NASHPA Gas Processing and LPG Recovery Plant

PROC-FC-CB/NASHPA/PROJ-1247/2015

PROJECT NO.: NASHPA 1247

DOCUMENT NO.:
MATERIAL TAKE-OFF PAGE 1 OF 3
NGP-000-TEL-15.04-0003-06

Telecom MTO for Loading area

REVISION DETAILS

00 15/07/2016 Approved for Design Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

C 07/07/2016 Issued for Approval Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

B 27/06/2016 Issued for Review Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

A 20/06/2016 Internal Discipline Check Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

REV DATE DESCRIPTION PRPD CHKD REVD APPD

Doc Size: A4
NASHPA Gas Processing and LPG Recovery Plant
PROC-FC-CB/NASHPA/PROJ-1247/2015
DOC. NO. NGP-000-TEL-15.04-0003-06
DESCRIPTION Telecom MTO for Loading area
REVISION 00
PAGE 2 OF 3

REVISION HISTORY

REV. DATE REVISION DESCRIPTION

A 20/06/2016 Internal Discipline Check

B 27/06/2016 Issued for Review

C 07/07/2016 Issued for Approval

00 15/07/2016 Approved for Design


CLINET: Oil & Gas Development Company Ltd.(OGDCL) Date: 15/07/2016
CONTRACTOR:Hong Kong Huihua Global Technology Limited Wholly owned subsidiary of China OIL HBP Science and Technology Corporation Ltd.HBP/HH Revision: 00
Document Number:NGP-000-TEL-15.04-0003-06 Document name:Telecom MTO for Loading area Discipline Approved for Design
Package Number: 06 Area Definition: Loading area Page: 3 of 3

Sr.No. Definition Specification Quantity Unit Remarks

ANALOG
1 TELEPHONE set 1
TELEPHONE
DISTRIBUTION
2 FRAME 10 pairs, with Surge protective device set 1

3 TELEPHONE CABLE RVV 2x0.5 m 30


TELEPHONE
4 SOCKET PANEL set 1

5 JUNCTION BOX 300(W)x150(D)x400(H) set 1


GALVANIZED STELL
6 PIPE DN25 m 6
GALVANIZED STELL
7 PIPE DN50 m 12