DATE DAY ACTIVITY

06 - 19 - 17 1 Site Supervision works (Demolition, Excavation of Footing, Layout and


Staking)

06 - 20 - 17 2 Site Supervision works (Demolition, Excavation of Footing, Layout and


Staking, Assembling of Columns and Footings)

Site Supervision works (Demolition, Excavation of Footing, Layout and


06 - 21 - 17 3 Staking, Assembling of Columns and Footings)
CAD works (Pre-design of LSU Canteen)

Site Supervision works (Demolition, Excavation of Footing, Layout and


06 - 22 - 17 4 Staking, Assembling of Columns and Footings, Installation of Scaffolding)
CAD works (Pre-design of LSU Canteen)

06 - 23 - 17 5 Site Supervision works (Demolition, Excavation of Footing, Fabrication of


Truss)

06 - 24 - 17 6 Site Supervision works (Demolition, Excavation of Footing, Fabrication of


Truss, Stirrups and Ties, Installation of Scaffolding, Columns and Footings)

Site Supervision works (Demolition, Excavation of Footing, Fabrication of


06 - 25 - 17 7 Column Forms, Truss, Stirrups and Ties, Installation of Scaffolding,
Columns and Footings)

SUPERVISOR:

______________________________________
Print name & Signature
LA SALLE UNIVERSITY
COLLEGE OF ENGINEERING AND ARCHITECTURE
WEEKLY REPORT

Name: CLIFFORD JAN T. ATIG


Company: NORMAN ARANETA VALERA AND ASSOCIATES

DATE DAY ACTIVITY

Site Supervision works (Fabrication of Column Forms, Truss, Stirrups and


06 - 27 - 17 8 Ties, Installation of Columns)

06 - 28 - 17 9 Site Supervision works (Concrete Pouring for Footings)

Site Supervision works (Excavation of Wall Footing, Fabrication of


06 - 29 - 17 10 Stirrups and Ties, Installation of Column Ties)

Site Supervision works (Excavation of Wall Footing, Fabrication of


06 - 30 - 17 11 Stirrups and Ties, Installation of Column Ties)

Site Supervision works (Demolition, Excavation of Wall Footing,


07 - 01 - 17 12 Fabrication of Truss, Stirrups and Ties, Installation of Column Ties and
Roof Beam Stirrups)

Site Supervision works (Demolition, Excavation of Wall Footing,


07 - 02 - 17 13 Fabrication of Truss, Stirrups and Ties, Installation of Column Ties and
Roof Beam Stirrups)

14 Site Supervision works (Excavation of Footing, Concrete Pouring for Wall


07 - 03 - 17 Footing, Fabrication of Truss, Stirrups and Ties, Installation of Column
Ties and Roof Beam Stirrups, Installation of Bars for Wall Footing)

SUPERVISOR:

______________________________________
Print name & Signature
LA SALLE UNIVERSITY
COLLEGE OF ENGINEERING AND ARCHITECTURE
WEEKLY REPORT

Name: CLIFFORD JAN T. ATIG


Company: NORMAN ARANETA VALERA AND ASSOCIATES

DATE DAY ACTIVITY

Site Supervision works (Fabrication of Wall Footing Form, Excavation of


07 - 04 - 17 15 Wall Footing, Steel Fabrication)

07 - 05 - 17 16 Site Supervision works (Steel Fabrication, Clearing, Assembling of Column


Forms)

Site Supervision works (Wall Footing Excavation, Concrete Pouring for


07 - 06- 17 17 Wall Footing, Fabrication and Assembling of Stirrups and Ties)

Site Supervision works (Excavation of Wall Footing, Assembling of


07 - 07 - 17 18 Column Forms, Installation of Rafters, Concrete Pouring for Wall Footing)

07 - 08 - 17 19 Site Supervision works (Steel Fabrication, CHB Laying, Installation of


Rafters, Excavation of Wall Footing)

07 - 09 - 17 20 Site Supervision works (CHB Laying, Stripping of Forms)

07 - 10 - 17 21 Site Supervision works Excavation, Demolition, Assembling of


Formworks, Installation and Painting of Rafters, CHB laying)

SUPERVISOR:

______________________________________
Print name & Signature
LA SALLE UNIVERSITY
COLLEGE OF ENGINEERING AND ARCHITECTURE
WEEKLY REPORT

Name: CLIFFORD JAN T. ATIG


Company: NORMAN ARANETA VALERA AND ASSOCIATES

DATE DAY ACTIVITY

07 - 11 - 17 Site Supervision works (Steel Fabrication, Assembling of Formworks,


22 Column Concrete Filling and Wall Footing)

07 - 12 - 17 23 Site Supervision works (Painting of Rafters, CHB Laying, Steel


Fabrication, Assembling of Column Forms)

07 - 13 - 17 24 Site Supervision works (Installation of Rafters, CHB Laying, Assembling


of Column Forms)

07 - 14 - 17 Documentation (PERT-CPM and Site)


25 Site Supervision works (Concrete Pouring)

07 - 15 - 17 Site Supervision works (Installation of Rafters, Stripping of Forms,


26 Installation of Forms)

07 - 16 - 17 Site Supervision works (Stripping of Forms, Assembling of Forms,


27 Fabrication and Installation of Rafter Supports)

07 - 17 - 17 28 Site Supervision works (CHB Laying, Steel Fabrication, Concrete Pouring


for Beams and Columns)

SUPERVISOR:

______________________________________
Print name & Signature
LA SALLE UNIVERSITY
COLLEGE OF ENGINEERING AND ARCHITECTURE
WEEKLY REPORT

Name: CLIFFORD JAN T. ATIG


Company: NORMAN ARANETA VALERA AND ASSOCIATES

DATE DAY ACTIVITY

07 - 18 - 17 29 Site Supervision works (Stripping of Forms, CHB Laying, Concrete


Pouring)

07 - 19 - 17 30 Site Supervision works (Concrete Pouring for Roof Beam and Column,
Installation of Rafter Supports)

07 - 20 - 17 31 Site Supervision works (Concrete Pouring, CHB Laying, Rafter


Installation, Demolition, Filling)

07 - 21 - 17 32 Site Supervision works (Concrete Pouring, CHB Laying, Rafter


Installation, Demolition, Filling)

07 - 22 - 17 33 Site Supervision works (Concrete Pouring, CHB Laying, Rafter


Installation, Demolition, Filling)

07 - 23 - 17 34 Site Supervision works (Excavation for Ramp, Plastering, Assembling of


Scaffolding)