13.

0 ELECTRICAL SYSTEM HEALTHINESS

13.1 PARTIAL LOADING DETAILS

13.2 DETAILS OF ELECTRICAL TESTING (During the month)

13.3 STATION BATTERY SYSTEM STATUS

13.4 ACTION PLAN FOR ANY ABNORMALITY IN THE BATTERY SYSTEM

13.5 TRANSFORMERS DGA TEST STATUS

13.6. ERS COMPLIANCE

13.7 CRITICAL SPARES/REFURBISHING STATUS

13.1 PARTIAL LOADING DETAILS


Equiptment
Sl Gen Loss Root Cause And Remedial Measures
Data

1 Nil Nil Nil

13.2 DETAILS OF ELECTRICAL TESTING (During the month)

Equipt /
Test Observation Perodicity Responsibility
And Action Plan
DG Analysis of Power
Transformers AS PER 18.4
Sywd
Monthly EM Swyd
Equiptment

GT Transformers
Monthly EM Trafo & Lab
Thermo Done
Vision Scanning.
LT Swgr & Motor Quartely EM LT
HT Swgr &
Quartely EM HT
Motors
Others

Observation

Transformers No abnormality

LT Swgr &
No abnormality
motors

13.3 STATION BATTERY SYSTEM STATUS

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
LOCATION Single Earth
Fault in Result of capacity test
DC System Battery Bank of batteries in % age Voltage across total
(Y/N) Details with date Battery Bank
220V -1 100% 16-Nov-16 240.00
220V -2 110% 22-Nov-16 240.00
UNIT 1 N
24V-1 100% 18-Nov-16 27.97
24V-2 110% 22-Nov-16 28.08
220V -1 110% 17-Nov-15 239.30
220V -2 110% 18-Nov-15 240.40
UNIT 2 N
24V-1 110% 2-Dec-15 28.24
24V-2 110% 4-Dec-15 28.33

220V -1 110% 2-Sep-15 239.40

220V -2 110% 5-Sep-15 240.50

SG 24V-1 110% 30-Aug-15 27.11

SG 24V-2 110% 1-Sep-15 27.09


UNIT3 N
TG 24V-1 110% 30-Aug-15 27.05

TG 24V-2 110% 1-Sep-15 270.70

STN C&I 24V-1 110% 30-Aug-15 26.63

STN C&I 24V-2 100% 1-Sep-15 26.65

220V -1 120% 27-Dec-16 240.50

220V -2 120% 22-Dec-16 240.80

SG 24V-1 120% 29-Dec-16 26.99

SG 24V-2 120% 3-Jan-17 27.02


UNIT4 N
TG 24V-1 120% 29-Dec-16 27.11

TG 24V-2 120% 3-Jan-17 26.98

STN C&I 24V-1 110% 23-Dec-16 26.82

STN C&I 24V-2 110% 26-Dec-16 26.79

220V -1 110% 18-Jul-16 233.00

220V -2 100% 18-May-17 232.40


Swyd N
48V-1 110% 20-Jan-16 52.54

48V-2 110% 22-Jan-16 53.25

*Note: ORT Cordinator to check the above aspects personally (at random)

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
13.4 ACTION PLAN FOR ANY ABNORMALITY IN THE BATTERY SYSTEM

Unit / Battery Responsib Target


Problem Action plan
system ility Date

NIL

13.5 TRANSFORMERS DGA TEST STATUS


TRANSFORMERS LISTED FOR DGA TEST
SL NO TEST DATE
IN THE MONTH
GT#4R,4Y,4B,GT#1Y,UT#3,UAT#4A,4B,
1 16.05.2017
SpareGT(stage#1)

Note: Include the name of transformers/reactors undergoing DGA analysis according to the Stations configuration
TRANSFORMER HEALTH ASSESSMENT
ORT Coordinator may check if the data is entered in ERP - TCODE ZPMTRF_REP
ORT Coordinator may check if the data is entered in ERP - TCODE ZPMDCS_REP

13.6. ERS COMPLIANCE

COMPLIANCE SCORE FOR THE MONTH

ERS NON COMPLIANCE


SL.NO Unit Action Plan (Pr)
(DESCRIPTION)

Field protection devices in EHV


1 & Critical Transformers/To be U2 Material available at stores
replaced in ten years

Conservator air cell of


U1 Material available at stores
transformer rupture causing
unit tripping. ( All stations).
4
Conservator air cell to be
replaced after every 10
-12years. U2 Material available at stores

U1
LT Motors >100 KW/Breaker is U2
5 to be provided for all motors > PR (200070622) Initiated
100 KW. U3
U4
Failure of Generator tap-off
busduct sea-off bushing of
LAVT panel. Seal-off bushings
6 U4 Inspection during unit Overhaul
of Bus ducts to be physically
inspected for damages/ cracks
during shutdown of units
FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1
OPERATION SERVICES
Failure of Generator tap-off
busduct sea-off bushing of
LAVT panel. Seal-off bushings
6 U4 Inspection during unit Overhaul
of Bus ducts to be physically
inspected for damages/ cracks
during shutdown of units

REPLACEMENT OF
ELECTROMECH. RELAYS/All STG-1 Distance Realys : 6 out of 8 replaced. PR
GRP, Switchyard & to be initiated for remaining 2 relays
7 Switchgears Electromechanical SWYD STANDBY TRF Relays along with
relays are to be replaced by panel : PR to be initiated. Approved under
Numerical Relays.Unit wise Capital Budget 2017-18.
status/progr

U1
P.O. (4000177578) Placed. Welding recepticles
Safety/ELCB for welding & U2
8 received, balance material expected to reach
hand held tools supplies
siteby 15.07.2017
U3

Cracks in bus-duct bellows


causing moisture ingress into
bus-duct and causing tripping.
(All stations). Replacement of
9 U4 Inspection during unit Overhaul
outdoor busduct bellows to be
decided on the basis of the
condition as checked during
unit O/H.

REPLACEMENT OF
ELECTROMECH. RELAYS/All
GRP & Switchgears GRP and GRP Panels will reach the site by 05.06.17 and
10
Electromechanical relays are to Swgr PR no 100135141 initiated for swgr
be replaced by Numerical
Relays.Unit wise status/progr

13.7 CRITICAL SPARES/REFURBISHING STATUS


UNIT EQUIPMENT/SPARE STATUS

Sea water P.O. (4000181699 ) rectiformers material will


Both Electrolyzers not Working
System Electrolyzers (PO.4000163944)

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
May/2017

Target
Date

Nil

Target
Date

19-May-17

24-May-17

25-May-17

24-May-17

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
cross total
y Bank

0.00

0.00

7.97

8.08

9.30

0.40

8.24

8.33

9.40

0.50

7.11

7.09

7.05

0.70

6.63

6.65

0.50

0.80

6.99

7.02

7.11

6.98

6.82

6.79

3.00

2.40

2.54

3.25

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
Present Status

REASON IN CASE OF DEFFERMENT

As per Schedule

Stations configuration.

DGA
BATTERY HEALTHINESS

Score 95.96%

Responsibility Target Date

HOD EM AOH 2017

HOD EM Replaced in AOH 2016

HOD EM AOH 2017

HOD EM AOH 17-18

HOD EM Completed in AOH : 2016

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
HOD EM Completed in AOH : 2016

Distance relays: One relay


available to commission by
31.07.17, PR 100144732 under
approval for one more relay.
HOD EM

Stanby Trf Relays :PR by


30/06/2017

HOD EM P.O (4000177578) Placed

HOD EM Completed in AOH : 2016

GRP U-1: AOH:2018 2019


U-2: AOH: 2017-18

HOD EM
SWGR U-1: AOH:2018-2019 U-2 :
AOH: 2019-20120

TARGET DATE

iformers material will reach site by 31.05.2017.


ers (PO.4000163944) reached site.