLIERs and Sub-contractors is responsible, through its own organization, to implement the
necessary safety regulation and measures required so as to carry out safely the work assigned
by Contractor and to prevent any accident or incident that may endanger the safety of the
personnel or may result in damage to property.
SUPPLIERs and Sub-contractors shall implement and administer the environmental
requirements and shall, in the performance of the works, comply with all environmental
requirements and the requirements relating thereto as set forth in this Scope or Work.
SUPPLIERs and Sub-contractors shall have reporting system on monthly/weekly basis all the
HSE information pertinent to their activities.
SUPPLIERs and Sub-contractors should have HSE training program to provide instruction and
information on HSE standards, practices, procedures and work instructions
SUPPLIERs and Sub-contractors should have Risk Assessment process to analyse HSE risk
associated with subcontracted scope of works.
In addition every accident and/or injury involving SUPPLIERs and Sub-contractors personnel
and/or means or equipment shall be reported to the enforcing authorities and Bodies as per
applicable legislation where required.
SUPPLIERs and Sub-contractors shall timely provide adequate human, technical and financial

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 16 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

resources, so that to ensure the subcontracted SOW is carried out safely and in full respect to
the environment.
As part of SUPPLIERs and Sub-contractors HSE Management system, Emergency Response/
contingency procedures shall be ensured for all possible accidental scenarios.
SUPPLIERs and Sub-contractors who are required to work in the premises of
Company/Contractor and relevant Project sites in KSA, shall comply with all Health, Safety
and Environmental Protection requirements outlined in Contractor HSE Management System
(i.e. HSE Requirements for Subcontractors Doc No SPC-COR-HSE-002) and the COMPANY
SCHEDULE B & SCHEDULE D, as well as with other relevant COMPANY standards,
general instructions and requirements. This documentation shall be available upon on
request.

8. SUPPLIER PROPOSAL

This Material Requisition specifies COMPANYs requirements and the specifications of the
material to be supplied by the SUPPLIER to CONTRACTOR. SUPPLIER shall provide
quotation for the Corrosion Inhibitor Injection Unit as per the detailed scope of supply
specified in Appendix 2 of Technical Specification of Corrosion Inhibitor Injection Unit
(20-C-D-10-SM-S-PK-06-106). The material offered shall be in full compliance with the
reference documents listed in Appendix 3 of Technical Specification of Corrosion
Inhibitor Injection Unit (20-C-D-10-SM-S-PK-06-106).
In case of any conflict between the requirements of this document and the attached
specification or data sheet or deviations from the relevant COMPANY Standard, the
conflict, deviation or exception shall be brought to the attention of the CONTRACTOR
in writing for resolution. SUPPLIER shall provide listing of the exceptions, deviations or
conflicts to all Standards referred herein. Listing shall refer to number, title and section
of the standard to which reference is made. If there are no exceptions, conflicts or
deviations to a Standard, the SUPPLIER shall state the same.
Spare Parts / SPDP Package shall be as per Section 4.6 of Technical Specification of
Corrosion Inhibitor Injection Unit (20-C-D-10-SM-S-PK-06-106).
The SUPPLIER shall provide the following details with their quotation:
Detailed scope of supply

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 17 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

Preliminary General Arrangement Drawing (Indicating Overall Dimensions, Material of


construction, Weight details, etc.)
Piping & Instrument Diagram (P&ID)
Bill of Material (BOM)
Delivery period in terms of weeks
Preliminary Fabrication Schedule
Deviation list (if any)
Clarification list (if any)
Commissioning & 2-Years Spare Part List
Standard Technical Catalogues
Special tools and tackles for installation or maintenance
List of Sub-Suppliers
Reference List
ISO 9000 / 9001certificates
Compliance Statement to all COMPANY Standards & Project Documents attached
with MR (Refer format in Attachment 9)
Technical Tabulation (Refer format in Attachment 9)
Scope of Supply signed and stamped by Supplier ( Refer format in Attachment 9)
8.1 SUPPLIER RESPONSIBILITY

The SUPPLIER shall be responsible for the detailed design and reliability of the
material/equipment.
The requirements specified by the CONTRACTOR in this material requisition are the
minimum required. SUPPLIER shall be considered an expert in this type of material and
ultimately be responsible in all aspects considering material supply and operations.
The material shall be designed with the guarantee of safe operation under all normal
situations and that routine maintenance is possible during normal plant operation.
Any corrections, alterations or additions required to conform to this specification shall be
at the SUPPLIERs expense.
SUPPLIER is solely responsible with other Saudi Aramco approved sub-supplier for the

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 18 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

correct and approved supplied equipment/material.


Any errors or omissions in this material requisition or COMPANY standard shall not
absolve the SUPPLIER from the responsibility of providing a fully functional assembly.

8.2 CONFLICT AND DEVIATIONS

Saudi ARAMCO References: SAEP-302 Instructions for Obtaining a Waiver of a Mandatory


Saudi ARAMCO Requirement.

8.3 CONFLICTS

All conflicts between the requirements of this requisition, relevant specification, data sheets,
standards and all the other documents referenced on section 2 of this material requisition
shall be referred to the Contractor for clarification and resolution

8.3.1 DEVIATIONS

Any deviation less than minimum requirement of this specification and relevant company
standard as listed in section 2 of this material requisition shall be issued separately with the
bid by a dedicated section (Refer Attachment 9: FORM-AH-0206 SUPPLIER DEVIATIONS
LIST) listing all the deviation for CONTRACTOR / COMPANY approval.
Any clarification (different from deviation) for requirements of this specification and relevant
company standard as listed in section 2 of this material requisition shall be issued separately
with the bid by a dedicated section (Refer Attachment 9: FORM-AH-0207 SUPPLIER
CLARIFICATION LIST) for Contractor approval.

8.4 COMPLIANCE STATEMENT

SUPPLIER shall submit a compliance statement to the technical questionnaire provided in


Attachment 9.

9. WARRANTY

As per the special terms and conditions attached to Purchase Order.

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 19 of 20
LONG TERM AGREEMENT FOR
OFFSHORE FACILITIES
CONTRACT No. 6600035841 (OOK)

MATERIAL REQUISITION OF Doc.No.


CORROSION INHIBITOR INJECTION UNIT 20-C-D-10-SM-H-PK-06-101
Rev. X1 DATE 30.10.2016
SFNY 10 SLIPOVER JACKETS, 9 SLIPOVER
DECKS, PIPELINES, & CABLES
ASSOCIATED TO SFNY DUMMY No.:
CRPO# xxxxxxxxx. BI-10-00909 XXXXXX

10. SUPPLIER DOCUMENTATION REQUIREMENTS

10.1 LANGUAGE

All literature, documentation, correspondence, and other printed matter pertaining to this
Material Requisition shall be in English language.

10.2 NON-MATERIAL REQUIREMENTS (NMR)

Vendor shall refer to Appendix 4 of Technical Specifications of Corrosion Inhibitor Injection


Unit (20-C-D-10-SM-S-PK-06-106) and Attachment 6 for Non-Material Requirements for
their scope of supply.

11. LIST OF ATTACHMENTS

Document Description Remarks


Attachment 1 Technical Specification
Attachment 2 Data Sheets
Attachment 3 Project Documents
Attachment 4 Company Standards
Attachment 5 Inspection Requirements
Attachment 6 Non-Material Requirements (NMR)
Attachment 7 Saudi Aramco RVL
Attachment 8 Saudi Aramco Schedule Q Requirements
Attachment 9 Project Bid Evaluation Formats
List of applicable Saudi Aramco Standards changed
Attachment 10
from Abu Safah Project (i.e. 31-March-2014)

This document is CONFIDENTIAL and the sole property of SAIPEM. It shall not be shown to Third Parties nor used for purposes other than those for which it was prepared.

Page 20 of 20