You are on page 1of 2

FINAL INSPECTION MINUTES VILENTM .

, JSC
THE CLIENT: MCS MINING INDUSTRY LAO Co.,Ltd
CONTRACT NUMBER
PROJECT: WORKSHOP BUILDING
VL-15-10

MINUTES FOR COMPLETION

Project : WORKSHOP BUILDING


Subject : Supply Pre- engineered Steel Building and Overhead crance system 10MT
Location: Khammuane provice Lao PDR
According to Contract No: VL15-10 dated 15 July 2015 signed between MCS MINING INDUSTRY
LAO Co.,Ltd and VILENTM,.jsc for Supply Pre- engineered Steel Building and Overhead
crance system 10MT capacity at Khammuane provice Lao PDR
According to the design & drawings
According to the actual work at site;
Today, we are the undersigned:
On behalf of the Client: MCS MINING INDUSTRY LAO Co.,Ltd
1. Mr. - Title: .
2. Mr. - Title ..
On behalf of the Contractor: VILENTM .,JSC.
3. Mr.. - Title .
4. Mr. - Title ..

All parties agreed to execute this Completion Minutes for the Supply Pre- engineered Steel Building and
Overhead crance system 10MT for Workshop Building as the below contents:
- VILENTM., JSC has completed of supply for steel building and overhead crance system 10MT in
accordance with the signed contract and the requirement from the Employer.
- VILENTM., JSC has completed installation all the steel structures and overhead crance system 10MT
accordance with technical and architectural requirement and installation progress has been in time as
scheduled.
- Crane equipment as the contract:
TT Name equipment unit Qtty Remark
- Single girder crane with 2 speed 10MTx13.7m, hook lift 15m,
1 Hoists ABUS / Germany. - Remote control model SAGA1-L10/Gain set 01
Electric/Taiwan. - Crance Motor Sumitomo/Japan
2 Power lines along the building : 100A-3P-380V (ITS / Taiwan) to 30m set 01

3 Crance rail and accessories for 2x30m Running set 01


4 Ladder and platform set 01

Overall erection quality is satisfactory.


The minutes is made in two copies with equal legal validity, each party keep one copy.