You are on page 1of 2

V-01 C-01 E-01 E-02 E-03 FLASH SEPARATOR

INLET GAS COMPRESSOR AIR COOLER OUT LET FRIST EVAPORATOR CHILLER AND JT VALVE CHILLER AND JT VALVE
SEPARATOR BOOSTER GAS COMPRESSOR
BOOSTER

JT V

-35 deg F -45 deg F


FROM
-45 deg F 2" 150# 2" 150# 2" 150#
SEPARATOR TO LNG
Gas Cool In Gas Hot Out
2" 150#
PLANT
-35 deg F
E-03 V-02
180 deg F 115 deg F
V-01
Gas Hot In Gas Hot out Gas Hot In Gas Cool out
E-01 -35 deg F
-35 deg F
Gas Cool In
C-01 Gas Hot Out 45 deg F

E-02

Gas Hot In Gas Cool out 115 deg F PRV

115 deg F

2" 150# 2" 150# 2" 150#

2" 150#
TO CNG
PLANT
FROM INLET
GAS LNG
SEPARATOR

Reverence Specification Revision Owner Client Job No


Title REV Date Description By Chk Appd Client Appd

Engineering Title Drawing No


PFD
Scale PO .. No Rev.
PT. Prosympac LPG SYSTEM GAS TREATMENT A3
N/A N/A
V-03 E-04 V-04 E-05 E-06 V-05 E-07
GAS INLET LNG REBOILER 1ST DESTILATION HEAT REBOILER 2ND DESTILATION HEAT
SEPARATOR 1ST EXHANGER 1ST 2ND EXHANGER 2ND

FROM Out let C1, C2


TO MIXER LINE CNG
FLASH SEPARATOR PLANT
45 Deg F -25 Deg F
In Hot Gas Out Hot Gas Out let C3
V-03

E-05
120 Deg F 110 Deg F
In Hot Gas Out Hot Gas
In Cold R22 Out Cold R22
Out Cold V-04
In Cold Gas TO LPG TANK
-45 deg F Gas Out let C4
45 Deg F 600 LBM/HR C3
E-04 E-07
700 LBM /HR C4
120 Deg F
In Hot Oil Out Hot Oil
180 deg F 160 deg F Out Cold V-05
In Cold Gas Gas
In Cold H2O Out Cold H2O
45 Deg F
160 deg F 120 Deg F TO CONDENSATE TANK
E-06
In Hot Oil Out let C5 , C6 +
Out Hot Oil
FROM 160 deg F
120 deg F
HOT OIL BOILER

TO EXPANSION TANK
HOT OIL BOILER

Reverence Specification Revision Owner Client Job No


Title REV Date Description By Chk Appd Client Appd

Engineering Title Drawing No


PFD
Scale PO .. No Rev.
PT. Prosympac LPG SYSTEM A3
N/A N/A