You are on page 1of 11

Class : QCD

PT ASAHIMAS FLAT GLASS Tbk


FLAT GLASS GENERAL DIVISION No : WI - 001 - 008.G
RULES AND REGULATIONS
Page : 1 / 5

TITLE Tape Test Inspection Work Instructions

0 Established on 24 Oct 2017


No HISTORY and REVISION Date Approved by Checked by Issued by
FILE : C:\Users\EZIO\Downloads\[WI-001-008.G Tape Te GEN - FM - 001 - 000 - 004
Class : QCD
PT ASAHIMAS FLAT GLASS Tbk No : WI - 001 - 008.G
FLAT GLASS GENERAL DIVISION
Revision No. : Page : 2 / 5
RULES AND REGULATIONS
Date : Sign :
OPERATION AND QUALITY ASPECTS
Tape Test Inspection Work Instructions
Purpose Equipment and Materials Related Document

To ensure the adhesiveness of Masking tape (cellulose tape)


Coating against glass in accordance 1 inch wide
with established standards

Work Stage Important Point Reason

1. Preparation
1.1Check the condition of the - Conditions of tape are still feasible - Masking tape that has been spotted
equipment to wear marked with no spots indicating adhesivenya layer has
on the surface adhesive begun to decrease adhesiveness
so that if still used for testing tape
test results will not be maximized.

1.2Take samples of glass already in Glass taken must be glass


the coating of the production that is directly from the process
process

1.3Cut sample to size 34" x 20"

20"

34"
2. Inspection
2.1Glue the tape on the sample - The position of the tape from the edge- For uniform the point position testing
with position as in the picture of the sample 2 Inch

- After the tape is glued together - Keep the tape sticking tightly on the
tap the tape by hand Coating surface
FILE : C:\Users\EZIO\Downloads\[WI-001-008.G Tape T GEN - FM - 001 - 000 - 004
Class : QCD
PT ASAHIMAS FLAT GLASS Tbk No : WI - 001 - 008.G
FLAT GLASS GENERAL DIVISION
Revision No. : Page : 3 / 5
RULES AND REGULATIONS
Date : Sign :
OPERATION AND QUALITY ASPECTS
Tape Test Inspection Work Instructions
Purpose Equipment and Materials Related Document

2.2Pull Tape Peel and measure Drag with one beat - To uniform the technique
the length of Coating is peeling

2.3Calculate the test tape test results


Formula:

=( total coating peeled off (inchi))/("Total length of masking


tape" (Inchi)) 100%

2.4Record the test results of Tape


test

FILE : C:\Users\EZIO\Downloads\[WI-001-008.G Tape T GEN - FM - 001 - 000 - 004


Class : QCD
PT ASAHIMAS FLAT GLASS Tbk No : WI - 001 - 008.G
FLAT GLASS GENERAL DIVISION
RULES AND REGULATIONS Revision No. : Page : 4 / 5
Date : Sign :

ASPEK KESELAMATAN KERJA

Tape Test Inspection Work Instructions


Purpose Equipment and Materials
1. To ensure the basic requirements
work safety has been met
2. To protect the operator from the possibility
risk of work accident
Safety Shoes Safety Google Helmet Glove/sarung tangan

Work Stage Potential Hazards & Effects of Injury Prevention

1. Sample Preparation
1.1 Cut sample to size 34" x 20" - Hands exposed to the side of glass - Use Rubber Gloves
during fracture ---> Scratch on hand

- Eyes concave cullet when fracture - Use Safety Goggle


----> eye injury
FILE : GEN - FM - 001 - 000 - 004
Class : QCD
PT ASAHIMAS FLAT GLASS Tbk No : WI - 001 - 008.G
FLAT GLASS GENERAL DIVISION
RULES AND REGULATIONS Revision No. : Page : 5 / 5
Date : Sign :

ENVIRONMENT ASPECTS

Tape Test Inspection Work Instructions


Purpose Equipment and Materials

Work Stage Potential Hazard and Effect Prevention & Countermeasures

no impact on the environment


FILE : GEN - FM - 001 - 000 - 004
PT ASAHIMAS FLAT GLASS Tbk
FLAT GLASS GENERAL DIVISION
RULES AND REGULATIONS

DOCUMENT SOSIALIZATION RECORD


Tape Test Inspection Work Instructions

DOCUMENT TITLE : Tape Test Inspection Work Instructions


CODE OF DOC : QCD
DEPT. /DIV. : QUALITY CONTROL / PRODUKSI
NO. OF DOC. : WI - 001 - 008.G

NO NAME NIK DATE SIGNATURE


01 01 02

02
03 03 04

04
05 05 06

06
07 07 08

08

09 09 10

10

11 11 12

12
13 13 14

14
15 15 16

16
17 17 18

18

19 19 20

20

GEN - FM - 001 - 000 - 007


`
PT ASAHIMAS FLAT GLASS Tbk
FLAT GLASS GENERAL DIVISION
RULES AND REGULATIONS

HISTORY - LIST
DOCUMENT TITLE : Tape Test Inspection Work Instructions
CODE OF DOC : QCD
DEPT. /DIV. : QUALITY CONTROL / PRODUKSI
NO. OF DOC. : WI - 001 - 008.G

Page : 1 of 1
MODIFICATION of DOCUMENT DIV./DEPT Sign
No. REASON
Date Page & Item No PIC./Name Dept Head
Establish Document
0 24 Oct 17 Establish Quality System for Quality Control
Ganesha Plant

FILE : QMR-FM-001-000-006

You might also like