You are on page 1of 17

Resource Loading

No Task Name Predecor Successor Budgeted Budgated


Unit Cost
GI 150 KV PERAWANG
A. GENERAL PREPARATION
B. PROCUREMENT
B.2 EARTH WORKS
15 Issued Requistion For Quotation (RFQ)
16 Commercial Clarification and Negotiation
17 Sub Contract Agreement
B.3 CIVIL WORKS
18 Issued Requistion For Quotation (RFQ)
19 Commercial Clarification and Negotiation
20 Sub Contract Agreement
B.4 SUBSTATION EARTHING SYSTEM
Material BCC, Grounding Rod, Clamp & Acces
21 Issued Requistion For Quotation (RFQ)
22 Commercial Clarification and Negotiation
23 Award PO + Payment DP
24 Fabrication and FAT
25 Packing For Shippment Delivery
Transportation/Shippment (Forwarder)
26 Issued RFQ
27 Release PO
28 Shippment BCC, Grounding Rod, Clamp & Accessories
B.5 STEEL STRUCTURE FOR GANTRY
Material Gantry and Support
29 Issued Requistion For Quotation (RFQ)
30 Commercial Clarification and Negotiation
31 Award PO + Payment DP
32 Fabrication and FAT
33 Packing For Shippment Delivery
Transportation/Shippment (Forwarder)
34 Issued RFQ
35 Release PO
36 Shippment Gantry
B.6 INSULATOR and FITTINGS
Material Gantry and Support
37 Issued Requistion For Quotation (RFQ)
38 Commercial Clarification and Negotiation
39 Award PO + Payment DP
40 Fabrication and FAT
41 Packing For Shippment Delivery
Transportation/Shippment (Forwarder)
42 Issued RFQ
43 Release PO
44 Shippment Insulator and Fitting
B.7 BULK MATERIAL
Bulk Material
45 Issued Requistion For Quotation (RFQ)
46 Commercial Clarification and Negotiation
47 Award PO + Payment DP
Transportation/ Shipment
48 shippment for Material on Site Bulk Material
B.8 HV APPARATUS
Material 150 kV Disconnecting Switch (DS)
49 Issued Requistion For Quotation (RFQ)
50 Commercial Clarification and Negotiation
51 Award PO + Payment DP
52 Fabrication and FAT
53 Packing For Shippment Delivery
Material 150 kV Lightning Arrester (LA)
54 Issued Requistion For Quotation (RFQ)
55 Commercial Clarification and Negotiation
56 Award PO + Payment DP
57 Fabrication and FAT
58 Packing For Shippment Delivery
Transportation (Forwarder)
59 Issued RFQ DS and LA
60 Release PO DS and LA
61 Inland transportation Disconnecting Switch (DS)
62 Material on Site Disconnecting Switch (DS)
63 CIF Origin port of Lightning Arrester (LA)
64 Destination port of Lightning Arrester (LA)
65 Custom Clearance
66 Inland transportation Lightning Arrester (LA)
67 Material on Site Lightning Arrester (LA)

B.9 PROTECTION / CONTROL PANEL, SAS & MARSHALLING KIOSK

Material Protection Panel, SAS and Marshaling Kiosk


68 Issued Requistion For Quotation (RFQ)
69 Commercial Clarification and Negotiation
70 Award PO + Payment DP
71 Fabrication and FAT
72 Packing For Shippment Delivery
Transportation (Forwarder)
73 Issued RFQ
74 Release PO
75 Shippment Protection Panel, SAS and Marshaling Kiosk
76 Inland transportation
B.10 NGR & NCT
Material NGR & NCT
77 Issued Requistion For Quotation (RFQ)
78 Commercial Clarification and Negotiation
79 Award PO + Payment DP
80 Fabrication and FAT
81 Packing For Shippment Delivery
Transportation (Forwarder) NGR & NCT
82 Issued RFQ
83 Release PO
84 Shippment Protection Panel, SAS and Marshaling Kiosk
85 Inland transportation
B.11 BATTERY, CHARGER AND DISTRIBUTION BOARD
Material Battery, Charger, Distribution Board
86 Issued Requistion For Quotation (RFQ)
87 Commercial Clarification and Negotiation
88 Award PO + Payment DP
89 Fabrication and FAT
90 Packing For Shippment Delivery
Transportation Battery, Charger, Distribution Board
91 Issued RFQ
92 Release PO
93 Shippment Protection Panel, SAS and Marshaling Kiosk
94 Inland transportation
B.12 DIGITAL FAULT RECORDER
Material Digital Fault Recorder
95 Issued Requistion For Quotation (RFQ)
96 Commercial Clarification and Negotiation
97 Award PO + Payment DP
98 Fabrication and FAT
99 Packing For Shippment Delivery
Transportation ( Forwarder ) Battery, Charger, Distribution
Board
100 Issued RFQ
101 Release PO
102 Shippment Protection Panel, SAS and Marshaling Kiosk
103 Inland transportation
B. 13 CIRCUIT BREAKER (CB)
Material Circuit Breaker (CB)
104 Issued Requistion For Quotation (RFQ)
105 Commercial Clarification and Negotiation
106 Award PO + Payment DP
107 Fabrication and FAT
108 Packing For Shippment Delivery
Transportation ( Forwarder ) Circuit Breaker (CB)
109 Issued RFQ
110 Release PO
111 Shippment Protection Panel, SAS and Marshaling Kiosk
112 Inland transportation
B.14 CURRENT TRANSFORMER (CT)
Material Current Transformer (CT)
113 Issued Requistion For Quotation (RFQ)
114 Commercial Clarification and Negotiation
115 Award PO + Payment DP
116 Fabrication and FAT
117 Packing For Shippment Delivery
Transportation Current Transformer (CT)
118 Issued RFQ
119 Release PO
120 Shippment Protection Panel, SAS and Marshaling Kiosk
121 Inland transportation
B.15 CAPASITOR VOLTAGE TRANSFORMER (CVT)
Material Capasitor Voltage Transformer (CVT)
122 Issued Requistion For Quotation (RFQ)
123 Commercial Clarification and Negotiation
124 Award PO + Payment DP
125 Fabrication and FAT
126 Packing For Shippment Delivery
Transportation/Shippment Current Transformer (CT)
127 Issued RFQ
128 Release PO
129 Shippment Current Transformer (CT)
130 Inland transportation Current Transformer (CT)
B.16 MULTIPLEXER STM-4
Material Multiplexer STM-4
130 Issued Requistion For Quotation (RFQ)
131 Commercial Clarification and Negotiation
132 Award PO + Payment DP
133 Fabrication and FAT
134 Packing For Shippment Delivery
Transportation/Shippment Multiplexer STM-4
135 Issued RFQ
136 Release PO
137 Shippment Multiplexer STM-4
138 Inland transportation Multiplexer STM-4
B. 17 CONDUCTOR & CABLES
Material Conductor, LV Cables, MV Cables
139 Issued Requistion For Quotation (RFQ)
140 Commercial Clarification and Negotiation
141 Award PO + Payment DP
142 Fabrication and FAT
143 Packing For Shippment Delivery
Transportation/Shippment Conductor, LV Cables, MV Cables
144 Issued RFQ
145 Release PO
146 Shippment Conductor, LV Cables, MV Cables
147 Inland transportation Conductor, LV Cables, MV Cables
B. 18 ERECTION / INSTALLATION & TESTING PACKAGE
148 Issued RFQ
149 Quotation Received
150 Commercial Clarification and Negotiation
151 Release PO Erection/Instalation Work Package
C. CONSTRUCTION
COMMISSIONING
TOTAL 1.00
Resource Loading Stochastic Duration Estimation
Weight
Budgeted Optimistic Most Likely Pesmistic Expected Time Variance
Resource Progress
Work (O) (M) (P) (E T ) V
100.00%
100.00%
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00

0.00%

0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00%
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00
0.00% 0 0.00 0.00

0.00%
100.00% 0.00
mation Experience Duration Judgment
Probability Duration Duration GI Guluk - GI Garuda
GI Batu Licin GI Perawang
(D) (Rounded) Guluk Sakti

10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00

10.00% 0.00
10.00% 0.00
10.00% 0.00
10.00% 0.00
No Task Name

GI 150 KV PERAWANG
A. GENERAL PREPARATION
1 Contract Sign
2 Effective Date
3 Kick Off Meeting
4 BASTL
5 BAST 1
6 Submit Master Schedule (Baseline Schedule and S_Curve
7 Submit Project Execution Plan
8 Submit Material Catalog/Brand
9 Submit Vendor list
10 Submit HSE Plan
11 Submit Summary ITP Plan and Procedure
12 Submit Risk Register
13 Received Drawing From PLN UIP II SUMBAGUT
14 Received Material Spec From PLN UIP II SUMBAGUT
B. PROCUREMENT
B.2 EARTH WORKS
15 Issued Requistion For Quotation (RFQ)
16 Commercial Clarification and Negotiation
17 Sub Contract Agreement
B.3 CIVIL WORKS
18 Issued Requistion For Quotation (RFQ)
19 Commercial Clarification and Negotiation
20 Sub Contract Agreement
B.4 SUBSTATION EARTHING SYSTEM
Material BCC, Grounding Rod, Clamp & Acces
21 Issued Requistion For Quotation (RFQ)
22 Commercial Clarification and Negotiation
23 Award PO + Payment DP
24 Fabrication and FAT
25 Packing For Shippment Delivery
Transportation/Shippment (Forwarder)
26 Issued RFQ
27 Release PO
28 Shippment BCC, Grounding Rod, Clamp & Accessories
B.5 STEEL STRUCTURE FOR GANTRY
Material Gantry and Support
29 Issued Requistion For Quotation (RFQ)
30 Commercial Clarification and Negotiation
31 Award PO + Payment DP
32 Fabrication and FAT
33 Packing For Shippment Delivery
Transportation/Shippment (Forwarder)
34 Issued RFQ
35 Release PO
36 Shippment Gantry
B.6 INSULATOR and FITTINGS
Material Gantry and Support
37 Issued Requistion For Quotation (RFQ)
38 Commercial Clarification and Negotiation
39 Award PO + Payment DP
40 Fabrication and FAT
41 Packing For Shippment Delivery
Transportation/Shippment (Forwarder)
42 Issued RFQ
43 Release PO
44 Shippment Insulator and Fitting
B.7 BULK MATERIAL
Bulk Material
45 Issued Requistion For Quotation (RFQ)
46 Commercial Clarification and Negotiation
47 Award PO + Payment DP
Transportation/ Shipment
48 shippment for Material on Site Bulk Material
B.8 HV APPARATUS
Material 150 kV Disconnecting Switch (DS)
49 Issued Requistion For Quotation (RFQ)
50 Commercial Clarification and Negotiation
51 Award PO + Payment DP
52 Fabrication and FAT
53 Packing For Shippment Delivery
Material 150 kV Lightning Arrester (LA)
54 Issued Requistion For Quotation (RFQ)
55 Commercial Clarification and Negotiation
56 Award PO + Payment DP
57 Fabrication and FAT
58 Packing For Shippment Delivery
Transportation (Forwarder)
59 Issued RFQ DS and LA
60 Release PO DS and LA
61 Inland transportation Disconnecting Switch (DS)
62 Material on Site Disconnecting Switch (DS)
63 CIF Origin port of Lightning Arrester (LA)
64 Destination port of Lightning Arrester (LA)
65 Custom Clearance
66 Inland transportation Lightning Arrester (LA)
67 Material on Site Lightning Arrester (LA)
B.9 PROTECTION / CONTROL PANEL, SAS & MARSHALLING KIOSK
Material Protection Panel, SAS and Marshaling Kiosk
68 Issued Requistion For Quotation (RFQ)
69 Commercial Clarification and Negotiation
70 Award PO + Payment DP
71 Fabrication and FAT
72 Packing For Shippment Delivery
Transportation (Forwarder)
73 Issued RFQ
74 Release PO
75 Shippment Protection Panel, SAS and Marshaling Kiosk
76 Inland transportation
B.10 NGR & NCT
Material NGR & NCT
77 Issued Requistion For Quotation (RFQ)
78 Commercial Clarification and Negotiation
79 Award PO + Payment DP
80 Fabrication and FAT
81 Packing For Shippment Delivery
Transportation (Forwarder) NGR & NCT
82 Issued RFQ
83 Release PO
84 Shippment Protection Panel, SAS and Marshaling Kiosk
85 Inland transportation
B.11 BATTERY, CHARGER AND DISTRIBUTION BOARD
Material Battery, Charger, Distribution Board
86 Issued Requistion For Quotation (RFQ)
87 Commercial Clarification and Negotiation
88 Award PO + Payment DP
89 Fabrication and FAT
90 Packing For Shippment Delivery
Transportation Battery, Charger, Distribution Board
91 Issued RFQ
92 Release PO
93 Shippment Protection Panel, SAS and Marshaling Kiosk
94 Inland transportation
B.12 DIGITAL FAULT RECORDER
Material Digital Fault Recorder
95 Issued Requistion For Quotation (RFQ)
96 Commercial Clarification and Negotiation
97 Award PO + Payment DP
98 Fabrication and FAT
99 Packing For Shippment Delivery
Transportation ( Forwarder ) Battery, Charger, Distribution Board
100 Issued RFQ
101 Release PO
102 Shippment Protection Panel, SAS and Marshaling Kiosk
103 Inland transportation
B. 13 CIRCUIT BREAKER (CB)
Material Circuit Breaker (CB)
104 Issued Requistion For Quotation (RFQ)
105 Commercial Clarification and Negotiation
106 Award PO + Payment DP
107 Fabrication and FAT
108 Packing For Shippment Delivery
Transportation ( Forwarder ) Circuit Breaker (CB)
109 Issued RFQ
110 Release PO
111 Shippment Protection Panel, SAS and Marshaling Kiosk
112 Inland transportation
B.14 CURRENT TRANSFORMER (CT)
Material Current Transformer (CT)
113 Issued Requistion For Quotation (RFQ)
114 Commercial Clarification and Negotiation
115 Award PO + Payment DP
116 Fabrication and FAT
117 Packing For Shippment Delivery
Transportation Current Transformer (CT)
118 Issued RFQ
119 Release PO
120 Shippment Protection Panel, SAS and Marshaling Kiosk
121 Inland transportation
B.15 CAPASITOR VOLTAGE TRANSFORMER (CVT)
Material Capasitor Voltage Transformer (CVT)
122 Issued Requistion For Quotation (RFQ)
123 Commercial Clarification and Negotiation
124 Award PO + Payment DP
125 Fabrication and FAT
126 Packing For Shippment Delivery
Transportation/Shippment Current Transformer (CT)
127 Issued RFQ
128 Release PO
129 Shippment Current Transformer (CT)
130 Inland transportation Current Transformer (CT)
B.16 MULTIPLEXER STM-4
Material Multiplexer STM-4
130 Issued Requistion For Quotation (RFQ)
131 Commercial Clarification and Negotiation
132 Award PO + Payment DP
133 Fabrication and FAT
134 Packing For Shippment Delivery
Transportation/Shippment Multiplexer STM-4
135 Issued RFQ
136 Release PO
137 Shippment Multiplexer STM-4
138 Inland transportation Multiplexer STM-4
B. 17 CONDUCTOR & CABLES
Material Conductor, LV Cables, MV Cables
139 Issued Requistion For Quotation (RFQ)
140 Commercial Clarification and Negotiation
141 Award PO + Payment DP
142 Fabrication and FAT
143 Packing For Shippment Delivery
Transportation/Shippment Conductor, LV Cables, MV Cables
144 Issued RFQ
145 Release PO
146 Shippment Conductor, LV Cables, MV Cables
147 Inland transportation Conductor, LV Cables, MV Cables
B. 18 ERECTION / INSTALLATION & TESTING PACKAGE
148 Issued RFQ
149 Quotation Received
150 Commercial Clarification and Negotiation
151 Release PO Erection/Instalation Work Package
C. CONSTRUCTION
PREPARATION WORKS
151 Mobilisasi and Demobilisasi
152 Direksi Keet, Mess and Warehouse
153 land Clearing
154 Install Bouwplank
CIVIL WORKS
153 Pekerjaan Pondasi Switchyard
154 Pekerjaan Cable Duct dan Tutup Cable Duct
155 Pekerjaan Pipa Conduit
156 Pekerjaan Penyangga Kabel/Cable Tray
157 Pekerjaan Drainase
158 Pekerjaan Hamparan Koral dan Kansteen
159 Pekerjaan Pagar Switchyard
160 Pekerjaan Saluran Switchyard
161 Inspection Test adn Punchlist
SUBSTATION EARTHING SYSTEM
162 Instalation BCC, Grounding Rod, Clamp & Accessories
163 Inspection Test and Punchlist
STEEL STRUCTURE FOR GANTRY
164 Erection Gantry Steel Support
165 Inspection Test and Punchlist
INSULATOR & FITTINGS
166 Installation Insulator and Fitting
167 Inspection Test and Punchlist
HV APPARATUS
168 Install HV Apparatus
169 Install Power Transformer
170 Inspection Test and Punchlist
PROTECTION / CONTROL PANEL, SAS & MARSHALLING KIOSK
171 Installation Protection Panel, SAS and Marshaling Kiosk
172 Inspection Test and Punchlist
NGR & NCT
173 Installation NGR and NCT
174 Inspection Test and Punchlist
BATTERY, CHARGER AND DISTRIBUTION BOARD
175 Installation Battery, Charger
176 Inspection Test and Punchlist
DIGITAL FAULT RECORDER
177 Installation Digital fault Recorder
178 Inspection Test and Punchlist
CIRCUIT BREAKER (CB)
179 Installation Circuit Breaker (CB)
180 Inspection Test and Punchlist
CURRENT TRANSFORMER (CT)
181 Installation Current Transformer
182 Inspection Test and Punchlist
CAPASITOR VOLTAGE TRANSFORMER (CVT)
183 Installation Voltage transformer (VT)
184 Inspection Test and Punchlist
MULTIPLEXER STM-4
185 Installation Mulltiplexer - 4
186 Inspection Test and Punchlist
CONDUCTOR & CABLES
187 Install Conductor
188 Pull Wiring cable Protectrion Panel, SAS, MK
189 Pull Wiring Cable HV Apparatus
190 Pull Wiring cable Other Equipment & Panel
191 Inspection Test and Punchlist
COMMISSIONING
Other System
HV Apparatus
Protection Panel & SAS
System Test
Energize
TOTAL