Hostel Buildings
The planning considers the contour topography, terrain and eco-systems giving maximum
benefits to users. The efficiency in construction is maintained by reducing the cost of
construction with volume and weight of materials. Apart from basalt, other regional materials
like natural stones like Kadappah, granite, marble, sandstone, Gokak stone, Alkud sand are used
which are low energy intensive materials. Pre cast frames with fly ash are used in interiors for
WC and baths whilst as natural stones for flooring are used over 80% of the area further reducing
the cost.
The planning is to reduce conventional energy demand so the factors as day light, wind
and sun factors are considered for designing appropriate light and ventilation. Air conditioners
are not used anywhere in the project.
RPI Office of PTS Mess Building
The circulation efficiency is optimized by centrally managing roads and pedestrians.
Walkways for all buildings and infrastructure take minimum length for circulation. Lawns and
ample trees are provided in between paving for comfort from heat transfer. The aggregate
corridors and passages are provided for utility lines to maximize extra space.
Various energy saving aspects are incorporated in the project. Rain water harvesting, SIBF
system for water recyling and solar PV hybrid system for internal lighting and street lighting,
biogas plant for cooking and solar heaters for water heating are the main features of the project.
The recycled water is used for plantations and landscaping with additional benefits of creating
the pleasant atmosphere at lake front.
Project: Institutional
Client: Maharashtra State Police Housing & Welfare Corporation Pvt. Ltd.