Aguirre
41.08%
Planning Engineer
Rev: 3
Today is: Wednesday, December 28, 2016 59%
Balance Accompished
Balance Accompished
41.08% 59%
21 6141605935 0253 airline modification job in GTC# 4 Procurement 1 set 30-Nov-16 5-Dec-16 6 16-Jan-16 -30503 0% 100% DWG. Balance, Material Balance Total Mp 0 Total Mp 0
(Purchase pressure reducing valve) Total Mh 0 Total Mh 0
22 6141605962 0261 Pipe modification and relocation 4" dia, Shop & Site 3-Dec-16 8-Dec-16 5 29-Dec-16 20 29-Dec-16 1448 100% 0% Yellow Paint 1023, Site Touch up Total Mp 0 Total Mp 0
sch40, CS Total Mh 0 Total Mh 0
23 0274 Fabrication & Installation of FTC Shop & Site 10-Dec-16 15-Dec-16 5 29-Dec-16 15 29-Dec-16 1443 100% 0% Total Mp 0 Total Mp 0
Pink Copy Delivery note for invoicing
Pipe 3 qty, 500m lenght Total Mh 0 Total Mh 0
Urgent Material Request : 4nos of Plummer
block, 2nos of bearings Total Mp 0 Total Mp 0
24 0275/0284 (22222KEJW33 C3 VT, CH0004967548). Procurement 11-Dec-16 11-Dec-16 2 1-Jan-17 -30510 90% 10% 4 to 5 weeks
2nos of thread rod, 2.5mtr length,
1-inch dia with fine thread and 10 nos of nut Total Mh 0 Total Mh 0
for thread rod.
The Bridge Between Thimble press and but Total Mp 0 Total Mp 0
25 6141606456 0292 Shop & Site 12 17-Dec-16 22-Dec-16 5 4-Jan-16 -30515 0% 100%
stripping need to be covered with a Total Mh 0 Total Mh 0
chequered plate
Precission Company
Fabrication/Cutting
1. A.) Test Flange : OD1552mm x ID1320 Total Mp 0 Total Mp 0
mm x 182mm thk, 64 holes, Hole dia:36, 1
qty, CS
B.) Test Flange : OD1535mm x ID1315
26 0296 mm x 190mm thk, 64 holes, Hole dia:36, 1 Shop & Site 20-Dec-16 25-Dec-16 6 Hold -30517 0% 100% No status updates
qty, CS
Total Mh 0 Total Mh 0
2. A.) Test Ring OD1700mm x 1340mm x
251mm thk,64 holes, hole dia:36, 1 qty, CS
B.) Test Ring OD1660mm x 1310mm x
265 mm thk,68 holes, hole dia:36, 1 qty, CS
Material Request: Total Mp 0 Total Mp 0
27 0304 1- RETAINER RING(24 Pcs as per sample Procurement 26-Dec-16 28-Dec-16 5 29-Dec-16 -30521 100% 0% Retainer Ring cancel
given) Total Mh 0 Total Mh 0
2- 2- Graphite gasket (24 Pcs) 8 150
Installation of drift eliminator Panel Total Mp 0 Total Mp 0
28 6141606380 0282 assemblies to Air Compressor Manpower Supply 13-Dec-16 14-Dec-16 4 TFC -30512 0% 100% No detail scope for the job. Yamin Report
BAC COLLING TOWER Total Mh 0 Total Mh 0
Total Mp 0 Total Mp 0
30 6141605959 0310 Fabrication and installation of paper storage Shop & Site 29-Dec-16 5-Jan-17 7 11-Jan-17 -30524 0% 0% Material Balance
shelve - 5 nos. MTV Total Mh 0 Total Mh 0
Total Mp 0 Total Mp 0
31 0312 Major Boom Repair M43 Shop 31-Dec-16 5-Jan-17 5 -30525 0% 0%
Total Mh 0 Total Mh 0
Total Mp 0 Total Mp 0
32 0311 Purchase and Installation of Fabric Shop & Site 29-Dec-16 5-Jan-17 7 -30524 0% 0% DWG. Balance, Material Balance, Scope
Expansion joint Total Mh 0 Total Mh 0
Total Mp 0 Total Mp 0
33 6111622709 0309 Major Repair Boom 5 items Shop & Site 28-Dec-16 12-Jan-17 13 -30523 0% 0%
Total Mh 0 Total Mh 0
Total Mp 0 Total Mp 0
34 0313 Core Drilling Casthouse VDC line Area Site 31-Dec-16 1-Jan-17 2 1-Jan-17 -30525 0% 0%
Total Mh 0 Total Mh 0
Chart Title
120%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 95%
92% 90%
84% 84% 84%
80%
70%
65% 65%
60%
60%
50%
50%
40%
40% 35% 35%
30%