OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
JANUARY
February
March
Tuesday 3/1/2016
1 Leong Kar Heng 747/P5 Preparation of V.O for ID lockers
2 Oscar Saw 747/P4 Preparation of VRF for Archi Casaka
3
4
5
6
7
8
9
10
Wednesday 3/2/2016
1 Madi 771/T3 Prepare alternative BQ for tender
2 Ho Jia Yuen 779 Pile caps - RC, formwork and rebar
3 Leong Kar Heng 747 Preparation of Main Interim valuation
4 Oscar Saw 747 Preparation of Main Interim valuation
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 3/3/2016
1 Leong Kar Heng 747/P5 Preparation of Main Interim valuation
2
3
4
5
6
7
8
9
10
Friday 3/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/5/2016
1 Madi 771/T3 Prepare alternative BQ for tender
2 Ho Jia Yuen 790 Architectural works for tender - GF, FF & RL
3 Leong Kar Heng 747/1ST2GE Preparation of Main Interim valuation
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 3/6/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/7/2016
1 Oscar Saw 747/P4 Variation Order for Counter top & Basin
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Tuesday 3/8/2016
1 Shawal 747 Prepare Contract Drawing Icon City Package 5 Signage
2 Leong Kar Heng 747 Update p5 V.O list based on agreed V.O recommendation
3
4
5
6
7
8
9
10
Wednesday 3/9/2016
1 Leong Kar Heng 747/p5 Preparation of V.O for E.I 70 @ revised beam detail
2
3
4
5
6
7
8
9
10
Thursday 3/10/2016
1 Ho Jia Yuen 790 Beam Rebar for Sales gallery
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
2
3
4
5
6
7
8
9
10
Friday 3/11/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/12/2016
1 Ho Jia Yuen 779 Diaphragm wall Zones 6 & 7
2 Madi 771/SUB Remeasurement & Final Account (Tower 5)
3 Leong Kar Heng 747/p5 Preparation of V.O for E.I 102 @ revised beam detail
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Sunday 3/13/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/14/2016
1 Sum Nam Teng 763 Measurement for SLP payment
2 Cheng Meliyn 763 V O paper for Tower A
3 Madi 771/SUB Measurement for skin wall (VO due to revised drwg)
4 Lee Kian Woei 747 Package 7 Renovation Tender
5 Leong Kar Heng 747 EXT - Preparation of V.O for CBP in lieu of Diaphragm wall
6 Oscar Saw 747 Package 4 VO Measurement
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 3/15/2016
1 Wendy Kok 720-Setia Alam Adjustment of PC rated for floor and wall tiles
2 Sum Nam Teng 763 V O paper for Tower N
3 Cheng Meliyn 763 V O paper for Tower A
4 Lee Kian Woei 747 Package 6 Financial Statement
5 Leong Kar Heng 747 Package 5 Financial Statement
6
7
8
9
10
Wednesday 3/16/2016
1 Sum Nam Teng 763 V O paper for Tower N
2 Cheng Meliyn 763 V O paper for Tower A
3 Shawal 747 Prepare Contract Document
4 Leong Kar Heng 791 Jelutong VO measurement for ceiling
5 Oscar Saw 747 Package 4 VO Measurement
6 Lee Kian Woei 747 Package 7 VO for additional railling
7
8
9
10
Thursday 3/17/2016
1 Cheng Meljyn 763 VO paper for Section1 & Tower A
2 Sum Man Teng 763 VO paper for Tower N
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Friday 3/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/19/2016
1 Madi 771/T3 Measurement for prestress slab (Addendum)
2 Shawal 791 Prepare Contract Document Jelutong
3 Leong Kar Heng 747 Update P5 Financial statement
4 Oscar Saw 747 Quotation 38 VO measurement
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Sunday 3/20/2016
1 Madi 771/T3 BQ editing & measurement for ceiling (revised) - Addendum
2 Shawal 791 Prepare Contract Document Jelutong
4
5
6
7
8
9
10
Monday 3/21/2016
1 Cheng Meljyn 763 VO paper for Section 1a
2 Sum Man Teng 763 VO paper for Section 2a
3 Leong Kar Heng 791 Jelutong cost estimate for extension of structure part
4 Shawal 791 Prepare Contract Document Jelutong
5 Amir 700 Payment Sub-structure & Superstructure Package
7
8
9
10
Tuesday 3/22/2016
1 Cheng Meljyn 763 VO paper for Section 1a
2 Sum Man Teng 763 VO paper for Section 2a
3 Lee Kian Woei 747 Financial Statement Package 3 Residual
4 Leong Kar Heng 747 Package 5 VO additional wall paneling for tower 1 lobby
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Wednesday 3/23/2016
1 Shawal 747 Prepare Contract Document Icon City Package 5 Signage
2
3
4
5
6
7
8
9
10
Thursday 3/24/2016
1 Lee Kian Woei 747 Water Reticulation Remeasurement
2 Leong Kar Heng 747 Package 5 VO Measurement
3 Shawal 747 Prepare Contract Document CCTV
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Friday 3/25/2016
1 Oscar Saw 774 Prepare budget for Additonal Ramp D1
2
3
4
5
6
7
8
9
10
Saturday 3/26/2016
1 Madi 771/T3 BQ - Addendum
2 Lee Kian Woei 747 Water Reticulation Remeasurement
3 Leong Kar Heng 747 Package 5 VO Measurement
4 Oscar Saw 747 Package 4 VO Measurement
5 Shawal 747 Prepare Contract Drawing Icon City Package 3 Residual
6
7
8
9
10
Sunday 3/27/2016
1 Madi 771/T3 Estimate
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Monday 3/28/2016
1 Lee Kian Woei 747 Water Reticulation Remeasurement
2 Leong Kar Heng 747 Extension 2 Grid Line Progress Payment
3 Oscar Saw 747 Package 4 VO Measurement
4
5
6
7
8
9
10
Tuesday 3/29/2016
1 Lee Kian Woei 747 Water Reticulation Remeasurement
2 Leong Kar Heng 747 Package 5 NSC VO
3 Oscar Saw 747 Package 4 VO Measurement
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Wednesday 3/30/2016
1 Lee Kian Woei 747 Package 6 Progress Payment
2 Leong Kar Heng 747 Extension 2 Grid Line Progress Payment
3 Oscar Saw 747 VO Measurement
4
5
6
7
8
9
10
Thursday 3/31/2016
1 Lee Kian Woei 747 Water Reticulation Progress Payment
2 Leong Kar Heng 747 Package 5 Progress Payment
3 Oscar Saw 747 Package 4 VO Measurement
4 Shawal 747 Prepare Contract Document
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
April
Friday 4/1/2016
1 Oscar Saw 747 Measurement of workdone for Package 4 Progress Payment (March)
2
3
4
5
6
7
8
9
10
Saturday 4/2/2016
1 Oscar Saw 747 Progress Payment for Package 4 (March)
2 Lee Kian Woei 747 Progress Payment for Package 6 (March)
3 Leong Kar Heng 747 Progress Payment for Package 5 (March)
4 Shawal 747 Prepare Contract Document Art Sculpture
5
6
7
8
9
10
Sunday 4/3/2016
1
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Monday 4/4/2016
1 Oscar Saw 747 Package 4 Estimate Final adjustment of Contract Sum
2 Lee Kian Woei 747 Cost Estimate of epoxy paint for ramp
3 Leong Kar Heng 747 Estimate for escalator weather protection
4
5
6
7
8
9
10
Tuesday 4/5/2016
1 Lee Kian Woei 747 PCM Tender Report as requested by Mah Sing
2 Leong Kar Heng 747 VO Measurement for revised beam detail
3 Shawal 747 Prepare Contract Document Package 3 Residual
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Wednesday 4/6/2016
1 Lee Kian Woei 747 PCM Report as requested by Mah Sing
2 Leong Kar Heng 747 VO for additional architrave on lift lobby
3 Oscar Saw 747 PCM Report as requested by Mah Sing
4 Shawal 747 Prepare Contract Document Package 4 Signage
5
6
7
8
9
10
Thursday 4/7/2016
1 Lee Kian Woei 747 Vo Measurement for Package 6
2 Leong Kar Heng 747 PCM Report as requested by Mah Sing
3 Oscar Saw 747 PCM Report as requested by Mah Sing
4 Shawal 747 Prepare Contract Document Package 3 Residual Saucer Restaurant
5
6
7
8
9
10
Friday 4/8/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
1
2
3
4
5
6
7
8
9
10
Saturday 4/9/2016
1 Madi 771/SUB Measurement structural works (lowest basement)
2 Oscar Saw 747 VO Package 4 Aluminium & Glazing
3 Leong Kar Heng 747 VO Package 5 ID additional partition hoarding for VP room
4 Shawal 747 Prepare Contract Document Package 3 Residual
5
6
7
8
9
10
Sunday 4/10/2016
1 Madi 771/T3 Measurement structural works (staircase, lift core)
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Monday 4/11/2016
1 Cheng Meljyn 763 Interim Certificate
2 Sum Man Teng 763 Interim Certificate
3 Madi 771/T3 Measurement structural works (column -reinforcement)
4 Lee Kian Woei 747 Vo Measurement for LDP Upgrading
5 Leong Kar Heng 747 Loss and expenses for external 2 grid line
6 Oscar Saw 747 VO Package 4 Aluminium & Glazing
7 Shawal 747 Prepare Contract Document Package 3 Signage
8
9
10
Tuesday 4/12/2016
1 Cheng Meljyn 763 Interim Certificate
2 Sum Man Teng 763 Interim Certificate
3 Lee Kian Woei 747 Vo Measurement for LDP Upgrading Revised Signage
4 Oscar Saw 747 VO Package 4 Aluminium & Glazing
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 4/13/2016
1 Lee Kian Woei 747 Tabulation for Package 3, Package 4 7 Package 5 Car Park Construction Cost and GFA as
requested by Mah Sing
2 Leong Kar Heng 747 VO Package 4 Aluminium & Glazing & VRF Form
3 Shawal 747 Prepare Contract Document Package 5 Signage
4
5
6
7
8
9
10
Thursday 4/14/2016
1 Leong Kar Heng 747 Revised Package 5 Aluminium & Glazing Payment
2 Oscar Saw 747 Revised Package 4 Aluminium & Glazing Payment
3 Shawal 747 Prepare Contract Document Package 3 Residual Saucer Restaurant
4
5
6
7
8
9
10
Friday 4/15/2016
1 Madi 771/T3 Addendum BQ
2 Shawal 747 Prepare Contract Document Package 3 Residual Canopy
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
4
5
6
7
8
9
10
Saturday 4/16/2016
1 Madi 771/T3 PTE
2 Leong Kar Heng 747 VO for Package 5 ID Folding door
3 Oscar Saw 747 VO for Package 4 ID
4 Shawal 747 Prepare Contract Document Package 3 Residual Syphonic
5
6
7
8
9
10
Sunday 4/17/2016
1 Mohd Shawal KL/766 Pra-Sekolah Prepare MOA Doc for Pakej 8 Kompok 2 & 5 Urgent dispatch to KPM Putrajaya
2 as instructed by Sr Hisham / MK instruction to Shawal
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Monday 4/18/2016
1 Lee Kian Woei 747 Package 3 Residual Work Vo for VP Room Storage Cabinate
2 Leong Kar Heng 747 Package 5 Omission VO from contract
3 Oscar Saw 747 Revised Vo for Package 4 Aluminium & Glazing
4 Madi 771/T3 Prepare Tender Report
5
6
7
8
9
10
Tuesday 4/19/2016
1 Nurulhana 604 & 483 To work out the cost for Jalan Persiaran Selayang and Subang Mewah fiinal accounts for
2 Lee Kian Woei 747 Package 6 Vo for Additional Shower Screen
3 Leong Kar Heng 747 Package 5 VO for E.I 138 Revised Beam Detail
4 Oscar Saw 747 Package 4 VO for Stainless Steel Letter Box
5 Shawal 791 Prepare Contract Document For Signing
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 4/20/2016
1 Nurulhana 604 To work out the cost for landscaping Jalan Persiaran Selayang for tomorrow meeting with Derg
2 Madi 771/SUB Estimate VO for Structural Works
3 Oscar Saw 747 Package 4 VO for Revised Tac Tile
2 Shawal 747 Prepare Pam Form Contract Package 3 Residual Saucer Restaurant
3
4
5
6
7
8
9
10
Thursday 4/21/2016
1 Madi 771/T3 Prepare tender report
2 Shawal 747 Prepare Pam Form Contract Package 3 Residual Railing
3
4
5
6
7
8
9
10
Friday 4/22/2016
1 Lee Kian Woei 747 Package 3 Vo for Additional Plaster Ceiling for Lift Lobby
2 Leong Kar Heng 747 Package 5 VO for ID Upgrading work on management office
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Saturday 4/23/2016
1 Bryan Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
2 Aaron Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
3 Isaac Sek Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
4 Leong Kar Heng 747 Package 5 VO for ID Upgrading work on management office
5 Oscar Saw 747 Package 4 VO for ID work to tower 5 Level 3a
6
7
8
9
10
Sunday 4/24/2016
1 Bryan Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
2 Aaron Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
3 Isaac Sek Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
4 Madi 771/T3 Cost Comparison
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Monday 4/25/2016
1 Bryan Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
2 Aaron Raffles University - prelim estimate target telconfering with Raffles Uni on 28 April.
3
4
5
6
7
8
9
10
Tuesday 4/26/2016
1 Leong Kar Heng 747 Extension 2 Gird line Interim Payment
2 Oscar Saw 747 Package 4 Interim Payment
3 Lee Kian Woei 747 Package 6 Interim Payment
4 Shawal 747 Prepare Contract Document Package 3 Residual Saucer Restaurant
5
6
7
8
9
10
Wednesday 4/27/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 4/28/2016
1 Leong Kar Heng 747 Package 5 Interim Payment
2 Oscar Saw 747 Package 4 Interim Payment
3 Lee Kian Woei 747 Package 3 Residual Works Interim Payment
4 Isaac 779 LG Fllor and beams
5
6
7
8
9
10
Friday 4/29/2016
1 Leong Kar Heng 747 Package 5 ID VO Breakdown Rate
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Saturday 4/30/2016
1
2
3
4
5
6
7
8
9
10
May
Sunday 5/1/2016
1
2
3
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Monday 5/2/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 5/3/2016
1 Madi 771/T3 BQ (Addendum)
2 Amir 764 Revised Cost plan
3
4
5
6
7
8
9
10
Wednesday 5/4/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 5/5/2016
1 Sum Man Teng 763 Waterproofing BQ
2 Cheng Meljyn 763 Tower A & N Aluminium BQ
3 Ho Jia Yuen 779 BQ for Pile cap
4 Oscar Saw 747 Package 4 VO for Tower 3 Level 7 Additional Roof Louver
5 Madi 771/SUB Draft BQ for Tower 2
6 Shawal 747 Prepare Contract Document For Package 4 ID
7
8
9
10
Friday 5/6/2016
1
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Saturday 5/7/2016
1 Ho Jia Yuen 779 BQ for pile cap
2 Leong Kar Heng 747 Package 5 Cost estimate on additional trellis
3 Oscar Saw 747 Package 4 VO Enhancement
4 Shawal 747 Prepare Contract Drawing For Package 3 Residual Railing
5 Madi 771/SUB Draft BQ for Tower 2 & Bulk check
6 Amir 764 Revised Cost plan
7
8
9
10
Sunday 5/8/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Monday 5/9/2016
1 Sum Man Teng 763 BQ for Waterproofing
2 Cheng Meljyn 763 BQ for alumnium louvres
3 Ho Jia Yuen 779 Starter bars & compilation of the zones for tender
4 Hazirah 771/T2 Measurement for Structural Works (slab reinforcement LG1)
5 Shawal 747 Prepare Contract Document For Package 3 Residual Canopy
6 Lee Kian Woei 747 V.O for P3 glass enclosure
7 Leong Kar Heng 747 Package 5 ID work - upgrading work
8 Oscar Saw 747 Aluminium Cladding Measurement
9
10
Tuesday 5/10/2016
1 Sum Man Teng 763 BQ for waterproofing
2 Cheng Meljyn 763 interim certiticate
3 Isaac 779 Prepare tender documents for collection
4 Hazirah 771/T2 Measurement for Structural Works (ramp)
5 Shawal 747 Prepare Contract Document For Package 3 Residual Canopy
6 Amir 700 Measurement for Architetural Works
7 Lee Kian Woei 747 V.O for additional glass wall
8 Leong Kar Heng 747 Package 5 ID work - upgrading work
9 Oscasr Saw 747 VRF for Tower 5 L3a Cafeteria
10
Wednesday 5/11/2016
1 Shawal 747 Prepare Contract Document For Package 3 Residual Canopy
2 Sum Mun Teng 763 SLP Interim Certificate No. 8
3 Cheng Meijyn 763 Aluminium BQ for Tower A - revision
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
4
5
6
7
8
9
10
Thursday 5/12/2016
1 Sum Mun Teng 763 SLP Interim Certificate No. 8
2 Cheng Meijyn 763 Aluminium BQ for Mall - revision
3 Lee Kian Woei 747 V.O for additional glass wall
4 Leong Kar Heng 747 Package 5 - V.O for strengthen glass railing
5 Shawal 747 Prepare Contract Document For Package 3 Residual Canopy
6 Oscar Saw 747 Cost Breakdown for Archi Casaka V.O
7
8
9
10
Friday 5/13/2016
1 Madi 771/T3 Tender Report
2 Shema 698 Remeasurement of External Works
3 Aisyah 700 Remeasurement of Architectural works (Floor finishes B2-L6 retail & retail carpark)
4 Hazirah 771/Tower 3 Faade BQ
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Saturday 5/14/2016
1 Madi 771/T3 Tender Report
2 Shema 698 Remeasurement of External works
3 Norhafizah 698 Typing FA
4 Aisyah 700 Remeasurement of Architectural works (Floor finishes B2-L6 retail & retail carpark)
5 Hazirah 771/Tower 3 Faade BQ
6 Amir 700 Measurement for Architetural Works
7 Shawal 747 ID - Checking on BQ for contract binding
8
9
10
Sunday 5/15/2016
1 Madi 771/SUB Measurement (Tower-structural works)
2 Amir 700 Measurement for Architetural Works
3
4
5
6
7
8
9
10
Monday 5/16/2016
1 Shema 698 Remeasurement of External works
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
2 Aisyah 700 Remeasurement of Architectural works (Ceiling finishes B2-L6 retail & retail carpark)
3 Lee Kian Woei 747 P3 - V.O for signage bracket
4 Leong Kar Heng 747 Package 5 - V.O for revised beam @ E.I 153
5 Shawal 747 Prepare Contract Document
6 Sum Mun Teng 763 PP for Blocks H & J
7 Oscar Saw 747 Measurement Ceiling Work at Gourmet Street
8
9
10
Tuesday 5/17/2016
1 Shema 698 Remeasurement of External works
2 Sum Mun Teng 763 BQ for waterproofing Mall
3 Cheng Meijyn 763 Aluminium BQ for Tower A & N
4 Shawal 747 Prepare Dancing Droplet Contract Document
5 Oscar Saw 747 Steel Structure Measurement for Icon City Package 4
6
7
8
9
10
Wednesday 5/18/2016
1 Shema 698 Compiling draft Final accounts
2 Lee Kian Woei 747 P3 - V.O for Staircase enclosure
3 Leong Kar Heng 747 Package 5 - V.O for revised beam @ E.I 183
4 Shawal 747 Prepare Dancing Droplet Contract Document
5 Oscar Saw 747 Package 4 - V.O for revised Structure @ E.I 106
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Thursday 5/19/2016
1 Shema 698 Draft Final Account compilation
2 Sum Mun Teng 763 BQ for masonary Tower N
3 Cheng Meijyn 763 BQ for msaonary Tower A
4 Aisyah 700 Remeasurement of Architectural works (Floor finishes)
5 Leong Kar Heng 747 Package 5 - V.O for revised beam @ E.I 160
6 Shawal 747 Prepare Dancing Droplet Contract Document
7 Oscar Saw 747 Package 4 - Tower 3 Level 5 ID Work
8
9
10
Friday 5/20/2016
1 Madi 771/SUB Cost comparison for skin wall (variation order)
2 Oscar Saw 747 2 Grid Line - Omission of Structure work
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sat 5/21/2016
1 Madi 771/SUB Measurement (Hardscape works)
2 Afifah 700 Measurement (floor finishes @ L6, 9 & 10 )
3 Leong Kar Heng 747 Package 5 ID - estimate for ID works
4 Shawal 747 Prepare Dancing Droplet Contract Document
5 Oscar Saw 747 2 Grid Line - Omission of Structure work
6
7
8
9
10
Sunday 5/22/2016
1 Madi 771/SUB Measurement (Hardscape works)
2 Afifah 700 Measurement (floor finishes @ L22, 39 & 40 )
3
4
5
6
7
8
9
10
Monday 5/23/2016
1 Shawal 747 Package 3 residual work - Prepare Aluminium work Contract Document
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Tuesday 5/24/2016
1 Lee Kian Woei 747 P3 - Comparison V.O of floor screeding saucer restaurant
2 Leong Kar Heng 747 Package EXT - estimated balance of work done and revised contract value
3 Shawal 747 Package 3 residual work - Prepare Aluminium work Contract Document
4 Oscar Saw 747 2 GridLine - Remeasurement for Revised Beam EI03
5
6
7
8
9
10
Wed 5/25/2016
1 Ho Jia Yuen 790 Architectural works for Ground and first floor
2 Lee Kian Woei 747 P6 - interim valuation
3 Leong Kar Heng 747 EXT - interim valuation
4 Oscar Saw 747 P4 - NSC ID VO
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Thurs 5/26/2016
1 Lee Kian Woei 747 P7 - interim valuation
2 Shawal 791 Jelutong - Prepare Contract Document
3
4
5
6
7
8
9
10
Friday 5/27/2016
1 Ema 700 Measurement (Architectural Works)
2 Amir 764 Cost plan
3 Shawal 791 Jelutong - Prepare Contract Document
4
5
6
7
8
9
10
Sat 5/28/2016
1 Hazirah 771 Furniture & Fixtures BQ
2 Madi 771/SUB Measurement (Structural works for basement tower)
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sun 5/29/2016
1 Shawal 791 Jelutong - Prepare Contract Document
2
3
4
5
6
7
8
9
10
Mon 5/30/2016
1 Hazirah 771 Measurement (Hardscape Works)
2 Lee Kian Woei 747 P6 - interim valuation
3 Leong Kar Heng 747 P5 - interim valuation
4 Shawal 747 Package 3 residual work - Prepare CCTV Contract drawing
5 Oscar Saw 747 P4 - interim valuation
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Tuesday 5/31/2016
1 Cheng Meljyn 763 Louvres measurement for tender Tower A, N, & Mall
2 Sum Man Teng 763 Compile tender doc with annexes
3 Syawal 763 Compile tender doc with annexes
4 Wee Yu Ni 763 Check drawing list
5 Hazirah 771 Measurement (Wall Finishes)
6 Lee Kian Woei 747 P3,4,5,6,7 - PCM report
7 Leong Kar Heng 747 P5 - interim valuation
8 Shawal 747 Package 3 residual work - Prepare CCTV Contract drawing
9 Oscar Saw 747 2 Grid Line - EI Measurement @ EI 05
10 Nurulhana 720 B2B Finap Payment
June
Wednesday 6/1/2016
1 Oscar Saw 747 2 Grid Line - EI Measurement @ EI 06
2 Lee Kian Woei 747 Package 6 VO for Additional Cabinet
3 Leong Kar Heng 747 Package 5 Estimated balance of work
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Thursday 6/2/2016
1 Cheng Meljyn 763 Measurement RC worksfor payment purposes ( subrstructure )
2 Sum Man Teng 763 Measurement RC worksfor payment purposes ( superstructure )
3 Wee Yu Ni 763 Check measurement to Tower J Masonry works
4 Ho Jia Yuen 779 Adjustment of architectural works Office Tower 3 ( level 3A to Roof )
5 Lee Kian Woei 747 Package 7 Estimate Final Contract Sum
6 Leong Kar Heng 747 Package 5 VO for escalator enclosure
7
8
9
10
Friday 6/3/2016
1 Madi 771/SUB Measurement (Structural works for rc wall)
2
3
4
5
6
7
8
9
10
Saturday 6/4/2016
1 Madi 771/SUB Draft BQ for Hardscape
2 Oscar Saw 747 P4 - Estimate Final Account
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Sunday 6/5/2016
1 Madi 771/SUB Draft BQ for Hardscape
2
3
4
5
6
7
8
9
10
Monday 6/6/2016
1 Cheng Meljyn 763 Measurement RC worksfor payment purposes ( subrstructure )
2 Sum Man Teng 763 Measurement RC worksfor payment purposes ( superstructure )
3 Wee Yu Ni 763 Check measurement to Tower J Masonry works
4 Oscar Saw 747 2GridLine - EI measurement @ EI 08
5 Lee Kian Woei 747 Water Reticulation Final Account
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Tuesday 6/7/2016
1 Cheng Meljyn 763 BQ Tender Masonry H, E
2 Sum Man Teng 763 BQ Tender Masonry H, E
3 Wee Yu Ni 763 BQ Tender Masonry H, E
4 Oscar Saw 747 2GridLine - EI measurement @ EI 09
5 Lee Kian Woei 747 Blockwall Remeasurement
6 Leong Kar Heng 747 Package 5 VO for escalator enclosure
7
8
9
10
Wednesday 6/8/2016
1 Lee Kian Woei 747 VO for LDP Upgrading Additional U Drain
2 Leong Kar Heng 747 Package 5 VO for Coring Work
3 Cheng Meljyn 763 BQ Tender Masonry H, E
4 Sum Man Teng 763 BQ Tender Masonry H, E
5
6
7
8
9
10
Thursday 6/9/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Friday 6/10/2016
1
2
3
4
5
6
7
8
9
10
Saturday 6/11/2016
1 Madi 771/SUB Measurement (Structural works for rc wall)
2 'Afifah 782/PB Draft VO & Statement of FA
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Sunday 6/12/2016
1 Madi 771/SUB Prepare BQ for hardscape works
2 Hana 720 & 604 Earthwork measurement tabulation & VO measurement (Roof Canopy)
3
4
5
6
7
8
9
10
Monday 6/13/2016
1 Oscar Saw 747 P4 - Remeasurement Archi Casaka Glass
2 Leong Kar Heng 747 P5 - Financial Statement
3 Hana 720 TNB - Rate tabulation
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 6/14/2016
1 Sum Man teng 763_11 PP for Besteel Engineering No.1
2 Cheng Meljyn 763_11 Measurement for masonary package fot Tower A
3 Oscar Saw 747 P4 - Financial Statement
4 Leong Kar Heng 747 P5 - Financial Statement
5 Hana 604 Remeasurement staircase 18 units
6
7
8
9
10
Wednesday 6/15/2016
1 Oscar Saw 747 2GridLine - Final Account
2 Leong Kar Heng 747 Phase 1 Consolidated Financial Statement
3 Sek Mun Chun 779 Bored piles measurement
4
5
6
7
8
9
10
Thursday 6/16/2016
1 Madi 771/SUB Prepare BQ for hardscape works & bulk check
2 Hana 604 Remeasurement staircase bungalow
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
4
5
6
7
8
9
10
Friday 6/17/2016
1 Oscar Saw 747 Breakdown of collection drain
2
3
4
5
6
7
8
9
10
Saturday 6/18/2016
1 Oscar Saw 747 P4 - Financial Statement Revised
2 Leong Kar Heng 747 Package 5 VO for ID Works
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Sunday 6/19/2016
1 Hana 604 VO for fencing wall
2 'Afifah 782/PB Draft VO & Statement of FA
3
4
5
6
7
8
9
10
Monday 6/20/2016
1 Oscar Saw 747 P4 Archi Casaka Final Account
2 Leong Kar Heng 747 Package 5 Remeasurement on ACP
3
4
5
6
7
8
9
10
Tuesday 6/21/2016
1 Lee Kian Woei 747 Package 6 & 7 Financial Statement
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 6/22/2016
1 Madi 771/SUB Prepare PTE for hardscape works
2 'Afifah 782/PB Draft VO & Statement of FA
3
4
5
6
7
8
9
10
Thursday 6/23/2016
1 Lee Kian Woei 747 Package 3 Cost estimate for additional safety railing for escalator
2 Leong Kar Heng 747 P5 - Updated list of VO
3 Oscar Saw 747 P4 Metal steel frame breakdown
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Friday 6/24/2016
1 Oscar Saw 747 P6 Omission of Contract Works
2
3
4
5
6
7
8
9
10
Saturday 6/25/2016
1 Ho Jia Yuen 779 Measurement and tabulation for columns ( B8 - LG )
2 Oscar Saw 747 P4 VO Recommendation
3 Leong Kar Heng 747 P5 VO Recommendation
4 Sek Mun Chun 779 Measurement and tabulation for columns ( B8 - LG )
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 6/26/2016
1 Leong Kar Heng 747 P5 VO sewerage pipe opening
2
3
4
5
6
7
8
9
10
Monday 6/27/2016
1 Oscar Saw 747 2 Gridline Final Account
2 Lee Kian Woei 747 Package 6 Interim Payment
3 Leong Kar Heng 747 Package 5 Interim Payment
4
5
6
7
8
9
10
Tuesday 6/28/2016
1 Ho Jia Yuen 779 Tabulation and tender report
2 Oscar Saw 747 Package 4 Interim Payment
3 Lee Kian Woei 747 Package 3 Signage Interim Payment
4 Leong Kar Heng 747 Package 5 Interim Payment
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 6/29/2016
1 Oscar Saw 747 2 Gridline Interim Payment
2 Lee Kian Woei 747 Package 3 Residual Work Interim Payment
3 Leong Kar Heng 747 Package 5 VO for additional canopy
4
5
6
7
8
9
10
Thursday 6/30/2016
1 Oscar Saw 747 PCM Report
2 Lee Kian Woei 747 PCM Report
3 Leong Kar Heng 747 PCM Report
4 Sum Man teng 763_11 Final Account for Bina Tegas
5 Cheng Meljyn 763_11 Final Account for Bina Tegas
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
July
Friday 7/1/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/2/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 7/3/2016
1
2
3
4
5
6
7
8
9
10
Monday 7/4/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 7/5/2016
1
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Wednesday 7/6/2016
1
2
3
4
5
6
7
8
9
10
Thursday 7/7/2016
1
2
3
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Friday 7/8/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/9/2016
1
2
3
4
5
6
7
8
9
10
Sunday 7/10/2016
1
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Monday 7/11/2016
1 Ho Jia Yuen 779 B4 Columns ( revised structural drawings )
2 Leong Kar Heng 747 Package 5 VO for EI 105 Revised Beam Detail
3 Oscar Saw 747 Package 4 VO for PC Rate Adjustment
4
5
6
7
8
9
10
Tuesday 7/12/2016
1 Ho Jia Yuen 779 Tabulation columns ( B7 - LG )
2 Leong Kar Heng 747 Package 5 VO for OSD Tank
3 Oscar Saw 747 Package 4 VO for ID
4 Lee Kian Woei 747 Package 3 Saucer Additional Screeding VRF and Vo
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Wednesgay 7/13/2016
Thursday 7/14/2016
1 Oscar Saw 747 Package 4 VO for ID Painting
2 Sum Man Tong 763 Measurement for PPC ( SLP )
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Friday 7/15/2016
1 Shawal 747 Package 6 NSC Kitchen Hood and Hob Preparation of Contract Document
2
3
4
5
6
7
8
9
10
Saturday 7/16/2016
1 Madi 771/T3 Prepare Tender Report for faade works
2 Leong Kar Heng 747 Package 5 Remeasurement of OSD Tank
3 Oscar Saw 747 Package 4 VO for ID Final Account
4
5
6
7
8
9
10
Sunday 7/17/2016
1 Madi 771/SUB Prepare Tender Report for faade works
2 Leong Kar Heng 747 Package 5 Remeasurement of OSD Tank
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Monday 7/18/2016
1 Leong Kar Heng 747 Package 5 VO for EI 93 Revised Beam
2 Oscar Saw 747 Package 4 VO for Final Account
3 Lee Kian Woei 747 Package 3 VO for Aluminium
4 Shawal 747 Package 6 NSC Kitchen Refrigerator Preparation of Contract Document
5 Cheng Meljyn 763 Measurement for PPC ( MASB )
6
7
8
9
10
Tuesday 7/19/2016
1 Leong Kar Heng 747 Package 5 NSC ID Preparation of Contract Document
2 Oscar Saw 747 Package 4 VO for Tower 3 Level 5 ID revised work
3 Lee Kian Woei 747 Package 3 VO for Aluminium
4 Shawal 747 Package 5 NSC ID Preparation of Contract Document
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Wednesday 7/20/2016
1 Leong Kar Heng 747 Bicycle Rack Preparation of Tender Document
2 Lee Kian Woei 747 Package 3 VO for Aluminium
3 Shawal 747 Package 5 NSC ID Preparation of Contract Document
4
5
6
7
8
9
10
Thursday 7/21/2016
1 Shema Sales Gallery ID tender documents
2 Leong Kar Heng 747 Bicycle Rack Preparation of Tender Document
3 Lee Kian Woei 747 Package 3 VO for Aluminium Remeasurement
4 Shawal 747 Package 5 NSC ID Preparation of Contract Document
5 Ho Jia Yuen 779 DW & Capping beam
6 Aaron Goh 779 Plunge In Column
7
8
9
10
Friday 7/22/2016
1 Shema Sales Gallery ID tender documents
2 Leong Kar Heng 747 Bicycle Rack Preparation of Tender Document
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Saturday 7/23/2016
1 Shema Sales Gallery ID tender documents
2 Madi 771/T3 Prepare Tender Report for faade works/BQ for tower 2
3 Leong Kar Heng 747 Bicycle Rack Preparation of Tender Document
4 Shawal 747 Package 3 NSC ID Preparation of Contract Document
5 Aaron Goh 779 Plunge In Column
6
7
8
9
10
Sunday 7/24/2016
1 Madi 771/SUB Draft VO for CBP package
2 Shawal 747 Package 3 NSC Saucer Restaurant Preparation of Contract Document
3
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Monday 7/25/2016
1 Leong Kar Heng 747 Package 5 VO remeasurement
2 Oscar Saw 747 Package 4 VRF for VO
3 Lee Kian Woei 747 Package 7 Interim Payment July
4 Shawal 747 Package 3 NSC Saucer Restaurant Preparation of Contract Document
5 Zalila 747 Package 3 NSC Saucer Restaurant Preparation of Form of Contract
6 Sum Man Tong 763 Measurement of area for Mall
7
8
9
10
Tuesday 7/26/2016
1 Leong Kar Heng 747 Package 5 Interim Payment July
2 Oscar Saw 747 Package 4 Interim Payment July
3 Lee Kian Woei 747 Package 6 Interim Payment July
4 Zalila 747 Package 3 NSC Aluminium Preparation of Form of Contract
5 Ho Jua Yuen 779 Tabulation for Pilecap Nos. ( zone 1 - 5 )
6 M Shawal GEN/64 Fee Proposal Edaran Otomobil Nasional Bhd
7 Sum Man Tong 763 Prepare cost plan for mall
8
9
10
Wednesday 7/27/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 7/28/2016
1 Leong Kar Heng 747 Package 5 VO remeasurement
2 Lee Kian Woei 747 Package 3 Residual Works Interim Payment July
3 Shawal 747 Package 3 NSC Glass Railing Preparation of Contract Document
4 Ho Jia Yuen 779 Pilecap RC and Fwk
5
6
7
8
9
10
Friday 7/29/2016
1 Leong Kar Heng 747 Extension of 2 Gird Line VO for Fabricated Cage
2 Lee Kian Woei 747 Package 3 Residual Works NSC Aluminium Final Account
3 Shawal 747 Package 6 NSC Kicthen System Preparation of Contract Document
4 Zalila 747 Package 6 NSC Kitchen System Preparation of Form of Contract
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Saturday 7/30/2016
1 Madi 771/T3 Prepare BQ/Tender Document for Mechanical Parking System
2 Leong Kar Heng 747 Package 5 VO for OSD Parapet Wall
3 Shawal 747 Package 6 NSC Kicthen System Preparation of Contract Document
4 Zalila 790 Typing tender documents
5
6
7
8
9
10
Sunday 7/31/2016
1 Shawal 747 Package 6 NSC Kicthen System Preparation of Contract Document
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
August
Monday 8/1/2016
1 Madi 771/SUB Draft Contract Document
2 Cheng Meljyn 763 measurement for PP 16 ( MASB )
3 Sum Man Teng 763 Measurement for PP 11 ( SLP )
4 Oscar Saw 747 VRF Preparation
5 Leong Kar Heng 747 VO for Waterstop Diaphragm Wall
6 Lee Kian Woei 747 PCM Report
7 Shawal 747 Contract Document Preparation
8
9
10
Tuesday 8/2/2016
1 Ho Jia Yuen 779 Summarising Pile cap measurement
2 Oscar Saw 747 JS Cabinet Final Account
3 Leong Kar Heng 747 Remeasurement of bores pile
4 Lee Kian Woei 747 Package 3 Tabulation of LAD for Sectional Completion
5 Shawal 747 Contract Document Preparation
6
7
8
9
10
Wednesday 8/3/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 8/4/2016
1 Ho Jia Yuen 779 OT cost plan measurement architectural Block 9 - GF, Block 1 - LG
2 Aaron Goh 779 Cost plan measurement LG
3 Cheng Meljyn 763 measurement for PP 3 ( Besteel )
4 Sum Man Teng 763 Measurement for PP 3 ( Besteel )
5 Oscar Saw 747 2 GridLine VO Omission of GrildLine PA1
6
7
8
9
10
Friday 8/5/2016
1 Aisyah 779 Conc & Fwk for salb / beam level B2
2 Hazirah 779 Conc & Fwk for salb / beam level B3
3 Leong Kar Heng 747 VO for handling caisson
4 Lee Kian Woei 747 Package 3 VO for additional bollard
5 Shawal 747 Contract Document Preparation
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Saturday 8/6/2016
1 Madi 771/SUB Measurement Basement Tower 2
2 Ho Jia Yuen 779 Measurement for tender - conc and fwk beam Zone 1 & 2 GF
3 Aaron Goh 779 Measurement for tender B7
4 Aisyah 779 Conc & Fwk for salb / beam level B2
5 Hazirah 779 Conc & Fwk for salb / beam level B3
6 Leong Kar Heng 747 Package 5 VO Remeasurement
7 Lee Kian Woei 747 Package 3 VO for revised carpark marking
8 Shawal 747 Contract Document Preparation
9
10
Sunday 8/7/2016
1 Hazirah 771/T3 Lowest Basement Tower 3 Remeasurement
2 Madi 771/SUB Measurement Basement Tower 2
3 Ho Jia Yuen 779 Measurement for tender - conc and fwk beam Zone 3 GF
4 Aaron Goh 779 Measurement for tender B8
5 Aisyah 779 Conc & Fwk for salb / beam level B2
6 Shawal 747 Contract Document Preparation
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Monday 8/8/2016
1 Ho Jia Yuen 779 RC Measurement Zone 6 & 7
2 Aaron Goh 779 Measurement for tender B8
3 Cheng Meljyn 763 measurement for PP 16 ( MASB )
4 Sum Man Teng 763 Measurement for PP 11 ( SLP )
5 Leong Kar Heng 747 Preparation contract document for extension 2 grid line
6 Lee Kian Woei 747 Blockwall Remeasurement
7 Shawal 747 Preparation contract document for extension 2 grid line
8
9
10
Tuesday 8/9/2016
1 Ho Jia Yuen 779 Cost plan mesurement, architectural works ( Level LG Office Tower 3A - 9 )
2 Oscar Saw 779 Measure no of H piles to be demolished
3 Aaron Goh 779 Measurement for tender and Compilation for tender B7 & B8
4 Shawal 747 Preparation contract document
5
6
7
8
9
10
Wednesday 8/10/2016
1 Ho Jia Yuen 779 Cost plan mesurement, architectural works ( Level B2 - 4 Office Tower 1 - 9 )
2 Cheng Meljyn 763 measurement for PP 3 ( Besteel )
3 Sum Man Teng 763 Measurement for PP 11 ( SLP )
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 8/11/2016
1 Cheng Meljyn 763 Tender documents for fire rated doors, frame & ironmongery
2 Oscar Saw 747 Package 4 - Archi Casaka Final Account
3 Lee Kian Woei 747 VO for Package 3 NSC Aluminium & Glazing
4 Shawal 747 Preparation contract document
5 Sum Man Teng 763 Tender documents for fire rated doors, frame & ironmongery
6 Zalila 747 Preparation contract document
7
8
9
10
Friday 8/12/2016
1 Ho Jia Yuen 779 Cost Plan measurement Level 1, wall finishes and door
2 Shawal 747 Preparation contract document
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Saturday 8/13/2016
1 Hazirah 771 VE wall finishes for B1 Tower 3
2 Madi 771/SUB Measurement (Tower 6-structural works for flat slab)
3 Oscar Saw 747 Calculation of Partial Possesion for Package 4 Section 1
4 Leong Kar Heng 747 VO for extension diaphragm wall handling cassion
5 Shawal 747 Preparation contract document
6
7
8
9
10
Sunday 8/14/2016
1 Hazirah 771/T3 VE wall finishes for B1 Tower 3
2 Madi 771/SUB Measurement (Tower 6-structural works for flat slab)
2 Shawal 747 Preparation contract document
4
5
6
7
8
9
10
Monday 8/15/2016
1 Hazirah 771/T3 VE wall finishes for B1 Tower 3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 8/16/2016
1 Aisyah 764 Measurement floor finishes
2 Leong Kar Heng 747 Tender preparation for canopy below saucer
3 Lee Kian Woei 747 VO for Package 3 Revised RC works
4
5
6
7
8
9
10
Wednesday 8/17/2016
1 Ho Jia Yuen 779 Cost Plan measure, OT 3A - 9 ( post tensioned slab / rc slab - rc, fwk rebar )plus compiling
2 Hazirah 771 BQ for Basement Tower 2 - qty check
3 Aisyah 764 Measurement floor finishes (by unit)
4 Oscar Saw 747 Package 4 - PC Rated Adjustment
5 Shawal 747 Preparation contract document
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Thursday 8/18/2016
1 Ho Jia Yuen 779 Cost plan measure Level 2 ( part ) - RC , fwk and rebar
2 Norhayati 787/788 Preparing Tender Documents for RSKU USJ Heights
3 Nor Hafizah 787/788 Preparing Tender Documents for RSKU USJ Heights
4 Hazirah 771 Measurement for Basement Tower 2
5 Oscar Saw 747 Package 4 - VRF Preparation for See Thro Fence
6 Shawal 747 Preparation contract document
7
8
9
10
Friday 8/19/2016
1 Norhayati 787/788 Preparing Tender Documents for RSKU USJ Heights
2 Nor Hafizah 787/788 Preparing Tender Documents for RSKU USJ Heights
3 Zainon 787/788 Preparing Tender Documents for RSKU USJ Heights
4 Shawal 747 Preparation contract document
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Saturday 8/20/2016
1 Cheng Meljyn 763 To measure quantities for MRT for Tender Documents
2 Hazirah 771 Revised measurement for beam LG1 tower 2(concrete & fwk)
3 Aisyah 764 Measurement floor area
4 Madi 771/SUB Measurement (Tower 2-structural works)
5 Oscar Saw 747 Package 4 - PC Rated Adjustment for JS Cabinet
6 Leong Kar Heng 747 Package 5 VO for RWDP for Basement 3,2,1
7 Lee Kian Woei 747 Tender Preparation for pylon sign
8 Shawal 747 Preparation contract document
9
10
Sunday 8/21/2016
1 Hazirah 771 Revised measurement for beam LG1 tower 2(concrete & fwk)
2 Aisyah 764 Measurement floor area
3 Madi 771/SUB Prepare list of VO for CBP package
4 Leong Kar Heng 747 Package 5 update on list of VO
5 Syawal 788 Photocopy Tender Documents RSKU EN11 & EN10
6
7
8
9
10
Monday 8/22/2016
1 Cheng Meljyn 763 To measure quantities for MRT for Tender Documents
2 Oscar Saw 747 Package 4 - Tower 3 Revised Headroom Height
3 Leong Kar Heng 747 Preparation of VRF form for Package 5
4 Lee Kian Woei 747 VO for Package 3 Revised carpark marking
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 8/23/2016
1 Cheng Meljyn 763 To compile BQ for MRT Link bridge
2 Oscar Saw 747 Package 4 - Tower 3 Main Lobby VO
3 Shawal 747 Preparation contract document
4
5
6
7
8
9
10
Wednesday 8/24/2016
1 Hazirah 771 Measurement LG1 Tower 2 - Beam reinforcement
2 Oscar Saw 747 Package 4 - Tower 3 Main Lobby VO
3 Leong Kar Heng 747 Interim Payment for Art Sculpture
4 Lee Kian Woei 747 VO for Package 3 Remeasurement
5 Shawal 747 Preparation contract document
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Thursday 8/25/2016
1 Hazirah 771 Draft BQ Basement Tower 2
2 Oscar Saw 747 Package 4 - Basement 3 Rectification Work (Bauer Area)
3 Leong Kar Heng 747 Interim Payment for Extension diaphram Wall
4 Lee Kian Woei 747 Interim Payment for Package 7
5 Shawal 747 Preparation contract document
6
7
8
9
10
Friday 8/26/2016
1
2
3
4
5
6
7
8
9
10
Saturday 8/27/2016
1 Oscar Saw 747 2 GridLine - Interim Certificate
2 Leong Kar Heng 747 Interim Payment for Extension diaphram Wall
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Sunday 8/28/2016
1
2
3
4
5
6
7
8
9
10
Monday 8/29/2016
1 Sum Man Teng 779 Tender report for RC structure combined with piling, retaining walls and plunge in columns
2 Oscar Saw 747 Package 4 - Interim Certificate
3 Leong Kar Heng 747 Interim Payment for Package 5
4 Lee Kian Woei 747 Interim Payment for Package 6
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Tuesday 8/30/2016
1 Oscar Saw 747 Package 4 - Gourmet Street Ceiling Measurement
2 Shawal 747 Preparation contract document
3
4
5
6
7
8
9
10
Wednesday 8/31/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
September
Thursday 9/1/2016
1 Oscar Saw 747 Package 4 - Planter Box Measurement
2 Leong Kar Heng 747 PCM Report for Package 5
3 Lee Kian Woei 747 PCM Report
4
5
6
7
8
9
10
Friday 9/2/2016
1 Oscar Saw 747 Package 4 & 2GL - PCM Report
2 Shawal 747 Preparation contract document
3
4
5
6
7
8
9
10
Saturday 9/3/2016
1 Hazirah 771 Lowest Basement Tower 6 - Remeasurement
2 Oscar Saw 747 Package 4 - Remeasurement of Hardscape Work
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 9/4/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/5/2016
1 Oscar Saw 747 2 GridLine - Final Account
2 Cheng Meljyn 763 Measurement for Bessteel PP No. 4
3 Leong Kar Heng 747 Dancing Droplet Final Account
4 Lee Kian Woei 747 Package 7 Financial Statement
5 Sum Man Teng 763 measurement for SLP payment 12
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Tuesday 9/6/2016
1 Oscar Saw 747 Package 4 - Brickwall Measurement
2 Cheng Meljyn 763 Measurement for Bessteel PP No. 4
3 Leong Kar Heng 747 Extension diaphram Wall Financial Statement
4 Lee Kian Woei 747 Package 3 Residual Work Financial Statement
5 Shawal 763 Preparation tender BQ
6
7
8
9
10
Wednesday 9/7/2016
1 Oscar Saw 747 Package 4 - Financial Statement
2 Ho Jia Yuen 779 Amend quantities to complete cost plan for Towers 2,3A,3,7 & 8
3 Cheng Meljyn 763 Measurement for Bessteel PP No. 4
4 Leong Kar Heng 747 Art Sculpture Final Account
5 Lee Kian Woei 747 Package 6 VO Measurement
6 Shawal 747 Preparation contract document
7 Sum Man teng 763 Prepare cost plan 13
8
9
10
Thursday 9/8/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Friday 9/9/2016
1 Oscar Saw 747 Package 4 - VRF Preparation - Stainless Steel Letter Box
2
3
4
5
6
7
8
9
10
Saturday 9/10/2016
1 Oscar Saw 747 Package 4 - Remeasurement Carpark Finishes
2 Cheng Meljyn 763 Measurement for Million Aim PP No. 17
3 Leong Kar Heng 747 Package 5 Remeasurement of OSD Tank
4 Lee Kian Woei 747 Pylon Tender Report
5 Shawal 747 Certified contract document
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Sunday 9/11/2016
1 Oscar Saw 747 Package 4 - VO Assessment for VO 67
2 Leong Kar Heng 747 Package 5 Remeasurement of OSD Tank
3
4
5
6
7
8
9
10
Monday 9/12/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 9/13/2016
1 Ho Jia Yuen 779 Measure RC works for Level B1 & LG pilecaps
2 Cheng Meljyn 763 Measurement for Million Aim PP No. 17
3 Leong Kar Heng 747 Art Sculpture Final Account
4 Lee Kian Woei 747 Pylon Tender Report
5 Oscar Saw 747 Package 4 - VO for Syfon system
6 Sum Man Teng 763 measurement for SLP payment 12
7
8
9
10
Wednesday 9/14/2016
1 Oscar Saw 747 Package 4 - PT Slab remeasurement
2
3
4
5
6
7
8
9
10
Thursday 9/15/2016
1 Syawal 788 Photocopy Tender Documents RSKU EN11 & EN10
2 Sum Man Teng 763 measurement for SLP payment 12
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
4
5
6
7
8
9
10
Friday 9/16/2016
1 Syawal 788 Photocopy Tender Documents RSKU EN11 & EN10
2 Oscar Saw 747 Package 4 Final Account
3 Leong Kar Heng 747 Package 5 VO PC Rated Adjustement
4
5
6
7
8
9
10
Saturday 9/17/2016
1 Madi 771/SUB CBP Package - VO
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Sunday 9/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/19/2016
1 Leong Kar Heng 747 Package 5 VO for external catch platform
2 Lee Kian Woei 747 Package 3 VRF and Vo
3 Oscar Saw 747 Package 4 Final Account
4
5
6
7
8
9
10
Tuesday 9/20/2016
1 Leong Kar Heng 747 Package 5 VO Remeasurement of OSD Tank
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 9/21/2016
1 Shawal 747 Certified contract document
2
3
4
5
6
7
8
9
10
Thursday 9/22/2016
1 Syawal 787&788 Replace pages of Tender Document at Sime Darby office
2 Yati 787&788 Replace pages of Tender Document at Sime Darby office
3 NorHafizah 787&788 Replace pages of Tender Document at Sime Darby office
4 Madi 771/SUB Measurement for structural works - slab T6
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Friday 9/23/2016
1
2
3
4
5
6
7
8
9
10
Saturday 9/24/2016
1 Leong Kar Heng 747 Package 5 Glass Railing and Canopy Final Account
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 9/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/26/2016
1 Leong Kar Heng 747 Package 5 Interim Payment
2 Lee Kian Woei 747 Package 6 Interim Payment
3
4
5
6
7
8
9
10
Tuesday 9/27/2016
1 Leong Kar Heng SAC Feasibility Study For SAC
2 Shawal 747 Certified contract document
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Wednesday 9/28/2016
1 Leong Kar Heng 747 Package 5 Interim Payment
2 Lee Kian Woei 747 Package 6 Interim Payment
3 Cheng Meljyn 763 Measurement for Tiling Tender
4
5
6
7
8
9
10
Thursday 9/29/2016
1 Saisa KL/773 Prepare Contract Documents - Check drawings and compiling other documents
2 Lee Kian Woei 747 Package 4 Interim Payment
3 Madi 771/SUB Measurement for structural works - beam T6
4 Sum Man Teng 763 measure brickwall and blockwall for mall
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Friday 9/30/2016
1 Lee Kian Woei 747 Package 4 Interim Payment
2
3
4
5
6
7
October
Saturday 10/1/2016
1 Saisa KL/773 Prepare Contract Documents - Check drawings and compiling other documents
2 Hazirah 771 VO TNB SSU LG1-Podium (Measurement)
3 Leong Kar Heng 747 Package 5 Interim Payment
4 Madi 771/SUB Measurement for structural works - skin wall
Sunday 10/2/2016
1 Saisa
2
Monday 10/3/2016
1 Madi 771/SUB Measurement for structural works - slab
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Tuesday 10/4/2016
1 Pua Zhi Xun 763 Measurement
2 Sum Man Teng 763 Measurement
3 Leong Kar Heng 747 External Diaphragm Wall Interim Payment
4 Lee Kian Woei 747 PCM Report
5
6
7
8
9
10
Wednesday 10/5/2016
1 Saisa KL/773 Prepare Contract Documents - Check drawings and compiling other documents
2 Pua Zhi Xun 763 Measurement
3 Sum Man Teng 763 Measurement
4 Siti Aisyah 700 Remeasurement lift core substructure works
5 Hazirah 771 VO TNB SSU LG1-Podium (Measurement)
6 Lee Kian Woei 747 PCM Report
7 Cheng Meljyn 763 Prepare BQ for Pavior Tender
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Thursday 10/6/2016
1 Pua Zhi Xun 763 Measurement
2 Sum Man Teng 763 Measurement
3 Siti Aisyah 700 Remeasurement lift core substructure works
4 Hazirah 771 VO TNB SSU LG1-Podium (Measurement)
5 Cheng Meljyn 763 Prepare BQ for Pavior Tender
6
7
8
9
10
Friday 10/7/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/8/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 10/9/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/10/2016
1 Pua Zhi Xun 763 Measurement
2 Leong Kar Heng 747 Package 5 Revised Beam Detail
3 Lee Kian Woei 747 Package 3 VO for Way Out Signage
4 Cheng Meljyn 763 Measurement for Pavior Tender
5 Sum Man Teng 763 Measure Wall for Mall
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Tuesday 10/11/2016
1 Pua Zhi Xun 763 Measurement
2 Leong Kar Heng 747 Package 5 VO List Updated
3 Lee Kian Woei 747 Package 3 VO for Aluminium & Glazing
4 Cheng Meljyn 763 Measurement for Pavior Tender
5 Sum Man Teng 763 Prepare Masonry BQ for Tower A
6
7
8
9
10
Wednesday 10/12/2016
1 Pua Zhi Xun 763 Measurement
2 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 5)
3 Sum Man Teng 763 Prepare Masonry BQ for Tower A
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Thursday 10/13/2016
1 Pua Zhi Xun 763 Measurement
2 Siti Aisyah 764 Measurement of Architectural works for Tower
3 Leong Kar Heng 747 PBB 2 Grid Line VO & VRF
4 Lee Kian Woei 747 Package 4 VO & VRF
5 Shawal 747 Preparation of Contract Document
6 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 5)
7 Madi 771/T3 VO/Payment
8 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 13)
9
10
Friday 10/14/2016
3 Leong Kar Heng 747 PBB 2 Grid Line Final Account
2
3
4
5
6
7
8
9
10
Saturday 10/15/2016
1 Hazirah 771 VO TNB SSU B1-LG (Measurement for structural works)
2 Siti Aisyah 764 Measurement of Architectural works for Tower
3 Leong Kar Heng 747 Water Reticulation VO & VRF
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Sunday 10/16/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/17/2016
1 Siti Aisyah 764 Measurement of Architectural works for Tower
2 Leong Kar Heng 747 Comment on the warranty submitted by Contractor for CPC
3 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 5)
4 Pua Zhi Xun 763 Interim Payment Measurement (Structural Works)
5 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 13)
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Tuesday 10/18/2016
1 Ho Jia Yuen 779 Prepare revised BQ for Tower Crane
2 Leong Kar Heng 747 Package 5 Kitchen Cabinet Final Account
3 Lee Kian Woei 747 Package 3 Residual Work Final Account
4 Shawal 747 Preparation of Contract Document
5 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 5)
6 Pua Zhi Xun 763 Interim Payment Measurement (Structural Works)
7 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 13)
8
9
10
Wednesday 10/19/2016
1 Leong Kar Heng 747 Package 5 Financial Statement
2 Lee Kian Woei 747 Package 6 Financial Statement
3 Shawal 747 Preparation of Contract Document
4 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 13)
5
6
7
8
9
10
Thursday 10/20/2016
1 Cheng Meljyn 763 Prepare Progress Payment Certificate (BESTEEL - Cert 5)
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
2 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 13)
3
4
5
6
7
8
9
10
Friday 10/21/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/22/2016
1 Hazirah 771 Remeasurement slab B3 Tower 3
2 Leong Kar Heng 747 Package 5 Financial Statement
3 Lee Kian Woei 747 Package 3 Residual Work Financial Statement
4 Pua Zhi Xun 763 Measurement on revised beam
5 Madi 771/T3 Prepare BQ for Gondola
6 Sum Man Teng 763 Measurement and Prepare BQ for Tower J,H and E Wall Finishes
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Sunday 10/23/2016
1 Madi 771/SUB Rationalisation of rate (Tower 2)
2
3
4
5
6
7
8
9
10
Monday 10/24/2016
1 Leong Kar Heng 747 Package 5 VO for Temporary Hoarding
2 Lee Kian Woei 747 Package 6 Interim Payment
3 Shawal 747 Preparation of Contract Document
4 Cheng Meljyn 763 Measurement for Pavior Tender
5 Pua Zhi Xun 763 Measurement for wall finishes
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 10/25/2016
1 Leong Kar Heng 747 Package 5 VO for ID Work
2 Lee Kian Woei 747 VO for Rectification Work for Icon City
3 Shawal 747 Preparation of Contract Document
4 Cheng Meljyn 763 Measurement for Pavior Tender
5 Pua Zhi Xun 763 Measurement for wall finishes
6 Sum Man Teng 763 Prepare Masonry Bill for Mall
7
8
9
10
Wednesday 10/26/2016
1 Pua Zhi Xun 763 Measurement on wall finishes
2
3
4
5
6
7
8
9
10
Thursday 10/27/2016
1 Lee Kian Woei 747 VO for New NJB at Ramp F1
2 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 14)
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Friday 10/28/2016
1 Leong Kar Heng 747 Package 5 Interim Payment
2 Lee Kian Woei 747 Package 3 Residual Work Interim Payment
3
4
5
6
7
8
9
10
Saturday 10/29/2016
1 Leong Kar Heng 747 Package 5 Interim Payment
2
3
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Sunday 10/30/2016
1 Leong Kar Heng 747 Package 5 Interim Payment
2
3
4
5
6
7
8
9
10
Monday 10/31/2016
1 Leong Kar Heng 747 Package 5 Estimated Balance of Contract Sum
2 Lee Kian Woei 747 Package 4 Interim Payment
3
4
5
6
7
8
9
10
November
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Tuesday 11/1/2016
1 Ho Jia Yuen 779 Measurement architectural works Tower 9
2 Aaron Gog 779 Cost paln measurement for Tower 2
3
4
5
6
7
8
9
10
Wednesday 11/2/2016
1 Cheng Meljyn 763 Update BQ for Pavior Tender
2 Sum Man Teng 763 Measurement of epoxy for Tower J,H,E,A,N and Mall
3 Pua Zhi Xun 763 Measurement on painting and tiling for tender
4
5
6
7
8
9
10
Thursday 11/3/2016
1 Ho Jia Yuen 779 Tower crane tabulation ( rental )
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Friday 11/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/5/2016
1 Hazirah 771 Remeasurement structural works (beam B2) - Tower 3
2 Aisyah 700 BQ for Signage
3 Ho Jia Yuen 779 Tower crane tabulation ( rental )
4 Madi 771/SUB Estimated VO for additional strutting at Tower 2
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Sunday 11/6/2016
1 Madi 771/SUB Measurement (Achitectural works - brickwork)
2
3
4
5
6
7
8
9
10
Monday 11/7/2016
1 Ho Jia Yuen 779 Instrumentation tabulation
2 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 6)
3 Pua Zhi Xun 763 measurement for interim certificate
4
5
6
7
8
9
10
Tuesday 11/8/2016
1 Pua Zhi Xun 763 measurement for interim certificate
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Wednesday 11/9/2016
1 Pua Zhi Xun 763 measurement for interim certificate
2
3
4
5
6
7
8
9
10
Thurday 11/10/2016
1 Hazirah 771 Measurement (VO works TNB structural omission at LG - beam & slab)
2 Aisyah 797 Measurement for Earthwork
3 Ho Jia Yuen 779 Tender Report - Rental of Tower cranes
4 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 14)
5 Pua Zhi Xun 763 measurement for interim certificate
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Friday 11/11/2016
1 Hazirah 771 Measurement (VO works TNB structural addition at LG - beam & slab)
2
3
4
5
6
7
8
9
10
Saturday 11/12/2016
1 Hissam 788 Measurements of earthworks for estimate
2 Ho Jia Yuen 779 Tabulation for purcahse of tower cranes
3 Madi 771/SUB VO for changes layout
4 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 14)
5 Syawal 775 Prepare Tender Document for PAAB
6
7
8
9
10
Sunday 11/13/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Monday 11/14/2016
1 Ho Jia Yuen 779 Tabulation for purcahse of tower cranes
2
3
4
5
6
7
8
9
10
Tuesday 11/15/2016
1 Hissam 788 Measurements of earthworks for estimate
2 Ho Jia Yuen 779 Tabulation for purcahse of tower cranes
3 Pua Zhi Xun 763 measurement for interim certificate
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Wednesday 11/16/2016
1 Hazirah 771 Remeasurement structural works (lowest basement - Tower 3)
2 Hissam 788 Measurements of earthworks for estimate
3 Ho Jia Yuen 779 Tabulation for purcahse of tower cranes
4 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 6)
5 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 14)
6 Pua Zhi Xun 763 measurement for interim certificate
7
8
9
10
Thursday 11/17/2016
1 Hazirah 771 Remeasurement structural works (beam B2 reinforcement) - Tower 3
2 Hissam 788 Measurements of earthworks for estimate
3 Ho Jia Yuen 779 Tender report for purchase of tower cranes
4 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 6)
5 Sum Man Teng 763 Measurement for Progress Payment Certificate (SLP - Cert 14)
6 Pua Zhi Xun 763 measurement for interim certificate
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Friday 11/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/19/2016
1 Yati 788 Measurement - drainage
2 Ho Jia Yuen 779 Tender Report on Instrumentation / measurement of B1 architectural
3 Madi 771/T3 Measurement of Architectural works (layout change)
4 Hazirah 771 Remeasurement of structural works (LG1 reinforcement Tower 3)
5 Aisyah 764 Draft BQ for Aluminium & glazing works
6 Cheng Meljyn 763 Measurement for Progress Payment Certificate (BESTEEL - Cert 6)
7 Sum Man Teng 763 Measurement of Painting for Tower E
8
9
10
Sunday 11/20/2016
1 Madi 771/SUB Measurement (piling VO)
2
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
4
5
6
7
8
9
10
Monday 11/21/2016
1 Ho Jia Yuen 779 measurement of B 1 architectural
2 Pua Zhi Xun 763 measurement for interim certificate
3
4
5
6
7
8
9
10
Tuesday 11/22/2016
1 Saisa KL/792 Measuring and pricing piling and pilecaps for estimate
2 Yati 788 Measurement - drainage
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Wednesday 11/23/2016
1 Hissam 773/SUPER Breaking down infra quantities into commercial and residential
2 Ho Jia Yuen 779 Office Tower 9 architectural measurement
3
4
5
6
7
8
9
10
Thursday 11/24/2016
1 Yati 788 Measurement - drainage
2 Hissam 773/SUPER Breaking down infra quantities into commercial and residential
3 Ho Jia Yuen 779 Compile measurements for Office Towers 1-9
4 Aaron Goh 779 Cost plan measurement Tower 3A
5
6
7
8
9
10
Friday 11/25/2016
1
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
2
3
4
5
6
7
8
9
10
Saturday 11/26/2016
1 Hissam 773/SUPER Breaking down infra quantities into commercial and residential
2 Ho Jia Yuen 779 compile measurements for podium LG to L3
3 Hazirah 771 Measurement for DCT & TNB PPU Faade
4
5
6
7
8
9
10
Sunday 11/27/2016
1 Ho Jia Yuen 779 compile quantities for basement, podium and office towers
2
3
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Monday 11/28/2016
1 Cheng Meljyn 763 Measurement for Ceiling Tender
2
3
4
5
6
7
8
9
10
Tuesday 11/29/2016
1 Cheng Meljyn 763 Prepare BQ & Tender Documents for Ceiling Tender
2 Sum Man Teng 763 Measurement of Painting for mall
3 Pua Zhi Xun 763 measurement for canopy
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 11/30/2016
1
2
3
4
5
6
7
8
9
10
December
Thursday 12/1/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/2/2016
1
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
2
3
4
5
6
7
8
9
10
Saturday 12/3/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/4/2016
1
2
3
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
7
8
9
10
Monday 12/5/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/6/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Wednesday 12/7/2016
1
2
3
4
5
6
7
8
9
10
Thursday 12/8/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/9/2016
1
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
5
6
7
8
9
10
Saturday 12/10/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/11/2016
1
2
3
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
10
Monday 12/12/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/13/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/14/2016
1
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
3
4
5
6
7
8
9
10
Thursday 12/15/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/16/2016
1
2
3
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
8
9
10
Saturday 12/17/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/19/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
1
2
3
4
5
6
7
8
9
10
Tuesday 12/20/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/21/2016
1
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
6
7
8
9
10
Thursday 12/22/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/23/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
Saturday 12/24/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/26/2016
1
2
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
4
5
6
7
8
9
10
Tuesday 12/27/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/28/2016
1
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
9
10
Thursday 12/29/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/30/2016
1
2
3
4
5
6
7
8
9
10
Saturday 12/31/2016
1
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime App
Item Date / Name
Project Scope of Works (with breakdown)
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
JANUARY
February
March
Tuesday 3/1/2016
1 Leong Kar Heng 6.00pm 9.30pm completed
2 Oscar Saw 6.00pm 9.00pm completed
3
4
5
6
7
8
9
10
Wednesday 3/2/2016
1 Madi 6.45pm 10.00pm to be continued
2 Ho Jia Yuen 6.00pm 7.15pm completed
3 Leong Kar Heng 6.00pm 9.00pm to be continued
4 Oscar Saw 6.00pm 8.30pm to be continued
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 3/3/2016
1 Leong Kar Heng 6.00pm 9.30pm to be continued
2
3
4
5
6
7
8
9
10
Friday 3/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/5/2016
1 Madi 8.45am 3.15pm completed
2 Ho Jia Yuen 12.00noon 6.30pm completed
3 Leong Kar Heng 12.00pm 5.00pm completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 3/6/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/7/2016
1 Oscar Saw 6.00pm 8.30pm Completed
2
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Tuesday 3/8/2016
1 Shawal 5.30pm 8.30pm
2 Leong Kar Heng 6.00pm 9.30pm completed
3
4
5
6
7
8
9
10
Wednesday 3/9/2016
1 Leong Kar Heng 6.00pm 9.30pm completed
2
3
4
5
6
7
8
9
10
Thursday 3/10/2016
1 Ho Jia Yuen 6.00pm 9.00pm completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
2
3
4
5
6
7
8
9
10
Friday 3/11/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/12/2016
1 Ho Jia Yuen 11.30am 4.00pm completed
2 Madi 8.30am 2.00pm completed
3 Leong Kar Heng 11.30am 5.30pm completed
4
5
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Sunday 3/13/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/14/2016
1 Sum Nam Teng 6.00pm 7.30pm completed
2 Cheng Meliyn 6.00pm 9.00pm continue
3 Madi 6.00pm 8.45pm completed
4 Lee Kian Woei 6.00pm 9.00pm to be continued
5 Leong Kar Heng 6.00pm 9.00pm to be continued
6 Oscar Saw 6.00pm 8.30pm to be continued
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 3/15/2016
1 Wendy Kok 6.00pm 9.30pm to be continue
2 Sum Nam Teng 6.00pm 10.00pm to complete
3 Cheng Meliyn 6.00pm 9.30pm to complete
4 Lee Kian Woei 6.00pm 10.00pm to be continued
5 Leong Kar Heng 6.00pm 9.30pm to be continued
6
7
8
9
10
Wednesday 3/16/2016
1 Sum Nam Teng 6.00pm 10.00pm to complete
2 Cheng Meliyn 6.00pm 10.00pm to complete
3 Shawal 6.00pm 9.00pm to be continued
4 Leong Kar Heng 6.00pm 9.30pm to be continued
5 Oscar Saw 6.00pm 8.30pm to be continued
6 Lee Kian Woei 6.00pm 10.00pm to be continued
7
8
9
10
Thursday 3/17/2016
1 Cheng Meljyn 6.00pm 7.00pm to complete
2 Sum Man Teng 6.00pm 7.00pm to complete
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Friday 3/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/19/2016
1 Madi 8.30am 6.00pm completed
2 Shawal 1.30pm 6.30pm to be continued
3 Leong Kar Heng 10.45am 1.30pm completed
4 Oscar Saw 2.00pm 5.30pm to be continued
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Sunday 3/20/2016
1 Madi 9.30am 4.30pm completed
2 Shawal 2.00pm 4.30pm to be continued
4
5
6
7
8
9
10
Monday 3/21/2016
1 Cheng Meljyn 6.00pm 8.30pm to complete
2 Sum Man Teng 6.00pm 10.00pm to complete
3 Leong Kar Heng 6.00pm 9.45pm to be continued
4 Shawal 5.30pm 10.00pm to be continued
5 Amir 6.30pm 10.00pm completed
7
8
9
10
Tuesday 3/22/2016
1 Cheng Meljyn 6.00pm 7.30pm completed
2 Sum Man Teng 6.00pm 7.30pm completed
3 Lee Kian Woei 6.00pm 9.00pm to be continued
4 Leong Kar Heng 6.00pm 9.00pm to be continued
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Wednesday 3/23/2016
1 Shawal 5.30pm 8.30pm to be continued
2
3
4
5
6
7
8
9
10
Thursday 3/24/2016
1 Lee Kian Woei 6.00pm 9.15pm to be continued
2 Leong Kar Heng 6.00pm 9.15pm to be continued
3 Shawal 5.30pm 9.00pm to be continued
4
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Friday 3/25/2016
1 Oscar Saw 6.00pm 7.15pm to complete
2
3
4
5
6
7
8
9
10
Saturday 3/26/2016
1 Madi 8.30am 5.30pm completed
2 Lee Kian Woei 10.30am 5.45pm to be continued
3 Leong Kar Heng 10.30am 5.45pm to be continued
4 Oscar Saw 11.15am 5.30pm to be continued
5 Shawal 12.30pm 5.45pm to be continued
6
7
8
9
10
Sunday 3/27/2016
1 Madi 9.00am 1.00pm completed
2
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Monday 3/28/2016
1 Lee Kian Woei 6.00pm 10.15pm to be continued
2 Leong Kar Heng 6.00pm 10.15pm to be continued
3 Oscar Saw 6.00pm 8.30pm to be continued
4
5
6
7
8
9
10
Tuesday 3/29/2016
1 Lee Kian Woei 6.00pm 10.15pm to be continued
2 Leong Kar Heng 6.00pm 10.45pm to be continued
3 Oscar Saw 6.00pm 10.00pm to be continued
4
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Wednesday 3/30/2016
1 Lee Kian Woei 6.00pm 9.30pm to be continued
2 Leong Kar Heng 6.00pm 9.30pm to be continued
3 Oscar Saw 6.00pm 9.15pm to be continued
4
5
6
7
8
9
10
Thursday 3/31/2016
1 Lee Kian Woei 6.00pm 9.30pm to be continued
2 Leong Kar Heng 6.00pm 9.30pm to be continued
3 Oscar Saw 6.00pm 9.15pm to be continued
4 Shawal 5.30pm 9.00pm to be continued
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
April
Friday 4/1/2016
1 Oscar Saw 6.00pm 7.15pm to be continued
2
3
4
5
6
7
8
9
10
Saturday 4/2/2016
1 Oscar Saw 10.15am 6.45pm to be continued
2 Lee Kian Woei 12.00pm 6.00pm to be continued
3 Leong Kar Heng 10.15pm 4.50pm to be continued
4 Shawal 1.15pm 6.15pm to be continued
5
6
7
8
9
10
Sunday 4/3/2016
1
2
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Monday 4/4/2016
1 Oscar Saw 6.00pm 9.15pm to be continued
2 Lee Kian Woei 6.00pm 9.00pm to be continued
3 Leong Kar Heng 6.00pm 9.30pm to be continued
4
5
6
7
8
9
10
Tuesday 4/5/2016
1 Lee Kian Woei 6.00pm 9.00pm to be continued
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3 Shawal 5.30pm 9.00pm to be continued
4
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Wednesday 4/6/2016
1 Lee Kian Woei 6.00pm 9.15pm to be continued
2 Leong Kar Heng 6.00pm 9.15pm to be continued
3 Oscar Saw 6.00pm 9.00pm to be continued
4 Shawal 5.30pm 9.00pm to be continued
5
6
7
8
9
10
Thursday 4/7/2016
1 Lee Kian Woei 6.00pm 9.00pm to be continued
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3 Oscar Saw 6.00pm 9.00pm to be continued
4 Shawal 5.30pm 9.00pm to be continued
5
6
7
8
9
10
Friday 4/8/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
1
2
3
4
5
6
7
8
9
10
Saturday 4/9/2016
1 Madi 8.30am 7.45pm to be continued
2 Oscar Saw 10.45am 5.30pm to be continued
3 Leong Kar Heng 10.30am 3.30pm to be continued
4 Shawal 2.30pm 8.00pm to be continued
5
6
7
8
9
10
Sunday 4/10/2016
1 Madi 8.30am 1.45pm completed
2
3
4
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Monday 4/11/2016
1 Cheng Meljyn 6.00 - 8.30pm next day
2 Sum Man Teng 6.00 - 8.30pm next day
3 Madi 6.00pm 10.00pm completed
4 Lee Kian Woei 6.00pm 9.15pm to be continued
5 Leong Kar Heng 6.00pm 9.30pm to be continued
6 Oscar Saw 6.00pm 7.00pm to be continued
7 Shawal 5.30pm 10.00pm to be continued
8
9
10
Tuesday 4/12/2016
1 Cheng Meljyn 6.00 - 8.30pm To complete today
2 Sum Man Teng 6.00 - 8.30pm To complete today
3 Lee Kian Woei 6.00pm 8.00pm to be continued
4 Oscar Saw 6.00pm 8.15pm to be continued
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 4/13/2016
1 Lee Kian Woei 6.00pm 9.00pm to be continued
Thursday 4/14/2016
1 Leong Kar Heng 6.00pm 10.00pm to be continued
2 Oscar Saw 6.00pm 9.00pm to be continued
3 Shawal 5.30pm 10.00pm to be continued
4
5
6
7
8
9
10
Friday 4/15/2016
1 Madi 6.00pm 9.00pm completed
2 Shawal 5.30pm 7.30pm to be continued
3
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
4
5
6
7
8
9
10
Saturday 4/16/2016
1 Madi 9.00am 6.00pm completed
2 Leong Kar Heng 10.50am 4.50pm to be continued
3 Oscar Saw 10.45am 5.45pm to be continued
4 Shawal 12.00pm 6.00pm to be continued
5
6
7
8
9
10
Sunday 4/17/2016
1 Mohd Shawal 2.30pm 5.30pm
2
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Monday 4/18/2016
1 Lee Kian Woei 6.00pm 9.00pm to be continued
2 Leong Kar Heng 6.00pm 9.15pm to be continued
3 Oscar Saw 6.00pm 9.00pm to be continued
4 Madi 6.00pm 9.15pm completed
5
6
7
8
9
10
Tuesday 4/19/2016
1 Nurulhana 6.30pm 9.45pm completed
2 Lee Kian Woei 6.00pm 10.00pm to be continued
3 Leong Kar Heng 6.00pm 9.15pm to be continued
4 Oscar Saw 6.00pm 9.00pm to be continued
5 Shawal 5.30pm 10.00pm to be continued
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 4/20/2016
1 Nurulhana 6.00pm 9.15pm completed
2 Madi 6.00pm 8.45pm completed
3 Oscar Saw 6.00pm 9.15pm to be continued
2 Shawal 5.30pm 8.30pm completed
3
4
5
6
7
8
9
10
Thursday 4/21/2016
1 Madi 6.00pm 9.00pm completed
2 Shawal 5.30pm 8.30pm completed
3
4
5
6
7
8
9
10
Friday 4/22/2016
1 Lee Kian Woei 6.00pm 7.00pm to be continued
2 Leong Kar Heng 6.00pm 7.00pm to be continued
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Saturday 4/23/2016
1 Bryan To be continued
2 Aaron 10.30am 6.00pm To be continued
3 Isaac Sek 12.00noon 5.30pm To be continued
4 Leong Kar Heng 10.00am 5.00pm to be continued
5 Oscar Saw 10.00am 5.00pm to be continued
6
7
8
9
10
Sunday 4/24/2016
1 Bryan To be continued
2 Aaron 11.00am 2.00pm To be continued
3 Isaac Sek 10.00am 5.00pm To be continued
4 Madi 8.45am 1.45pm completed
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Monday 4/25/2016
1 Bryan To be continued
2 Aaron 6.00pm 7.00pm To be continued
3
4
5
6
7
8
9
10
Tuesday 4/26/2016
1 Leong Kar Heng 6.00pm 10.00pm to be continued
2 Oscar Saw 6.00pm 9.15pm to be continued
3 Lee Kian Woei 6.00pm 9.00pm to be continued
4 Shawal 5.30pm 9.00pm to be continued
5
6
7
8
9
10
Wednesday 4/27/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 4/28/2016
1 Leong Kar Heng 6.00pm 9.00pm to be continued
2 Oscar Saw 6.00pm 9.00pm to be continued
3 Lee Kian Woei 6.00pm 9.00pm to be continued
4 Isaac 6.00pm 7.00pm complete
5
6
7
8
9
10
Friday 4/29/2016
1 Leong Kar Heng 6.00pm 7.00pm to be continued
2
3
4
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Saturday 4/30/2016
1
2
3
4
5
6
7
8
9
10
May
Sunday 5/1/2016
1
2
3
4
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Monday 5/2/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 5/3/2016
1 Madi 6.00pm 8.00pm completed
2 Amir 6.00pm 8.00pm completed
3
4
5
6
7
8
9
10
Wednesday 5/4/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 5/5/2016
1 Sum Man Teng 6.00pm 9.30pm complete
2 Cheng Meljyn 6.00pm 9.30pm complete
3 Ho Jia Yuen 6.00pm 9.30pm to continue
4 Oscar Saw 6.00pm 8.45pm to be continued
5 Madi 6.00pm 9.00pm completed
6 Shawal 5.30pm 8.45pm to be continued
7
8
9
10
Friday 5/6/2016
1
2
3
4
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Saturday 5/7/2016
1 Ho Jia Yuen 11.30am 8.00pm complete
2 Leong Kar Heng 11.00am 5.45pm to be continued
3 Oscar Saw 11.30am 5.30pm to be continued
4 Shawal 11.45am 7.15pm complete
5 Madi 8.30am 8.00pm completed
6 Amir 2.30pm 8.00pm completed
7
8
9
10
Sunday 5/8/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Monday 5/9/2016
1 Sum Man Teng 6.00pm 10.00pm to continue
2 Cheng Meljyn 6.00pm 10.00pm to continue
3 Ho Jia Yuen 6.00pm 10.00pm complete
4 Hazirah 6.00pm 10.00pm completed
5 Shawal 5.30pm 10.00pm to be continued
6 Lee Kian Woei 6.00pm 9.00pm completed
7 Leong Kar Heng 6.00pm 9.00pm to be continued
8 Oscar Saw 6.00pm 9.30pm to be continued
9
10
Tuesday 5/10/2016
1 Sum Man Teng 6.00pm 10.00pm complete
2 Cheng Meljyn 6.00pm 10.00pm complete
3 Isaac 6.00pm 7.00pm complete
4 Hazirah 6.00pm 8.30pm completed
5 Shawal 5.30pm 8.00pm to be continued
6 Amir 7.00pm 10.00pm to be continued
7 Lee Kian Woei 6.00pm 9.00pm completed
8 Leong Kar Heng 6.00pm 9.00pm to be continued
9 Oscasr Saw 6.00pm 9.00pm to be continued
10
Wednesday 5/11/2016
1 Shawal 5.30pm 9.00pm to be continued
2 Sum Mun Teng 6.00pm 9.00pm to be continued
3 Cheng Meijyn 6.00pm 9.00pm completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
4
5
6
7
8
9
10
Thursday 5/12/2016
1 Sum Mun Teng 6.00pm 9.00pm completed
2 Cheng Meijyn 6.00pm 9.00pm Completed
3 Lee Kian Woei 6.00pm 9.00pm completed
4 Leong Kar Heng 6.00pm 9.00pm to be continued
5 Shawal 5.30pm 9.30pm to be continued
6 Oscar Saw 6.00pm 8.00pm to be continued
7
8
9
10
Friday 5/13/2016
1 Madi 6.00pm 9.45pm completed
2 Shema 6.00pm 8.30pm to continue
3 Aisyah 6.00pm 8.30pm to continue
4 Hazirah 6.00pm 8.30pm to continue
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Saturday 5/14/2016
1 Madi 11.15am 8.15pm completed
2 Shema 11.30am 5.15pm to complete
3 Norhafizah 9.00am 5.15pm completed
4 Aisyah 10.30am 8.00pm to continue
5 Hazirah 10.30am 8.00pm to continue
6 Amir 3.00pm 8.00pm to be continued
7 Shawal 11.00am 8.15pm completed
8
9
10
Sunday 5/15/2016
1 Madi 12.00pm 4.15pm completed
2 Amir 12.00pm 5.00pm to be continued
3
4
5
6
7
8
9
10
Monday 5/16/2016
1 Shema 6.00pm 9.00pm to complete
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 5/17/2016
1 Shema 6.00pm 8.15pm completed
2 Sum Mun Teng 6.00pm 9.00pm completed
3 Cheng Meijyn 6.00pm 9.00pm completed
4 Shawal 5.30pm 8.15pm to be continued
5 Oscar Saw 6.00pm 8.15pm completed
6
7
8
9
10
Wednesday 5/18/2016
1 Shema 6.00pm 9.00pm to complete
2 Lee Kian Woei 6.00pm 9.00pm completed
3 Leong Kar Heng 6.00pm 8.30pm completed
4 Shawal 5.30pm 9.00pm to be continued
5 Oscar Saw 6.00pm 8.30pm to be continued
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Thursday 5/19/2016
1 Shema 6.00pm 8.45pm completed
2 Sum Mun Teng 6.00pm 9.00pm completed
3 Cheng Meijyn 6.00pm 9.00pm completed
4 Aisyah 6.00pm 7.00pm to continue
5 Leong Kar Heng 6.00pm 8.30pm completed
6 Shawal 5.30pm 8.30pm to be continued
7 Oscar Saw 6.00pm 8.30pm completed
8
9
10
Friday 5/20/2016
1 Madi 6.00pm 9.00pm completed
2 Oscar Saw 6.00pm 7.00pm to be continued
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sat 5/21/2016
1 Madi 9.30am 7.30pm completed
2 Afifah 9.35am 4.35pm completed
3 Leong Kar Heng 11.00am 5.45pm completed
4 Shawal 9.20am 7.30pm to be continued
5 Oscar Saw 11.00am 5.45pm to be continued
6
7
8
9
10
Sunday 5/22/2016
1 Madi 9.15am 5.15pm completed
2 Afifah 9.40am 3.00pm completed
3
4
5
6
7
8
9
10
Monday 5/23/2016
1 Shawal 5.30pm 9.00pm to be continued
2
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Tuesday 5/24/2016
1 Lee Kian Woei 6.00pm 9.00pm completed
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3 Shawal 5.30pm 9.00pm to be continued
4 Oscar Saw 6.00pm 8.45pm to be continued
5
6
7
8
9
10
Wed 5/25/2016
1 Ho Jia Yuen 6.00pm 7.30pm
2 Lee Kian Woei 6.00pm 7.30pm to be continued
3 Leong Kar Heng 6.00pm 9.00pm to be continued
4 Oscar Saw 6.00pm 7.30pm to be continued
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Thurs 5/26/2016
1 Lee Kian Woei 6.00pm 8.00pm to be continued
2 Shawal 5.30pm 8.45pm to be continued
3
4
5
6
7
8
9
10
Friday 5/27/2016
1 Ema 6.00pm 9.00pm to be continued
2 Amir 6.00pm 9.00pm to be continued
3 Shawal 5.30pm 8.45pm to be continued
4
5
6
7
8
9
10
Sat 5/28/2016
1 Hazirah 11.00am 5.30pm completed
2 Madi 9.45am 6.00pm completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sun 5/29/2016
1 Shawal 12.45pm 4.15pm to be continued
2
3
4
5
6
7
8
9
10
Mon 5/30/2016
1 Hazirah 6.00pm 9.00pm completed
2 Lee Kian Woei 6.00pm 9.00pm completed
3 Leong Kar Heng 6.00pm 9.00pm to be continued
4 Shawal 5.30pm 9.00pm to be continued
5 Oscar Saw 6.00pm 9.00pm completed
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Tuesday 5/31/2016
1 Cheng Meljyn 6.00pm 11.30pm completed
2 Sum Man Teng 6.00pm 11.30pm completed
3 Syawal 10.45pm 11.30pm completed
4 Wee Yu Ni 6.00pm 11.30pm completed
5 Hazirah 7.30pm 10.30pm completed
6 Lee Kian Woei 6.00pm 9.15pm completed
7 Leong Kar Heng 6.00pm 9.30pm to be continued
8 Shawal 5.30pm 11.30pm to be continued
9 Oscar Saw 6.00pm 9.00pm completed
10 Nurulhana 7.30pm 10.30pm completed
June
Wednesday 6/1/2016
1 Oscar Saw 6.00pm 9.00pm completed
2 Lee Kian Woei 6.00pm 8.30pm to be continued
3 Leong Kar Heng 6.00pm 8.30pm to be continued
4
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Thursday 6/2/2016
1 Cheng Meljyn 6.00pm 9.30pm to be continued
2 Sum Man Teng 6.00pm 9.30pm to be continued
3 Wee Yu Ni 6.00pm 9.30pm to be continued
4 Ho Jia Yuen 6.00pm 9.00pm complete
5 Lee Kian Woei 6.00pm 9.00pm to be continued
6 Leong Kar Heng 6.00pm 9.00pm to be continued
7
8
9
10
Friday 6/3/2016
1 Madi 6.00pm 8.30pm completed
2
3
4
5
6
7
8
9
10
Saturday 6/4/2016
1 Madi 1.00pm 7.45pm to be continued
2 Oscar Saw 11.30am 5.30pm to be continued
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Sunday 6/5/2016
1 Madi 9.30am 6.00pm completed
2
3
4
5
6
7
8
9
10
Monday 6/6/2016
1 Cheng Meljyn 6.00pm 8.00pm to be continued
2 Sum Man Teng 6.00pm 9.00pm to be continued
3 Wee Yu Ni 6.00pm 9.00pm to be continued
4 Oscar Saw 6.00pm 9.00pm to be continued
5 Lee Kian Woei 6.00pm 9.00pm to be continued
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Tuesday 6/7/2016
1 Cheng Meljyn 6.00pm 9.30pm to be continued
2 Sum Man Teng 6.00pm 9.30pm to be continued
3 Wee Yu Ni 6.00pm 9.30pm
4 Oscar Saw 6.00pm 9.00pm to be continued
5 Lee Kian Woei 6.00pm 8.30pm to be continued
6 Leong Kar Heng 6.00pm 8.45pm to be continued
7
8
9
10
Wednesday 6/8/2016
1 Lee Kian Woei 6.00pm 8.30pm to be continued
2 Leong Kar Heng 6.00pm 8.30pm to be continued
3 Cheng Meljyn 6.00pm 9.45pm to complete
4 Sum Man Teng 6.00pm 9.45pm to complete
5
6
7
8
9
10
Thursday 6/9/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Friday 6/10/2016
1
2
3
4
5
6
7
8
9
10
Saturday 6/11/2016
1 Madi 9.00am 6.00pm completed
2 'Afifah 11.00am 4.15pm to be continued
3
4
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Sunday 6/12/2016
1 Madi 9.30am 4.45pm completed
2 Hana 11.45am 4.30pm to be continued
3
4
5
6
7
8
9
10
Monday 6/13/2016
1 Oscar Saw 6.00pm 9.00pm to be continued
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3 Hana 8.00pm 10.00pm to be continued
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 6/14/2016
1 Sum Man teng 6.00pm 7.30pm completed
2 Cheng Meljyn 6.00pm 9.00pm cpmpleted
3 Oscar Saw 6.00pm 9.00pm cpmpleted
4 Leong Kar Heng 6.00pm 9.45pm to be continued
5 Hana 8.00pm 10.00pm to be continued
6
7
8
9
10
Wednesday 6/15/2016
1 Oscar Saw 6.00pm 9.00pm to be continued
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3 Sek Mun Chun 6.00pm 8.00pm to complete
4
5
6
7
8
9
10
Thursday 6/16/2016
1 Madi 6.00pm 9.30pm completed
2 Hana 8.00pm 9.30pm to be continued
3
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
4
5
6
7
8
9
10
Friday 6/17/2016
1 Oscar Saw 6.00pm 7.30pm to be continued
2
3
4
5
6
7
8
9
10
Saturday 6/18/2016
1 Oscar Saw 6.00pm 9.00pm to be continued
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Sunday 6/19/2016
1 Hana 12.45pm 4.30pm to be continued
2 'Afifah 11.00am 4.15pm to be continued
3
4
5
6
7
8
9
10
Monday 6/20/2016
1 Oscar Saw 6.00pm 8.00pm to be continued
2 Leong Kar Heng 6.00pm 8.30pm to be continued
3
4
5
6
7
8
9
10
Tuesday 6/21/2016
1 Lee Kian Woei 6.00pm 8.45pm to be continued
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 6/22/2016
1 Madi 8.45am 5.00pm completed
2 'Afifah 11.00am 4.15pm to be continued
3
4
5
6
7
8
9
10
Thursday 6/23/2016
1 Lee Kian Woei 6.00pm 8.30pm to be continued
2 Leong Kar Heng 6.00pm 8.30pm to be continued
3 Oscar Saw 6.00pm 8.30pm to be continued
4
5
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Friday 6/24/2016
1 Oscar Saw 6.00pm 7.30pm to be continued
2
3
4
5
6
7
8
9
10
Saturday 6/25/2016
1 Ho Jia Yuen 10.30am 4.00pm to continue
2 Oscar Saw 10.15am 5.00pm to be continued
3 Leong Kar Heng 11.00am 5.30pm to be continued
4 Sek Mun Chun 10.30am 5.00pm to complete
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 6/26/2016
1 Leong Kar Heng 11.00am 2.15pm to be continued
2
3
4
5
6
7
8
9
10
Monday 6/27/2016
1 Oscar Saw 6.00pm 7.30pm to be continued
2 Lee Kian Woei 6.00pm 8.30pm to be continued
3 Leong Kar Heng 6.00pm 8.30pm to be continued
4
5
6
7
8
9
10
Tuesday 6/28/2016
1 Ho Jia Yuen end week to complete
2 Oscar Saw 6.00pm 8.45pm to be continued
3 Lee Kian Woei 6.00pm 8.30pm to be continued
4 Leong Kar Heng 6.00pm 8.30pm to be continued
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 6/29/2016
1 Oscar Saw 6.00pm 8.30pm to be continued
2 Lee Kian Woei 6.00pm 8.30pm to be continued
3 Leong Kar Heng 6.00pm 8.45pm to be continued
4
5
6
7
8
9
10
Thursday 6/30/2016
1 Oscar Saw 6.00pm 8.00pm to be continued
2 Lee Kian Woei 6.00pm 9.30pm to be continued
3 Leong Kar Heng 6.00pm 9.30pm to be continued
4 Sum Man teng 6.00pm 9.00pm to be continued
5 Cheng Meljyn 6.00pm 9.30pm to be continued
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
July
Friday 7/1/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/2/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 7/3/2016
1
2
3
4
5
6
7
8
9
10
Monday 7/4/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 7/5/2016
1
2
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Wednesday 7/6/2016
1
2
3
4
5
6
7
8
9
10
Thursday 7/7/2016
1
2
3
4
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Friday 7/8/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/9/2016
1
2
3
4
5
6
7
8
9
10
Sunday 7/10/2016
1
2
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Monday 7/11/2016
1 Ho Jia Yuen 6.00pm 7.15pm to complete
2 Leong Kar Heng 6.00pm 6.45pm to be continued
3 Oscar Saw 6.00pm 8.00pm to be continued
4
5
6
7
8
9
10
Tuesday 7/12/2016
1 Ho Jia Yuen 6.00pm 8.30pm to complete
2 Leong Kar Heng 6.00pm 9.00pm to be continued
3 Oscar Saw 6.00pm 9.00pm to be continued
4 Lee Kian Woei 6.00pm 9.00pm to be continued
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Wednesgay 7/13/2016
Thursday 7/14/2016
1 Oscar Saw 6.00pm 8.45pm to be continued
2 Sum Man Tong 6.00pm 8.45pm completed
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Friday 7/15/2016
1 Shawal 5.30pm 8.45pm to be continued
2
3
4
5
6
7
8
9
10
Saturday 7/16/2016
1 Madi 8.45am 2.00pm to be continued
2 Leong Kar Heng 11.00am 4.45pm to be continued
3 Oscar Saw 11.30am 5.30pm to be continued
4
5
6
7
8
9
10
Sunday 7/17/2016
1 Madi 10.30am 6.00pm completed
2 Leong Kar Heng 9.45am 1.00pm to be continued
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Monday 7/18/2016
1 Leong Kar Heng 6.00pm 9.15pm to be continued
2 Oscar Saw 6.00pm 9.00pm to be continued
3 Lee Kian Woei 6.00pm 9.15pm to be continued
4 Shawal 5.30pm 9.00pm to be continued
5 Cheng Meljyn 6.00pm 8.45pm completed
6
7
8
9
10
Tuesday 7/19/2016
1 Leong Kar Heng 6.00pm 9.30pm to be continued
2 Oscar Saw 6.00pm 8.45pm to be continued
3 Lee Kian Woei 6.00pm 9.30pm to be continued
4 Shawal 5.30pm 9.30pm to be continued
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Wednesday 7/20/2016
1 Leong Kar Heng 6.00pm 9.00pm to be continued
2 Lee Kian Woei 6.00pm 9.00pm to be continued
3 Shawal 5.30pm 9.00pm to be continued
4
5
6
7
8
9
10
Thursday 7/21/2016
1 Shema 6.00pm 9.00pm In progress
2 Leong Kar Heng 6.00pm 9.15pm to be continued
3 Lee Kian Woei 6.00pm 9.00pm to be continued
4 Shawal 5.30pm 9.30pm to be continued
5 Ho Jia Yuen 6.00pm 7.00pm to complete
6 Aaron Goh 6.00pm 7.30pm to be continued
7
8
9
10
Friday 7/22/2016
1 Shema 6.00pm 7.45pm In progress
2 Leong Kar Heng 6.00pm 7.15pm to be continued
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Saturday 7/23/2016
1 Shema 10.30am 7.00pm in progress
2 Madi 9.15am 5.00pm completed
3 Leong Kar Heng 11.00am 6.15pm to be continued
4 Shawal 11.30am 9.45pm to be continued
5 Aaron Goh 10.30am 3.00pm to complete
6
7
8
9
10
Sunday 7/24/2016
1 Madi 10.30am 2.00pm completed
2 Shawal 2.30pm 8.00pm to be continued
3
4
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Monday 7/25/2016
1 Leong Kar Heng 6.00pm 9.45pm to be continued
2 Oscar Saw 6.00pm 8.00pm to be continued
3 Lee Kian Woei 6.00pm 9.00pm to be continued
4 Shawal 5.30pm 9.45pm to be continued
5 Zalila 5.30pm 9.25pm to be continued
6 Sum Man Tong 6.00pm 6.45pm to continue
7
8
9
10
Tuesday 7/26/2016
1 Leong Kar Heng 6.00pm 9.15pm to be continued
2 Oscar Saw 6.00pm 7.30pm to be continued
3 Lee Kian Woei 6.00pm 9.15pm to be continued
4 Zalila 5.30pm 6.15pm to be continued
5 Ho Jua Yuen 6.00pm 9.30pm to complete
6 M Shawal 5.30pm 12.00pm Completed
7 Sum Man Tong 6.00pm 10.45pm completed
8
9
10
Wednesday 7/27/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 7/28/2016
1 Leong Kar Heng 6.00pm 6.45pm to be continued
2 Lee Kian Woei 6.00pm 6.45pm to be continued
3 Shawal 5.30pm 10.00pm to be continued
4 Ho Jia Yuen 6.00pm 9.00pm to complete
5
6
7
8
9
10
Friday 7/29/2016
1 Leong Kar Heng 6.00pm 7.00pm to be continued
2 Lee Kian Woei 6.00pm 7.30pm to be continued
3 Shawal 5.30pm 8.00pm to be continued
4 Zalila 5.30pm 7.30pm to be continued
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Saturday 7/30/2016
1 Madi 10.30am 4.15pm completed
2 Leong Kar Heng 11.00am 7.00pm to be continued
3 Shawal 2.30pm 7.30pm to be continued
4 Zalila 10.00am 3.30pm completed
5
6
7
8
9
10
Sunday 7/31/2016
1 Shawal 10.15am 5.45pm to be continued
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
August
Monday 8/1/2016
1 Madi 6.00pm 8.00pm completed
2 Cheng Meljyn 6.00pm 7.15pm to continue
3 Sum Man Teng 6.00pm 7.15pm to continue
4 Oscar Saw 6.00pm 8.30pm to continue
5 Leong Kar Heng 6.00pm 8.30pm to continue
6 Lee Kian Woei 6.00pm 9.15pm to continue
7 Shawal 5.30pm 9.45pm to continue
8
9
10
Tuesday 8/2/2016
1 Ho Jia Yuen 6.00pm 8.30pm to complete
2 Oscar Saw 6.00pm 8.30pm to continue
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 6.00pm 9.00pm to continue
5 Shawal 5.30pm 9.00pm to continue
6
7
8
9
10
Wednesday 8/3/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 8/4/2016
1 Ho Jia Yuen 6.00pm 8.15pm to be continued
2 Aaron Goh 6.00pm 8.15pm completed
3 Cheng Meljyn 6.00pm 8.15pm
4 Sum Man Teng 6.00pm 8.15pm
5 Oscar Saw 6.00pm 8.15pm completed
6
7
8
9
10
Friday 8/5/2016
1 Aisyah 6.00pm 8.15pm to continue
2 Hazirah 6.00pm 8.15pm to continue
3 Leong Kar Heng 6.00pm 8.00pm to continue
4 Lee Kian Woei 6.00pm 8.00pm to continue
5 Shawal 5.30pm 7.00pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Saturday 8/6/2016
1 Madi 10.00am 3.45pm to be continued
2 Ho Jia Yuen 10.00am 5.30pm completed
3 Aaron Goh 10.00am 5.30pm completed
4 Aisyah 10.45am 4.30pm to continue
5 Hazirah 10.45am 4.30pm completed
6 Leong Kar Heng 10.30am 4.30pm to continue
7 Lee Kian Woei 10.30am 3.30pm to continue
8 Shawal 1.30pm 8.30pm to continue
9
10
Sunday 8/7/2016
1 Hazirah 10.15am 8.45pm completed
2 Madi 10.00am 5.15pm completed
3 Ho Jia Yuen 10.00am 1.00pm completed
4 Aaron Goh 10.30am 3.00pm to continue
5 Aisyah 10.15am 8.45pm completed
6 Shawal 1.15pm 6.15pm to continue
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Monday 8/8/2016
1 Ho Jia Yuen 6.00pm 8.45pm to complete
2 Aaron Goh 6.00pm 8.15pm to continue
3 Cheng Meljyn 6.00pm 8.45pm to continue
4 Sum Man Teng 6.00pm 8.45pm to continue
5 Leong Kar Heng 6.00pm 9.00pm to continue
6 Lee Kian Woei 6.00pm 9.00pm to continue
7 Shawal 5.30pm 9.30pm to continue
8
9
10
Tuesday 8/9/2016
1 Ho Jia Yuen 6.00pm 10.00pm to continue
2 Oscar Saw 6.00pm 8.15pm to complete
3 Aaron Goh 6.00pm 10.00pm completed
4 Shawal 5.30pm 11.00pm to continue
5
6
7
8
9
10
Wednesday 8/10/2016
1 Ho Jia Yuen 6.00pm 8.15pm to continue
2 Cheng Meljyn 6.00pm 8.15pm completed
3 Sum Man Teng 6.00pm 8.15pm completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 8/11/2016
1 Cheng Meljyn 6.00pm 7.30pm completed
2 Oscar Saw 6.00pm 8.45pm to continue
3 Lee Kian Woei 6.00pm 8.00pm to continue
4 Shawal 5.30pm 11.30pm to continue
5 Sum Man Teng 6.00pm 7.30pm completed
6 Zalila 5.30pm 9.35pm to continue
7
8
9
10
Friday 8/12/2016
1 Ho Jia Yuen 6.00pm 7.30pm to complete
2 Shawal 5.30pm 7.30pm to continue
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Saturday 8/13/2016
1 Hazirah 10.30am 7.00pm to be continued
2 Madi 9.00am 6.00pm to continue
3 Oscar Saw 11.00am 5.15pm completed
4 Leong Kar Heng 10.30am 5.30pm to continue
5 Shawal 2.45pm 7.45pm to continue
6
7
8
9
10
Sunday 8/14/2016
1 Hazirah 9.30am 12.10pm to be continued
2 Madi 9.15am 2.00pm to continue
2 Shawal 2.30pm 5.30pm to continue
4
5
6
7
8
9
10
Monday 8/15/2016
1 Hazirah 6.00pm 8.00pm completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 8/16/2016
1 Aisyah 6.00pm 10.00pm completed
2 Leong Kar Heng 6.00pm 8.30pm to continue
3 Lee Kian Woei 6.00pm 8.00pm to continue
4
5
6
7
8
9
10
Wednesday 8/17/2016
1 Ho Jia Yuen 6.00pm 8.15pm to complete
2 Hazirah 6.00pm 9.30pm to be continued
3 Aisyah 6.00pm 9.30pm to be continued
4 Oscar Saw 6.00pm 8.30pm to be continued
5 Shawal 5.30pm 9.30pm to continue
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Thursday 8/18/2016
1 Ho Jia Yuen 6.00pm 8.15pm to complete
2 Norhayati 6.00pm 9.10pm to complete
3 Nor Hafizah 6.00pm 9.10pm to complete
4 Hazirah 6.00pm 10.00pm completed
5 Oscar Saw 6.00pm 8.15pm completed
6 Shawal 5.30pm 10.30pm to continue
7
8
9
10
Friday 8/19/2016
1 Norhayati 6.00pm 10.00pm completed
2 Nor Hafizah 6.00pm 10.00pm completed
3 Zainon 5.30pm 10.00pm completed
4 Shawal 5.30pm 7.30pm to continue
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Saturday 8/20/2016
1 Cheng Meljyn 12.30pm 3.30pm to continue
2 Hazirah 10.45pm 10.00pm completed
3 Aisyah 11.45am 10.00pm to be continued
4 Madi 10.15am 5.45pm to continue
5 Oscar Saw 11.00am 5.30pm to be continued
6 Leong Kar Heng 11.00am 6.15pm to continue
7 Lee Kian Woei 3.15pm 6.15pm to continue
8 Shawal 12.30pm 10.30pm to continue
9
10
Sunday 8/21/2016
1 Hazirah 12pm 4.00pm completed
2 Aisyah 11.45am 5.30pm completed
3 Madi 10.30am 5.45pm completed
4 Leong Kar Heng 10.30am 1.00pm to continue
5 Syawal 1.30pm 11.00pm completed
6
7
8
9
10
Monday 8/22/2016
1 Cheng Meljyn 6.00pm 7.30pm completed
2 Oscar Saw 6.00pm 8.30pm completed
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 7.45pm 9.00pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 8/23/2016
1 Cheng Meljyn 6.00pm 7.30pm completed
2 Oscar Saw 6.00pm 8.30pm to be continued
3 Shawal 5.30pm 9.30pm to continue
4
5
6
7
8
9
10
Wednesday 8/24/2016
1 Hazirah 6.00pm 8.00pm completed
2 Oscar Saw 6.00pm 8.00pm completed
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 6.00pm 9.00pm to continue
5 Shawal 5.30pm 10.00pm to continue
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Thursday 8/25/2016
1 Hazirah 6.00pm 10.00pm completed
2 Oscar Saw 6.00pm 9.30pm completed
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 6.00pm 9.00pm to continue
5 Shawal 5.30pm 9.00pm to continue
6
7
8
9
10
Friday 8/26/2016
1
2
3
4
5
6
7
8
9
10
Saturday 8/27/2016
1 Oscar Saw 11.00am 5.30pm completed
2 Leong Kar Heng 10.30am 5.50pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Sunday 8/28/2016
1
2
3
4
5
6
7
8
9
10
Monday 8/29/2016
1 Sum Man Teng 6.00pm 7.30pm completed
2 Oscar Saw 6.00pm 9.00pm completed
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 6.00pm 9.00pm to continue
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Tuesday 8/30/2016
1 Oscar Saw 6.00pm 7.15pm to be continued
2 Shawal 5.30pm 8.00pm to continue
3
4
5
6
7
8
9
10
Wednesday 8/31/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
September
Thursday 9/1/2016
1 Oscar Saw 6.00pm 9.30pm completed
2 Leong Kar Heng 6.00pm 9.00pm to continue
3 Lee Kian Woei 6.00pm 9.00pm to continue
4
5
6
7
8
9
10
Friday 9/2/2016
1 Oscar Saw 6.00pm 8.15pm completed
2 Shawal 5.30pm 7.30pm to continue
3
4
5
6
7
8
9
10
Saturday 9/3/2016
1 Hazirah 12.00pm 6.30pm to continue
2 Oscar Saw 11.00am 5.30pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 9/4/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/5/2016
1 Oscar Saw 6.00pm 9.30pm to continue
2 Cheng Meljyn 6.00pm 8.00pm to continue
3 Leong Kar Heng 6.00pm 8.15pm to continue
4 Lee Kian Woei 6.00pm 8.30pm to continue
5 Sum Man Teng 6.00pm 8.00pm to continue
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Tuesday 9/6/2016
1 Oscar Saw 6.00pm 9.30pm to continue
2 Cheng Meljyn 6.00pm 8.00pm to continue
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 6.00pm 9.00pm to continue
5 Shawal 5.30pm 9.00pm to continue
6
7
8
9
10
Wednesday 9/7/2016
1 Oscar Saw 6.00pm 9.00pm completed
2 Ho Jia Yuen 6.00pm 9.00pm completed
3 Cheng Meljyn 6.00pm 9.00pm to continue
4 Leong Kar Heng 6.00pm 8.45pm to continue
5 Lee Kian Woei 6.00pm 8.30pm to continue
6 Shawal 5.30pm 9.00pm to continue
7 Sum Man teng 6.00pm 8.00pm to continue
8
9
10
Thursday 9/8/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Friday 9/9/2016
1 Oscar Saw 6.00pm 7.00pm Completed
2
3
4
5
6
7
8
9
10
Saturday 9/10/2016
1 Oscar Saw 10.45am 5.30pm to continue
2 Cheng Meljyn 11.00am 4.30pm to continue
3 Leong Kar Heng 11.00am 4.30pm to continue
4 Lee Kian Woei 11.00am 6.00pm to continue
5 Shawal 2.30pm 6.30pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Sunday 9/11/2016
1 Oscar Saw 11.00am 4.15pm to continue
2 Leong Kar Heng 10.45am 4.15pm to continue
3
4
5
6
7
8
9
10
Monday 9/12/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 9/13/2016
1 Ho Jia Yuen 6.00pm 8.30pm complete
2 Cheng Meljyn 6.00pm 8.30pm complete
3 Leong Kar Heng 6.00pm 8.30pm to continue
4 Lee Kian Woei 6.00pm 10.15pm to continue
5 Oscar Saw 6.00pm 9.00pm to continue
6 Sum Man Teng 6.00pm 8.00pm to continue
7
8
9
10
Wednesday 9/14/2016
1 Oscar Saw 6.00pm 8.00pm to continue
2
3
4
5
6
7
8
9
10
Thursday 9/15/2016
1 Syawal 5.30pm 10.30pm to continue
2 Sum Man Teng 6.00pm 6.45pm completed
3
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
4
5
6
7
8
9
10
Friday 9/16/2016
1 Syawal 5.30pm 9.30pm completed
2 Oscar Saw 11.00am 5.30pm to continue
3 Leong Kar Heng 12.30pm 4.45pm to continue
4
5
6
7
8
9
10
Saturday 9/17/2016
1 Madi 10.30am 4.30pm completed
2
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Sunday 9/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/19/2016
1 Leong Kar Heng 6.00pm 9.00pm to continue
2 Lee Kian Woei 6.00pm 9.00pm to continue
3 Oscar Saw 6.00pm 9.00pm to continue
4
5
6
7
8
9
10
Tuesday 9/20/2016
1 Leong Kar Heng 6.00pm 7.15pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 9/21/2016
1 Shawal 5.30pm 8.30pm to continue
2
3
4
5
6
7
8
9
10
Thursday 9/22/2016
1 Syawal 5.30pm 7.00pm Completed
2 Yati 5.30pm 7.00pm Completed
3 NorHafizah 5.30pm 7.00pm Completed
4 Madi 10.15am 12.30pm completed
5
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Friday 9/23/2016
1
2
3
4
5
6
7
8
9
10
Saturday 9/24/2016
1 Leong Kar Heng 11.30pm 5.15pm to continue
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 9/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/26/2016
1 Leong Kar Heng 6.00pm 9.00pm to continue
2 Lee Kian Woei 6.00pm 9.00pm to continue
3
4
5
6
7
8
9
10
Tuesday 9/27/2016
1 Leong Kar Heng 6.00pm 9.00pm to continue
2 Shawal 5.30pm 9.00pm to continue
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Wednesday 9/28/2016
1 Leong Kar Heng 6.00pm 9.30pm to continue
2 Lee Kian Woei 6.00pm 9.30pm to continue
3 Cheng Meljyn 6.00pm 8.00pm to continue
4
5
6
7
8
9
10
Thursday 9/29/2016
1 Saisa 6.00pm 8.00pm to continue
2 Lee Kian Woei 6.00pm 8.00pm to continue
3 Madi 6.00pm 8.30pm completed
4 Sum Man Teng 6.00pm 8.00pm to continue
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Friday 9/30/2016
1 Lee Kian Woei 6.00pm 8.00pm to continue
2
3
4
5
6
7
October
Saturday 10/1/2016
1 Saisa 10.00am 6.00pm completed
2 Hazirah 12.10pm 6.00pm to continue
3 Leong Kar Heng 11.45am 4.45pm to continue
4 Madi 9.00am 6.00pm completed
Sunday 10/2/2016
1 Saisa
2
Monday 10/3/2016
1 Madi 10.00am 2.00pm completed
2
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Tuesday 10/4/2016
1 Pua Zhi Xun 6.00pm 7.30pm to continue
2 Sum Man Teng 6.00pm 7.30pm to continue
3 Leong Kar Heng 6.00pm 9.00pm to continue
4 Lee Kian Woei 6.00pm 9.30pm to continue
5
6
7
8
9
10
Wednesday 10/5/2016
1 Saisa 6.00pm 8.45pm completed
2 Pua Zhi Xun 6.00pm 8.30pm to continue
3 Sum Man Teng 6.00pm 8.30pm to continue
4 Siti Aisyah 6.00pm 8.45pm to continue
5 Hazirah 6.00pm 8.30pm to continue
6 Lee Kian Woei 6.00pm 8.45pm to continue
7 Cheng Meljyn 6.00pm 8.30pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Thursday 10/6/2016
1 Pua Zhi Xun 6.00pm 9.15pm to continue
2 Sum Man Teng 6.00pm 9.15pm to continue
3 Siti Aisyah 6.00pm 8.00pm completed
4 Hazirah 6.00pm 8.00pm completed
5 Cheng Meljyn 6.00pm 8.00pm to continue
6
7
8
9
10
Friday 10/7/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/8/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 10/9/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/10/2016
1 Pua Zhi Xun 6.00pm 8.00pm to continue
2 Leong Kar Heng 6.00pm 9.15pm to continue
3 Lee Kian Woei 6.00pm 9.15pm to continue
4 Cheng Meljyn 6.00pm 8.00pm to continue
5 Sum Man Teng 6.00pm 8.00pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Tuesday 10/11/2016
1 Pua Zhi Xun 6.00pm 8.00pm to continue
2 Leong Kar Heng 6.00pm 9.30pm to continue
3 Lee Kian Woei 6.00pm 9.30pm to continue
4 Cheng Meljyn 6.00pm 7.30pm to continue
5 Sum Man Teng 6.00pm 7.30pm to continue
6
7
8
9
10
Wednesday 10/12/2016
1 Pua Zhi Xun 6.00pm 8.00pm to continue
2 Cheng Meljyn 6.00pm 8.00pm to continue
3 Sum Man Teng 6.00pm 8.00pm to continue
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Thursday 10/13/2016
1 Pua Zhi Xun 6.00pm 8.00pm to continue
2 Siti Aisyah 6.00pm 9.30pm to continue
3 Leong Kar Heng 6.00pm 9.30pm to continue
4 Lee Kian Woei 6.00pm 9.30pm to continue
5 Shawal 5.30pm 9.00pm to continue
6 Cheng Meljyn 6.00pm 8.00pm to continue
7 Madi 6.30pm 8.45pm completed
8 Sum Man Teng 6.00pm 8.00pm to continue
9
10
Friday 10/14/2016
3 Leong Kar Heng 6.00pm 7.45pm to continue
2
3
4
5
6
7
8
9
10
Saturday 10/15/2016
1 Hazirah 11.10am 7.30pm completed
2 Siti Aisyah 11.10am 7.30pm to continue
3 Leong Kar Heng 10.00am 6.00pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Sunday 10/16/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/17/2016
1 Siti Aisyah 6.00pm 9.00pm completed
2 Leong Kar Heng 6.00pm 8.45pm to continue
3 Cheng Meljyn 6.00pm 7.45pm to continue
4 Pua Zhi Xun 6:00pm 8:00pm to continue
5 Sum Man Teng 6.00pm 8.15pm to continue
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Tuesday 10/18/2016
1 Ho Jia Yuen 6.00pm 7.30pm completed
2 Leong Kar Heng 6.00pm 9.00pm to continue
3 Lee Kian Woei 6.00pm 9.00pm to continue
4 Shawal 5.30pm 9.30pm to continue
5 Cheng Meljyn 6.00pm 8.15pm to continue
6 Pua Zhi Xun 6:00pm 8:00pm to continue
7 Sum Man Teng 6.00pm 8.15pm to continue
8
9
10
Wednesday 10/19/2016
1 Leong Kar Heng 6.00pm 9.00pm to continue
2 Lee Kian Woei 6.00pm 9.00pm to continue
3 Shawal 5.30pm 10.45pm to continue
4 Sum Man Teng 6.00pm 8.15pm to continue
5
6
7
8
9
10
Thursday 10/20/2016
1 Cheng Meljyn 6.00pm 7.00pm Completed
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Friday 10/21/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/22/2016
1 Hazirah 11.30am 6.30pm completed
2 Leong Kar Heng 12.00pm 4.30pm to continue
3 Lee Kian Woei 10.15am 6.00pm to continue
4 Pua Zhi Xun 3.00pm 5.00pm to continue
5 Madi 10.00am 7.15pm completed
6 Sum Man Teng 12.00pm 3.30pm to continue
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Sunday 10/23/2016
1 Madi 9.30am 5.15pm completed
2
3
4
5
6
7
8
9
10
Monday 10/24/2016
1 Leong Kar Heng 6.00pm 9.15pm to continue
2 Lee Kian Woei 6.00pm 9.15pm to continue
3 Shawal 5.30pm 8.30pm to continue
4 Cheng Meljyn 6.00pm 8.00pm to continue
5 Pua Zhi Xun 6.00pm 8.00pm to continue
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 10/25/2016
1 Leong Kar Heng 6.00pm 9.00pm to continue
2 Lee Kian Woei 6.00pm 9.00pm to continue
3 Shawal 5.30pm 8.30pm to continue
4 Cheng Meljyn 6.00pm 8.00pm to continue
5 Pua Zhi Xun 6.00pm 7.30pm to continue
6 Sum Man Teng 6.00pm 8.00pm to continue
7
8
9
10
Wednesday 10/26/2016
1 Pua Zhi Xun 6.00pm 7.00pm completed
2
3
4
5
6
7
8
9
10
Thursday 10/27/2016
1 Lee Kian Woei 6.00pm 7.00pm to continue
2 Sum Man Teng 6.00pm 8.00pm to continue
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Friday 10/28/2016
1 Leong Kar Heng 6.00pm 7.45pm to continue
2 Lee Kian Woei 6.00pm 8.00pm to continue
3
4
5
6
7
8
9
10
Saturday 10/29/2016
1 Leong Kar Heng 11.45am 5.15pm to continue
2
3
4
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Sunday 10/30/2016
1 Leong Kar Heng 2.00pm 6.15pm to continue
2
3
4
5
6
7
8
9
10
Monday 10/31/2016
1 Leong Kar Heng 6.00pm 9.30pm to continue
2 Lee Kian Woei 6.00pm 9.30pm to continue
3
4
5
6
7
8
9
10
November
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Tuesday 11/1/2016
1 Ho Jia Yuen 6.00pm 7.15pm to continue
2 Aaron Gog 6.00pm 7.30pm complete
3
4
5
6
7
8
9
10
Wednesday 11/2/2016
1 Cheng Meljyn 6.00pm 9.30pm completed
2 Sum Man Teng 6.00pm 7.30pm completed
3 Pua Zhi Xun 6.00pm 9.30pm complete
4
5
6
7
8
9
10
Thursday 11/3/2016
1 Ho Jia Yuen 6.00pm 7.00pm to continue
2
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Friday 11/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/5/2016
1 Hazirah 11.15am 5.30pm to continue
2 Aisyah 11.15am 5.30pm to continue
3 Ho Jia Yuen 11.00am 1.00pm to continue
4 Madi 9.45am 7.15pm completed
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Sunday 11/6/2016
1 Madi 9.15am 2.00pm completed
2
3
4
5
6
7
8
9
10
Monday 11/7/2016
1 Ho Jia Yuen 6.00pm 7.30pm to continue
2 Cheng Meljyn 6.00pm 7.30pm to continue
3 Pua Zhi Xun 6.00pm 7.30pm to continue
4
5
6
7
8
9
10
Tuesday 11/8/2016
1 Pua Zhi Xun 6.00pm 8.00pm to continue
2
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Wednesday 11/9/2016
1 Pua Zhi Xun 6.00pm 8.00pm to continue
2
3
4
5
6
7
8
9
10
Thurday 11/10/2016
1 Hazirah 6.00pm 8.00pm completed
2 Aisyah 6.00pm 8.00pm to continue
3 Ho Jia Yuen 6.00pm 7.00pm completed
4 Sum Man Teng 6.00pm 8.00pm to continue
5 Pua Zhi Xun 6.00pm 8.00pm to continue
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Friday 11/11/2016
1 Hazirah 11.15am 6.00pm completed
2
3
4
5
6
7
8
9
10
Saturday 11/12/2016
1 Hissam 11.20am 6.00..pm to continue
2 Ho Jia Yuen 11.15am 4.00pm to continue
3 Madi 9.00am 6.00pm completed
4 Sum Man Teng 11.00am 6.30pm to continue
5 Syawal 2.30pm 10.00pm completed
6
7
8
9
10
Sunday 11/13/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Monday 11/14/2016
1 Ho Jia Yuen 6.00pm 8.30pm to continue
2
3
4
5
6
7
8
9
10
Tuesday 11/15/2016
1 Hissam 6.00pm 8.00pm to continue
2 Ho Jia Yuen 6.00pm 8.30pm to continue
3 Pua Zhi Xun 6.00pm 8.30pm to continue
4
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Wednesday 11/16/2016
1 Hazirah 8.00pm 9.30pm to continue
2 Hissam 6.00pm 8.00pm to continue
3 Ho Jia Yuen 6.00pm 9.30pm completed
4 Cheng Meljyn 6.00pm 7.15pm to continue
5 Sum Man Teng 6.00pm 7.15pm to continue
6 Pua Zhi Xun 6.00pm 9.15pm to continue
7
8
9
10
Thursday 11/17/2016
1 Hazirah 7.00pm 8.30pm completed
2 Hissam 6.00pm 8.00pm completed
3 Ho Jia Yuen 6.00pm 9.00pm completed
4 Cheng Meljyn 6.00pm 9.00pm to continue
5 Sum Man Teng 6.00pm 8.00pm to continue
6 Pua Zhi Xun 6.00pm 8.15pm to continue
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Friday 11/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/19/2016
1 Yati 10.30am 5.30pm to continue
2 Ho Jia Yuen 11.15am 4.30pm report completed
3 Madi 9.30am 6.00pm completed
4 Hazirah 12.30pm 5.30pm to continue
5 Aisyah 12.30pm 5.00pm to continue
6 Cheng Meljyn 12.30pm 5.30pm to continue
7 Sum Man Teng 12.00pm 5.30pm to continue
8
9
10
Sunday 11/20/2016
1 Madi 9.30am 2.00pm completed
2
3
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
4
5
6
7
8
9
10
Monday 11/21/2016
1 Ho Jia Yuen 6.00pm 7.00pm completed
2 Pua Zhi Xun 6.00pm 8.30pm completed
3
4
5
6
7
8
9
10
Tuesday 11/22/2016
1 Saisa 6.00pm 9.45pm Completed
2 Yati 6.00pm 10.00pm to continue
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Wednesday 11/23/2016
1 Hissam 6.00pm 8.00pm to continue
2 Ho Jia Yuen 6.00pm 8.00pm to continue
3
4
5
6
7
8
9
10
Thursday 11/24/2016
1 Yati 6.00pm 10.00pm to continue
2 Hissam 6.00pm 8.00pm to continue
3 Ho Jia Yuen 6.00pm 9.00pm completed
4 Aaron Goh 6.00pm 7.45pm completed
5
6
7
8
9
10
Friday 11/25/2016
1
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
2
3
4
5
6
7
8
9
10
Saturday 11/26/2016
1 Hissam 10.00am 6.00pm completed
2 Ho Jia Yuen 10.30am 5.30pm completed
3 Hazirah 12.00pm 5.30pm to continue
4
5
6
7
8
9
10
Sunday 11/27/2016
1 Ho Jia Yuen 11.15am 5.00pm completed
2
3
4
5
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Monday 11/28/2016
1 Cheng Meljyn 6.00pm 7.00pm to continue
2
3
4
5
6
7
8
9
10
Tuesday 11/29/2016
1 Cheng Meljyn 6.00pm 8.00pm to continue
2 Sum Man Teng 6.00pm 8.00pm to continue
3 Pua Zhi Xun 6.00pm 7.30pm to complete
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 11/30/2016
1
2
3
4
5
6
7
8
9
10
December
Thursday 12/1/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/2/2016
1
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
2
3
4
5
6
7
8
9
10
Saturday 12/3/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/4/2016
1
2
3
4
5
6
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
7
8
9
10
Monday 12/5/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/6/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Wednesday 12/7/2016
1
2
3
4
5
6
7
8
9
10
Thursday 12/8/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/9/2016
1
2
3
4
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
5
6
7
8
9
10
Saturday 12/10/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/11/2016
1
2
3
4
5
6
7
8
9
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
10
Monday 12/12/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/13/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/14/2016
1
2
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
3
4
5
6
7
8
9
10
Thursday 12/15/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/16/2016
1
2
3
4
5
6
7
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
8
9
10
Saturday 12/17/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/19/2016
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
1
2
3
4
5
6
7
8
9
10
Tuesday 12/20/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/21/2016
1
2
3
4
5
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
6
7
8
9
10
Thursday 12/22/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/23/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
Saturday 12/24/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/26/2016
1
2
3
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
4
5
6
7
8
9
10
Tuesday 12/27/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/28/2016
1
2
3
4
5
6
7
8
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
9
10
Thursday 12/29/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/30/2016
1
2
3
4
5
6
7
8
9
10
Saturday 12/31/2016
1
OVERTIME
me. All
Thestaff
targeted
who will
timeline
be claiming
filled byovertime
team leader
shallisstill
merely
fill infor
theplanning
overtime&sheet
monitoring
as perof
normal
overtime.
office
Allpractice.
staff who will be claiming overtime shall still fill in
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
JANUARY
February
March
Tuesday 3/1/2016
1 Leong Kar Heng
2 Oscar Saw
3
4
5
6
7
8
9
10
Wednesday 3/2/2016
1 Madi
2 Ho Jia Yuen
3 Leong Kar Heng
4 Oscar Saw
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Thursday 3/3/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Friday 3/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/5/2016
1 Madi
2 Ho Jia Yuen
3 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4 Oscar Saw
5 Nurulhan
6
7
8
9
10
Sunday 3/6/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/7/2016
1 Oscar Saw
2
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Tuesday 3/8/2016
1 Shawal
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Wednesday 3/9/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Thursday 3/10/2016
1 Ho Jia Yuen
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2
3
4
5
6
7
8
9
10
Friday 3/11/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/12/2016
1 Ho Jia Yuen
2 Madi
3 Leong Kar Heng
4
5
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Sunday 3/13/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/14/2016
1 Sum Nam Teng
2 Cheng Meliyn
3 Madi
4 Lee Kian Woei
5 Leong Kar Heng
6 Oscar Saw
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Tuesday 3/15/2016
1 Wendy Kok
2 Sum Nam Teng
3 Cheng Meliyn
4 Lee Kian Woei
5 Leong Kar Heng
6
7
8
9
10
Wednesday 3/16/2016
1 Sum Nam Teng
2 Cheng Meliyn
3 Shawal
4 Leong Kar Heng
5 Oscar Saw
6 Lee Kian Woei
7
8
9
10
Thursday 3/17/2016
1 Cheng Meljyn
2 Sum Man Teng
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Friday 3/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/19/2016
1 Madi
2 Shawal
3 Leong Kar Heng
4 Oscar Saw
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Sunday 3/20/2016
1 Madi
2 Shawal
4
5
6
7
8
9
10
Monday 3/21/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Leong Kar Heng
4 Shawal
5 Amir
7
8
9
10
Tuesday 3/22/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Lee Kian Woei
4 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Wednesday 3/23/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Thursday 3/24/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Shawal
4
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Friday 3/25/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 3/26/2016
1 Madi
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5 Shawal
6
7
8
9
10
Sunday 3/27/2016
1 Madi
2
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Monday 3/28/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Tuesday 3/29/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Wednesday 3/30/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Thursday 3/31/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
April
Friday 4/1/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 4/2/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4 Shawal
5
6
7
8
9
10
Sunday 4/3/2016
1
2
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Monday 4/4/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
10
Tuesday 4/5/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Shawal
4
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Wednesday 4/6/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
Thursday 4/7/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
Friday 4/8/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1
2
3
4
5
6
7
8
9
10
Saturday 4/9/2016
1 Madi
2 Oscar Saw
3 Leong Kar Heng
4 Shawal
5
6
7
8
9
10
Sunday 4/10/2016
1 Madi
2
3
4
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Monday 4/11/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Madi
4 Lee Kian Woei
5 Leong Kar Heng
6 Oscar Saw
7 Shawal
8
9
10
Tuesday 4/12/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Lee Kian Woei
4 Oscar Saw
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Wednesday 4/13/2016
1 Lee Kian Woei
Thursday 4/14/2016
1 Leong Kar Heng
2 Oscar Saw
3 Shawal
4
5
6
7
8
9
10
Friday 4/15/2016
1 Madi
2 Shawal
3
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4
5
6
7
8
9
10
Saturday 4/16/2016
1 Madi
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
Sunday 4/17/2016
1 Mohd Shawal Completed for sending to binder
2
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Monday 4/18/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Madi
5
6
7
8
9
10
Tuesday 4/19/2016
1 Nurulhana
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5 Shawal
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Wednesday 4/20/2016
1 Nurulhana
2 Madi
3 Oscar Saw
2 Shawal
3
4
5
6
7
8
9
10
Thursday 4/21/2016
1 Madi
2 Shawal
3
4
5
6
7
8
9
10
Friday 4/22/2016
1 Lee Kian Woei
2 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Saturday 4/23/2016
1 Bryan
2 Aaron
3 Isaac Sek
4 Leong Kar Heng
5 Oscar Saw
6
7
8
9
10
Sunday 4/24/2016
1 Bryan
2 Aaron
3 Isaac Sek
4 Madi
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Monday 4/25/2016
1 Bryan
2 Aaron
3
4
5
6
7
8
9
10
Tuesday 4/26/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5
6
7
8
9
10
Wednesday 4/27/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Shawal
2
3
4
5
6
7
8
9
10
Thursday 4/28/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Isaac
5
6
7
8
9
10
Friday 4/29/2016
1 Leong Kar Heng
2
3
4
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Saturday 4/30/2016
1
2
3
4
5
6
7
8
9
10
May
Sunday 5/1/2016
1
2
3
4
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Monday 5/2/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 5/3/2016
1 Madi
2 Amir
3
4
5
6
7
8
9
10
Wednesday 5/4/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Sum Man Teng
2 Cheng Meljyn
3 Leong Kar Heng
4 Oscar Saw
5 Lee Kian Woei
6 Shawal
7 Amir
8
9
10
Thursday 5/5/2016
1 Sum Man Teng
2 Cheng Meljyn
3 Ho Jia Yuen
4 Oscar Saw
5 Madi
6 Shawal
7
8
9
10
Friday 5/6/2016
1
2
3
4
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Saturday 5/7/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5 Madi
6 Amir
7
8
9
10
Sunday 5/8/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Monday 5/9/2016
1 Sum Man Teng
2 Cheng Meljyn
3 Ho Jia Yuen
4 Hazirah
5 Shawal
6 Lee Kian Woei
7 Leong Kar Heng
8 Oscar Saw
9
10
Tuesday 5/10/2016
1 Sum Man Teng
2 Cheng Meljyn
3 Isaac
4 Hazirah
5 Shawal
6 Amir
7 Lee Kian Woei
8 Leong Kar Heng
9 Oscasr Saw
10
Wednesday 5/11/2016
1 Shawal
2 Sum Mun Teng
3 Cheng Meijyn
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4
5
6
7
8
9
10
Thursday 5/12/2016
1 Sum Mun Teng
2 Cheng Meijyn
3 Lee Kian Woei
4 Leong Kar Heng
5 Shawal
6 Oscar Saw
7
8
9
10
Friday 5/13/2016
1 Madi
2 Shema
3 Aisyah
4 Hazirah
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Saturday 5/14/2016
1 Madi
2 Shema
3 Norhafizah
4 Aisyah
5 Hazirah
6 Amir
7 Shawal
8
9
10
Sunday 5/15/2016
1 Madi
2 Amir
3
4
5
6
7
8
9
10
Monday 5/16/2016
1 Shema
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2 Aisyah
3 Lee Kian Woei
4 Leong Kar Heng
5 Shawal
6 Sum Mun Teng
7 Oscar Saw
8
9
10
Tuesday 5/17/2016
1 Shema
2 Sum Mun Teng
3 Cheng Meijyn
4 Shawal
5 Oscar Saw
6
7
8
9
10
Wednesday 5/18/2016
1 Shema
2 Lee Kian Woei
3 Leong Kar Heng
4 Shawal
5 Oscar Saw
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Thursday 5/19/2016
1 Shema
2 Sum Mun Teng
3 Cheng Meijyn
4 Aisyah
5 Leong Kar Heng
6 Shawal
7 Oscar Saw
8
9
10
Friday 5/20/2016
1 Madi
2 Oscar Saw
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Sat 5/21/2016
1 Madi
2 Afifah
3 Leong Kar Heng
4 Shawal
5 Oscar Saw
6
7
8
9
10
Sunday 5/22/2016
1 Madi
2 Afifah
3
4
5
6
7
8
9
10
Monday 5/23/2016
1 Shawal
2
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Tuesday 5/24/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Shawal
4 Oscar Saw
5
6
7
8
9
10
Wed 5/25/2016
1 Ho Jia Yuen To complete next day
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Thurs 5/26/2016
1 Lee Kian Woei
2 Shawal
3
4
5
6
7
8
9
10
Friday 5/27/2016
1 Ema
2 Amir
3 Shawal
4
5
6
7
8
9
10
Sat 5/28/2016
1 Hazirah
2 Madi
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3 Afifah
4 Ema
5 Amir
6 Shawal
7 Oscar Saw
8
9
10
Sun 5/29/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Mon 5/30/2016
1 Hazirah
2 Lee Kian Woei
3 Leong Kar Heng
4 Shawal
5 Oscar Saw
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Tuesday 5/31/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Syawal
4 Wee Yu Ni
5 Hazirah
6 Lee Kian Woei
7 Leong Kar Heng
8 Shawal
9 Oscar Saw
10 Nurulhana
June
Wednesday 6/1/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Thursday 6/2/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Wee Yu Ni
4 Ho Jia Yuen
5 Lee Kian Woei
6 Leong Kar Heng
7
8
9
10
Friday 6/3/2016
1 Madi
2
3
4
5
6
7
8
9
10
Saturday 6/4/2016
1 Madi
2 Oscar Saw
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Sunday 6/5/2016
1 Madi
2
3
4
5
6
7
8
9
10
Monday 6/6/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Wee Yu Ni
4 Oscar Saw
5 Lee Kian Woei
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Tuesday 6/7/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Wee Yu Ni
4 Oscar Saw
5 Lee Kian Woei
6 Leong Kar Heng
7
8
9
10
Wednesday 6/8/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Cheng Meljyn
4 Sum Man Teng
5
6
7
8
9
10
Thursday 6/9/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Friday 6/10/2016
1
2
3
4
5
6
7
8
9
10
Saturday 6/11/2016
1 Madi
2 'Afifah
3
4
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Sunday 6/12/2016
1 Madi
2 Hana
3
4
5
6
7
8
9
10
Monday 6/13/2016
1 Oscar Saw
2 Leong Kar Heng
3 Hana
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Tuesday 6/14/2016
1 Sum Man teng
2 Cheng Meljyn
3 Oscar Saw
4 Leong Kar Heng
5 Hana
6
7
8
9
10
Wednesday 6/15/2016
1 Oscar Saw
2 Leong Kar Heng
3 Sek Mun Chun
4
5
6
7
8
9
10
Thursday 6/16/2016
1 Madi
2 Hana
3
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4
5
6
7
8
9
10
Friday 6/17/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 6/18/2016
1 Oscar Saw
2 Leong Kar Heng
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Sunday 6/19/2016
1 Hana
2 'Afifah
3
4
5
6
7
8
9
10
Monday 6/20/2016
1 Oscar Saw
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Tuesday 6/21/2016
1 Lee Kian Woei
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Wednesday 6/22/2016
1 Madi
2 'Afifah
3
4
5
6
7
8
9
10
Thursday 6/23/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Friday 6/24/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 6/25/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Leong Kar Heng
4 Sek Mun Chun
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Sunday 6/26/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Monday 6/27/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
10
Tuesday 6/28/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Lee Kian Woei
4 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5 Sum Man teng
6 Cheng Meljyn
7
8
9
10
Wednesday 6/29/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
10
Thursday 6/30/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4 Sum Man teng
5 Cheng Meljyn
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
July
Friday 7/1/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/2/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Sunday 7/3/2016
1
2
3
4
5
6
7
8
9
10
Monday 7/4/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 7/5/2016
1
2
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Wednesday 7/6/2016
1
2
3
4
5
6
7
8
9
10
Thursday 7/7/2016
1
2
3
4
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Friday 7/8/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/9/2016
1
2
3
4
5
6
7
8
9
10
Sunday 7/10/2016
1
2
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Monday 7/11/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Tuesday 7/12/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4 Lee Kian Woei
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Wednesgay 7/13/2016
told to stop after CCM on 14th July 2016 due to drawing
1 Ho Jia Yuen revision
2 Leong Kar Heng
3 Oscar Saw
4 Lee Kian Woei
5
6
7
8
9
10
Thursday 7/14/2016
1 Oscar Saw
2 Sum Man Tong
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Friday 7/15/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Saturday 7/16/2016
1 Madi
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Sunday 7/17/2016
1 Madi
2 Leong Kar Heng
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Monday 7/18/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Cheng Meljyn
6
7
8
9
10
Tuesday 7/19/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Wednesday 7/20/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4
5
6
7
8
9
10
Thursday 7/21/2016
1 Shema On going to complete by 26th July 2016
2 Leong Kar Heng
3 Lee Kian Woei
4 Shawal
5 Ho Jia Yuen
6 Aaron Goh
7
8
9
10
Friday 7/22/2016
1 Shema On going to complete by 26th July 2016
2 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3 Zalila
4 Shawal
5
6
7
8
9
10
Saturday 7/23/2016
1 Shema On going to complete by 26th July 2016
2 Madi
3 Leong Kar Heng
4 Shawal
5 Aaron Goh
6
7
8
9
10
Sunday 7/24/2016
1 Madi
2 Shawal
3
4
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Monday 7/25/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Zalila
6 Sum Man Tong
7
8
9
10
Tuesday 7/26/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Zalila
5 Ho Jua Yuen
6 M Shawal OT together with MK Wong Closing Date 27/7 12 noon
7 Sum Man Tong
8
9
10
Wednesday 7/27/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Zalila
6
7
8
9
10
Thursday 7/28/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Ho Jia Yuen
5
6
7
8
9
10
Friday 7/29/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Zalila
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Saturday 7/30/2016
1 Madi
2 Leong Kar Heng
3 Shawal
4 Zalila
5
6
7
8
9
10
Sunday 7/31/2016
1 Shawal
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
August
Monday 8/1/2016
1 Madi
2 Cheng Meljyn
3 Sum Man Teng
4 Oscar Saw
5 Leong Kar Heng
6 Lee Kian Woei
7 Shawal
8
9
10
Tuesday 8/2/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Wednesday 8/3/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Aaron Goh
2 Ho Jia Yuen
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Thursday 8/4/2016
1 Ho Jia Yuen
2 Aaron Goh
3 Cheng Meljyn
4 Sum Man Teng
5 Oscar Saw
6
7
8
9
10
Friday 8/5/2016
1 Aisyah
2 Hazirah
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Saturday 8/6/2016
1 Madi
2 Ho Jia Yuen
3 Aaron Goh
4 Aisyah
5 Hazirah
6 Leong Kar Heng
7 Lee Kian Woei
8 Shawal
9
10
Sunday 8/7/2016
1 Hazirah
2 Madi
3 Ho Jia Yuen
4 Aaron Goh
5 Aisyah
6 Shawal
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Monday 8/8/2016
1 Ho Jia Yuen
2 Aaron Goh
3 Cheng Meljyn
4 Sum Man Teng
5 Leong Kar Heng
6 Lee Kian Woei
7 Shawal
8
9
10
Tuesday 8/9/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Aaron Goh
4 Shawal
5
6
7
8
9
10
Wednesday 8/10/2016
1 Ho Jia Yuen
2 Cheng Meljyn
3 Sum Man Teng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4 Oscar Saw
5 Leong Kar Heng
6 Lee Kian Woei
7 Shawal
8 Zalila
9
10
Thursday 8/11/2016
1 Cheng Meljyn
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Sum Man Teng
6 Zalila
7
8
9
10
Friday 8/12/2016
1 Ho Jia Yuen
2 Shawal
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Saturday 8/13/2016
1 Hazirah
2 Madi
3 Oscar Saw
4 Leong Kar Heng
5 Shawal
6
7
8
9
10
Sunday 8/14/2016
1 Hazirah
2 Madi
2 Shawal
4
5
6
7
8
9
10
Monday 8/15/2016
1 Hazirah
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Tuesday 8/16/2016
1 Aisyah
2 Leong Kar Heng
3 Lee Kian Woei
4
5
6
7
8
9
10
Wednesday 8/17/2016
1 Ho Jia Yuen
2 Hazirah
3 Aisyah
4 Oscar Saw
5 Shawal
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Thursday 8/18/2016
1 Ho Jia Yuen
2 Norhayati
3 Nor Hafizah
4 Hazirah
5 Oscar Saw
6 Shawal
7
8
9
10
Friday 8/19/2016
1 Norhayati
2 Nor Hafizah
3 Zainon
4 Shawal
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Saturday 8/20/2016
1 Cheng Meljyn
2 Hazirah
3 Aisyah
4 Madi
5 Oscar Saw
6 Leong Kar Heng
7 Lee Kian Woei
8 Shawal
9
10
Sunday 8/21/2016
1 Hazirah
2 Aisyah
3 Madi
4 Leong Kar Heng
5 Syawal
6
7
8
9
10
Monday 8/22/2016
1 Cheng Meljyn
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5 Shawal
6
7
8
9
10
Tuesday 8/23/2016
1 Cheng Meljyn
2 Oscar Saw
3 Shawal
4
5
6
7
8
9
10
Wednesday 8/24/2016
1 Hazirah
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Thursday 8/25/2016
1 Hazirah
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Friday 8/26/2016
1
2
3
4
5
6
7
8
9
10
Saturday 8/27/2016
1 Oscar Saw
2 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Sunday 8/28/2016
1
2
3
4
5
6
7
8
9
10
Monday 8/29/2016
1 Sum Man Teng
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Tuesday 8/30/2016
1 Oscar Saw
2 Shawal
3
4
5
6
7
8
9
10
Wednesday 8/31/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
September
Thursday 9/1/2016
1 Oscar Saw
2 Leong Kar Heng
3 Lee Kian Woei
4
5
6
7
8
9
10
Friday 9/2/2016
1 Oscar Saw
2 Shawal
3
4
5
6
7
8
9
10
Saturday 9/3/2016
1 Hazirah
2 Oscar Saw
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3 Leong Kar Heng
4 Shawal
5
6
7
8
9
10
Sunday 9/4/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/5/2016
1 Oscar Saw
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Sum Man Teng
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Tuesday 9/6/2016
1 Oscar Saw
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Wednesday 9/7/2016
1 Oscar Saw
2 Ho Jia Yuen
3 Cheng Meljyn
4 Leong Kar Heng
5 Lee Kian Woei
6 Shawal
7 Sum Man teng
8
9
10
Thursday 9/8/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Oscar Saw
2 Shawal
3 Cheng Meljyn
4
5
6
7
8
9
10
Friday 9/9/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 9/10/2016
1 Oscar Saw
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Sunday 9/11/2016
1 Oscar Saw
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Monday 9/12/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Tuesday 9/13/2016
1 Ho Jia Yuen
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Oscar Saw
6 Sum Man Teng
7
8
9
10
Wednesday 9/14/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Thursday 9/15/2016
1 Syawal
2 Sum Man Teng
3
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4
5
6
7
8
9
10
Friday 9/16/2016
1 Syawal
2 Oscar Saw
3 Leong Kar Heng
4
5
6
7
8
9
10
Saturday 9/17/2016
1 Madi
2
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Sunday 9/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/19/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Oscar Saw
4
5
6
7
8
9
10
Tuesday 9/20/2016
1 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Wednesday 9/21/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Thursday 9/22/2016
1 Syawal
2 Yati
3 NorHafizah
4 Madi
5
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Friday 9/23/2016
1
2
3
4
5
6
7
8
9
10
Saturday 9/24/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Sunday 9/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/26/2016
1 Leong Kar Heng
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Tuesday 9/27/2016
1 Leong Kar Heng
2 Shawal
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Wednesday 9/28/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Cheng Meljyn
4
5
6
7
8
9
10
Thursday 9/29/2016
1 Saisa
2 Lee Kian Woei
3 Madi
4 Sum Man Teng
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Friday 9/30/2016
1 Lee Kian Woei
2
3
4
5
6
7
October
Saturday 10/1/2016
1 Saisa
2 Hazirah
3 Leong Kar Heng
4 Madi
Sunday 10/2/2016
1 Saisa
2
Monday 10/3/2016
1 Madi
2
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Tuesday 10/4/2016
1 Pua Zhi Xun
2 Sum Man Teng
3 Leong Kar Heng
4 Lee Kian Woei
5
6
7
8
9
10
Wednesday 10/5/2016
1 Saisa
2 Pua Zhi Xun
3 Sum Man Teng
4 Siti Aisyah
5 Hazirah
6 Lee Kian Woei
7 Cheng Meljyn
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Thursday 10/6/2016
1 Pua Zhi Xun
2 Sum Man Teng
3 Siti Aisyah
4 Hazirah
5 Cheng Meljyn
6
7
8
9
10
Friday 10/7/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/8/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Pua Zhi Xun
2 Leong Kar Heng
3 Lee Kian Woei
4 Cheng Meljyn
5 Madi
6 Sum Man Teng
7
8
9
10
Sunday 10/9/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/10/2016
1 Pua Zhi Xun
2 Leong Kar Heng
3 Lee Kian Woei
4 Cheng Meljyn
5 Sum Man Teng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Tuesday 10/11/2016
1 Pua Zhi Xun
2 Leong Kar Heng
3 Lee Kian Woei
4 Cheng Meljyn
5 Sum Man Teng
6
7
8
9
10
Wednesday 10/12/2016
1 Pua Zhi Xun
2 Cheng Meljyn
3 Sum Man Teng
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Thursday 10/13/2016
1 Pua Zhi Xun
2 Siti Aisyah
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6 Cheng Meljyn
7 Madi
8 Sum Man Teng
9
10
Friday 10/14/2016
3 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Saturday 10/15/2016
1 Hazirah
2 Siti Aisyah
3 Leong Kar Heng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4 Lee Kian Woei
5 Pua Zhi Xun
6
7
8
9
10
Sunday 10/16/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/17/2016
1 Siti Aisyah
2 Leong Kar Heng
3 Cheng Meljyn
4 Pua Zhi Xun
5 Sum Man Teng
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Tuesday 10/18/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Lee Kian Woei
4 Shawal
5 Cheng Meljyn
6 Pua Zhi Xun
7 Sum Man Teng
8
9
10
Wednesday 10/19/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Sum Man Teng
5
6
7
8
9
10
Thursday 10/20/2016
1 Cheng Meljyn
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2 Sum Man Teng
3
4
5
6
7
8
9
10
Friday 10/21/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/22/2016
1 Hazirah
2 Leong Kar Heng
3 Lee Kian Woei
4 Pua Zhi Xun
5 Madi
6 Sum Man Teng
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Sunday 10/23/2016
1 Madi
2
3
4
5
6
7
8
9
10
Monday 10/24/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Cheng Meljyn
5 Pua Zhi Xun
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Tuesday 10/25/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Cheng Meljyn
5 Pua Zhi Xun
6 Sum Man Teng
7
8
9
10
Wednesday 10/26/2016
1 Pua Zhi Xun
2
3
4
5
6
7
8
9
10
Thursday 10/27/2016
1 Lee Kian Woei
2 Sum Man Teng
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Friday 10/28/2016
1 Leong Kar Heng
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Saturday 10/29/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Sunday 10/30/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Monday 10/31/2016
1 Leong Kar Heng
2 Lee Kian Woei
3
4
5
6
7
8
9
10
November
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Tuesday 11/1/2016
1 Ho Jia Yuen
2 Aaron Gog
3
4
5
6
7
8
9
10
Wednesday 11/2/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Pua Zhi Xun
4
5
6
7
8
9
10
Thursday 11/3/2016
1 Ho Jia Yuen
2
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Friday 11/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/5/2016
1 Hazirah
2 Aisyah
3 Ho Jia Yuen
4 Madi
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Sunday 11/6/2016
1 Madi
2
3
4
5
6
7
8
9
10
Monday 11/7/2016
1 Ho Jia Yuen
2 Cheng Meljyn
3 Pua Zhi Xun
4
5
6
7
8
9
10
Tuesday 11/8/2016
1 Pua Zhi Xun
2
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Wednesday 11/9/2016
1 Pua Zhi Xun
2
3
4
5
6
7
8
9
10
Thurday 11/10/2016
1 Hazirah
2 Aisyah
3 Ho Jia Yuen
4 Sum Man Teng
5 Pua Zhi Xun
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Friday 11/11/2016
1 Hazirah
2
3
4
5
6
7
8
9
10
Saturday 11/12/2016
1 Hissam
2 Ho Jia Yuen
3 Madi
4 Sum Man Teng
5 Syawal
6
7
8
9
10
Sunday 11/13/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1 Madi
2
3
4
5
6
7
8
9
10
Monday 11/14/2016
1 Ho Jia Yuen
2
3
4
5
6
7
8
9
10
Tuesday 11/15/2016
1 Hissam
2 Ho Jia Yuen
3 Pua Zhi Xun
4
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Wednesday 11/16/2016
1 Hazirah
2 Hissam
3 Ho Jia Yuen
4 Cheng Meljyn
5 Sum Man Teng
6 Pua Zhi Xun
7
8
9
10
Thursday 11/17/2016
1 Hazirah
2 Hissam
3 Ho Jia Yuen
4 Cheng Meljyn
5 Sum Man Teng
6 Pua Zhi Xun
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Friday 11/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/19/2016
1 Yati
2 Ho Jia Yuen
3 Madi
4 Hazirah
5 Aisyah
6 Cheng Meljyn
7 Sum Man Teng
8
9
10
Sunday 11/20/2016
1 Madi
2
3
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4
5
6
7
8
9
10
Monday 11/21/2016
1 Ho Jia Yuen
2 Pua Zhi Xun
3
4
5
6
7
8
9
10
Tuesday 11/22/2016
1 Saisa
2 Yati
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Wednesday 11/23/2016
1 Hissam
2 Ho Jia Yuen
3
4
5
6
7
8
9
10
Thursday 11/24/2016
1 Yati
2 Hissam
3 Ho Jia Yuen
4 Aaron Goh
5
6
7
8
9
10
Friday 11/25/2016
1
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2
3
4
5
6
7
8
9
10
Saturday 11/26/2016
1 Hissam
2 Ho Jia Yuen
3 Hazirah
4
5
6
7
8
9
10
Sunday 11/27/2016
1 Ho Jia Yuen
2
3
4
5
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Monday 11/28/2016
1 Cheng Meljyn
2
3
4
5
6
7
8
9
10
Tuesday 11/29/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Pua Zhi Xun
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Wednesday 11/30/2016
1
2
3
4
5
6
7
8
9
10
December
Thursday 12/1/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/2/2016
1
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2
3
4
5
6
7
8
9
10
Saturday 12/3/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/4/2016
1
2
3
4
5
6
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
7
8
9
10
Monday 12/5/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/6/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Wednesday 12/7/2016
1
2
3
4
5
6
7
8
9
10
Thursday 12/8/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/9/2016
1
2
3
4
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
5
6
7
8
9
10
Saturday 12/10/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/11/2016
1
2
3
4
5
6
7
8
9
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
10
Monday 12/12/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/13/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/14/2016
1
2
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
3
4
5
6
7
8
9
10
Thursday 12/15/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/16/2016
1
2
3
4
5
6
7
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
8
9
10
Saturday 12/17/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/19/2016
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
1
2
3
4
5
6
7
8
9
10
Tuesday 12/20/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/21/2016
1
2
3
4
5
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
6
7
8
9
10
Thursday 12/22/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/23/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
Saturday 12/24/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/26/2016
1
2
3
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
4
5
6
7
8
9
10
Tuesday 12/27/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/28/2016
1
2
3
4
5
6
7
8
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
9
10
Thursday 12/29/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/30/2016
1
2
3
4
5
6
7
8
9
10
Saturday 12/31/2016
1
OVERTIME
ill in The
the overtime
targeted timeline
sheet asfilled
per normal
by team
office
leader
practice.
is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
Overtime Application (Senior to plan and schedule for the completion of works)
e Application App
Item Date / Name Remarks
(any issue, outstanding works, available of details, current Kang KK Hisham Badrul Wong MK
outstanding works)
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
JANUARY
February
March
Tuesday 3/1/2016
1 Leong Kar Heng
2 Oscar Saw
3
4
5
6
7
8
9
10
Wednesday 3/2/2016
1 Madi
2 Ho Jia Yuen
3 Leong Kar Heng
4 Oscar Saw
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Thursday 3/3/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Friday 3/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/5/2016
1 Madi
2 Ho Jia Yuen
3 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4 Oscar Saw
5 Nurulhan
6
7
8
9
10
Sunday 3/6/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/7/2016
1 Oscar Saw
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Tuesday 3/8/2016
1 Shawal
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Wednesday 3/9/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Thursday 3/10/2016
1 Ho Jia Yuen
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2
3
4
5
6
7
8
9
10
Friday 3/11/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/12/2016
1 Ho Jia Yuen Works completed, tendered
2 Madi
3 Leong Kar Heng
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Sunday 3/13/2016
1
2
3
4
5
6
7
8
9
10
Monday 3/14/2016
1 Sum Nam Teng
2 Cheng Meliyn
3 Madi
4 Lee Kian Woei
5 Leong Kar Heng
6 Oscar Saw
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Tuesday 3/15/2016
1 Wendy Kok
2 Sum Nam Teng
3 Cheng Meliyn
4 Lee Kian Woei
5 Leong Kar Heng
6
7
8
9
10
Wednesday 3/16/2016
1 Sum Nam Teng
2 Cheng Meliyn
3 Shawal
4 Leong Kar Heng
5 Oscar Saw
6 Lee Kian Woei
7
8
9
10
Thursday 3/17/2016
1 Cheng Meljyn
2 Sum Man Teng
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Friday 3/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 3/19/2016
1 Madi
2 Shawal
3 Leong Kar Heng
4 Oscar Saw
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Sunday 3/20/2016
1 Madi
2 Shawal
4
5
6
7
8
9
10
Monday 3/21/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Leong Kar Heng
4 Shawal
5 Amir
7
8
9
10
Tuesday 3/22/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Lee Kian Woei
4 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Wednesday 3/23/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Thursday 3/24/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Shawal
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Friday 3/25/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 3/26/2016
1 Madi
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5 Shawal
6
7
8
9
10
Sunday 3/27/2016
1 Madi
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Monday 3/28/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Tuesday 3/29/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Wednesday 3/30/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Thursday 3/31/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
April
Friday 4/1/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 4/2/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4 Shawal
5
6
7
8
9
10
Sunday 4/3/2016
1
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Monday 4/4/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
10
Tuesday 4/5/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Shawal
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Wednesday 4/6/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
Thursday 4/7/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
Friday 4/8/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1
2
3
4
5
6
7
8
9
10
Saturday 4/9/2016
1 Madi
2 Oscar Saw
3 Leong Kar Heng
4 Shawal
5
6
7
8
9
10
Sunday 4/10/2016
1 Madi
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Monday 4/11/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Madi
4 Lee Kian Woei
5 Leong Kar Heng
6 Oscar Saw
7 Shawal
8
9
10
Tuesday 4/12/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Lee Kian Woei
4 Oscar Saw
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Wednesday 4/13/2016
1 Lee Kian Woei
Thursday 4/14/2016
1 Leong Kar Heng
2 Oscar Saw
3 Shawal
4
5
6
7
8
9
10
Friday 4/15/2016
1 Madi
2 Shawal
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4
5
6
7
8
9
10
Saturday 4/16/2016
1 Madi
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5
6
7
8
9
10
Sunday 4/17/2016
1 Mohd Shawal
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Monday 4/18/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4 Madi
5
6
7
8
9
10
Tuesday 4/19/2016
1 Nurulhana
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5 Shawal
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Wednesday 4/20/2016
1 Nurulhana
2 Madi
3 Oscar Saw
2 Shawal
3
4
5
6
7
8
9
10
Thursday 4/21/2016
1 Madi
2 Shawal
3
4
5
6
7
8
9
10
Friday 4/22/2016
1 Lee Kian Woei
2 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Saturday 4/23/2016
1 Bryan
2 Aaron
3 Isaac Sek
4 Leong Kar Heng
5 Oscar Saw
6
7
8
9
10
Sunday 4/24/2016
1 Bryan
2 Aaron
3 Isaac Sek
4 Madi
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Monday 4/25/2016
1 Bryan
2 Aaron
3
4
5
6
7
8
9
10
Tuesday 4/26/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5
6
7
8
9
10
Wednesday 4/27/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Shawal
2
3
4
5
6
7
8
9
10
Thursday 4/28/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Isaac
5
6
7
8
9
10
Friday 4/29/2016
1 Leong Kar Heng
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Saturday 4/30/2016
1
2
3
4
5
6
7
8
9
10
May
Sunday 5/1/2016
1
2
3
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Monday 5/2/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 5/3/2016
1 Madi
2 Amir
3
4
5
6
7
8
9
10
Wednesday 5/4/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Sum Man Teng
2 Cheng Meljyn
3 Leong Kar Heng
4 Oscar Saw
5 Lee Kian Woei
6 Shawal
7 Amir
8
9
10
Thursday 5/5/2016
1 Sum Man Teng
2 Cheng Meljyn
3 Ho Jia Yuen
4 Oscar Saw
5 Madi
6 Shawal
7
8
9
10
Friday 5/6/2016
1
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Saturday 5/7/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4 Shawal
5 Madi
6 Amir
7
8
9
10
Sunday 5/8/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Monday 5/9/2016
1 Sum Man Teng
2 Cheng Meljyn
3 Ho Jia Yuen
4 Hazirah
5 Shawal
6 Lee Kian Woei
7 Leong Kar Heng
8 Oscar Saw
9
10
Tuesday 5/10/2016
1 Sum Man Teng
2 Cheng Meljyn
3 Isaac
4 Hazirah
5 Shawal
6 Amir
7 Lee Kian Woei
8 Leong Kar Heng
9 Oscasr Saw
10
Wednesday 5/11/2016
1 Shawal
2 Sum Mun Teng
3 Cheng Meijyn
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4
5
6
7
8
9
10
Thursday 5/12/2016
1 Sum Mun Teng
2 Cheng Meijyn
3 Lee Kian Woei
4 Leong Kar Heng
5 Shawal
6 Oscar Saw
7
8
9
10
Friday 5/13/2016
1 Madi
2 Shema
3 Aisyah
4 Hazirah
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Saturday 5/14/2016
1 Madi
2 Shema
3 Norhafizah
4 Aisyah
5 Hazirah
6 Amir
7 Shawal
8
9
10
Sunday 5/15/2016
1 Madi
2 Amir
3
4
5
6
7
8
9
10
Monday 5/16/2016
1 Shema
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2 Aisyah
3 Lee Kian Woei
4 Leong Kar Heng
5 Shawal
6 Sum Mun Teng
7 Oscar Saw
8
9
10
Tuesday 5/17/2016
1 Shema
2 Sum Mun Teng
3 Cheng Meijyn
4 Shawal
5 Oscar Saw
6
7
8
9
10
Wednesday 5/18/2016
1 Shema
2 Lee Kian Woei
3 Leong Kar Heng
4 Shawal
5 Oscar Saw
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Thursday 5/19/2016
1 Shema
2 Sum Mun Teng
3 Cheng Meijyn
4 Aisyah
5 Leong Kar Heng
6 Shawal
7 Oscar Saw
8
9
10
Friday 5/20/2016
1 Madi
2 Oscar Saw
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Sat 5/21/2016
1 Madi
2 Afifah
3 Leong Kar Heng
4 Shawal
5 Oscar Saw
6
7
8
9
10
Sunday 5/22/2016
1 Madi
2 Afifah
3
4
5
6
7
8
9
10
Monday 5/23/2016
1 Shawal
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Tuesday 5/24/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Shawal
4 Oscar Saw
5
6
7
8
9
10
Wed 5/25/2016
1 Ho Jia Yuen
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Thurs 5/26/2016
1 Lee Kian Woei
2 Shawal
3
4
5
6
7
8
9
10
Friday 5/27/2016
1 Ema
2 Amir
3 Shawal
4
5
6
7
8
9
10
Sat 5/28/2016
1 Hazirah
2 Madi
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3 Afifah
4 Ema
5 Amir
6 Shawal
7 Oscar Saw
8
9
10
Sun 5/29/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Mon 5/30/2016
1 Hazirah
2 Lee Kian Woei
3 Leong Kar Heng
4 Shawal
5 Oscar Saw
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Tuesday 5/31/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Syawal
4 Wee Yu Ni
5 Hazirah
6 Lee Kian Woei
7 Leong Kar Heng
8 Shawal
9 Oscar Saw
10 Nurulhana
June
Wednesday 6/1/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Thursday 6/2/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Wee Yu Ni
4 Ho Jia Yuen
5 Lee Kian Woei
6 Leong Kar Heng
7
8
9
10
Friday 6/3/2016
1 Madi
2
3
4
5
6
7
8
9
10
Saturday 6/4/2016
1 Madi
2 Oscar Saw
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Sunday 6/5/2016
1 Madi
2
3
4
5
6
7
8
9
10
Monday 6/6/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Wee Yu Ni
4 Oscar Saw
5 Lee Kian Woei
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Tuesday 6/7/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Wee Yu Ni
4 Oscar Saw
5 Lee Kian Woei
6 Leong Kar Heng
7
8
9
10
Wednesday 6/8/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Cheng Meljyn
4 Sum Man Teng
5
6
7
8
9
10
Thursday 6/9/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Friday 6/10/2016
1
2
3
4
5
6
7
8
9
10
Saturday 6/11/2016
1 Madi
2 'Afifah
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Sunday 6/12/2016
1 Madi
2 Hana
3
4
5
6
7
8
9
10
Monday 6/13/2016
1 Oscar Saw
2 Leong Kar Heng
3 Hana
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Tuesday 6/14/2016
1 Sum Man teng
2 Cheng Meljyn
3 Oscar Saw
4 Leong Kar Heng
5 Hana
6
7
8
9
10
Wednesday 6/15/2016
1 Oscar Saw
2 Leong Kar Heng
3 Sek Mun Chun
4
5
6
7
8
9
10
Thursday 6/16/2016
1 Madi
2 Hana
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4
5
6
7
8
9
10
Friday 6/17/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 6/18/2016
1 Oscar Saw
2 Leong Kar Heng
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Sunday 6/19/2016
1 Hana
2 'Afifah
3
4
5
6
7
8
9
10
Monday 6/20/2016
1 Oscar Saw
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Tuesday 6/21/2016
1 Lee Kian Woei
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Wednesday 6/22/2016
1 Madi
2 'Afifah
3
4
5
6
7
8
9
10
Thursday 6/23/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Oscar Saw
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Friday 6/24/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 6/25/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Leong Kar Heng
4 Sek Mun Chun
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Sunday 6/26/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Monday 6/27/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
10
Tuesday 6/28/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Lee Kian Woei
4 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5 Sum Man teng
6 Cheng Meljyn
7
8
9
10
Wednesday 6/29/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4
5
6
7
8
9
10
Thursday 6/30/2016
1 Oscar Saw
2 Lee Kian Woei
3 Leong Kar Heng
4 Sum Man teng
5 Cheng Meljyn
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
July
Friday 7/1/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/2/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Sunday 7/3/2016
1
2
3
4
5
6
7
8
9
10
Monday 7/4/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 7/5/2016
1
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Wednesday 7/6/2016
1
2
3
4
5
6
7
8
9
10
Thursday 7/7/2016
1
2
3
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Friday 7/8/2016
1
2
3
4
5
6
7
8
9
10
Saturday 7/9/2016
1
2
3
4
5
6
7
8
9
10
Sunday 7/10/2016
1
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Monday 7/11/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Tuesday 7/12/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4 Lee Kian Woei
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Wednesgay 7/13/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Oscar Saw
4 Lee Kian Woei
5
6
7
8
9
10
Thursday 7/14/2016
1 Oscar Saw
2 Sum Man Tong
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Friday 7/15/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Saturday 7/16/2016
1 Madi
2 Leong Kar Heng
3 Oscar Saw
4
5
6
7
8
9
10
Sunday 7/17/2016
1 Madi
2 Leong Kar Heng
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Monday 7/18/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Cheng Meljyn
6
7
8
9
10
Tuesday 7/19/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Wednesday 7/20/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4
5
6
7
8
9
10
Thursday 7/21/2016
1 Shema
2 Leong Kar Heng
3 Lee Kian Woei
4 Shawal
5 Ho Jia Yuen
6 Aaron Goh
7
8
9
10
Friday 7/22/2016
1 Shema
2 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3 Zalila
4 Shawal
5
6
7
8
9
10
Saturday 7/23/2016
1 Shema
2 Madi
3 Leong Kar Heng
4 Shawal
5 Aaron Goh
6
7
8
9
10
Sunday 7/24/2016
1 Madi
2 Shawal
3
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Monday 7/25/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Zalila
6 Sum Man Tong
7
8
9
10
Tuesday 7/26/2016
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Zalila
5 Ho Jua Yuen
6 M Shawal
7 Sum Man Tong
8
9
10
Wednesday 7/27/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Leong Kar Heng
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Zalila
6
7
8
9
10
Thursday 7/28/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Ho Jia Yuen
5
6
7
8
9
10
Friday 7/29/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Zalila
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Saturday 7/30/2016
1 Madi
2 Leong Kar Heng
3 Shawal
4 Zalila
5
6
7
8
9
10
Sunday 7/31/2016
1 Shawal
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
August
Monday 8/1/2016
1 Madi
2 Cheng Meljyn
3 Sum Man Teng
4 Oscar Saw
5 Leong Kar Heng
6 Lee Kian Woei
7 Shawal
8
9
10
Tuesday 8/2/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Wednesday 8/3/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Aaron Goh
2 Ho Jia Yuen
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Thursday 8/4/2016
1 Ho Jia Yuen
2 Aaron Goh
3 Cheng Meljyn
4 Sum Man Teng
5 Oscar Saw
6
7
8
9
10
Friday 8/5/2016
1 Aisyah
2 Hazirah
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Saturday 8/6/2016
1 Madi
2 Ho Jia Yuen
3 Aaron Goh
4 Aisyah
5 Hazirah
6 Leong Kar Heng
7 Lee Kian Woei
8 Shawal
9
10
Sunday 8/7/2016
1 Hazirah
2 Madi
3 Ho Jia Yuen
4 Aaron Goh
5 Aisyah
6 Shawal
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Monday 8/8/2016
1 Ho Jia Yuen
2 Aaron Goh
3 Cheng Meljyn
4 Sum Man Teng
5 Leong Kar Heng
6 Lee Kian Woei
7 Shawal
8
9
10
Tuesday 8/9/2016
1 Ho Jia Yuen
2 Oscar Saw
3 Aaron Goh
4 Shawal
5
6
7
8
9
10
Wednesday 8/10/2016
1 Ho Jia Yuen
2 Cheng Meljyn
3 Sum Man Teng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4 Oscar Saw
5 Leong Kar Heng
6 Lee Kian Woei
7 Shawal
8 Zalila
9
10
Thursday 8/11/2016
1 Cheng Meljyn
2 Oscar Saw
3 Lee Kian Woei
4 Shawal
5 Sum Man Teng
6 Zalila
7
8
9
10
Friday 8/12/2016
1 Ho Jia Yuen
2 Shawal
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Saturday 8/13/2016
1 Hazirah
2 Madi
3 Oscar Saw
4 Leong Kar Heng
5 Shawal
6
7
8
9
10
Sunday 8/14/2016
1 Hazirah
2 Madi
2 Shawal
4
5
6
7
8
9
10
Monday 8/15/2016
1 Hazirah
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Tuesday 8/16/2016
1 Aisyah
2 Leong Kar Heng
3 Lee Kian Woei
4
5
6
7
8
9
10
Wednesday 8/17/2016
1 Ho Jia Yuen
2 Hazirah
3 Aisyah
4 Oscar Saw
5 Shawal
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Thursday 8/18/2016
1 Ho Jia Yuen
2 Norhayati
3 Nor Hafizah
4 Hazirah
5 Oscar Saw
6 Shawal
7
8
9
10
Friday 8/19/2016
1 Norhayati
2 Nor Hafizah
3 Zainon
4 Shawal
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Saturday 8/20/2016
1 Cheng Meljyn
2 Hazirah
3 Aisyah
4 Madi
5 Oscar Saw
6 Leong Kar Heng
7 Lee Kian Woei
8 Shawal
9
10
Sunday 8/21/2016
1 Hazirah
2 Aisyah
3 Madi
4 Leong Kar Heng
5 Syawal
6
7
8
9
10
Monday 8/22/2016
1 Cheng Meljyn
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5 Shawal
6
7
8
9
10
Tuesday 8/23/2016
1 Cheng Meljyn
2 Oscar Saw
3 Shawal
4
5
6
7
8
9
10
Wednesday 8/24/2016
1 Hazirah
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Thursday 8/25/2016
1 Hazirah
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Friday 8/26/2016
1
2
3
4
5
6
7
8
9
10
Saturday 8/27/2016
1 Oscar Saw
2 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Sunday 8/28/2016
1
2
3
4
5
6
7
8
9
10
Monday 8/29/2016
1 Sum Man Teng
2 Oscar Saw
3 Leong Kar Heng
4 Lee Kian Woei
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Tuesday 8/30/2016
1 Oscar Saw
2 Shawal
3
4
5
6
7
8
9
10
Wednesday 8/31/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
September
Thursday 9/1/2016
1 Oscar Saw
2 Leong Kar Heng
3 Lee Kian Woei
4
5
6
7
8
9
10
Friday 9/2/2016
1 Oscar Saw
2 Shawal
3
4
5
6
7
8
9
10
Saturday 9/3/2016
1 Hazirah
2 Oscar Saw
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3 Leong Kar Heng
4 Shawal
5
6
7
8
9
10
Sunday 9/4/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/5/2016
1 Oscar Saw
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Sum Man Teng
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Tuesday 9/6/2016
1 Oscar Saw
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6
7
8
9
10
Wednesday 9/7/2016
1 Oscar Saw
2 Ho Jia Yuen
3 Cheng Meljyn
4 Leong Kar Heng
5 Lee Kian Woei
6 Shawal
7 Sum Man teng
8
9
10
Thursday 9/8/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Oscar Saw
2 Shawal
3 Cheng Meljyn
4
5
6
7
8
9
10
Friday 9/9/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Saturday 9/10/2016
1 Oscar Saw
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Sunday 9/11/2016
1 Oscar Saw
2 Leong Kar Heng
3
4
5
6
7
8
9
10
Monday 9/12/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Tuesday 9/13/2016
1 Ho Jia Yuen
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei
5 Oscar Saw
6 Sum Man Teng
7
8
9
10
Wednesday 9/14/2016
1 Oscar Saw
2
3
4
5
6
7
8
9
10
Thursday 9/15/2016
1 Syawal
2 Sum Man Teng
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4
5
6
7
8
9
10
Friday 9/16/2016
1 Syawal
2 Oscar Saw
3 Leong Kar Heng
4
5
6
7
8
9
10
Saturday 9/17/2016
1 Madi
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Sunday 9/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/19/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Oscar Saw
4
5
6
7
8
9
10
Tuesday 9/20/2016
1 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Wednesday 9/21/2016
1 Shawal
2
3
4
5
6
7
8
9
10
Thursday 9/22/2016
1 Syawal
2 Yati
3 NorHafizah
4 Madi
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Friday 9/23/2016
1
2
3
4
5
6
7
8
9
10
Saturday 9/24/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Sunday 9/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 9/26/2016
1 Leong Kar Heng
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Tuesday 9/27/2016
1 Leong Kar Heng
2 Shawal
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Wednesday 9/28/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Cheng Meljyn
4
5
6
7
8
9
10
Thursday 9/29/2016
1 Saisa
2 Lee Kian Woei
3 Madi
4 Sum Man Teng
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Friday 9/30/2016
1 Lee Kian Woei
2
3
4
5
6
7
October
Saturday 10/1/2016
1 Saisa
2 Hazirah
3 Leong Kar Heng
4 Madi
Sunday 10/2/2016
1 Saisa
2
Monday 10/3/2016
1 Madi
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Tuesday 10/4/2016
1 Pua Zhi Xun
2 Sum Man Teng
3 Leong Kar Heng
4 Lee Kian Woei
5
6
7
8
9
10
Wednesday 10/5/2016
1 Saisa
2 Pua Zhi Xun
3 Sum Man Teng
4 Siti Aisyah
5 Hazirah
6 Lee Kian Woei
7 Cheng Meljyn
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Thursday 10/6/2016
1 Pua Zhi Xun
2 Sum Man Teng
3 Siti Aisyah
4 Hazirah
5 Cheng Meljyn
6
7
8
9
10
Friday 10/7/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/8/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Pua Zhi Xun
2 Leong Kar Heng
3 Lee Kian Woei
4 Cheng Meljyn
5 Madi
6 Sum Man Teng
7
8
9
10
Sunday 10/9/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/10/2016
1 Pua Zhi Xun
2 Leong Kar Heng
3 Lee Kian Woei
4 Cheng Meljyn
5 Sum Man Teng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Tuesday 10/11/2016
1 Pua Zhi Xun
2 Leong Kar Heng
3 Lee Kian Woei
4 Cheng Meljyn
5 Sum Man Teng
6
7
8
9
10
Wednesday 10/12/2016
1 Pua Zhi Xun
2 Cheng Meljyn
3 Sum Man Teng
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Thursday 10/13/2016
1 Pua Zhi Xun
2 Siti Aisyah
3 Leong Kar Heng
4 Lee Kian Woei
5 Shawal
6 Cheng Meljyn
7 Madi
8 Sum Man Teng
9
10
Friday 10/14/2016
3 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Saturday 10/15/2016
1 Hazirah
2 Siti Aisyah
3 Leong Kar Heng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4 Lee Kian Woei
5 Pua Zhi Xun
6
7
8
9
10
Sunday 10/16/2016
1
2
3
4
5
6
7
8
9
10
Monday 10/17/2016
1 Siti Aisyah
2 Leong Kar Heng
3 Cheng Meljyn
4 Pua Zhi Xun
5 Sum Man Teng
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Tuesday 10/18/2016
1 Ho Jia Yuen
2 Leong Kar Heng
3 Lee Kian Woei
4 Shawal
5 Cheng Meljyn
6 Pua Zhi Xun
7 Sum Man Teng
8
9
10
Wednesday 10/19/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Sum Man Teng
5
6
7
8
9
10
Thursday 10/20/2016
1 Cheng Meljyn
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2 Sum Man Teng
3
4
5
6
7
8
9
10
Friday 10/21/2016
1
2
3
4
5
6
7
8
9
10
Saturday 10/22/2016
1 Hazirah
2 Leong Kar Heng
3 Lee Kian Woei
4 Pua Zhi Xun
5 Madi
6 Sum Man Teng
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Sunday 10/23/2016
1 Madi
2
3
4
5
6
7
8
9
10
Monday 10/24/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Cheng Meljyn
5 Pua Zhi Xun
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Tuesday 10/25/2016
1 Leong Kar Heng
2 Lee Kian Woei
3 Shawal
4 Cheng Meljyn
5 Pua Zhi Xun
6 Sum Man Teng
7
8
9
10
Wednesday 10/26/2016
1 Pua Zhi Xun
2
3
4
5
6
7
8
9
10
Thursday 10/27/2016
1 Lee Kian Woei
2 Sum Man Teng
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Friday 10/28/2016
1 Leong Kar Heng
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Saturday 10/29/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Sunday 10/30/2016
1 Leong Kar Heng
2
3
4
5
6
7
8
9
10
Monday 10/31/2016
1 Leong Kar Heng
2 Lee Kian Woei
3
4
5
6
7
8
9
10
November
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Tuesday 11/1/2016
1 Ho Jia Yuen
2 Aaron Gog
3
4
5
6
7
8
9
10
Wednesday 11/2/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Pua Zhi Xun
4
5
6
7
8
9
10
Thursday 11/3/2016
1 Ho Jia Yuen
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Friday 11/4/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/5/2016
1 Hazirah
2 Aisyah
3 Ho Jia Yuen
4 Madi
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Sunday 11/6/2016
1 Madi
2
3
4
5
6
7
8
9
10
Monday 11/7/2016
1 Ho Jia Yuen
2 Cheng Meljyn
3 Pua Zhi Xun
4
5
6
7
8
9
10
Tuesday 11/8/2016
1 Pua Zhi Xun
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Wednesday 11/9/2016
1 Pua Zhi Xun
2
3
4
5
6
7
8
9
10
Thurday 11/10/2016
1 Hazirah
2 Aisyah
3 Ho Jia Yuen
4 Sum Man Teng
5 Pua Zhi Xun
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Friday 11/11/2016
1 Hazirah
2
3
4
5
6
7
8
9
10
Saturday 11/12/2016
1 Hissam
2 Ho Jia Yuen
3 Madi
4 Sum Man Teng
5 Syawal
6
7
8
9
10
Sunday 11/13/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1 Madi
2
3
4
5
6
7
8
9
10
Monday 11/14/2016
1 Ho Jia Yuen
2
3
4
5
6
7
8
9
10
Tuesday 11/15/2016
1 Hissam
2 Ho Jia Yuen
3 Pua Zhi Xun
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Wednesday 11/16/2016
1 Hazirah
2 Hissam
3 Ho Jia Yuen
4 Cheng Meljyn
5 Sum Man Teng
6 Pua Zhi Xun
7
8
9
10
Thursday 11/17/2016
1 Hazirah
2 Hissam
3 Ho Jia Yuen
4 Cheng Meljyn
5 Sum Man Teng
6 Pua Zhi Xun
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Friday 11/18/2016
1
2
3
4
5
6
7
8
9
10
Saturday 11/19/2016
1 Yati
2 Ho Jia Yuen
3 Madi
4 Hazirah
5 Aisyah
6 Cheng Meljyn
7 Sum Man Teng
8
9
10
Sunday 11/20/2016
1 Madi
2
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4
5
6
7
8
9
10
Monday 11/21/2016
1 Ho Jia Yuen
2 Pua Zhi Xun
3
4
5
6
7
8
9
10
Tuesday 11/22/2016
1 Saisa
2 Yati
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Wednesday 11/23/2016
1 Hissam
2 Ho Jia Yuen
3
4
5
6
7
8
9
10
Thursday 11/24/2016
1 Yati
2 Hissam
3 Ho Jia Yuen
4 Aaron Goh
5
6
7
8
9
10
Friday 11/25/2016
1
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2
3
4
5
6
7
8
9
10
Saturday 11/26/2016
1 Hissam
2 Ho Jia Yuen
3 Hazirah
4
5
6
7
8
9
10
Sunday 11/27/2016
1 Ho Jia Yuen
2
3
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Monday 11/28/2016
1 Cheng Meljyn
2
3
4
5
6
7
8
9
10
Tuesday 11/29/2016
1 Cheng Meljyn
2 Sum Man Teng
3 Pua Zhi Xun
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Wednesday 11/30/2016
1
2
3
4
5
6
7
8
9
10
December
Thursday 12/1/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/2/2016
1
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2
3
4
5
6
7
8
9
10
Saturday 12/3/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/4/2016
1
2
3
4
5
6
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
7
8
9
10
Monday 12/5/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/6/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Wednesday 12/7/2016
1
2
3
4
5
6
7
8
9
10
Thursday 12/8/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/9/2016
1
2
3
4
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
5
6
7
8
9
10
Saturday 12/10/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/11/2016
1
2
3
4
5
6
7
8
9
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
10
Monday 12/12/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/13/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/14/2016
1
2
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
3
4
5
6
7
8
9
10
Thursday 12/15/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/16/2016
1
2
3
4
5
6
7
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
8
9
10
Saturday 12/17/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/19/2016
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
1
2
3
4
5
6
7
8
9
10
Tuesday 12/20/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/21/2016
1
2
3
4
5
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
6
7
8
9
10
Thursday 12/22/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/23/2016
1
2
3
4
5
6
7
8
9
10
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
Saturday 12/24/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/26/2016
1
2
3
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
4
5
6
7
8
9
10
Tuesday 12/27/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/28/2016
1
2
3
4
5
6
7
8
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
9
10
Thursday 12/29/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/30/2016
1
2
3
4
5
6
7
8
9
10
Saturday 12/31/2016
1
OVERTIME
The targeted timeline filled by team leader is merely for planning & monitoring of overtime. All staff who will be claiming overtime shall still fill in
n of works)
Approval (Tick by Senior, can be more than one tick)
Item Date / Name Confirm work uploaded to server (Name
Chan TC Oh CC Wendy Kok Kamsiah Sharipah
of senior to be inserted)
2
3
4
5
6
7
8
9
10
JANUARY
Friday 1/1/2016
1
2
3
4
5
Monday 1/4/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Ramdani 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Nurul Huda 779 Tender opening Pavilion 9.30am
4
5
Tuesday 1/5/2016
1 Amir 764 CCM MRCB 2.00pm
2 Badrul / Marziah 787 CCM RSKU Sime Darby 9.30am
3 Madi 771/T3 CCM PJ Sentral Site Office 2.00pm
4 Madi 771/SUB Site Meeting PJ Sentral Site Office 3.00pm
5 T C Chan 698 CPC Meeting Tropicana HQ 3.30pm
6 Leong Kar Heng 791 Site Meeting Studio Bikin 10.00am 12.30pm
7
Wednesday 1/6/2016
1 T C Chan / Wee 763 site meeting EkoCheras 3.00pm
2 Wee / Cheng 763 Site valuation EkoCheras 11.00am
3 Wendy Kok Gen Send my son to airport KLIA 2 8.30am 10.15am
4 Lee Kian Woei 747 Package 6 & 7 Site Meeting Icon City 9.00am 3.30pm
5
Thursday 1/7/2016
1 Ziela 650/PT15.3 CCM & Site Meeting Kota Seriemas 8.30am
2 Wendy Kok Gen Go to KWSP Jalan Gasing 8.00am 10.00am
3 Zulkifili Meeting Tropicana Tower Golf Villa 2.00pm
4 Oscar Saw 747 Package 4 Site Meeting Icon City 9.00am
5 Oscar Saw 747 TCM Icon City 3.30pm
6 Hana 604/483 Final Account Meeting Dergahayu 11.30am
7 Mrs Ooi / Zul purchaser claim for defective work Tropicana Tower Golf Villa 3.00pm 6.30pm
8
9
10
Friday 1/8/2016
1 T C Chan / Saw 774 Briefing on Preliminaries for TRS Mah Sing HQ 5.00pm
2 Ramdani/Amir 700-05 Site Valuation Mont Kiara 9.00am
3 Amir 764/SG Site Valuation 9 Seputeh 2.30pm
4 Hana 604/Ph2. Site Meeting & CCM Selayang Height 10.00am
5 Mrs Ooi / Kamsiah / Aaron / Aisyah Final Account mtg re Pkge D - Al Ambia IOI tower level 9 9.30am 1.30pm
6 Mrs Ooi / Kamsiah / Aaron / Aisyah Final Account mtg re Pkge D -HAB IOI tower level 9 6.00pm Postponed to Monday 11 Jan 2016
7
8
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 1/11/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Ramdani 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Madi 771/T5 CCM MRCB 2.00pm
4 Wendy & Leong Kar Heng 747 Package 5 VO meeting Mah Sing 10.00am
5 Mrs Ooi / Kamsiah / Aaron / Aisyah Final Account mtg re Pkge D -HAB IOI tower level 9 2.00pm 4.30pm
6 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.00pm
7 Oscar Saw 770 Roof val (12pm) drainage Val (230pm) Site Mea Tiling (330pm) SRJK Chong Hwa 11.00am
8
9
10
Tuesday 1/12/2016
1 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
2 Mrs Ooi / Aaron 758 Softscape measurement verification Epsom 9.00am 2.25pm
3 Leong Kar Heng 791 Site Meeting Jelutong 10.00am 12.30pm
4 Huda / Bryan / Ian 779 & 790 Site Visit to DTC to prepare BQ Dataran Damansara 11.00am
5 Wee Yu Ni / Sum Man Teng 763 Site Valuation for Town House J & H - Substructure Works EkoCheras 3.30pm
6 Wendy Kok 791 Site Meeting Jelutong 11.00am 12.30pm
7 Wendy Kok Gen To arrange painting works for Mrs Cheong's house Bangsar 8.30am 10.30am
8 'Afifah 778 Technical Meeting MAA Architect 12.30pm
9 Madi 771/T5 Discussion for proposed hotel MRCB 11.45am
10
Wednesday 1/13/2016
1 Badrul / Marziah 787 PDC Presentation RSKU Oasis Ara Damansara 3.00pm
2 Lee Kian Woei 747 Package 3 Residual Works Site Meeting Icon City 9.00am
3 Wendy Kok 720 Setia Alam meeting at site Setia Alam 8.30am
4 'Afifah 782 Valuation The Curve 12.30pm
5 Shema 698 Meeting (upgrading works) Tropicana City Mall 4.00pm
6 Madi 771/T3 Meeting with end user MBSB, Damansara 1.45pm
7 Huda 779 DTC - Site Meeting DTC 4.00pm
8
9
10
Thursday 1/14/2016
1 Huda 779 CCM Pavilion 10.00am
2 Leong Kar Heng 747 Package 5 Site Meeting Icon City 9.00am
3 Leong Kar Heng 747 TCM Icon City 3.30pm
4
5
Friday 1/15/2016
1 Wee 763 CCM EkoCheras 2.30pm
2 Madi 771/SUB Meeting MRSB 9.45am
3
4
5
Monday 1/18/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
YONG DAN MOHAMAD FAIZ SDN BHD
2 Sharipah 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wong/Hana 789 Tender Opening MRCB 4.00pm
4 Wendy Kok 747 VO Meeting on Aluminium NSC for P4, P5, Main contract for
P5, Extension of Diaphragm Wall, Sewerage & Water Reticulation Mahsing 9.00am 4.00pm
5 Leong Kar Heng 747 VO Meeting on Aluminium NSC for P4, P5, Main contract for
P5 and Extension of Diaphragm Wall Mahsing 9.00am 3.00pm
6 Oscar Saw 747 VO Meeting on Aluminium NSC for P4, P5, Main contract for
P5 and Extension of Diaphragm Wall Mahsing 9.00am 3.00pm
7 Lee Kian Woei 747 VO Meeting for Sewerage Mahsing 10.30am 3.00pm
8
Tuesday 1/19/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Wendy Kok Damansara Site Meeting Damansara 9.00am
3 Mrs Ooi / Zul Golf Villa - FA mtg Tropicana tower 11.00am 3.15pm
4 Huda NU Sentral - FA mtg Customer Solution Dept - T2 L30 3.00pm
6 Madi 771/SUB Site Meeting PJ Sentral Site Office 3.00pm
5 Madi 771/T3 CCM PJ Sentral Site Office 2.00pm
7 Wendy Kok 720 Setia Alam - split unit retaining wall costing Mentari 3.00pm 5.30pm
8
9
10
Wednesday 1/20/2016
1 T C Chan / Wee 763 site meeting EkoCheras 3.00pm
2 Lee Kian Woei 747 Package 6 & 7 Site Meeting Icon City 9.00am
3 Badrul / Zulkifili 775 CCM - Kahang PAAB 11.00am
4 Badrul / Marziah 773/MBW Tender Briefing 4D6A PKB, Kinrara 3.00pm
5 'Afifah 782 CCM & Site Meeting Mutiara Rini 8.30am
6 Leong Kar Heng 747 COO Meeting with the main contractor for the progress for P5 Icon City 3.00pm
7 Wendy Kok 712 Rimbun - substructure FA meeting with GDP architect GDP 4.00pm
8 Wendy Kok Late to work by 1 hour and will make up by OT
9
10
Thursday 1/21/2016
1 Oscar Saw 747 Package 4 Site Meeting Icon City 9.00am
2 Oscar Saw 747 TCM Icon City 4.00pm
3 T C Chan / Shema 698 Meeting post CPC on additional works Tropicana HQ 3.30pm
4 Ziela 650/PT15.3 CCM & Site Meeting Kota Seriemas 8.30am
5 Wendy Kok 747 Sewerage Meeting Mah Sing 8.30am 12.30pm
6
Friday 1/22/2016
1 'Afifah 782 Valuation The Curve 12.30pm
2
3
4
5
Monday 1/25/2016
1 Public holiday
2
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 1/26/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
3 Wendy Kok Damansara Site Meeting Jelutong 9.30am 10.30am
4 Lee Kian woei 747-P6 Site valuation Icon City 8.30am
5 Leong Kar Heng 747-P5 Site valuation Icon City 8.30am
6 Madi 771/SUB Meeting MRSB 4.15pm
7
8
Wednesday 1/27/2016
1 Sharipah Service car VW Balakong 8.00am
2 Marziah 773/MBW Addendum Documentation Review I&P Setiawangsa 9.30am
3 Wendy Kok 720 CC Meeting / Site Meeting Setia Alam 10.30am 3.30pm
4 Wee Yu Ni / Cheng 763 Site valuation EkoCheras 9.30am
5 Madi 771/SUB Meeting with PKNS PJ Sentral site office 9.35am
6 Afifah Send doter to clinic 3.00pm 5.30pm
7 Leong Har Heng 747-P5 Site meeting Icon City 9.30am 2.20pm
8 Lee Kian woei 747-P3 Residual Site valuation Icon City 2.30pm
9
10
Thursday 1/28/2016
1 T C Chan / Huda 779 CCM Pavilion 10.00am
2 T C Chan / Shema 698 CCM / Upgrading Works Tropicana HQ 3.30pm
3 Ziela 650/PT15.3 CCM & Site Meeting Kota Seriemas 8.30am
4 Mrs Ooi / Kamsiah / Aaron 735 FA mtg with Mr Ho IOI Level 9 9.00am 11.15am
5 Lee Kian Woei 747-P3 Site meeting for Residual contract Icon Ciy 9.00am 2.00pm
6 Leong Kar Heng 747-P5 Site measurement for verification of waterproofing works Icon Ciy 3.00pm
7 done for annexe Indian temple (no construction drawings)
8 Leong Kar Heng 747-P5 Technical meeting Icon Ciy 4.00pm
9 WendyKok 747 Sewerage and Water Reticulation meeting WEA 4.00pm
10 Lee Kian Woei 747 Site Valuation for LDP Upgrading Icon Ciy 4.00pm
11 Madi 771/SUB Meeting with PKNS MRCB 9.30am
Friday 1/29/2016
1 TC Chan / Wee 763 CCM EkoCheras 3.00pm
2 Leong Kar Heng 747 2 Gird Line Site Valuation Icon Ciy 9.00am
3 Lee Kian Woei 747 Package 4 Site Valuation Icon Ciy 9.30am
4 Badrul / Marziah 788 Technical Meeting Shah Sanad Architects 3.00pm
5
February
Monday 2/1/2016
1 Badrul / Marziah 788 VE Workshop - RSKU USJ Heights Sime Darby Bkt Jelutong 9.00am
2
3
4
5
Tuesday 2/2/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 2/3/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 782 Technical Meeting The Curve 9.00pm
4 Madi 768 Meeting - Final Account Sime Darby 2.00pm
5
Thursday 2/4/2016
1 Zulkifli Jamaris 723 VO Meeting - Golf Villa Tropicana City 10.00am 12.00pm
2 Madi 771/T3 discussion MRCB 11.15am
3
Friday 2/5/2016
1 Oscar Saw 770 Site Mttg SRJK Chong Hwa SRJK Chong Hwa Gombak 9.00am
2 'Afifah 778 Site valuation Mutiara Rini 10.00am
3 Hana 604 Site Meeting Selayang 9.30am
4
5
Monday 2/8/2016
1
2
3
4
5
Tuesday 2/9/2016
1
2
3
4
5
Wednesday 2/10/2016
1
2
3
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 2/11/2016
1
2
3
4
5
Friday 2/12/2016
1
2
3
4
5
Monday 2/15/2016
1 Wendy Kok Gen Go to Medi Klinik Wong Taman Desa Old Klang Road 3.00pm
2 Hana 604 Site Valuation Selayang 3.15pm
3
4
5
Tuesday 2/16/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Mrs Ooi / Kurshi 758 Site check on sanitary ftgs Epsom 8.30am
3 Wendy Kok 791 Site meeting on bungalow renovation & extension for Datin Yong Damansara 9.00am 12.00noon
4 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
5 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
6
Wednesday 2/17/2016
1 Wendy Kok 720 CC Meeting / Site Meeting for B2B & 39 units bungalow Setia Alam 9.00am
2 Leong Har Heng 747-P5 Site Walk / Site meeting Icon City 9.30am
3 Badrul Project Presentation - Elmina West (New) Sime Darby 2.30pm
4 Marziah 787 Consultant Coordination Meeting RSKU SSAP, Shah Alam 2.00pm
5
6
Thursday 2/18/2016
1 Lee Kian Woei 747-P3 Site Walk / Site meeting Icon City 9.00am 1.00pm
2 Lee Kian Woei 747 TCM Icon City 3.30pm
3 T C Chan / Shema 698 Meeting on additonal works Tropicana HQ 3.00pm
4 Mrs Ooi / Kamsiah 735 FA Mtg re additional topping to B3 & Al Ambia debit notes & back Charges IOI Level 9 9.00am 1.00pm
5
Friday 2/19/2016
1 Wendy Kok /Hana 604-P6 VO meeing, CC Meeting & Site Meeting Selayang Heights 9.00am
2 To check the extent of road kerb for estimates toa dvise Dergahayu
3 T C Chan / Wee Yu Ni 763 CCM EkoCheras Site 3.00pm
4 Mrs Ooi / Kamsiah 735 FA Mtg re HAB pkge C & D IOI Level 9 9.00am 11.30am
5 Lee Kian Woei 747 Sewerage Contract Document Issue Mah Sing 9.00am 12.00pm
6 Wendy Kok 604 Meeting with Mentari at PKNS Office PKNS 3.00pm
7 Kushi To pick up son from nanny (not feeling well) 3.30pm 5.30pm
YONG DAN MOHAMAD FAIZ SDN BHD
8
9
10
Monday 2/22/2016
1 Sharipah/Amir 700-05 CCM Mont Kiara 8.30am
2 Sharipah 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.00pm
4 Badrul 788 CCM - RSKU USJ Heights Bkt Jelutong 2.00pm
5 Oscar Saw 774 Site valuation Icon City ramps 8.30am
6 Huda / Bryan 779 Tender Interview Pavilion 11.30am
7 T C Chan / Wee / Oscar / Cheng / Sum 763 Ekovest Open House Ekovest HQ 4.00pm
8 Kamsiah Go to Lembaga Hasil 8.30am 10.30am
9
10
Tuesday 2/23/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
3 Badrul 773 CCM - 4D6A Bandar Kinrara PKB Kinrara 2.30pm
4 Madi 771/T3 VO Meeting MBSB Damansara 9.30am
5 Mrs Ooi / Kurshi / Aaron 758 Site check - U drains gradients as built details Epsom 9.00am 2.25pm
6 Huda 779 Tender Opening Pavillion Tower Level 9 4.00pm 4.30pm
7
8
9
10
Wednesday 2/24/2016
1 'Afifah 782 CCM & Site Meeting Mutiara Rini 9.00am
2 Badrul / Zulkifili 775 CCM - Kahang PAAB 10.00am
3 'Afifah 782 Site Valuation The Curve 2.00pm
4 Wee Yu Ni / T C Chan 763 Site meeting EkoCheras 3.30pm
5 Lee Kian Woei 747-P6 & P7 Site meeting Icon City 9.00am
6 Leong Kar Heng 747-P5 Meeting on scope of VO works Icon City 3.00pm
7 Wendy Kok 747-WR Water reticulation VO meeting WEA 4.00pm
8 Madi 771/SUB VO Discussion MBSB 2.00pm
9 Lee Kian Woei 747-P3 Site Valuation Icon City 3.00pm
10
Thursday 2/25/2016
1 T C Chan / Huda 779 CCM Pavilion 10.00am 12.00pm
2 T C Chan / Huda 779 Meeting on CPC for Hoarding pavilion 12.00pm 1.00pm
3 Wendy Kok 720-Infra Site measurement of Jalan U13 with Mentari & PKNS Setia Alam 8.00am 1.45pm
4 Ziela 650/PT15.3 CCM & Site Meeting Kota Seriemas 8.30am
5 Oscar Saw 747-P4 Site Meeting & Technical Meeting Icon City 9.00am
6 Bryan Dentist appt 2.00pm 5.30pm
7 T C Chan / Shema 698 Meeting on Defectes Rectification / Additonal works Tropicana HQ 3.00pm 5.30pm
8
9
10
11
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 2/26/2016
7 Wendy Kok 747-P5 Package 5 VO meeting Mah Sing 9.00am
6 Leong Kar Heng 747-P5 Package 5 VO meeting Mah Sing 9.00am
9 Lee Kian Woei 747-P6 & P7 Site Valuation Icon City 3.00pm
6 Leong Kar Heng 747-P5 Site Valuation Icon City 3.00pm
5
Monday 2/29/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Mrs Ooi / Bryan FA mtg re landscape & external works & Level 6 podium work Danga Bay 7.00pm
4 Leong Kar Heng 747-P5 VO Meeting with Client, Contractor and Consultants Mahsing 9.00am 12.00pm
5 T C Chan / Huda 790 Meting on Sales gallery Pavilion 11.00am 12.30pm
6 T C Chan / Wee Yu Ni 763 Discussion on system formwork in relation to doors and windows Ekovest HQ 2.30pm 5.00pm
7 'Afifah 778 Tender Opening Bousted 2.00pm
8
9
10
March
Tuesday 3/1/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Zulkifili 775 Final Design Review Package 2 SAJ, Larkin 8.30am 5.30pm
3 Marziah 773 Site Posssession Meeting PKB 8.30am 12.30pm
4 Wendy Kok 791 Site meeting on bungalow renovation & extension for Datin Yong Damansara 9.00am 12.30pm
5 Mrs Ooi / Kurshi / Aaron 758 Meeting re Makasya Loss & expense claim Arcadis JUBM 2.30pm
6 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
7 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
8 'Afifah 782/PB CCM & Site Meeting Mutiara Rini 10.00am
9
10
Wednesday 3/2/2016
1 Marziah 788 CCM Sime Darby Bukit Jelutong 9.00am 12.00pm
2 T C Chan / Huda 779 Discussion on revised piling and curatin wall Pavilion 2.00pm 5.00pm
3 Shema / Chong 698 Site measurement Tropicana Avenue 9.00am
4 Wendy Kok 720 CC Meeting / Site Meeting for B2B & 39 units 0-lots bungalow Mentari 10.00am 2.20pm
5 Madi 771/SUB Site Meeting MRCB 9.30am
6
Thursday 3/3/2016
1 Mrs Ooi / Zulkilifi Golf Villa - EOT mtg Tropicana Tower Level 9 10.00am
2 Lee Kian Woei 747-P3 Site Walk with COO of Mahsing and Site Meeting Icon City 9.00am 3.00pm
3 Hana 720 Setia Alam 39 units 0-lot bungalow site valuation for P.P. No. 6 Setia Alam 3.00pm
4 T C Chan 698 CCM Tropicana Tower Level 9 3.00pm
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 3/4/2016
1 Wee / Cheng / Sum 763 Site valuation EkoCheras Site 9.30am 11.30am
2 Wee / T C Chan 763 CCM EkoCheras site 3.00pm
3 Madi 771/SUB Site valuation Site Office PJ sentral 9.00am
4 Nurulhana 604/P6 CC Meting & Site Meeting Selayang Heights 9.00am 12.30pm
5 Saw XL 770 Site Meeting SMJK Chong Hwa 10.00am 3
6
Monday 3/7/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok / Oscar Saw 747-P4 VO Meeting with Client, Consultants and Contractor Mahsing 9.00am 1.00pm
4 Leong Kar Heng 747 Requested to CCC Meeting by Mahsing Icon City 3.00pm
5 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.00pm
6
7
Tuesday 3/8/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
3 Wee / Huda / Kamsiah / Bryan / Chong / Kurshi Attend site organised by CIDB for CPD points Sungai Buloh 9.00am 1.00pm
4 Wendy Kok 791 Site Meeting on VO and quotation received for the structural Jelutong 9.00am 12.30pm
5 repair for spalling concrete and site valuation
6 Madi 771/T3 Discussion on tender MRCB 10.30am
7 Ziela 650/PH3 Site measurement Kota seriemas 9.00am
8 'Afifah 778 Site valuation Mutiara Rini 3.00pm
9 Saw XL 770 Site Valuation Drainage package SMJK Chong Hwa 3.00pm
10
Wednesday 3/9/2016
1 Wee / T C Chan 763 Site Meeting EkoCheras Site 3.30pm
2 Lee Kian Woei 747-P6 & P7 Site walk & Site meeting Icon City 9.00am
3 Wendy Kok 747-P5 Site walk with Mahsing management for handing over of P5 Icon City 3.00pm
4 Mrs Ooi / Zul FA Mtg - Golf Villa Tropicana Tower 2.45pm 5.50pm
5 Huda 779 Site Mtg PBD 3.30pm
6
Thursday 3/10/2016
1 T C Chan / Huda 779 CCM Pavilion Office 10.00am 1.00pm
2 Oscar Saw 747 Site Metting Icon City 9.30am
3 Oscar Saw 747 TCm Icon City 3.00pm
4
5
Friday 3/11/2016
1 Wendy Kok Gen Free Memmogram Columbia Asia Hospital Setapak 3.00pm
2 Badrul/Marziah 788 CCM RSKU USJ Heights Shah Sanad Architects 3.00pm
3 'Afifah 778 Tender clarification & interview Menara Boustead 2.30pm
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 3/14/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Mrs Ooi Send car for service 8.30am 9.45am
4 Kurshi Hospital check up 2.00pm
5 Wendy Kok 712 Site valuation for post CCC works instructed by Client Rimbun 9,00am 1.00pm
6 Wendy Kok Emergency time leave for personal matter 4.30pm 5.30pm
7 Mrs Ooi Collect car from service centre 5.00pm
8 Badrul/Marziah 773/MBW Meeting 4D6A regarding alternative submission PKB 9.30am 2.00pm
9 Madi 771/T3 VO meeting Site Office, PJ Sentral 11.00am
10 Oscar Saw 747/P4 Site Measurement on Archi Casaka VO Works Icon City 10.00am 1.00pm
11 MKWong/Nurulhana 789 Tender Interview MRCB Prasarana SB 9.30am 12.30pm
Tuesday 3/15/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Marziah 773/SG Site Meeting - Sales Gallery PKB 9.00am
3 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
4 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
5 Wendy Kok 791 Jelutong site meeting and clarification of structural roof VO claim Jelutong 9.00am 11.30am
6 Leong Kar Heng 791 Jelutong site meeting and clarification of retaining wall VO claim Jelutong 9.00am 11.30am
7 Lee Kian Woei 747-WR Site measurement for Water Reticulation for as-built drawings Icon City 9.00am 12.00pm
8 for final accounts
9
10
Wednesday 3/16/2016
1 Wendy Kok 720 CC Meeting / Site Meeting for B2B & 39 units 0-lots bungalow Setia Alam 10.00am 2.30pm
2 Leong Kar Heng 747-P5 Site walk and site meeting Icon City 9.00am
3 'Afifah 782 Site valuation & VO Discussion The Curve 2.30pm
4 Zul 723 RFV discussion Tropicana Tower 3.40pm 5.45pm
5
Thursday 3/17/2016
1 T C Chan 698 CCM & tender Opening Tropicana HQ 3.00pm
2 Wendy Kok 791 VO Meeting and discussion on quotations received for structural Studio Bikin 2.00pm
3 Leong Kar Heng 791 repairs for spalling concrete Studio Bikin 2.00pm
4 Lee Kian Woei 747-P3 Site walk and site meeting Icon City 9.00am
5 Lee Kian Woei 747 Technical Meeting Icon City 3.00pm
6 Norhayati 735 VO Discussion with Contractor LRT Site Office 8.30am 1.00pm
7 Norhayati 735 VO Presentation to Prasarana LRT Site Office 2.30pm
8 Mrs Ooi / Bryan / Aaron Discussion on Casa Tebrau Menara MBMR 2.00pm
9
10
Friday 3/18/2016
1 T C Chan / Wee 763 CCM EkoCheras Site 3.00pm
2 Norhayati 735 Site Valuation & Claim Checking LRT Site Office 8.30am
3 Nurulhana 604/P6 CC Meting & Site Meeting Selayang Heights 9.00am 12.30pm
4 Huda 779 Tender Opening Pavillion 3.30pm
5 Saw XL 770 Site Meeting SMJK Chong Hwa 10.00am 3.00pm
6 MK Wong/Nurulhana 789 Tender Interview MRCB Prasarana SB 3.00pm 5.30pm
7
YONG DAN MOHAMAD FAIZ SDN BHD
8
9
10
Monday 3/21/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CC & Site Meeting Mutiara Rini 2.00pm
4 Wendy Kok / Oscar Saw 747-P4 VO Meeting Mahsing HQ 9.30am 1.30pm
5 Madi 771/SUB Meeting progress for basement Site Office PJ sentral 2.00pm
6 Marziah 773MBW Technical Meeting & VE Discussion PDA Architects 3.00pm
7
8
9
10
Tuesday 3/22/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
3 Mrs Ooi / Bryan CCM Raffles Uni - DWP - UBN Tower 8.30am 12.05pm
4 Leong Kar Heng 791 Site Meeting and check VO works for costing Jelutong site 9.00am
5 Wendy Kok 747 Ad hoc meeting on VP and CCC for Phase 1 Mahsing 9.30am
6 Wendy Kok / Lee Kian Woei 784 Consultant Meeting on Icon City - Phase 2 Sentral 2.30pm
7 Saw XL 770 Joint Val RW Piping Arch package SMJK Chong Hwa 3.00pm 5.00pm
8
9
10
Wednesday 3/23/2016
1 Wendy Kok 791 VO meeting Studio Bikin 9.30am 12.00pm
2 Leong Kar Heng 791 VO meeting Studio Bikin 9.30am 12.30pm
3 Lee Kian Woei 747-P6 Site walk and site meeting Icon City 9.30am 1.00pm
4 Oscar Saw 774 Meeting on JKR requirements Mah Sing 3.00pm
5
Thursday 3/24/2016
1 T C Chan / Huda 779 Tender Opening / CCM
2 Badrul / Zulkifili 775 CCM Kahang PAAB Office 10.00am
3 Mrs Ooi / Zulkilifli Golf Villa Tropicana Office Level 7 3.00pm
4 Norhayati 735 Site Valuation LRT Site Office 8.30am
5 Wendy Kok 791 To meet architect on the rationalisation for contarct documents Studio Bikin 8.30am 10.00am
6 binding
7 Oscar Saw 747-P4 Site walk and site meeting Icon City 9.00am 2.00pm
8 'Afifah 778 Tender clarification & interview Menara Boustead 2.00pm
9 Amir 764 Discussion MRCB 10.30am
10 Oscar Saw 747 Technical Meeting Icon City 4.00pm
Friday 3/25/2016
1 Lee Kian Woei 747 Site valuation for Blockwall (Projurutek) Icon City 3.00pm
2 Lee Kian Woei 747 Site valuation for Upgrading of LDP highway (Umech) Icon City 4.00pm
3 Leong Kar Heng 747 Site valuation for Piling and Diphragm Wall (Pintaras) Icon City 4.00pm
4 Oscar Saw 747 Site valuation for Package 4 Icon City 10.00am
5
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 3/28/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok 747 Site walk arranged by COO, Mr. William Ow Icon City 9.30am 12.30pm
4 Lee Kian Woei 747-P6, P7 Site valuation Icon City 10.00am
5 Leong Kar Heng 747-P5 Site valuation Icon City 10.00am
6 Marziah 773-SG Site Meeting for Sales Gallery 4D6A PKB 9.30am
7 Mrs Cheong Dental appt 2.00pm
8 Aaron Goh 735 Send Draft NSC FA (HAB) to IOI Putrajaya IOI Putrajaya 3.00pm 5.00pm
9 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.00pm
10
Tuesday 3/29/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Wendy Kok 791 Site Meeting and VO Meeting Jelutong 9.30am 1.30pm
3 Wendy Kok 747-P5 VO Meeting with Client, Cionsultant and Contarctor Mahsing 2.30pm 7.00pm
4 Leong Kar Heng 747-P5 VO Meeting with Client, Cionsultant and Contarctor Mahsing 2.30pm
5 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
6 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
7 Yatie 736 VO Discussion with Contractor Minco LRT Site Office 8.30am
8
9
10
Wednesday 3/30/2016
1 Wendy Kok 720-39 units Site Walk, CCM & Site Meeting Setia Alam 9.00am 1.30pm
2 Wendy Kok 791 VO Meeting with Client and Consultants Bukit Tunku 3.00pm 6.30pm
3 Leong Kar Heng 747-P5 Site walk and Site meeting Icon City 9.30am 12.45pm
4 Kamsiah Go to Jabatan Pendaftaran Negara 8.30am 12.00pm
5 Badrul/Marziah 773/MBW TCM 4D6A PDA Architects 2.30pm
6 Yatie 736 VO Discussion with Contractor Minco LRT Site Office 8.30am
7 T C Chan / Wee Yu Ni 763 Discussion with Stefan Leong Ekovest HQ 4.30pm
8 'Afifah 778 Tender Clarification & Interview Menara Boustead 2.30pm
9 Oscar Saw 774 Site valuation for External Ramp Iconcity 11.00am 1.00pm
10
Thursday 3/31/2016
1 Kamsiah Technical Visit to NIRO Ceramic (M) Sdn Bhd - for CPD point Sec. 15, Shaha Alam 8.30am 1.00pm
2 Huda / Bryan Ng 790 / 779 tender opening / discussion on budget Pavilion 4.00pm
3 Lee Kian Woei 747-P3 Site meeting Icon City 11.00am
4 Wendy Kok (to replace Hana on MC) 720-39 units Site Valuation for P.P. No. 7 Setia Alam 3.00pm
5 Kamsiah / Kurshi CPD Niro Ceramics 8.30am 1.00pm
6
April
Friday 4/1/2016
1 Wee / Cheng / Sum 763 Site valuation EkoCheras 9.30am 12.00pm
2 Wee / T C Chan 763 CCM EkoCheras 3.00pm 6.00pm
3 Nurulhana 604-P6 Site Meeting for Parcel 6 - Phase 2 Selayang Heighst 9.00am
YONG DAN MOHAMAD FAIZ SDN BHD
4 Wendy Kok 604 To discuss estimate cost for Jalan Persiaran Selayang Dergahayu 2.00pm
5 Madi 771/T3 Site valuation PJ Sentral Site 2.00pm
6
Monday 4/4/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Badrul / Zulkifili 775 Cost Review Package 1 PAAB 9.00am
4 Wendy / Oscar Saw 747-P4 VO Meeting with Mahsing (Involve William Ow), PBB and SN Low Mahsing 9.00am 1.00pm
5
Tuesday 4/5/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
3 Wendy Kok 791 Site Meeting Jelutong 9.30am
4 Leong Kar Heng / Oscar Saw 747-P4&P5 VO meeting with Archi Casaka on the glazing sub-contarct Mahsing 9.00am
5 Lee Kian Woei 747-P3 Site inspection and meeting Icon City 9.00am
6 Norhayati 736 Meeting with Prasarana LRT Site Office Ara Damandara 2.00pm
7 Badrul/Marziah 773/MBW CCM 4D6A I&P Setiawangsa 2.00pm
8
9
10
Wednesday 4/6/2016
1 Wee Yu NI 763 Site Meeting EkoCheras 3.00pm 6.00pm
2 T C Chan / Shema 698 Tender Interview on additonal works Tropicana Avenue 9.30am 12.00pm
3 Zul / Hafizah / Hissam Golf Villa -- Site measurement Golf villa 10.30am
4 Amir 764/SG Discussion MRCB 9.30am
5 Madi 771/SUB Meeting (TCM) MRCB 9.15am
6 Norhayati 736 VO Meeting with Minco & Prasarana LRT Site Office Ara Damandara 2.00pm
7 Leong Kar Heng 747-P5 Payment discussion Wisma Mahsing 9.30am 10.45am
8 Lee Kian Woei 747-P6 & P7 Site Meeting Icon City 9.00am
9 Huda / Bryan 779 Site Meeting DTC 4.00pm
10
Thursday 4/7/2016
1 T C Chan / Bryan 779 CCM Pavilion 9.30am 12.00pm
2 T C Chan / Bryan Asia Water exhibition KLCC 12.00pm 2.00pm
3 Wee Yu Ni Meeting Wisma EkoCheras 8.30pm
4 Zulkifli 723 VO discussion Tropicana Tower 3.00pm
5 Oscar Saw 747-P4 Site walk, site meeting Icon City 9.00am 1.00pm
6 Oscar Saw 747-P4 Technical Meeting Icon City 3.00pm
7 'Afifah 778 Tender opening Menara Boustead 2.00pm
8
9
10
Friday 4/8/2016
1 Mrs Cheong Medical check up - MC given. Pantai Medical Centre 8.30am
2 Badrul/Marziah 788 TCM RSKU USJ Heights Shah Sanad Arch 2.30pm
3 Wendy Kok 604 Meeting with Client on the construction cost for Jln Persiaran Selayang Heights 2.30pm
4 Selayang and Kumpulan Awanbina's quotation on upgrading works
5 to Jalan Persiaran Selayang
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 4/11/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Marziah 773/SG Site Meeting Sales Gallery 4D6A Bandar Kinrara PKB Bdr Kinrara 9.30am
4 Badrul/Zulkifili 775 Meeting to Discuss NSC Package PAAB 9.30am
5 Mrs Ooi Send car for repair 8.30am 10.00am
6 T C Chan / Bryan 779 discussion on budget Pavilion 3.30pm
7 Madi 771/T3 Site visit for Tower 3 PJ Sentral Site 9.30am
8 'Afifah 778 CCM & Site Meeting Mutiara Rini 9.30am
9
10
Tuesday 4/12/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Marziah 773/MBW TCM 4D6A Bandar Kinrara PKB Bdr Kinrara 2.30pm
3 Leong Kar Heng 747-P5 Meeting with Archi Casaka on their VO Mahsing 9.30am
4 Oscar Saw 747-P4 Meeting with Archi Casaka on their VO Mahsing 9.30am
5 Wendy Kok 747-P4-P5 Requested by Mahsing to attend Meeting with Archi Casaka Mahsing 9.30am 10.30am
on their VO
6 Wendy Kok 791 Site Meeting Jelutong 11.00am 1.00pm
7 Lee Kian Woei 747-P3-RW Site measurementfor slip road J Icon City 10.00am 3.00pm
8 Badrul/Ziela 736 Meeting with Tropicana legal department Tropicana Corp 2.00pm
9 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
10 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
11 Amir 764/SG Site valuation 9 Seputeh site 2.30pm
12 Leong Kar Heng 747-P5 Requested by Mahsing to attend Meeting to assist in SN Low office SN Low office 5.00pm
to assit the architect to issue VRF for Archi Casaka VO for
approval by Mahsing
Wednesday 4/13/2016
1 'Afifah 782 Meeting Mutiara Rini 9.30am
2 Leong Kar Heng 747-P5 Site walk and Site meeting Icon City 9.30am 4.30pm
3 Wendy Kok 720 CC Meeting and Site Meeting Mentari Parkville 10.30am 3.00pm
4 T C Chan / Huda 779 Meeting on Budget Pavilion 3.30pm
5 Norhayati 736 VO Meeting LRT Ara Damansara Site Office 8.30am
6 Ziela 741 Discussion with Tropicana Project & Legal Tropicana Corp 3.30pm
7
8
9
10
Thursday 4/14/2016
1 Wendy Kok 791 Meeting with architect and Contractor on VO issues Studio Bikin 3.00pm
2 Lee Kian Woei 747-P3 Site meeting Icon City 10.00am
3 Lee Kian Woei 747 Technical Meeting Icon City 3.00pm
4 T C Chan/ Shema 698 Tender Clarification Tropicana HQ 2.30pm
5 Nurulhana 604-P6 Site valuation for Progress Claim No. 21 (Phase 2) Selayang Heights 9.30am
6 Mrs Ooi/ Bryan Raffles Meeting Ampang Raffles 10.00am 12.20pm
7 Badrul Meeting with architect - potential new job Kelana Jaya 3.00pm
8 Huda 723 Lot G meeting on GBI Material Cost PJ Sentral meeting L30 5.30pm
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 4/15/2016
1 T C Chan / Wee Yu NI 763 CCM EkoCheras 3.00pm 6.00pm
2 Mrs Ooi / Bryan 795 Mtg with PMC estimate re Raffles University Johor DWP 10.00am 2.20pm
3 Nurulhana 604-P6 Site meeting and CCM (Phase2) Selayang Heights 9.30am 2.30pm
4 Zulkifili 775 CC Meeting PAAB 9.30am 12.30pm
5
Monday 4/18/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Lee Kian Woei 747-P3 GBI assessment meeting with all the Green Consultant (BSD) Oval Tower @ Damansara 2.30pm
4 Leong Kar Heng 747-P5 GBI assessment meeting with all the Green Consultant (BSD) Oval Tower @ Damansara 2.30pm
5 Shema 698 Tender opening Tropicana HQ
6 Madi 771/T3 Tender opening for Tower MRCB 2.30pm
7
8
9
10
Tuesday 4/19/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Amir 764/SG Site Meeting 9 Seputeh 2.00pm
3 Wendy Kok 791 Site Meeting Jelutong 9.30am 2.00pm
4 Badrul / Marziah 773/MBW Technical Meeting 4D6A Site 8.30am
5 Leong Kar Heng 747 To replace Sewerage Contarct Documents with Mahsing Mahsing 9.30am 10.00am
6 Marziah 773/SG Rationalisation of Rates with Ctr and INP I&P 2.30pm
7 Norhayati 736 Checking Claim with OPUS & Minco KLJ Site Office 8.30am 5.30pm
8
9
10
Wednesday 4/20/2016
1 Bryan 779 Site meeting DTC 4.00pm
2 Lee Kian Woei 747-P6, P7 Site walk & site meeting Icon City 9.00am
3 Lee Kian Woei 747-P6, P7 Site valuation Icon City 3.00pm
4 Leong Kar Heng 747-P5 Site valuation Icon City 3.00pm
5 Wendy Kok / Nurulhana 604 Jalan Persiaran Selayang cost estimates meeting Dergahayu 9.30am 3.00pm
6 483 Meeting on back-charged defect works to Main contractor final Dergahayu 10.30am
7 account meeting
8 Norhayati 736 VO Meeting with Prasarana KLJ Site Office 2.00pm
9 Marziah 788 Discussion on Feasibility Study Shah Sanad Arch 4.00pm
10 Madi 771/SUB Meeting (Tower 2 Sub-structure Works) PJ Sentral Site Office 10.30am
Thursday 4/21/2016
1 Bryan 779 CCM Pavilion 10.00am 12.00pm
2 Oscar Saw 747-P4 Site walk & site meeting Icon City 9.30am 2.20pm
3 747 Technical Meeting Icon City 4.00pm
4 Nurulhana 604 To discuss landscaping cost along Jalan Persiaran Dergahayu 9.30am 2.00pm
5 Selayang
6 Wendy Kok 720 Meeting with Mr Chua on the Guard Houses VO for Setia Mentari 3.30pm
YONG DAN MOHAMAD FAIZ SDN BHD
7 Alam
8 Oscar Saw 747 CCM Icon City 4.15pm
9
10
Friday 4/22/2016
1 Mrs Ooi / Bryan / Aaron Tropez Final Account Mtg Tropicana City Tower 10.30am
2 Wendy Kok 712 Meeting with Datuk PK Poh on CMGD issued for sub-structure Amphil 9.30am
works and released of 2nd moiety
3 Lee Kian Woei 747-P3 EOT Meeting for Package 3 Residual Works SNL Office 10.00am
4 Afifah 782/PB VO Meeting Bousted 10.30am
5 Oscar Saw 747-P4 Package 4 Site Valuation Icon City 3.00pm
6
7
8
9
Monday 4/25/2016
1 Amir 700-05 CCM Mont Kiara 8.30am
2 Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CC & Site Meeting Mutiara Rini 2.00pm
4 Wendy 747-P4&5 VO Meeting with client, consultants and contractors for P5 and Mahsing 3.00pm 7.00pm
VO meeting for works afetr CPC for P4 & 5
5 Leong Kar Heng 747-P5 VO Meeting with client, consultants and contractors for P5 and Mahsing 3.00pm 7.00pm
VO meeting for works afetr CPC for P4 & 5
6 Oscar Saw 747-P4&5 VO meeting for works afetr CPC for P4 Mahsing 4.30pm 7.00pm
7 Lee Kian Woei 747-P3 Package 3 Residual Works site valuation Icon City 3.00pm
8 Mrs Ooi Spasm / Pain in neck & shoulder. See chinese doctor. Taman Maluri 8.30am
9
10
Tuesday 4/26/2016
1 Amir 764 CCM MRCB 2.00pm
2 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
3 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
4 Wendy Kok 791 Site meeting Jelutong 9.30am 11.30am
5 Norhayati 736 Site Valuation LRT site 8.30am
6 Ziela Sime Darby Vendor Registration Ara Damansara 8.30am
7 Leong Kar Heng 747-EXT External 2 Grid Line site valuation Icon City 9.00am 11.30pm
8 Wendy Kok 720 Site valuation and site measurement for split level retaining Setia Alam 3.00pm
wall (VO works)
9
10
Wednesday 4/27/2016
1 Badrul/Zulkifili 775 CCM Kahang PAAB 2.00pm
2 Leong Kar Heng 747-P5 Site walk & site meeting Icon City 9.30am
3 Wendy Kok 720 Site meeting Setia Alam 9.30am
4 Mrs Ooi Follow up treatment for neck pain Taman Maluri 1.00pm
5
Thursday 4/28/2016
1 Chan TC / Mrs Ooi / Wee Yu Ni / Bryan Ng Glodon Annual Conference Connexion 2 Nexus 1.30pm 5.30pm
YONG DAN MOHAMAD FAIZ SDN BHD
2 Mrs Ooi/ Bryan / Aaron Raffles Uni 1st draft estimate presentation at DWP via teleconferencing DWP office 2.00pm
with Raffles uni Spore
3 Lee Kian Woei 747-P3 Site walk and site meeting Icon City 9.30am
4 Lee Kian Woei 747 Technical meeting for all packages Icon City 4.00pm
5 Nurulhana 720 Site emasurement for split unit retaining wall Setia Alam 2.30pm
6 Madi 771/T3 Discussion on Tender Report & collect document MRCB 2.15pm
7
8
Friday 4/29/2016
1 Norhayati 736 Site Valuation LRT site 8.30am
2 Oscar Saw 770 Site Meeting SMJK Chong Hwa 10.00am 3.00pm
3
4
5
May
Monday 5/2/2016
1
2
3
4
5
Tuesday 5/3/2016
1 Mrs Ooi / Huda DTC Tender Briefing -Package Piling & RC upto B1 Pavillion Postponed until further notice
2 Norhayati 736 VO measurement with Ctr/Minco Site 8.30am
3 Mrs Ooi Follow up treatment for neck pain 2.00pm
4 Badrul 788 Tender Briefing - RSKU USJ Heights Ara Damansara 4.00pm
5 Oscar Saw 747-P4 Meeting with contract departments on payment issues Mahsing 4.00pm
6 Madi 771/SUB Site Valuation PJ Sentral Site 9.45am
7
8
9
10
Wednesday 5/4/2016
1 Norhayati 736 VO measurement with Ctr/Minco Site 8.30am
2 Mrs Ooi / Bryan / Aaron Trpoez Final Account mtg JB 7.00am
3 TC Chan 698 Meeting Tropicana 8.00am
4 Madi 771/T3 Tender Interview MRCB 8.30am
5 Amir 700/SUPER Site Valuation Mont Kiara 8.30am
6 Lee Kian Woei 747-P6 & P7 Site walk & site meeting Icon City 9.30am 2.00pm
7 T C Chan 763 Site meeting EkoCheras 3.00pm
8 Wee / Cheng / Sum 763 Site valuation EkoCheras 9.00am 12.30pm
9 Huda 779 Site Meeting DTC 3.00pm
10
Thursday 5/5/2016
1 T C Chan / Huda 779 CCM Pavilion 10.00am 12.00pm
2 Oscar Saw 747-P4 Site walk & site meeting Icon City 9.30am
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 5/6/2016
1 T C Chan / Huda 779 tender briefing Pavilion 10 4.30pm
2 Wendy Kok 720 Meeting with Mr Chua on the Guard houses VO Mentari 4.00pm 6.00pm
3
4
5
Monday 5/9/2016
1 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.30pm
2 Sharipah 700-05 CCM Mont Kiara 8.30am
3 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
4 Lee Kian Woei 747 Meeting requested by Mahsing with all the consultants on the Icon City 9.30am 1.00pm
5 issue of carpark flooding at the basement
6 Lee Kian Woei 747 Package 3 Aluminium Final Site Inspection Icon City 2.00pm 4.00pm
7
8
9
10
Tuesday 5/10/2016
1 Norhayati 736 VO Meeting with Contractor & Consultants LRT Site Office Ara Damansara 8.30am
2 Marziah 773/SG Site Meeting PKB 9.30am 11.45am
3 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
4 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
5 Sharipah/Amir 764 CCM MRCB 2.00pm
6 Wendy Kok 791 Site meeting Jelutong 9.30am 11.50am
7 Wendy Kok 720 Guard house and TNb VO meeting Mentari 3.00pm 6.00pm
8
9
10
Wednesday 5/11/2016
1 Leong Kar Heng 747-P5 Site walk and Site meeting Icon City 9.30am
2 Wendy Kok 720 CC Meeting on Medium Cost Apartment and Site Meeting on 0-lot Mentari 10.00am
2 Wendy Kok / Leong Kar Heng 747 VO meeting with client and consultants on Pintaras VO Mahsing 3.00pm
3 Mrs Ooi 735 Mtg with Mr Ho re Fees IOI Level 9 2.00pm
4 Norhayati 736 VO meeting with Minco and Opus Opus 8.30am
5 Preparing VO presentation for Prasarana meeting Site Office 5.30pm
6 Hana 789 Discussion on Contract Document MRCB 2.30pm
7 Afifah 789 Technical Meeting Arkitek MAA 9.30am
8 Madi 768 Meeting Imaar Architect 2.00pm
9
YONG DAN MOHAMAD FAIZ SDN BHD
10
Thursday 5/12/2016
1 Madi 771/T3 Tender Opening (2nd submission) MRCB 10.00am
2 Mrs Cheong Medical Check up Pantai Medical Centre 8.30am
3 Norhayati 736 VO Presentation to Prasarana Prasarana 8.30am
4 Lee Kian Woei 747/P3 Package 3 Residual Work Site Meeting and Site Walk Icon City 9.00am
5 Lee Kian Woei 747 ACM Icon City 4.00pm
6 Wendy Kok 720 Sewerage and Roadworks VO meeting with Mr. Chua Mentari 4.30pm
7 Kurshi Leave early to fetch mother for check up 5.00pm
8 T C Chan / Huda 779 Meeting Pavilion 11.30am 3.30pm
9
10
Friday 5/13/2016
1 Lee Kian Woei Gen Police report on car accident at Setia Alam on the way home after work 8.30am 9.00am
2 Nurulhana 604-P6 Site Meeting for Package 2 Selayang Heights 9.30am
3 T C Chan / Wee 763 CCM EkoCheras 3.00pm 6.00pm
4 Kamsiah See doctor Shah Alam 9.00am 11.00am
5 Marziah/Badrul 788 Technical meeting RSKU Sime Darby USJ 2.30pm
6 Badrul QS Division AGM Hotel Istana 4.30pm
7 Bryan / Huda / Aaron/ LeeKW/Leong / Mrs Ooi QS Division AGM Hotel Istana 4.50pm
8 Oscar Saw Site Inspection Icon City 10.00am 12.00pm
9
10
Monday 5/16/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Madi 771/SUB Meeting MRCB 9.30am
4 Marziah 773 e-Contract Document review 4D6A Sales Gallery I&P Setiawangsa 2.30pm
5
Tuesday 5/17/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Mrs Ooi Doc appt neck pain - follow up treatment 12.00noon
3 Badrul/Marziah 788 Tender Document Review RSKU Sime Darby 8.30am 12.50pm
4
5
Wednesday 5/18/2016
1 Madi/Hazirah 771/SUB Meeting (Basement for Tower 2) Site Office, PJ Sentral 9.00am
2 Marziah 775 Finalising Preliminaries with PAAB Contract PAAB 2.00pm
3 Wendy Kok 791 Site Meeting Jelutong 9.30am 12.00pm
4 Lee Kian Woei 747-P6 & P7 Site walk & site meeting Icon City 9.30am 2.00pm
5 Kurshi Collect car from workshop 8.30am 10.30am
6 Huda Site Meeting DTC site 4.00pm
7 T C Chan / Wee 763 Site Meeting EkoCheras 3.00pm 6.30pn
8
9
10
Thursday 5/19/2016
YONG DAN MOHAMAD FAIZ SDN BHD
1 Oscar Saw 747-P4 Site walk & site meeting Icon City 9.30am
2 747 Technical Meeting Icon City 4.00pm
3 Lee Kian Woei 747 Blockwall site valuation Icon City 3.00pm
4 Huda / T C Chan 779 CCM Pavilion 10.00pm 12.00pm
5 Madi 771/T3 Discussion MRCB 10.30am
6
7
Friday 5/20/2016
1 Wendy Kok 720 Site measurement for drainage work Setia Alam 9.30am 4.30pm
2 Chan TC Car broke down - waiting for AAM to take to workshop 8.30am
3 Badrul 773 Meeting with PKB Head of Contract ref: 4D6A MBW Kinrara 2.30pm
4 Leong Kar Heng 747/EXT Site valuation Icon City Site 4.00pm
5
6
Monday 5/23/2016
1 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.30pm
2 Sharipah 700-05 CCM Mont Kiara 8.30am
3 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
4 Lee Kian Woei 747-P6 & P7 Package 6 & 7 site valuation Icon City 9.30am 1.00pm
5 Leong Kar Heng 747-P5 Package 5 site valuation Icon City 9.30am 1.00pm
6 Norhayati 736 VO Presentation to Prasarana Prasarana 2.30pm
7 Madi 768 Final account (meeting) Sime Darby 2.15pm
8 Nurulhana 789 Discussion with client on the BQ contents MRCB 11.15am 2.15pm
9
10
Tuesday 5/24/2016
1 Marziah 773/SG Site Meeting Sales Gallery 4D6A Kinrara 8.30am
2 Sharipah/Amir 764 CCM MRCB 2.00pm
3 Sharipah Service car VW Balakong 8.00am
5 Wendy Kok 791 Site Meeting Jelutong 9.30am 12.45pm
6 Aaron Going to bank 8.30am 11.15am
7 Huda 779 Tender Interview DTC-KL/1220 Traffic Management Pavillion Tower L9 2.00pm 4.00pm
8 Huda 779 Tender Opening DTC/KL/1232 - Bored pile, retaining wall & lowest structur Pavillion Tower L9 4.00pm 4.30pm
9 Nurulhana Gen Medical check up Clinic Putrajaya 2.30pm
10 Wee Yu Ni 763 Masonry Tender BQ Preparation - Discussion weth Shum LY EkoCheras site 4.30pm
11 Oscar Saw 747-P4 Site valuation Icon City 3.00pm
12 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
13 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
Wednesday 5/25/2016
1 Wendy Kok 720 CC Meeting on Medium Cost Apartment and Site Meeting on 0-lot Setia Alam 9.30am 3.00pm
2 Leong Kar Heng 747-P5 Package 5 Site Meeting Icon City 10.30am
3 Oscar Saw 770 Site Measuirement Roof Package SMJK Chong Hwa 9.00am
4 Wendy Kok 712 Substructure VO meeting GDP 3.00pm
5 Nurulhana (postpone to 26/5/2016) 720 Site valuation Setia Alam 2.30pm
6
7
8
9
YONG DAN MOHAMAD FAIZ SDN BHD
10
Thursday 5/26/2016
1 Lee Kian Woei 747-P6 & P7 Package 6 & 7 site meeting Icon City 9.30am
2 Nurulhana 720 Site valuation and site measurement of split level retaining wall Setia Alam 9.30am
3 Madi 771/SUB Site Meeting Site Office PJ sentral 10.00am
5 Ziela 650/PH3 Meeting & Site valuation Kota seriemas 9.00am
6 Marziah 773/SG Contract Document Finalisation meeting I&P Setiawangsa 2.00pm
7 Oscar Saw 747-P4 Site Verification for Workdone Icon City 9.30am
8
9
10
Friday 5/27/2016
1 Badrul / Marziah 788 Tender Coordination Meeting RSKU Sime Darby 8.30am
2 Mrs Ooi / Kurshi / Aaron 758 Final Account Meeting Arcadis JUBM 9.00am
3 Wendy Kok 747 Site inspection for handive over (replace Leong on AL) Icon City 11.30am 12.00pm
4 Lee Kian Woei 747-UM Site Valuation for Road & Drainage works at LDP under LITRAK Icon City 10.00am
5 Nurulhana 604-P6 Site meeting Selayang Heighst 10.00am
6 Wendy Kok / Lee Kian Woei 747-P5 NSC VO meeting Mahsing 4.00pm
7 Huda / Ho JY 779 Site Valuation DTC site 3.30pm
8
9
10
Monday 5/30/2016
1 'Afifah 778 CCM & Site Meeting Mutiara Rini 9.00am
2 Sharipah 700-05 CCM Mont Kiara 8.30am
3 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
4 Badrul/Zulkifili 775 CCM Kahang PAAB 3.00pm
5 Zulkifili / Marziah 775 Review Tender Document HLA 10.00am
6 Badrul CCM Elmina Green Sime Darby 8.30am 10.30am
7
8
9
10
Tuesday 5/31/2016
1 Amir 764 Technical Meeting RSP 9.00am
2 Sharipah 700-05 Meeting Dkira Place 2.00pm
3 Wendy Kok 791 Site Meeting Jelutong 9.30am 12.30pm
4 Leong 747/P5 2nd CPC joint inspection Icon City site 10.15am
5 Wee Yu Ni Replacement passport 8.30am 1.00pm
6
7
8
9
10
June
Wednesday 6/1/2016
YONG DAN MOHAMAD FAIZ SDN BHD
1 Wee Yu Ni Sum Man Teng / Cheng Meljyn 763 Site walk/ Site valuation / Sika presentation / Site metting Eko Cheras ( Site ) 8.30am
2 Lee Kian Woei 747-P6 & P7 Site Walk & Site Meeting for Package 6 & Package 7 Icon City 9.00am 3.30pm
3 Huda 779 Site Meeting No. 26 DTC (Site) 3.00pm
4 Norhayati 736 Site Valuation LRT Station Sites 8.30am
5 Nurulhana 720 - 38 Site valuation for 38 0-lots Setia Alam 3.00pm
6 Wendy Kok 712 Substructure VO meeting GDP 4.00pm
7 Madi 771/SUB TCM Basement Tower 2 MRCB 9.30am
8 Madi/Hazirah 771/SUB Site Valuation PJ Sentral Site Office 2.30pm
9
10
Thursday 6/2/2016
1 Badrul / Marziah 773/MBW Discussion on potential Vos - called by I&P PKB Kinrara 10.00am
3 Oscar Saw 747-P4 Site walk & site meeting Icon City 9.30am 2.00pm
4 Oscar Saw 747 Technical Meeting Icon City 4.00pm
5
6
7
8
9
10
Friday 6/3/2016
1 Wendy Kok 720 Site measurement for Drainage and Sewerage for Phase 2 Setia Alam 8.30am
3 Oscar Saw 747 Site inspection for handing over 2 grid line Icon City 9.30am
4 Nurulhana 604-P6 Site inspection for CPC Selayang Heights 9.30am
5 Leong Kar Heng 747-P5 P5 Site inspection for ID renovation work at L3 management office Icon City 4.30am
6 Ziela Follow up medical check up Poliklinik Shaik (Sunway Sdn Bhd) 3.00pm 4.30pm
7 Shema 698 Tender opening Tropicana HQ 4.30pm
8
9
10
Monday 6/6/2016
1 Wendy Kok & Lee Kian Woei 747 EOT & VO meeting for Package 3 Residual & Package 5 Mah Sing 9.30am 1.30pm
2 Madi 771/SUB Discussion MRCB 9.15am
3 'Afifah 778/SUB CCM & Site Meeting Mutiara Rini 2.00pm
4 Amir 700 Site Valuation Mont Kiara 10.00am
5
6
7
8
9
10
Tuesday 6/7/2016
1 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
2 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
3 Wendy Kok 791 Site Meeting Jelutong 10.30am 12.30pm
4 Wee Yu Ni To collect passport 8.30am 10.30am
5 Marziah 773/SG CCM Sales Gallery Kinrara 8.30am 1.00pm
6 Norhayati 736 VO Discussion Opus 8.30am 5.30pm
7 Amir 764 CCM MRCB 10.00am
YONG DAN MOHAMAD FAIZ SDN BHD
8
9
10
Wednesday 6/8/2016
1 Wendy Kok 720 CC Meeting and Site Meeting on 0-lot Phase 2 Mentari 10.30am 2.30pm
2 Leong Kar Heng 747-P5 Package 5 Site Meeting Icon City 9.30am 12.30pm
3 Badrul / Hana CCM Elmina Green EG1 Sime Darby 2.00pm
4 Leong Kar Heng 747-P5 Package 5 ID V.O Meeting Icon City 3.00pm
5 Ho Jia Yuen 779 Site valuation - DTC DTC 3.30pm
6
7
8
9
10
Thursday 6/9/2016
1 Mrs Ooi Collect car from workshop 8.30am 10.45am
2 Lee Kian Woei 747-P3 Package 3 Residual Work Site Meeting Icon City 9.00am
3
4
5
6
7
8
9
10
Friday 6/10/2016
1 Oscar Saw 770 Final Account Phase 1 Meeting SMJK Chong Hwa 11.00am
2 T C Chan 714 Meeting regarding resuming work Berjaya 10.00am
3 T C Chan / Wee Yu Ni 763 CCM EkoCheras 2.30pm
4 Wendy Kok / Leong Kar Heng 747-P5 VO meeting for Aluminium NSC Mahsing 9.30am
5 Madi/Hazirah 771 Discussion on facade tender Meinhart Office 9.15am
6
7
8
9
10
Monday 6/13/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok 720 VO meeting on TNB sub-station and Guard House Mentari 4.30pm 7.10pm
4
5
6
7
8
9
10
Tuesday 6/14/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 6/15/2016
1 Madi/Hazirah 771/SUB TCM (Basement Tower 2) PJ Sentral Site Office 9.00pm
2 Badrul / Hana CCM Elmina Green EG1 Sime Darby 2.00pm
3 T C Chan 763 Site Meeting EkoCheras 3.00pm
3 Leong Kar Heng 747 Package 6 & 7 Site Meeting Mahsing 11.00am 1.00pm
5
6
7
8
9
10
Thursday 6/16/2016
1 Oscar Saw 747-P4 Site walk & site meeting Icon City 9.30am 3.00pm
2 Wendy Kok 720 VO Meeting on Earthworks qty Mentari 3.30pm
3 Oscar Saw 747-P4 TCM Icon City 4.30pm
4 T C Chan 779 CCM Pavilion 10.00am 1.00pm
5
6
7
8
9
10
Friday 6/17/2016
1 'Afifah 778/SUPER Site Possession Meeting Mutiara Rini 10.00am
2 Mrs Ooi Send car to workshop ( parts arrived ) 8.30am 9.50am
3 Wendy Kok 791 VO Meeting Studio Bikin 3.30pm
4 Hana 604 Site Meeting Selayang Heights 9.45am 3.30pm
5
6
7
8
9
Monday 6/20/2016
1 'Afifah 778/SUB CCM & Site Meeting Mutiara Rini 2.00pm
2 Sharipah 700-05 CCM Mont Kiara 8.30am
3 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
4 Marziah 773/SG Site Meeting for sales gallery Kinrara 8.30am 1.40pm
5 Marziah 773/SG Finalising e-contract document with I&P ; Dokumaya; PDA Kinrara 2.00pm
6
YONG DAN MOHAMAD FAIZ SDN BHD
7
8
9
10
Tuesday 6/21/2016
1 Sharipah/Amir 764 CCM MRCB 10.00am
2 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
3 Madi 771/T3 CCM Site Office PJ sentral 3.30pm
4 Wendy Kok 791 Site Meeting Jelutong 9.30am 12.00pm
5 Lee Kian Woei 747-P6 & P7 Package 6 & 7 site valuation Icon City 9.30am 1.00pm
6 Leong Kar Heng 747-P5 Package 5 site valuation Icon City 9.30am 1.00pm
7
8
9
10
Wednesday 6/22/2016
1 Badrul / Hana CCM Elmina Green EG1 Sime Darby 2.00pm
2
3
4
5
6
7
8
9
10
Thursday 6/23/2016
1 Lee Kian Woei 747-P3 Package 3 Residual Work Site Meeting Icon City 10.30am 1.30pm
2 Wendy Kok 720 Site count of the floor and wall tiles to determine wastages Setia Alam 4.00pm
3 Amir 764/SG Site valuation 9 Seputeh 2.15pm
4
5
6
7
8
9
10
Friday 6/24/2016
1 Badrul / Marziah 788 CCM RSKU USJ Heights Sime Darby 8.30am
2 Madi 768 Final account mtg Sime Darby 2.00pm
3 Leong Kar Heng 747-ext Extensionof 2 grid line site valuation Icon City 4.00pm
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 6/27/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Shema 698 Tender Opening Tropicana HQ 10.00am
4 Wendy Kok / Leong Kar Heng 747-P5 VO Meeting Mahsing 9.30am 1.00pm
5 Oscar Saw 747-P4 Site Valuation Icon City 11.00am 3.00pm
6
7
8
9
10
Tuesday 6/28/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Wendy Kok 747 Faade lighting cordination meeting Mahsing 9.30am 1.00pm
3 Lee Kian Woei 747 P3 Slip road J V.O meeting Site, Icon City 9.30am 11.30am
4
5
6
7
8
9
10
Wednesday 6/29/2016
1 Badrul / Hana CCM Elmina Green EG1 Sime Darby 2.00pm
2 T C Chan 714 Site meeting Hanoi 3.00pm
3 Wee Yu Ni GBI Meeting Eko Cheras site office 9.00am
4 Leong Kar Heng 747 P5 Site meeting Site, Icon City 9.30am 1.00pm
5 Wendy Kok 720 CC Meeting and Site Meeting on 0-lots-Phase 2 Mentari 10.00am 1.00pm
6 Huda 779 Site meeting DTC 2.30pm
7 Madi 771/SUB TCM Tower 6 MRCB 9.30am
8 Shamirul 764/SG VO Meeting MRCB 2.00pm
9
10
Thursday 6/30/2016
1 T C Chan 714 Site meeting Hanoi 8.30am 6.00pm
2 Huda 779 CCM Pavilion 10.00am 12.00pm
3 Oscar Saw 747 Package 4 Site Meeting Site, Icon City 9.00am
4 Leong Kar Heng 747 Handing over meeting for Tower 1 Site, Icon City 11.30am
5 Lee Kian Woei 747 TCM Site, Icon City 3.00pm
6 Marziah 773/SG CCC Inspection Sales Gallery Kinrara 2.00pm
7
8
9
10
July
Friday 7/1/2016
1 T C Chan 714 Site meeting Hanoi 8.30am 7.00pm
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 7/4/2016
1 T C Chan 779 Tender Briefing Pavilion 11.00am 1.00pm
2 T C Chan 763 Site Meeting EkoCheras 3.00pm 6.30pm
3
4
5
6
7
8
9
10
Tuesday 7/5/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 7/6/2016
1
2
3
4
5
6
7
8
9
10
Thursday 7/7/2016
1
2
3
4
5
6
YONG DAN MOHAMAD FAIZ SDN BHD
7
8
9
10
Friday 7/8/2016
1
2
3
4
5
6
7
8
9
10
Monday 7/11/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 7/12/2016
1 Badrul / Marziah 788 RSKU Coordination Meeting Alma Architecs 9.00am
3 Wendy Kok 791 Site Meeting Jelutong 9.30am 12.00pm
4 Mrs Ooi Chinese Doctor 2.00pm
5 Kamsiah Dentist 2.00pm
6 Madi 771/SUB Send contract document MRCB 11.15am
7 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
8 Madi 771/T3 CCM Site Office PJ sentral 4.00pm
9
10
Wednesday 7/13/2016
1 Marziah 773/SG Site Valuation Sales Gallery Kinrara 9.00am
2 Marziah 773 Site Possession Meeting MBW Kinrara 3.00pm
3 Badrul / Zulkifili 775 Meeting to discuss NSC matters PAAB 2.00pm
4 Lee Kian Woei 747-P6 & P7 Package 6 & 7 site meeting Icon City 9.00am
5 Wendy Kok 720 Site Meting Setia Aalm 12.20pm 2.50pm
6 Huda 779 Site Meeting DTC 3.00pm
7 Mrs Ooi / Bryan / Aaron FA mtg with Vincent TDBSB Tropez JB 8.30am 11.30pm
8
9
10
Thursday 7/14/2016
YONG DAN MOHAMAD FAIZ SDN BHD
1 Lee Kian Woei 747-P3 Package 3-Residual Works Site Meeting Site, Icon City 9.00am
2 Shema 698 Site valuation for Direct contract Tropicana Avenue 2.00pm
3 T C Chan 779 CCM Pavilion 10.00am
4 Wendy Kok / Leong Kar Heng 747-Ext EOT meeting on the Diaphragm Wall and Bored Piles for the 2
5 Madi 771/SUB Tender Opening for Faade MRCB 9.15am
6 Afifah 778 Site Valuation Package 4 Mutiara Rini 9.30am
7
8
9
10
Friday 7/15/2016
1 Badrul / Yatie 788 RSKU Tender Document Coordination Workshop Sime Darby 9.00am 5.00pm
2 Nurulhana 604-P6 Site meeting & Site inspection for CPC Selayang Heights 9.30am
3
4
5
6
7
8
9
10
Monday 7/18/2016
1 'Afifah 778 CCM & Site Meeting Package 4 Mutiara Rini 2.00pm
2 Sharipah 700-05 CCM Mont Kiara 8.30am
3 Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
4 T C Chan 763 Signing ceremony of anchor tenants KL Hilton 3.00pm
5 Wendy Kok / Leong Kar Heng 747-P5 VO Meeting with client, consultants and contractor Mahsing 9.00am 1.00pm
6 Wendy Kok / Lee/Leong/Osar 747-P3,P4,P5 Main contractor and all NSC on balance works before CPC Icon City 2.00pm
7 Marziah/Ziela 773/SG Site Valuation Sales Gallery Kinrara 2.00pm
8 Badrul 788 RSKU QS Coordination Meeting AAR 2.00pm
9 Madi 771/T3 Collect tender document MRCB 9.00am
10
Tuesday 7/19/2016
1 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
2 Madi 771/T3 CCM Site Office PJ sentral 4.00pm
3 Sharipah/Amir 764 CCM MRCB 10.00am
4 T C Chan 790 Meeting on ID package for Sales gallery Pavilion - level 10 11.30am
5 Wendy Kok 791 Site Meeting Jelutong 9.30am 12.30pm
6 Lee Kian Woei 747-P3 Site valuation for Sliproad J Icon City 3.00pm
7
8
9
10
Wednesday 7/20/2016
1 Huda 779 Workshop on basement and retail Pavilion - level 9 10.00am 12.30pm
2 T C Chan / Yu NI 763 Site Meeting EkoCheras 2.30pm 6.00pm
3 Badrul / Zulkifili 775 Workshop on Contract issues PAAB 9.00am 4.00pm
4 Badrul / Hana CCM Elmina Green Sime Darby 2.00pm
5 Leong Kar Heng 747 P5 Site meeting Site, Icon City 9.30am
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 7/21/2016
1 Huda / T C Chan 779 Briefing on structure Pavilion - level 9 10.00am
2 Oscar Saw 747 Package 4 Site Meeting Site, Icon City 9.00am
3 747 Technical Meeting Icon City site 4.00pm
4 Mrs Cheong / Jennifer Send car to Workshop - Battery out of order 8.30am
5
6
7
8
9
10
Friday 7/22/2016
1 Lee Kian Woei 747-P6 Site valuation Icon City 9.00am
2 Leong Kar Heng 747-P5 Site valuation Icon City 9.00am
3 Nurulhana 604-P6 Site valuation Selayang Heights 3.00pm
4 Oscar Saw 747-P4 Site valuation Icon City 3.00pm
5 Madi 771/SUB Discussion (on Landscape tender) MRCB 4.30pm
6 Afifah 778 Discussion Menara Bousted 9.00am
7
8
9
10
Monday 7/25/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok / Lee Kian Woei 747-P3 VO Meeting with contractor, consultants and client Mahsing 9.00am 1.00pm
4 Yatie/Marziah/Ziela 788/MBW RSKU Tender Document Coordination Workshop Sime Darby 9.00am 5.00pm
5
6
7
8
9
10
Tuesday 7/26/2016
1 Sharipah 764 Technical Meeting RSP 9.00am
2 Wendy Kok 791 Site Meeting Jelutong 9.30am
3 Leong Kar Heng 747-Ext Site valuation Icon City 10.00am
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 7/27/2016
1 Lee Kian Woei 747-P6&7 Site walk & site meeting Icon City 9.00am 3.00pm
2 Wee Yu NI / Wendy Kok 763 Tender interview fro Aluminium NSC tender EkoCheras 8.30am
3 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
4
5
6
7
8
9
10
Thursday 7/28/2016
1 Lee Kian Woei 747-P3 Residual Site walk & site meeting Icon City 10.00am
2 Lee Kian Woei 747-P3 Residual VO Meeting with Zaidun Leeng Icon City 2.00pm
3 Marziah / Ziela 773/MBW Site meeting 4D6A MBW Kinrara 9.00am
4 Marziah / Ziela 773/MBW Rationalisation of Rates Discussion with PKB Kinrara 2.00pm
5 Oscar / Wendy Kok 747-P4 EOT Meeting with consultants and client Mahsing 3.30pm
6 Madi 771/SUB Collect Document MRCB 2.00pm
7 Sharipah/'Afifah 778 Discussion Menara Bousted 9.00am
8
9
10
Friday 7/29/2016
1 Madi/Hazirah 771/SUB Site valuation Site Office PJ sentral 9.00am
2 Badrul / Marziah / Ziela 773/MBW Rationalisation of Rates Meeting with Ctr Kinrara 2.00pm
3 TC Chan / Wendy Kok 763 CC Meeting Eco-Cheras 2.00pm
4
5
6
7
8
9
10
August
Monday 8/1/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok / Leong Kar Heng 747-P5 VO Meeting with contractor, consultants and clients Icon City 9.30am 1.00pm
4 'Afifah 778 CCM & Site Meeting Package 4 Mutiara Rini 2.00pm
5 Huda 779 Tender opening Pavilion 4.00pm
6
7
8
9
10
Tuesday 8/2/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 8/3/2016
1 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
2 Leong Kar Heng 747-P5 Site Meeting Icon City 9.30am
3 Madi 771/SUB CCM Phase 1C (Tower 6) MRCB 9.00am
4 Shema 790 Meeting Pavilion 2.00pm
5 Wendy Kok 720 CC Meeting / Site Meeting Setia Alam 10.20am 3.00pm
6 Wendy Kok / Cheng / Sum 763 Site Meeting Ekocheras 3.00pm
7 Oscar 747 CPC Inspection 2GL Icon City 3.00pm
8
9
10
Thursday 8/4/2016
1 Oscar Saw 747-P4 Site Meeting Icon City 9.30am
2 Oscar Saw 747 TCM Icon City 3.00pm
3 Sharipah 700-05 Meeting Dkiara Place 8.30am
4 T C Chan 779 Tender Interveiw Pavilion 2.00pm
5
6
7
8
9
10
Friday 8/5/2016
1 Oscar Saw 747-P4 VO Meeting Icon City 9.30am 12.30pm
2 T C Chan / Huda 779 Tender Interview Pavilion 2.00pm 7.00pm
3
4
5
6
7
8
9
10
Monday 8/8/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok / Lee Kian Woei 747-P3 VO Meeting with contracors, consultants and clients Mahsing 9.00am
4 Wendy Kok 720 VO Meeting with Mr. Chua Mentari 3.30pm 6.00pm
5 'Afifah 778 Site Valuation Package 4 Mutiara Rini 9.30am
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 8/9/2016
1 Leong Kar Heng 747 2 grid line meeting Mahsing 9.00am 12.00pm
2 Amir 764 TCM RSP Architect 2.00pm
3
4
5
6
7
8
9
10
Wednesday 8/10/2016
1 Hazirah 771/SUB TCM Phase 1C Site Office PJ sentral 9.00am
2 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
3 Mrs Ooi / Aaron 625 FA presentation to Iskandar Waterfront Tropez sales office 8.30am
4 Lee Kian Woei 747-P6&7 Site walk & site meeting Icon City 9.00am
5 Wendy Kok 712 Sub-structure VO meeting with client Amphil 9.30am 12.00pm
6 Ziela 650 Discussion & collect cheque PNB Seriemas 2.00pm
7
8
9
10
Thursday 8/11/2016
1 Lee Kian Woei 747-P3 Residual Site walk & site meeting Icon City 10.30am
2 Huda / T C Chan 779 CCM Pavilion 10.00am 12.00pm
3
4
5
6
7
8
9
10
Friday 8/12/2016
1 Oscar Saw 747-P4 Show unit CPC inspection Icon City 9.00am 10.50am
2 TC Chan / Wendy Kok 763 CC Meeting Eco-Cheras 2.00pm
3 Madi 771/SUB Discussion MRCB 2.30pm
4 Cheng / Sum 763 To submit Tender Documents and discuss Tendering Sschedule Eco-Cheras 4.30pm
5 with Ekovest
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 8/15/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CCM & Site Meeting Package 4 Mutiara Rini 2.00pm
4
5
6
7
8
9
10
Tuesday 8/16/2016
1 Sharipah/Amir 764 CCM MRCB 2.00pm
2 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
3 Madi 771/T3 CCM Site Office PJ sentral 4.00pm
4 Wendy Kok 791 Site Meeting & Site valuation Jelutong 9.30am 12.00pm
5 Nurul Huda 779 Tender briefing Pavilion 2.30pm 6.30pm
6
7
8
9
10
Wednesday 8/17/2016
1 Madi 771/SUB CCM Phase 1C (Basement) MRCB 9.30am
2 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
3 Leong Kar Heng 747/P5 Site walk + Site meeting Site, Icon City 9.30am
4 Wendy Kok 712 Rimbun CUI meeting with BSD Ampang 9.30am
5 Wendy Kok / Cheng / Sum 763 Site Meeting Ekocheras 3.00pm
6 T C Chan 779 Tender briefing Pavilion 8.30am 12.30pm
7
8
9
10
Thursday 8/18/2016
1 'Afifah SKYWALK Meeting Menara Bousted 2.00pm
2 Oscar Saw 747-P4 Site Meeting Icon City 9.30am
3 Oscar Saw 747 TCM Icon City 3.00pm
4 Cheng / Sum 763 To liaise with Ekovest site staff on the demarcation of works for Ekocheras 2.30pm
5 the different contractors and to meet Shum to re-demarcate
6 the scope of works
7 Wendy Kok 763 To present financial statement to Shum Ekocheras 3.30pm
8 Shema 779 Tender opening Pavilion 3.00pm
9
10
Friday 8/19/2016
1 Madi 771/T3 Tender Interview Faade MRCB 8.45am
2 Sharipah 778 Discussion Menara Bousted 9.00am
3 Hazirah 771 Discussion (Tower 6) Achisphere Puchong 9.30am
YONG DAN MOHAMAD FAIZ SDN BHD
4
5
6
7
8
9
10
Monday 8/22/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CCM & Site Meeting Package 4 Mutiara Rini 2.00pm
4 Wendy Kok / Leong Kar Heng 747-P5 VO Meeting with contractor, consultants and clients Icon City 9.30am 12.30pm
5 Oscar Saw 747-P4 Show unit CPC inspection Icon City 11.30pm 2.45pm
6 Lee Kian Woei Car broke down. 8.30am 10.15pm
7
8
9
10
Tuesday 8/23/2016
1 Wendy Kok 791 VO Meeting with Architect and Engineer Studio Bikin 9.30am 1.00pm
2 Hana 792 Elmina Green QS Coordination Meeting Sime Darby 9.30am
3 Sharipah/Amir 764 Meeting MRCB 9.00am
4 Madi 768 Final Account Mtg Sime Darby 3.00pm
4 Oscar 747-P4 Site verification for work done for lift door and fire rated door Icon City 11.30am 12.45pm
5 Leong Kar Heng 747-P5,P6,P7 Site valuation Icon City 2.30pm
7
8
9
10
Wednesday 8/24/2016
1 Hazirah 771/SUB TCM Phase 1C Site Office PJ Sentral 9.00am
2 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
3 Badrul QSIC Sunway Putra Hotel 8.30am
4 Sharipah Workshop VW Balakong 9.00am
5 Lee Kian Woei 747-P6&7 Site walk & site meeting Icon City 9.00am
7 Oscar 747-P4 VO Meeting with contractor, consultants and client Icon City 3.00pm
8
9
10
Thursday 8/25/2016
1 Badrul / Zulkifili 775 Taklimat Pengurusan Kontrak PAAB PAAB 9.00am 5.30pm
2 Aaron Hospital check up
5 Lee Kian Woei 747-P3-Residual Site walk for CCC Icon City 9.00am
4 Wendy Kok 720-0-lot VO Meeting with Mentari Mentari 3.00pm
5 Leong Kar Heng 747 Site valuation extension diaphragm wall Icon City 3.00pm 4.00pm
6
7
8
YONG DAN MOHAMAD FAIZ SDN BHD
9
10
Friday 8/26/2016
1 TC Chan / Wendy Kok 763 CC Meeting Eco-Cheras 2.00pm
2 Hana 792 Discussion Sime Darby Convention Centre 3.30pm
3 Ho jia Yuen 779 Site Valuation Damansara Town Centre 3.30pm
4 Oscar Saw 747 Site Valuation for Icon City Package 4 Icon City 3.00pm
5
6
7
8
9
10
Monday 8/29/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CCM & Site Meeting Package 4 Mutiara Rini 2.00pm
4 Leong Kar Heng 747 Verification of work done by sculpture fro recommendation of payments Icon City 9.30am 10.30am
5
6
7
8
9
10
Tuesday 8/30/2016
1 Sharipah/Amir 764 CCM MRCB 10.00am
2 Madi 771/SUB Site Meeting Site Office PJ sentral 2.00pm
3 Madi 771/T3 CCM Site Office PJ sentral 4.00pm
4 Wendy Kok 791 Jelutong site meeting Jelutong 9.00am
5 Wendy Kok 720/39 0-lots VO Meeting with Mr Chua Mentari 11.30am
6 Lee Kian Woei 747-P3(Residual) VO Meeting with client, consultants and contractor Mahsing 2.00pm
7 Sum 763 To deliver 12 sets of Tender Documents for MRT to Ekovest Ekocheras 8.30am
8 Saisa 773 Site Valuation 4D6A Bandar Kinrara 8.30am
9 Madi 771/T3/Faade Tender Opening MRCB 9.45am
10
Wednesday 8/31/2016
1
2
3
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
September
Thursday 9/1/2016
1 Wendy Kok 763 Site valuation and site meeting EkoCheras 8.30am 6.00pm
2 Sum Man Teng 763 Site valuation and site meeting EkoCheras 8.30am 6.00pm
3 Cheng Meljyn 763 Site valuation and site meeting EkoCheras 8.30am 6.00pm
4 Amir/Aishah 700 Site Valuation Mont Kiara 8.30am
5 Hana 720 Site valuation Setia Alam 2.45pm 5.30pm
6 T C Chan / Nurul Huda 779 Tender briefing Pavilion level 9 11.00am 2.30pm
7 Oscar Saw 747 Site Meeting Icon City 9.00am 2.30pm
8 Oscar Saw 747 TCM Icon City 4.00pm
Friday 9/2/2016
1 Madi 771/T3/SUB VO Discussion MRCB 8.30am
2 Wendy Kok 720 Site checking of tiles, rainwater plumbing, ceiling works, drainage works, Setia Alam 9.15am 2.15pm
3 site measurement of black galazy counter top
4 Shema 698 Tender opening Tropicana HQ 4.14pm
5
6
Saturday 9/3/2016
1
2
3
4
5
6
Sunday 9/4/2016
1
2
3
4
5
6
Monday 9/5/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Mrs Ooi Tropez - Set Off & Spare tiles mtg 8.30am
4 Zulkifili 723 Golf Villa - FA mtg Tropicana Tower Level 9 4.00pm
5
6
Tuesday 9/6/2016
1 Badrul / Zulkifili 775 CCM - Kahang PAAB 2.00pm
2 'Afifah 778 Site Valuation Package 4 Mutiara Rini 9.30am
3 Madi 771/SUB Discussion VO MRCB 4.15pm
4 Hazirah 771/SUB Site Valuation PJ Sentral Site 9.30am
5 Shema Meeting Pavillion Tower 2.00pm
6 Leong Kar Heng 747-P5 Discussion VO for Tower 1 Level 33 glass railing Mah Sing 9.30am 10.45am
Wednesday 9/7/2016
1 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 9/8/2016
1 Badrul / Saisa 773/MBW CCM - 4D6A Bandar Kinrara 8.30am
2 Lee Kian Woei 747-P3 RW Site Meeting Icon City 9.30am 12.45pm
3 Lee Kian Woei 747 TCM Icon City 3.30pm
4 Wendy Kok 720 To attend to infra works final accounts with PKNS together with PKNS< Shah Alam 10.30am
Mr Chua of Mentari (ad-hoc meeting and I was informed on 6/9/2016)
5 Wendy Kok / Sum 763 Briefing by Shum from Ekovest to update the cost plan Ekovest Cheras 2.30pm
6 Oscar Saw 770 Meeting Arch Struct Drainage Packages Vos Final Accs SMJK Chong Hwa 11.00pm
7 Shema Site Valuation DTC 10.00am
Friday 9/9/2016
1 Lee Kian Woei 747-P4 VO Meeting Mah Sing 11.00am
2 Oscar Saw / Wendy 747-P4 VO Meeting Mah Sing 11.00am
3 Shema Site mtg - Pavllion Pavillion 3.30pm
4 Lee Kian Woei 747-P7 Reno Site Walk and Discussion for PMU Renovation Icon City 9.00am
5 Leong Kar Heng 747-Pylon Collect tender document Mah Sing 4.45pm
6 TC Chan / Wendy Kok 763 CC Meeting Eco-Cheras 2.00pm
7 Madi 771/SUB Discussion VO MRCB 3.30pm
Saturday 9/10/2016
1
2
3
4
5
6
Sunday 9/11/2016
1
2
3
4
5
6
Tuesday 9/13/2016
1 Oscar Saw 747-P4 VRF Discussion SNL Office SS15 9.00am 11.00am
2
YONG DAN MOHAMAD FAIZ SDN BHD
3
4
5
6
Wednesday 9/14/2016
1 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 10.30am
2 Shema Site Valuation Upgrading Package Tropicana Avenue 2.00pm
3 Sum Man Teng 763 Site meeting EkoCheras 2.30pm
4 Cheng Meljyn 763 Site meeting EkoCheras 2.30pm
5 Lee Kian Woei 747-P6 & P7 Package 6 & Package 7 Site meeting Icon City 9.00am
6 Oscar Saw / Leong KH 747-P5 & P4 Package 4 & 5 Aluminium & Glazing VO Meeting Mah Sing 2.00pm 3.00pm
Thursday 9/15/2016
1 Mrs Ooi CPD talk - What does progressing with works regularly & deligently RICS - Armada Hotel 5.00pm
means & Professional Negligence
2 Shema 790 Tender Opening ID Works Pavillion Tower 12.00pm
3 Mrs Cheong Dental Appointment 2.00pm
4 Oscar Saw 747-P4 Package 4 Site Meeting Icon City 9.00am 2.00pm
5
6
Saturday 9/17/2016
1
2
3
4
5
6
Sunday 9/18/2016
1
2
3
4
5
6
Monday 9/19/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 CCM & Site Meeting Package 4 Mutiara Rini 2.00pm
4 Zulkifili / Hissam Site measurement Golf Villa 11.00am
5 Yati/Syawal/Hafiza/Yahaya 788 & 787 Deliver tender documents RSKU to Sime Darby Sime Darby 4.30pm
6
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 9/20/2016
1 Wendy Kok 791 Jelutong - Site Meeting and VO Meeting Jelutong 9.00am 2.00pm
2 Yati/Syawal/Hafiza 788 & 787 Change pages tender documents RSKU Sime Darby 2.30pm
3 Oscar Saw 747-P4 Package 4 Final Account Mah Sing 9.00am 11.00am
4
5
Wednesday 9/21/2016
1 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 10.00am 5.30pm
2 Leong Kar Heng 747-P5 Site Meeting Icon City 10.30am 2.00pm
3 Lee Kian Woei 747-P3 RW VO Meeting Mahsing 2.30pm
4 Leong Kar Heng 747-P5 VO Meeting Mahsing 3.30pm
5 Nurul Huda 779 Site Meeting Pavilion 3.00pm
6
Thursday 9/22/2016
1 'Afifah SKYWALK Meeting Menara Bousted 2.00pm
2 Badrul / Saisa 773/MBW CCM - 4D6A Bandar Kinrara 8.30am 12.30pm
3 Mrs. Ooi / Nurul Huda 779 CCM Pavilion level 9 8.30am 1.00pm
4 Nurul Huda 779 Discussion on Cost Plan 12.30pm
5 Mrs Ooi / Huda 779 Negotiation meeting - Substructure 5.00pm
6 Sharipah/Amir 764 CCM MRCB 10.00am
7 Lee Kian Woei 747-P3 RW Package 3 Residual Site Meeting Icon City 9.30am 12.00pm
8 Lee Kian Woei 747 TCM Icon City 3.30pm
Friday 9/23/2016
1 Madi 771/SUB Discussion & send contract document MRCB 3.00pm
2 Cheng Meljyn 763 CCM EkoCheras 2.30pm
3 Leong Kar Heng 747 Deliver Contract Document to Mah Sing Mah Sing 8.30am 10.00am
4 Lee Kian Woei / Leong Kar Heng 747 Package 5, 6, 7 Site Valuation Icon City 3.00pm
5
6
Saturday 9/24/2016
1
2
3
4
5
6
Sunday 9/25/2016
1
2
3
4
5
6
Monday 9/26/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Amir 764/SG ID VO Meeting 9 Seputeh 2.00pm
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 9/27/2016
1 Badrul Site Visit Potential New Project Penang 8.30am 5.30pm
2 Wendy Kok 791 Jelutong - Site Meeting and Site Valuation Jelutong 9.00am 1.00pm
3 Lee Kian Woei 747 - signage To discuss signage VO with client and contractor Icon City 10.40am 3.00pm
4 Mrs Ooi See Chinese doctor re cough 8.30am 2.30pm
5 Hana KL-720- 0-lots Site valuation for Progress Claim No. 13 Setia Alam 2.30pm
6 Madi 771/SUB Site Meeting Site Office PJ Sentral 2.00pm
7 Nurulhuda 779 Site valuation DTC 4.00pm
8 Ho Jia Yuen 779 Site valuation DTC 4.00pm
Wednesday 9/28/2016
1 Badrul / Zulkifili 775 CCM Kahang PAAB 8.30am 1.20pm
2 Badrul / Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
3 Lee Kian Woei 747-P6&7 Site walk & site meeting Icon City 9.00am
3 Leong Kar Heng 747 - P4 & P5 Bicycle rack tender interview Mahsing 2.30pm
4 Lee Kian Woei 747 Pylon tender interview Mahsing 2.30pm
5 Wendy Kok/ Cheng Meljyn 763 Site Meeting Ekocheras 2.30pm
6 Madi 771/T6 CCM Phase 1c MRCB 10.00am
7 Madi 771/T3 CCM Tower 3 MRCB 2.30pm
Thursday 9/29/2016
1 Lee Kian Woei 747-P4 Site walk & site meeting Icon City 9.00am
2 Wendy Kok / Leong Kar Heng 747 - Ext Meeting regarding Pintaras VO claimed Mahsing 3.30pm
3 T C Chan 714 Meeting in Hanoi Hanoi 9.15am depart
4 Mrs Cheong Doctor Cxheck up Hospital Pantai 8.30am
5
6
Friday 9/30/2016
1 Badrul / Hana 792 PDC Presentation Elmina Green Phase 1a Sime Darby 2.30pm
2 Wendy Kok / Sum / Nick 763 ID Meeting, Floor and Wall Tiles and Masonary Ekovest 9.30am 3.45pm
3 T C Chan 714 Meeting in Hanoi Hanoi 4.35pm touch down
4 Leong Kar Heng 747 - Ext Valuation for fabricated cage Icon City 9.30pm 10.30pm
5
6
October
Monday 10/1/2016
1 Wendy Kok 763 Meeting with Shum (Ekovest) for Revised Cost Plan 13, Budget & GBI Ekovest Cheras 10.00am 4.45pm
October
Monday 10/3/2016
1
2
3
YONG DAN MOHAMAD FAIZ SDN BHD
4
5
6
7
8
9
10
Tuesday 10/4/2016
1 Badrul/Zulkifili 775 Evaluation Criteria Standardisation Session PAAB 8.30am 5.30pm
2 'Afifah 778 CCM & Site Meeting Mutiara Rini 2.00pm
3
4
5
6
7
8
9
10
Wednesday 10/5/2016
1 Hazirah 771/SUB TCM Site Office PJ Sentral 10.00am
2 Badrul/Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
3 Mrs Ooi Dental Appointment 9.00am 11.00am
4 Cheng / Sum 763 Site valuation Ekocheras 9.00am 2.00pm
5 Leong Kar Heng 747 Site walk / site valuation Icon City 9.00am
6 Huda 779 Site meeting Pavilion Damansara Heights 3.30pm
7
8
9
10
Thursday 10/6/2016
1 Sharipah/Amir 764 CCM MRCB 10.00am
2 Badrul/Saisa 773 Site Meeting 4D6A MBW Bandar Kinrara 10.00am 12.30pm
3 Mrs Cheong Dental apt 8.30am
4 T C Chan / Huda 779 CCM Pavilion 10.00am
5 Wendy 763 GSC office Damansara Jaya 10.30am
6 Shema 790 site valuation Damansara Town Centre 3.00pm
7 Zulkifili 723 Final Account Meeting Tropicana 2.00pm
8 Madi 771/SUB Site Valuation PJ Sentral Site Office 2.30pm
9 'Afifah 778 Site Valuation Package 4 Mutiara Rini 3.00pm
10 Lee Kian Woei 747 TCM Icon City 4.00pm
Friday 10/7/2016
1 Saisa 773 Site Valuation 4D6A MBW Bandar Kinrara 2.30pm
2 Lee Kian Woei 747 Package 4 VO Meeting Mah Sing 9.00am
5 Lee Kian Woei 747 Package 7 PMU Renovation discussion Mah Sing 4.00pm
4
5
6
7
8
YONG DAN MOHAMAD FAIZ SDN BHD
9
10
Monday 10/10/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 Wendy Kok 747-P2 Meeting to resolve Bauer's final accounts Mahsing 4.00pm
4
5
6
7
8
9
10
Tuesday 10/11/2016
1 Madi 771/SUB Site Meeting Site Office PJ Sentral 2.00pm
2 Madi 771/T3 CCM Tower 3 MRCB 4.00pm
3 Wendy Kok 763 Eko-cheras - Meeting requested by Shum to go through the Tendering Ek0-cheras 9.00am 6.30pm
4 Schedule and to schedule out the balance tenders yet to call
5 Saisa 773/MBW Discussion with INP QS regarding payment Bandar Kinrara 2.30pm
6 Madi 768 Meeting Sime Darby 10.30am
7
8
9
10
Wednesday 10/12/2016
1 Madi 771/T6 CCM Tower 1C MRCB 10.00am
2 Wendy Kok 720 CC Meeting and Site Meeting for 0-lots bungalows Setia Alam 10.00am
3 T C Chan 763 Site Meeting Eko-cheras 2.30pm
4 Lee Kian Woei 747-P3 Residual Site Meeting Icon City 9.00am
5 Lee Kian Woei 747-P3 Residual VO Meeting Mahsing 3.00pm
6 Leong Kar Heng 747 - P5 VO Meeting Mahsing 4.00pm
7 Badrul/Hana 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
8 Shema 790 CCM Pavilion 2.00pm
9
10
Thursday 10/13/2016
1 Lee Kian Woei 747-P4 Site Meeting Icon City 10.00am
2 Kamsiah Dental appt Shah Alam 8.30am 10.00am
3 Norhayati 736 VO Discussion Ara Damansara 8.30am 3.00pm
4 Madi 768 VO Meeting SDPA 1.30pm
5
6
7
8
9
10
Friday 10/14/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 10/17/2016
1 Badrul ESH Standard BQ Discussion. Sime Darby 2.30pm
2 Sharipah 700-05 CCM Mont Kiara 8.30am
3 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
4 Huda / Ho jia Yuen 779 Tender Interview for Tower Crane 3.00pm 5.30pm
5
6
7
8
9
10
Tuesday 10/18/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 10/19/2016
1 Hazirah 771/SUB TCM Site Office PJ Sentral 10.00am
2 Badrul/Hana/Saisa 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
3 Madi 771/T3 Tender Interview MRCB 10.30am
4 Huda 779 Tender opening / site meeting Pavilion / DTC 3.00pm
5 Ho Jia Yuen 779 Site meeting DTC 4.00pm
6 Leong Kar Heng 747-P5 Site Meeting Icon City 9.30am 12.30pm
7
8
9
10
Thursday 10/20/2016
1 Sharipah/Amir 764 CCM MRCB 10.00am
2 Badrul/Saisa 773 Site Meeting 4D6A MBW Bandar Kinrara 10.00am
3 Wendy Kok (refer CPD Record) Technical Visit to Saint-Gobain (Malaysia) Sdn Bhd Saint-Gobain (M) Sdn Bhd 10.00am 1.30pm
4 Kamsiah See doctor - knee pain 8.30am 11.00am
5 T C Chan / Huda 779 CCM Pavilion 9.30am 12.30pm
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 10/21/2016
1 Mrs Cheong Dental appt 8.30am
2 Badrul 792 Foundation works review and discussion Sime Darby 8.30am
3 TC Chan 763 CC Meeting Eko Cheras 2.30pm
4 Madi 768 VO Meeting Sime Darby 9.30am
5
6
7
8
9
10
Monday 10/24/2016
1 Mrs Ooi / Aaron FA Mtg with Tropicana Danga Bay Sales Office TDBSB 8.00am
2 Lee Kian Woei 747/P6&7 Site valuation Icon City 8.30am
3 Leong Kar Heng 747/P5 Site valuation Icon City 8.30am
4 T C Chan / Shema 790 Tender interview for ID works Pavilion 2.00pm
5 Madi 771/TS CCM Tower 5 MRCB 2.00pm
6
7
8
9
10
Tuesday 10/25/2016
1 Madi 771/SUB Site Meeting Site Office PJ Sentral 2.00pm
2 Madi 771/T3 CCM Tower 3 MRCB 4.00pm
3 Wendy Kok 791 Site meeting / Site Valuation Jelutong 11.30am 2.30pm
4
5
6
7
8
9
10
Wednesday 10/26/2016
1 Madi 771/T6 CCM Tower 1C MRCB 10.00am
2 Badrul / Zulkifili 775 Kahang CCM PAAB 8.30am
3 Badrul / Saisa 792 CCM Elmina Green Phase 1a Sime Darby 2.00pm
4 T C Chan 763 Site meeting EkoCheras 2.30pm
5 Mrs Ooi Send car for service 8.30am 10.30am
6 Shema Sales Gallery mtg 2.30pm
7 Mrs Ooi Collect car from workshop Pavillion 2.30pm
8 Lee Kian Woei 747/P6&P7 Site meeting Icon City 9.30am 2.00pm
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 10/27/2016
1 Badrul / Marziah 773 Meeting regarding NSC - 4D6A Bandar Kinrara 8.30am
2 Mrs Ooi Workshop - consult on car suspension system - noise 8.30am 10.00am
3 Lee Kian Woei 747/P4 Site meeting Icon City 10.45am 2.00pm
4 Shema 698 Briefing on Business centre for Tropicana Avenue 3.30pm
5
6
7
8
9
10
Friday 10/28/2016
1 Wendy Kok 720 Site valuation No. 14 for 39 0-lots bungalow Setia Alam Setia Alam 9.00am
2 Shema 790 Tender opening Pavilion 4.00pm
3 Sharipah/Aishah Meeting ( Masjid Gemas) MRCB 2.30pm
4 'Afifah GEN/PH1G/HD Discussion Menara Boustead 2.30pm
5
6
7
8
9
10
Monday 10/31/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 'Afifah 778 Site Walk, CCM & Site Meeting Mutiara Rini 9.30am
4 Zulkilifi 723 Guard House kick off meeting Tropicana 2.30pm
5 'Afifah 778 Site Valuation Package 4 Mutiara Rini 3.00pm
6 Leong Kar Heng 747/P5 Site Measurement Icon City 10.30am 12.00pm
7 Yati 736 VO Discussion with Minco Ara Damansara 2.00pm
8
9
10
November
Tuesday 1st November 2016
1 Wendy Kok 712 Site valuation for Signage Claim No. 5 Rimbun 9.30am 10.30am
2 Wendy Kok 791 Site meeting and site valuation Jelutong 10.30am 12.30pm
3 Madi 771/T3 Discussion (tender for gondola) MRCB 11.05am
4 Huda 779 Tender Interview Pavilion
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
1 Ho Jia Yuen Programme for QS Registration UiTM Shah Alam 8.30am 5.30pm
2 Cheng Meljyn Programme for QS Registration UiTM Shah Alam 8.30am 5.30pm
3 Madi 771/T6 CCM Phase 1C MRCB 10.00am
4 Badrul 792 CCM Elmina Green Phase 1a Sime Darby 3.00pm
5 Marziah 773/MBW Site Valuation 3 Kinrara 9.30am
6 Marziah 773/MBW Contract Document Review Kinrara 2.00pm
7 Wendy Kok / Nick Pua 763 Witness testing of mock up windows Tan Central metal, Balakong 10.00am 1.00pm
8 Leong Kar Heng 747-P5 VO Meeting Mahsing 4.00pm 5.30pm
9 T C Chan 779 Tender briefing on instrumentation Pavilion 11.00am 1.30pm
10 T C Chan 763 Site meeting EkoCheras 2.00pm
3 Lee Kian Woei 747 Block wall site measurement Icon City 10.30am
4 Mrs Ooi 735 CMGD Mtg IOI Putrajaya 10.00am
5 Marziah 773 Technical/Consultant Coordination Meeting PDA Architects 2.30pm
December
Thursday 12/1/2016
1 Sharipah/Amir 764 CCM MRCB 10.00am
2 Badrul / Marziah 773 Site Meeting 4D6A MBW Kinrara 9.00am
3 Wendy Kok 763 Gypsum plasterboard ceiling briefing Ekovest site office 3.00pm
4 T C Chan 779 CCM Pavilion 9.00am 12.15pm
5 T C Chan 774 Meeting Mah Sing 3.20pm 6.30pm
6 'Afifah GEN/PH1G/HD Tender opening Menara Boustead 2.00pm
7
8
9
YONG DAN MOHAMAD FAIZ SDN BHD
10
Friday 12/2/2016
1 T C Chan 763 CCM EkoCheras 2.30pm
2 Madi 771/T5 CCM Tower 5 MRCB 2.00pm
3 'Afifah 778 Site Valuation Package 4 Mutiara Rini 3.30pm
4 Leong Kar Heng 747-P5 VO meeting for Aluminium NSC Mahsing 1.30pm 4.00pm
5
6
7
8
9
10
Saturday 12/3/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/4/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/5/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Sharipah/Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3 T C Chan 714 Meeting Hanoi
4 Madi/Hazirah 771/SUB Site Valuation for Substructure works Site Office PJ Sentral 2.00pm
5
6
7
8
9
10
Tuesday 12/6/2016
1 Madi 771/T3 Site walk/CCM Tower 3 Site Office PJ Sentral 9.00am
2 Madi 771/SUB Site Meeting Site Office PJ Sentral 2.30pm
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 12/7/2016
1 Madi 771/T6 CCM Phase 1C MRCB 10.00am
2 Badrul / Saisa 792 CCM Elmina Green Phase 1a Sime Darby 10.00am
3 Lee Kian Woei 747 P6 Site Meeting Icon City 9.00am
4 Shema 790 ccm Pavilion 2.00pm
5 T C Chan 763 Site meeting EkoCheras 2.00pm
6
7
8
9
10
Thursday 12/8/2016
1 Cheng/Sum/Nick 763 Site Valuation fro November work done Ekovest site office 9.00am
2 Madi 771/T3/faade Tender Opening (Faade) MRCB 11.15am
3
4
5
6
7
8
9
10
Friday 12/9/2016
1 Aaron Goh 735 Witness to site measurements IOI Mall 10.00am
2
3
4
5
6
7
8
9
10
Saturday 12/10/2016
1
2
3
4
5
6
7
YONG DAN MOHAMAD FAIZ SDN BHD
8
9
10
Sunday 12/11/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/12/2016
1 Replacement holiday for Sultan of Selangor Bday
2 Prophet Muhammad Bday
3
4
5
6
7
8
9
10
Tuesday 12/13/2016
1 Replacement for Prophet Muhammad Bday
2
3
4
5
6
7
8
9
10
Wednesday 12/14/2016
1 Hazirah 771/SUB TCM Site Office PJ Sentral 9.30am
2 Nurul Huda / Ho Jia Yuen 779 Site meeting and measurement DTC site 2.00pm
3 Wendy Kok 720 Setia Alam - CC Meeting & Site Meeting Mentari 10.30am 1.00pm
4
5
6
7
8
9
10
Thursday 12/15/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 12/16/2016
1 T C Chan 763 CCM EkoCheras 3.00pm
2 Wendy / Lee or leong Savana II - Kick off meeting Mah Sing 2.30pm
3
4
5
6
7
8
9
10
Saturday 12/17/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/19/2016
1 Sharipah 700-05 CCM Mont Kiara 8.30am
2 Amir 700-05 Site Meeting for sub-structure & Superstructure package Mont Kiara 2.00pm
3
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
6
7
8
9
10
Tuesday 12/20/2016
1 Madi 771/T3 Site walk/CCM Tower 3 Site Office PJ Sentral 9.00am
2 Madi 771/SUB Site Meeting Site Office PJ Sentral 2.30pm
3
4
5
6
7
8
9
10
Wednesday 12/21/2016
1 Madi 771/SUB CCM Phase 1C & Tower 6 MRCB 9.00am
2
3
4
5
6
7
8
9
10
Thursday 12/22/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/23/2016
1
2
3
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Saturday 12/24/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/26/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/27/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/28/2016
1 Hazirah 771/SUB TCM Site Office PJ Sentral 9.30am
2
3
YONG DAN MOHAMAD FAIZ SDN BHD
4
5
6
7
8
9
10
Thursday 12/29/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/30/2016
1
2
3
4
5
6
7
8
9
10
Saturday 12/31/2016
1
2
3
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
December
YONG DAN MOHAMAD FAIZ SDN BHD
JANUARY
Friday 1/1/2016
1
2
3
4
5
Monday 1/4/2016
1 Sharipah
2 Sharipah/Ramdani
3 Nurul Huda
4
5
Tuesday 1/5/2016
1 Amir
2 Badrul / Marziah
3 Madi
4 Madi
5 T C Chan
6 Leong Kar Heng
7
Wednesday 1/6/2016
1 T C Chan / Wee
2 Wee / Cheng
3 Wendy Kok
4 Lee Kian Woei
5
Thursday 1/7/2016
1 Ziela
2 Wendy Kok
3 Zulkifili
4 Oscar Saw
5 Oscar Saw
6 Hana
7 Mrs Ooi / Zul
8
9
10
Friday 1/8/2016
1 T C Chan / Saw
2 Ramdani/Amir
3 Amir
4 Hana
5 Mrs Ooi / Kamsiah / Aaron / Aisyah
6 Mrs Ooi / Kamsiah / Aaron / Aisyah
7
8
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 1/11/2016
1 Sharipah
2 Sharipah/Ramdani
3 Madi
4 Wendy & Leong Kar Heng
5 Mrs Ooi / Kamsiah / Aaron / Aisyah
6 'Afifah
7 Oscar Saw
8
9
10
Tuesday 1/12/2016
1 Amir
2 Mrs Ooi / Aaron
3 Leong Kar Heng
4 Huda / Bryan / Ian
5 Wee Yu Ni / Sum Man Teng
6 Wendy Kok
7 Wendy Kok
8 'Afifah
9 Madi
10
Wednesday 1/13/2016
1 Badrul / Marziah
2 Lee Kian Woei
3 Wendy Kok
4 'Afifah
5 Shema
6 Madi
7 Huda
8
9
10
Thursday 1/14/2016
1 Huda
2 Leong Kar Heng
3 Leong Kar Heng
4
5
Friday 1/15/2016
1 Wee
2 Madi
3
4
5
Monday 1/18/2016
1 Sharipah
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 1/19/2016
1 Sharipah/Amir
2 Wendy Kok
3 Mrs Ooi / Zul
4 Huda
6 Madi
5 Madi
7 Wendy Kok
8
9
10
Wednesday 1/20/2016
1 T C Chan / Wee
2 Lee Kian Woei
3 Badrul / Zulkifili
4 Badrul / Marziah
5 'Afifah
6 Leong Kar Heng
7 Wendy Kok
8 Wendy Kok
9
10
Thursday 1/21/2016
1 Oscar Saw
2 Oscar Saw
3 T C Chan / Shema
4 Ziela
5 Wendy Kok
6
Friday 1/22/2016
1 'Afifah
2
3
4
5
Monday 1/25/2016
1 Public holiday
2
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 1/26/2016
1 Sharipah
2 Amir
3 Wendy Kok
4 Lee Kian woei
5 Leong Kar Heng
6 Madi
7
8
Wednesday 1/27/2016
1 Sharipah
2 Marziah Scheduled all day
3 Wendy Kok
4 Wee Yu Ni / Cheng
5 Madi
6 Afifah
7 Leong Har Heng
8 Lee Kian woei
9
10
Thursday 1/28/2016
1 T C Chan / Huda
2 T C Chan / Shema
3 Ziela
4 Mrs Ooi / Kamsiah / Aaron
5 Lee Kian Woei
6 Leong Kar Heng
7
8 Leong Kar Heng
9 WendyKok
10 Lee Kian Woei
11 Madi
Friday 1/29/2016
1 TC Chan / Wee
2 Leong Kar Heng
3 Lee Kian Woei
4 Badrul / Marziah
5
February
Monday 2/1/2016
1 Badrul / Marziah
2
3
4
5
Tuesday 2/2/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 2/3/2016
1 Sharipah
2 Sharipah
3 'Afifah
4 Madi
5
Thursday 2/4/2016
1 Zulkifli Jamaris
2 Madi
3
Friday 2/5/2016
1 Oscar Saw
2 'Afifah
3 Hana
4
5
Monday 2/8/2016
1
2
3
4
5
Tuesday 2/9/2016
1
2
3
4
5
Wednesday 2/10/2016
1
2
3
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 2/12/2016
1
2
3
4
5
Monday 2/15/2016
1 Wendy Kok
2 Hana
3
4
5
Tuesday 2/16/2016
1 Sharipah/Amir
2 Mrs Ooi / Kurshi
3 Wendy Kok
4 Madi
5 Madi
6
Wednesday 2/17/2016
1 Wendy Kok
2 Leong Har Heng
3 Badrul
4 Marziah Short Notice given via phone at 11.30am.
5
6
Thursday 2/18/2016
1 Lee Kian Woei
2 Lee Kian Woei
3 T C Chan / Shema
4 Mrs Ooi / Kamsiah
5
Friday 2/19/2016
1 Wendy Kok /Hana
2
3 T C Chan / Wee Yu Ni
4 Mrs Ooi / Kamsiah
5 Lee Kian Woei
6 Wendy Kok
7 Kushi Will replace time at the later date. Replced on Monday 6.00pm - 9.30pm
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 2/22/2016
1 Sharipah/Amir
2 Sharipah
3 'Afifah
4 Badrul
5 Oscar Saw
6 Huda / Bryan
7 T C Chan / Wee / Oscar / Cheng / Sum
8 Kamsiah Will replace time at the later date
9
10
Tuesday 2/23/2016
1 Sharipah
2 Amir
3 Badrul
4 Madi
5 Mrs Ooi / Kurshi / Aaron
6 Huda
7
8
9
10
Wednesday 2/24/2016
1 'Afifah
2 Badrul / Zulkifili
3 'Afifah
4 Wee Yu Ni / T C Chan
5 Lee Kian Woei
6 Leong Kar Heng
7 Wendy Kok
8 Madi
9 Lee Kian Woei
10
Thursday 2/25/2016
1 T C Chan / Huda
2 T C Chan / Huda
3 Wendy Kok
4 Ziela
5 Oscar Saw
6 Bryan To replace time
7 T C Chan / Shema
8
9
10
11
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 2/29/2016
1 Sharipah
2 Sharipah/Amir
3 Mrs Ooi / Bryan
4 Leong Kar Heng
5 T C Chan / Huda
6 T C Chan / Wee Yu Ni
7 'Afifah
8
9
10
March
Tuesday 3/1/2016
1 Sharipah/Amir
2 Zulkifili
3 Marziah
4 Wendy Kok
5 Mrs Ooi / Kurshi / Aaron
6 Madi
7 Madi
8 'Afifah
9
10
Wednesday 3/2/2016
1 Marziah
2 T C Chan / Huda
3 Shema / Chong
4 Wendy Kok
5 Madi
6
Thursday 3/3/2016
1 Mrs Ooi / Zulkilifi
2 Lee Kian Woei
3 Hana
4 T C Chan
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 3/4/2016
1 Wee / Cheng / Sum
2 Wee / T C Chan
3 Madi
4 Nurulhana
5 Saw XL
6
Monday 3/7/2016
1 Sharipah
2 Sharipah/Amir
3 Wendy Kok / Oscar Saw
4 Leong Kar Heng
5 'Afifah
6
7
Tuesday 3/8/2016
1 Sharipah
2 Amir
3 Wee / Huda / Kamsiah / Bryan / Chong / Kurshi CPD - 2points
4 Wendy Kok
5
6 Madi
7 Ziela
8 'Afifah
9 Saw XL
10
Wednesday 3/9/2016
1 Wee / T C Chan
2 Lee Kian Woei
3 Wendy Kok
4 Mrs Ooi / Zul
5 Huda
6
Thursday 3/10/2016
1 T C Chan / Huda
2 Oscar Saw
3 Oscar Saw
4
5
Friday 3/11/2016
1 Wendy Kok
2 Badrul/Marziah
3 'Afifah
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 3/15/2016
1 Sharipah/Amir
2 Marziah
3 Madi
4 Madi
5 Wendy Kok
6 Leong Kar Heng
7 Lee Kian Woei
8
9
10
Wednesday 3/16/2016
1 Wendy Kok
2 Leong Kar Heng
3 'Afifah
4 Zul
5
Thursday 3/17/2016
1 T C Chan
2 Wendy Kok
3 Leong Kar Heng
4 Lee Kian Woei
5 Lee Kian Woei
6 Norhayati
7 Norhayati
8 Mrs Ooi / Bryan / Aaron
9
10
Friday 3/18/2016
1 T C Chan / Wee
2 Norhayati
3 Nurulhana
4 Huda
5 Saw XL
6 MK Wong/Nurulhana
7
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 3/21/2016
1 Sharipah
2 Sharipah/Amir
3 'Afifah
4 Wendy Kok / Oscar Saw
5 Madi
6 Marziah
7
8
9
10
Tuesday 3/22/2016
1 Sharipah
2 Amir
3 Mrs Ooi / Bryan
4 Leong Kar Heng
5 Wendy Kok
6 Wendy Kok / Lee Kian Woei
7 Saw XL
8
9
10
Wednesday 3/23/2016
1 Wendy Kok
2 Leong Kar Heng
3 Lee Kian Woei
4 Oscar Saw
5
Thursday 3/24/2016
1 T C Chan / Huda
2 Badrul / Zulkifili
3 Mrs Ooi / Zulkilifli
4 Norhayati
5 Wendy Kok
6
7 Oscar Saw
8 'Afifah
9 Amir
10 Oscar Saw
Friday 3/25/2016
1 Lee Kian Woei
2 Lee Kian Woei
3 Leong Kar Heng
4 Oscar Saw
5
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 3/28/2016
1 Sharipah
2 Sharipah/Amir
3 Wendy Kok
4 Lee Kian Woei
5 Leong Kar Heng
6 Marziah
7 Mrs Cheong
8 Aaron Goh
9 'Afifah
10
Tuesday 3/29/2016
1 Sharipah/Amir
2 Wendy Kok
3 Wendy Kok
4 Leong Kar Heng
5 Madi
6 Madi
7 Yatie
8
9
10
Wednesday 3/30/2016
1 Wendy Kok
2 Wendy Kok
3 Leong Kar Heng
4 Kamsiah
5 Badrul/Marziah
6 Yatie
7 T C Chan / Wee Yu Ni
8 'Afifah
9 Oscar Saw
10
Thursday 3/31/2016
1 Kamsiah
2 Huda / Bryan Ng
3 Lee Kian Woei
4 Wendy Kok (to replace Hana on MC)
5 Kamsiah / Kurshi
6
April
Friday 4/1/2016
1 Wee / Cheng / Sum
2 Wee / T C Chan
3 Nurulhana
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 4/4/2016
1 Sharipah
2 Sharipah/Amir
3 Badrul / Zulkifili
4 Wendy / Oscar Saw
5
Tuesday 4/5/2016
1 Sharipah
2 Amir
3 Wendy Kok
4 Leong Kar Heng / Oscar Saw
5 Lee Kian Woei
6 Norhayati
7 Badrul/Marziah
8
9
10
Wednesday 4/6/2016
1 Wee Yu NI
2 T C Chan / Shema
3 Zul / Hafizah / Hissam
4 Amir
5 Madi
6 Norhayati
7 Leong Kar Heng
8 Lee Kian Woei
9 Huda / Bryan
10
Thursday 4/7/2016
1 T C Chan / Bryan
2 T C Chan / Bryan
3 Wee Yu Ni
4 Zulkifli
5 Oscar Saw
6 Oscar Saw
7 'Afifah
8
9
10
Friday 4/8/2016
1 Mrs Cheong
2 Badrul/Marziah
3 Wendy Kok
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 4/11/2016
1 Sharipah
2 Sharipah/Amir
3 Marziah
4 Badrul/Zulkifili
5 Mrs Ooi
6 T C Chan / Bryan
7 Madi
8 'Afifah
9
10
Tuesday 4/12/2016
1 Sharipah/Amir Cancelled
2 Marziah
3 Leong Kar Heng
4 Oscar Saw
5 Wendy Kok
6 Wendy Kok
7 Lee Kian Woei
8 Badrul/Ziela
9 Madi
10 Madi
11 Amir
12 Leong Kar Heng
Wednesday 4/13/2016
1 'Afifah
2 Leong Kar Heng
3 Wendy Kok
4 T C Chan / Huda
5 Norhayati
6 Ziela
7
8
9
10
Thursday 4/14/2016
1 Wendy Kok
2 Lee Kian Woei
3 Lee Kian Woei
4 T C Chan/ Shema
5 Nurulhana
6 Mrs Ooi/ Bryan
7 Badrul
8 Huda
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 4/15/2016
1 T C Chan / Wee Yu NI
2 Mrs Ooi / Bryan
3 Nurulhana
4 Zulkifili
5
Monday 4/18/2016
1 Sharipah
2 Sharipah/Amir
3 Lee Kian Woei
4 Leong Kar Heng
5 Shema
6 Madi
7
8
9
10
Tuesday 4/19/2016
1 Sharipah
2 Amir
3 Wendy Kok
4 Badrul / Marziah
5 Leong Kar Heng
6 Marziah
7 Norhayati
8
9
10
Wednesday 4/20/2016
1 Bryan
2 Lee Kian Woei
3 Lee Kian Woei
4 Leong Kar Heng
5 Wendy Kok / Nurulhana
6
7
8 Norhayati
9 Marziah
10 Madi
Thursday 4/21/2016
1 Bryan
2 Oscar Saw
3
4 Nurulhana
5
6 Wendy Kok
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 4/22/2016
1 Mrs Ooi / Bryan / Aaron
2 Wendy Kok
Monday 4/25/2016
1 Amir
2 Amir
3 'Afifah
4 Wendy
6 Oscar Saw
7 Lee Kian Woei
8 Mrs Ooi
9
10
Tuesday 4/26/2016
1 Amir
2 Madi
3 Madi
4 Wendy Kok
5 Norhayati
6 Ziela
7 Leong Kar Heng
8 Wendy Kok
9
10
Wednesday 4/27/2016
1 Badrul/Zulkifili
2 Leong Kar Heng
3 Wendy Kok
4 Mrs Ooi
5
Thursday 4/28/2016
1 Chan TC / Mrs Ooi / Wee Yu Ni / Bryan Ng
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 4/29/2016
1 Norhayati
2 Oscar Saw
3
4
5
May
Monday 5/2/2016
1
2
3
4
5
Tuesday 5/3/2016
1 Mrs Ooi / Huda
2 Norhayati
3 Mrs Ooi
4 Badrul
5 Oscar Saw
6 Madi
7
8
9
10
Wednesday 5/4/2016
1 Norhayati
2 Mrs Ooi / Bryan / Aaron
3 TC Chan
4 Madi
5 Amir
6 Lee Kian Woei
7 T C Chan
8 Wee / Cheng / Sum
9 Huda
10
Thursday 5/5/2016
1 T C Chan / Huda
2 Oscar Saw
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 5/6/2016
1 T C Chan / Huda
2 Wendy Kok
3
4
5
Monday 5/9/2016
1 'Afifah
2 Sharipah
3 Sharipah/Amir
4 Lee Kian Woei
5
6 Lee Kian Woei
7
8
9
10
Tuesday 5/10/2016
1 Norhayati
2 Marziah
3 Madi
4 Madi
5 Sharipah/Amir
6 Wendy Kok
7 Wendy Kok
8
9
10
Wednesday 5/11/2016
1 Leong Kar Heng
2 Wendy Kok
2 Wendy Kok / Leong Kar Heng
3 Mrs Ooi
4 Norhayati
5
6 Hana
7 Afifah
8 Madi
9
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 5/12/2016
1 Madi
2 Mrs Cheong
3 Norhayati
4 Lee Kian Woei
5 Lee Kian Woei
6 Wendy Kok
7 Kurshi To make up another day
8 T C Chan / Huda
9
10
Friday 5/13/2016
1 Lee Kian Woei
2 Nurulhana
3 T C Chan / Wee
4 Kamsiah Time slip submitted
5 Marziah/Badrul
6 Badrul
7 Bryan / Huda / Aaron/ LeeKW/Leong / Mrs Ooi
8 Oscar Saw
9
10
Monday 5/16/2016
1 Sharipah
2 Sharipah/Amir
3 Madi
4 Marziah
5
Tuesday 5/17/2016
1 Sharipah
2 Mrs Ooi
3 Badrul/Marziah
4
5
Wednesday 5/18/2016
1 Madi/Hazirah
2 Marziah
3 Wendy Kok
4 Lee Kian Woei
5 Kurshi To make up time
6 Huda
7 T C Chan / Wee
8
9
10
Thursday 5/19/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 5/20/2016
1 Wendy Kok
2 Chan TC
3 Badrul
4 Leong Kar Heng
5
6
Monday 5/23/2016
1 'Afifah
2 Sharipah
3 Sharipah/Amir
4 Lee Kian Woei
5 Leong Kar Heng
6 Norhayati
7 Madi
8 Nurulhana
9
10
Tuesday 5/24/2016
1 Marziah
2 Sharipah/Amir
3 Sharipah
5 Wendy Kok
6 Aaron Make up time later
7 Huda
8 Huda
9 Nurulhana To submit time slip
10 Wee Yu Ni
11 Oscar Saw
12 Madi
13 Madi
Wednesday 5/25/2016
1 Wendy Kok
2 Leong Kar Heng
3 Oscar Saw
4 Wendy Kok
5 Nurulhana (postpone to 26/5/2016)
6
7
8
9
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 5/26/2016
1 Lee Kian Woei
2 Nurulhana
3 Madi
5 Ziela
6 Marziah
7 Oscar Saw
8
9
10
Friday 5/27/2016
1 Badrul / Marziah
2 Mrs Ooi / Kurshi / Aaron
3 Wendy Kok
4 Lee Kian Woei
5 Nurulhana
6 Wendy Kok / Lee Kian Woei
7 Huda / Ho JY
8
9
10
Monday 5/30/2016
1 'Afifah
2 Sharipah
3 Sharipah/Amir
4 Badrul/Zulkifili
5 Zulkifili / Marziah
6 Badrul
7
8
9
10
Tuesday 5/31/2016
1 Amir
2 Sharipah
3 Wendy Kok
4 Leong
5 Wee Yu Ni To make up time later. OT 31 May 2016. KL763
6
7
8
9
10
June
Wednesday 6/1/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 6/2/2016
1 Badrul / Marziah
3 Oscar Saw
4 Oscar Saw
5
6
7
8
9
10
Friday 6/3/2016
1 Wendy Kok
3 Oscar Saw
4 Nurulhana
5 Leong Kar Heng
6 Ziela Time slip submitted & uploaded
7 Shema
8
9
10
Monday 6/6/2016
1 Wendy Kok & Lee Kian Woei
2 Madi
3 'Afifah
4 Amir
5
6
7
8
9
10
Tuesday 6/7/2016
1 Madi
2 Madi
3 Wendy Kok
4 Wee Yu Ni To make up time. 07 June OT 6.00pm - 9.00pm
5 Marziah
6 Norhayati
7 Amir
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 6/8/2016
1 Wendy Kok
2 Leong Kar Heng
3 Badrul / Hana
4 Leong Kar Heng
5 Ho Jia Yuen
6
7
8
9
10
Thursday 6/9/2016
1 Mrs Ooi
2 Lee Kian Woei
3
4
5
6
7
8
9
10
Friday 6/10/2016
1 Oscar Saw
2 T C Chan
3 T C Chan / Wee Yu Ni
4 Wendy Kok / Leong Kar Heng
5 Madi/Hazirah
6
7
8
9
10
Monday 6/13/2016
1 Sharipah
2 Sharipah/Amir
3 Wendy Kok
4
5
6
7
8
9
10
Tuesday 6/14/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 6/15/2016
1 Madi/Hazirah
2 Badrul / Hana
3 T C Chan
3 Leong Kar Heng
5
6
7
8
9
10
Thursday 6/16/2016
1 Oscar Saw
2 Wendy Kok
3 Oscar Saw
4 T C Chan
5
6
7
8
9
10
Friday 6/17/2016
1 'Afifah
2 Mrs Ooi
3 Wendy Kok
4 Hana
5
6
7
8
9
Monday 6/20/2016
1 'Afifah
2 Sharipah
3 Sharipah/Amir
4 Marziah
5 Marziah
6
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 6/21/2016
1 Sharipah/Amir
2 Madi
3 Madi
4 Wendy Kok
5 Lee Kian Woei
6 Leong Kar Heng
7
8
9
10
Wednesday 6/22/2016
1 Badrul / Hana
2
3
4
5
6
7
8
9
10
Thursday 6/23/2016
1 Lee Kian Woei
2 Wendy Kok
3 Amir
4
5
6
7
8
9
10
Friday 6/24/2016
1 Badrul / Marziah
2 Madi
3 Leong Kar Heng
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 6/28/2016
1 Sharipah
2 Wendy Kok
3 Lee Kian Woei
4
5
6
7
8
9
10
Wednesday 6/29/2016
1 Badrul / Hana
2 T C Chan
3 Wee Yu Ni
4 Leong Kar Heng
5 Wendy Kok
6 Huda
7 Madi
8 Shamirul
9
10
Thursday 6/30/2016
1 T C Chan
2 Huda
3 Oscar Saw
4 Leong Kar Heng
5 Lee Kian Woei
6 Marziah
7
8
9
10
July
Friday 7/1/2016
1 T C Chan
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 7/4/2016
1 T C Chan
2 T C Chan
3
4
5
6
7
8
9
10
Tuesday 7/5/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 7/6/2016
1
2
3
4
5
6
7
8
9
10
Thursday 7/7/2016
1
2
3
4
5
6
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 7/8/2016
1
2
3
4
5
6
7
8
9
10
Monday 7/11/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 7/12/2016
1 Badrul / Marziah
3 Wendy Kok
4 Mrs Ooi
5 Kamsiah
6 Madi
7 Madi
8 Madi
9
10
Wednesday 7/13/2016
1 Marziah
2 Marziah
3 Badrul / Zulkifili
4 Lee Kian Woei
5 Wendy Kok
6 Huda
7 Mrs Ooi / Bryan / Aaron
8
9
10
Thursday 7/14/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 7/15/2016
1 Badrul / Yatie (all day event)
2 Nurulhana
3
4
5
6
7
8
9
10
Monday 7/18/2016
1 'Afifah
2 Sharipah
3 Amir
4 T C Chan
5 Wendy Kok / Leong Kar Heng
6 Wendy Kok / Lee/Leong/Osar
7 Marziah/Ziela
8 Badrul
9 Madi
10
Tuesday 7/19/2016
1 Madi
2 Madi
3 Sharipah/Amir
4 T C Chan
5 Wendy Kok
6 Lee Kian Woei
7
8
9
10
Wednesday 7/20/2016
1 Huda
2 T C Chan / Yu NI
3 Badrul / Zulkifili
4 Badrul / Hana
5 Leong Kar Heng
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 7/21/2016
1 Huda / T C Chan
2 Oscar Saw
3
4 Mrs Cheong / Jennifer
5
6
7
8
9
10
Friday 7/22/2016
1 Lee Kian Woei
2 Leong Kar Heng
3 Nurulhana
4 Oscar Saw
5 Madi
6 Afifah
7
8
9
10
Monday 7/25/2016
1 Sharipah
2 Amir
3 Wendy Kok / Lee Kian Woei
4 Yatie/Marziah/Ziela
5
6
7
8
9
10
Tuesday 7/26/2016
1 Sharipah
2 Wendy Kok
3 Leong Kar Heng
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 7/27/2016
1 Lee Kian Woei
2 Wee Yu NI / Wendy Kok
3 Badrul / Hana
4
5
6
7
8
9
10
Thursday 7/28/2016
1 Lee Kian Woei
2 Lee Kian Woei
3 Marziah / Ziela
4 Marziah / Ziela
5 Oscar / Wendy Kok
6 Madi
7 Sharipah/'Afifah
8
9
10
Friday 7/29/2016
1 Madi/Hazirah
2 Badrul / Marziah / Ziela
3 TC Chan / Wendy Kok
4
5
6
7
8
9
10
August
Monday 8/1/2016
1 Sharipah
2 Sharipah/Amir
3 Wendy Kok / Leong Kar Heng
4 'Afifah
5 Huda
6
7
8
9
10
Tuesday 8/2/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 8/3/2016
1 Badrul / Hana
2 Leong Kar Heng
3 Madi
4 Shema
5 Wendy Kok
6 Wendy Kok / Cheng / Sum
7 Oscar
8
9
10
Thursday 8/4/2016
1 Oscar Saw
2 Oscar Saw
3 Sharipah
4 T C Chan
5
6
7
8
9
10
Friday 8/5/2016
1 Oscar Saw
2 T C Chan / Huda
3
4
5
6
7
8
9
10
Monday 8/8/2016
1 Sharipah
2 Amir
3 Wendy Kok / Lee Kian Woei
4 Wendy Kok
5 'Afifah
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 8/9/2016
1 Leong Kar Heng
2 Amir
3
4
5
6
7
8
9
10
Wednesday 8/10/2016
1 Hazirah
2 Badrul / Hana
3 Mrs Ooi / Aaron
4 Lee Kian Woei
5 Wendy Kok
6 Ziela
7
8
9
10
Thursday 8/11/2016
1 Lee Kian Woei
2 Huda / T C Chan
3
4
5
6
7
8
9
10
Friday 8/12/2016
1 Oscar Saw
2 TC Chan / Wendy Kok
3 Madi
4 Cheng / Sum
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 8/15/2016
1 Sharipah
2 Sharipah/Amir
3 'Afifah
4
5
6
7
8
9
10
Tuesday 8/16/2016
1 Sharipah/Amir
2 Madi
3 Madi
4 Wendy Kok
5 Nurul Huda
6
7
8
9
10
Wednesday 8/17/2016
1 Madi
2 Badrul / Hana
3 Leong Kar Heng
4 Wendy Kok
5 Wendy Kok / Cheng / Sum
6 T C Chan
7
8
9
10
Thursday 8/18/2016
1 'Afifah
2 Oscar Saw
3 Oscar Saw
4 Cheng / Sum
5
6
7 Wendy Kok
8 Shema
9
10
Friday 8/19/2016
1 Madi
2 Sharipah
3 Hazirah
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 8/22/2016
1 Sharipah
2 Sharipah/Amir
3 'Afifah
4 Wendy Kok / Leong Kar Heng
5 Oscar Saw
6 Lee Kian Woei To replace with overtime
7
8
9
10
Tuesday 8/23/2016
1 Wendy Kok
2 Hana
3 Sharipah/Amir
4 Madi
4 Oscar
5 Leong Kar Heng
7
8
9
10
Wednesday 8/24/2016
1 Hazirah
2 Badrul / Hana
3 Badrul
4 Sharipah
5 Lee Kian Woei
7 Oscar
8
9
10
Thursday 8/25/2016
1 Badrul / Zulkifili
2 Aaron Dengue
5 Lee Kian Woei
4 Wendy Kok
5 Leong Kar Heng
6
7
8
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 8/26/2016
1 TC Chan / Wendy Kok
2 Hana
3 Ho jia Yuen
4 Oscar Saw
5
6
7
8
9
10
Monday 8/29/2016
1 Sharipah
2 Sharipah/Amir
3 'Afifah
4 Leong Kar Heng
5
6
7
8
9
10
Tuesday 8/30/2016
1 Sharipah/Amir
2 Madi
3 Madi
4 Wendy Kok
5 Wendy Kok
6 Lee Kian Woei
7 Sum
8 Saisa
9 Madi
10
Wednesday 8/31/2016
1
2
3
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 9/2/2016
1 Madi
2 Wendy Kok
3
4 Shema
5
6
Saturday 9/3/2016
1
2
3
4
5
6
Sunday 9/4/2016
1
2
3
4
5
6
Monday 9/5/2016
1 Sharipah
2 Sharipah/Amir
3 Mrs Ooi
4 Zulkifili
5
6
Tuesday 9/6/2016
1 Badrul / Zulkifili
2 'Afifah
3 Madi
4 Hazirah
5 Shema
6 Leong Kar Heng
Wednesday 9/7/2016
1 Badrul / Hana
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 9/8/2016
1 Badrul / Saisa
2 Lee Kian Woei
3 Lee Kian Woei
4 Wendy Kok
Friday 9/9/2016
1 Lee Kian Woei
2 Oscar Saw / Wendy
3 Shema
4 Lee Kian Woei
5 Leong Kar Heng
6 TC Chan / Wendy Kok
7 Madi
Saturday 9/10/2016
1
2
3
4
5
6
Sunday 9/11/2016
1
2
3
4
5
6
Tuesday 9/13/2016
1 Oscar Saw
2
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 9/14/2016
1 Badrul / Hana
2 Shema
3 Sum Man Teng
4 Cheng Meljyn
5 Lee Kian Woei
6 Oscar Saw / Leong KH
Thursday 9/15/2016
1 Mrs Ooi
2 Shema
3 Mrs Cheong
4 Oscar Saw
5
6
Saturday 9/17/2016
1
2
3
4
5
6
Sunday 9/18/2016
1
2
3
4
5
6
Monday 9/19/2016
1 Sharipah
2 Sharipah/Amir
3 'Afifah
4 Zulkifili / Hissam
5 Yati/Syawal/Hafiza/Yahaya
6
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 9/20/2016
1 Wendy Kok
2 Yati/Syawal/Hafiza
3 Oscar Saw
4
5
Wednesday 9/21/2016
1 Badrul / Hana Presentation finished at 5.00pm
2 Leong Kar Heng
3 Lee Kian Woei
4 Leong Kar Heng
5 Nurul Huda
6
Thursday 9/22/2016
1 'Afifah
2 Badrul / Saisa
3 Mrs. Ooi / Nurul Huda
4 Nurul Huda
5 Mrs Ooi / Huda
6 Sharipah/Amir
7 Lee Kian Woei
8 Lee Kian Woei
Friday 9/23/2016
1 Madi
2 Cheng Meljyn
3 Leong Kar Heng
4 Lee Kian Woei / Leong Kar Heng
5
6
Saturday 9/24/2016
1
2
3
4
5
6
Sunday 9/25/2016
1
2
3
4
5
6
Monday 9/26/2016
1 Sharipah
2 Amir
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 9/27/2016
1 Badrul
2 Wendy Kok
3 Lee Kian Woei
4 Mrs Ooi
5 Hana
6 Madi
7 Nurulhuda
8 Ho Jia Yuen
Wednesday 9/28/2016
1 Badrul / Zulkifili
2 Badrul / Hana
3 Lee Kian Woei
3 Leong Kar Heng
4 Lee Kian Woei
5 Wendy Kok/ Cheng Meljyn
6 Madi
7 Madi
Thursday 9/29/2016
1 Lee Kian Woei
2 Wendy Kok / Leong Kar Heng
3 T C Chan
4 Mrs Cheong
5
6
Friday 9/30/2016
1 Badrul / Hana
2 Wendy Kok / Sum / Nick
3 T C Chan
4 Leong Kar Heng
5
6
October
Monday 10/1/2016
1 Wendy Kok
October
Monday 10/3/2016
1
2
3
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 10/4/2016
1 Badrul/Zulkifili
2 'Afifah
3
4
5
6
7
8
9
10
Wednesday 10/5/2016
1 Hazirah
2 Badrul/Hana
3 Mrs Ooi
4 Cheng / Sum
5 Leong Kar Heng
6 Huda
7
8
9
10
Thursday 10/6/2016
1 Sharipah/Amir
2 Badrul/Saisa
3 Mrs Cheong
4 T C Chan / Huda
5 Wendy
6 Shema
7 Zulkifili
8 Madi
9 'Afifah
10 Lee Kian Woei
Friday 10/7/2016
1 Saisa
2 Lee Kian Woei
5 Lee Kian Woei
4
5
6
7
8
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 10/10/2016
1 Sharipah
2 Sharipah
3 Wendy Kok
4
5
6
7
8
9
10
Tuesday 10/11/2016
1 Madi
2 Madi
3 Wendy Kok
4
5 Saisa
6 Madi
7
8
9
10
Wednesday 10/12/2016
1 Madi
2 Wendy Kok
3 T C Chan
4 Lee Kian Woei
5 Lee Kian Woei
6 Leong Kar Heng
7 Badrul/Hana
8 Shema
9
10
Thursday 10/13/2016
1 Lee Kian Woei
2 Kamsiah
3 Norhayati
4 Madi
5
6
7
8
9
10
Friday 10/14/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Monday 10/17/2016
1 Badrul
2 Sharipah
3 Sharipah/Amir
4 Huda / Ho jia Yuen
5
6
7
8
9
10
Tuesday 10/18/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 10/19/2016
1 Hazirah
2 Badrul/Hana/Saisa
3 Madi
4 Huda
5 Ho Jia Yuen
6 Leong Kar Heng
7
8
9
10
Thursday 10/20/2016
1 Sharipah/Amir
2 Badrul/Saisa
3 Wendy Kok (refer CPD Record)
4 Kamsiah
5 T C Chan / Huda
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 10/21/2016
1 Mrs Cheong
2 Badrul
3 TC Chan
4 Madi
5
6
7
8
9
10
Monday 10/24/2016
1 Mrs Ooi / Aaron
2 Lee Kian Woei
3 Leong Kar Heng
4 T C Chan / Shema
5 Madi
6
7
8
9
10
Tuesday 10/25/2016
1 Madi
2 Madi
3 Wendy Kok
4
5
6
7
8
9
10
Wednesday 10/26/2016
1 Madi
2 Badrul / Zulkifili
3 Badrul / Saisa
4 T C Chan
5 Mrs Ooi
6 Shema
7 Mrs Ooi
8 Lee Kian Woei
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 10/27/2016
1 Badrul / Marziah
2 Mrs Ooi
3 Lee Kian Woei
4 Shema
5
6
7
8
9
10
Friday 10/28/2016
1 Wendy Kok
2 Shema
3 Sharipah/Aishah
4 'Afifah
5
6
7
8
9
10
Monday 10/31/2016
1 Sharipah
2 Sharipah/Amir
3 'Afifah
4 Zulkilifi
5 'Afifah
6 Leong Kar Heng
7 Yati
8
9
10
November
Tuesday 1st November 2016
1 Wendy Kok
2 Wendy Kok
3 Madi
4 Huda
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
December
Thursday 12/1/2016
1 Sharipah/Amir
2 Badrul / Marziah
3 Wendy Kok
4 T C Chan
5 T C Chan
6 'Afifah
7
8
9
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 12/2/2016
1 T C Chan
2 Madi
3 'Afifah
4 Leong Kar Heng
5
6
7
8
9
10
Saturday 12/3/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/4/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/5/2016
1 Sharipah
2 Sharipah/Amir
3 T C Chan
4 Madi/Hazirah
5
6
7
8
9
10
Tuesday 12/6/2016
1 Madi
2 Madi
YONG DAN MOHAMAD FAIZ SDN BHD
Wednesday 12/7/2016
1 Madi
2 Badrul / Saisa
3 Lee Kian Woei
4 Shema
5 T C Chan
6
7
8
9
10
Thursday 12/8/2016
1 Cheng/Sum/Nick
2 Madi
3
4
5
6
7
8
9
10
Friday 12/9/2016
1 Aaron Goh
2
3
4
5
6
7
8
9
10
Saturday 12/10/2016
1
2
3
4
5
6
7
YONG DAN MOHAMAD FAIZ SDN BHD
Sunday 12/11/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/12/2016
1 Replacement holiday for Sultan of Selangor Bday
2 Prophet Muhammad Bday
3
4
5
6
7
8
9
10
Tuesday 12/13/2016
1 Replacement for Prophet Muhammad Bday
2
3
4
5
6
7
8
9
10
Wednesday 12/14/2016
1 Hazirah
2 Nurul Huda / Ho Jia Yuen
3 Wendy Kok
4
5
6
7
8
9
10
Thursday 12/15/2016
YONG DAN MOHAMAD FAIZ SDN BHD
Friday 12/16/2016
1 T C Chan
2 Wendy / Lee or leong
3
4
5
6
7
8
9
10
Saturday 12/17/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/18/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/19/2016
1 Sharipah
2 Amir
3
4
5
YONG DAN MOHAMAD FAIZ SDN BHD
Tuesday 12/20/2016
1 Madi
2 Madi
3
4
5
6
7
8
9
10
Wednesday 12/21/2016
1 Madi
2
3
4
5
6
7
8
9
10
Thursday 12/22/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/23/2016
1
2
3
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
Saturday 12/24/2016
1
2
3
4
5
6
7
8
9
10
Sunday 12/25/2016
1
2
3
4
5
6
7
8
9
10
Monday 12/26/2016
1
2
3
4
5
6
7
8
9
10
Tuesday 12/27/2016
1
2
3
4
5
6
7
8
9
10
Wednesday 12/28/2016
1 Hazirah
2
3
YONG DAN MOHAMAD FAIZ SDN BHD
Thursday 12/29/2016
1
2
3
4
5
6
7
8
9
10
Friday 12/30/2016
1
2
3
4
5
6
7
8
9
10
Saturday 12/31/2016
1
2
3
4
5
6
7
8
9
10
YONG DAN MOHAMAD FAIZ SDN BHD
December
YONG DAN MOHAMAD FAIZ SDN BHD
JANUARY
February
March
April
Friday 1 April, 2016
1 Aaron
2 Mrs Ooi
3 Mrs Cheong
4 Jennifer
5
6
7
8
9
10
May
Monday 2 May, 2016
1
2
3
4
5
6
7
8
9
10
June
Wednesday 1 June, 2016
1 TC Chan (23/5 - 6/6/2016-9 days) 4/13/2016
2 Kurshi (30/5 to 3/6-5 days) 5/19/2016
3 Nor Hafizah (30/5 to 1/6-3 days) 5/20/2016
4 Ema (30/5 to 1/6-3 days) 5/23/2016
5 Sharipah
6 Syawal 1/6/2016
7
8
9
10
July
Friday 1 July, 2016
1 Mrs Ooi 6/29/2016
2 Marziah (1/2 day afternoon) 27/06/2016
3 Kamsiah
4
5
6
7
8
9
August
Monday 1 August, 2016
1 Hazirah 7/22/2016
2
3
September
Thursday 1 September, 2016
1 Ziela (19/8 to 7/10-32 days) 7/19/2016
2 Mrs Cheong
3
4
October
Monday 3 October, 2016
1 Awal Muharram
2
3
4
5
6
7
8
9
10
November
Tuesday 1 November, 2016
1 Jennifer 29-Sep-16
2 Ziela
3 Nick Pua 10/17/2016
4
5
6
7
8
December
Thursday 1 December, 2016
1 Mrs Ooi 9/29/2016
2 Wendy Kok (leave cancelled and to 11/25/2016
be re-arrange)
3 Nick Pua
4
5
6
7
8
9
10
Friday 2 December, 2016
1 Mrs Ooi 9/29/2016
2 Nick Pua
3
4
5
6
7
8
9
JANUARY
February
March
April
Friday 1 April, 2016
1 Aaron Form submitted & uploaded
2 Mrs Ooi Form submitted & uploaded - leave postponed to Monday 04 April 2016
3 Mrs Cheong MC submitted & uploaded
4 Jennifer Form submitted & uploaded
5
6
7
8
9
10
6
7
8
9
10
8
9
10
3
4
5
6
7
8
9
10
10
5
6
7
8
9
10
May
Monday 2 May, 2016
1
2
3
4
5
6
7
8
9
10
9
10
4
5
6
7
8
9
10
6
7
8
9
10
8
9
10
10
June
Wednesday 1 June, 2016
1 TC Chan (23/5 - 6/6/2016-9 days) Form submitted & sent to Jennifer
2 Kurshi (30/5 to 3/6-5 days) Form submitted & uploaded
3 Nor Hafizah (30/5 to 1/6-3 days) Form submitted & uploaded
4 Ema (30/5 to 1/6-3 days) Form submitted & uploaded
5 Sharipah Form submitted & uploaded
6 Syawal By sms. Form to be submitted & uploaded
7
8
9
10
6
7
8
9
10
1 Lee Kian Woei (13/6 to 20/6 - 6 days) Form submitted & uploaded
2 Nadirah Form to be submitted & uploaded
3 Ziela (Half day afternoon) Form submitted & uploaded
4
5
6
7
8
9
10
8
9
10
10
5
6
7
8
9
10
July
Friday 1 July, 2016
1 Mrs Ooi Form submitted & uploaded
2 Marziah (1/2 day afternoon) Form submitted & uploaded
3 Kamsiah Form submitted & uploaded
4
5
6
7
8
9
10
5
6
7
8
9
10
7
8
9
10
9
10
4
5
6
7
8
9
10
August
Monday 1 August, 2016
1 Hazirah Form submitted & uploaded
2
3
4
5
6
7
8
9
10
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
8
9
10
3
4
5
6
7
8
9
10
10
September
Thursday 1 September, 2016
1 Ziela (19/8 to 7/10-32 days) Form submitted & uploaded. Leave for performing hajj
2 Mrs Cheong Replace Tuesday working day
3
4
5
6
7
8
9
10
7
8
9
10
6
7
8
9
10
1 Ziela (19/8 to 7/10-32 days) Form submitted & uploaded. Leave for performing hajj
2 'Afifah Form submitted & uploaded.
3 Rohana To submit form.
4 Zainon Form submitted & uploaded.
5 Zalila (26-30/9/2016: 5 Days) Form submitted to jennifer Daughter accident
6
7
8
9
10
8
9
10
October
Monday 3 October, 2016
1 Awal Muharram
2
3
4
5
6
7
8
9
10
8
9
10
10
5
6
7
8
9
10
10
5
6
7
8
9
10
November
Tuesday 1 November, 2016
1 Jennifer Form submitted & uploaded
2 Ziela Form to be submitted & uploaded. By whatsapp.
3 Nick Pua Form submitted & uploaded
4
5
6
7
8
9
10
6
7
8
9
10
1 Mrs Ooi By sms. Form submitted - Accompany Simon to see doctor - sprain leg
2
3
4
5
6
7
8
9
10
8
9
10
3
4
5
6
7
8
9
10
10
5
6
7
8
9
10
December
Thursday 1 December, 2016
1 Mrs Ooi Form submitted & uploaded
2 Wendy Kok (leave cancelled and to Form submitted & uploaded
be re-arrange)
3 Nick Pua Informed via Cheng/Sum. MC to be submitted.
4
5
6
7
8
9
10
Friday 2 December, 2016
1 Mrs Ooi Form submitted & uploaded
2 Nick Pua Informed via Cheng/Sum. MC to be submitted.
3
4
5
6
7
8
9
10
5
6
7
8
9
10
7
8
9
10
2
3
4
5
6
7
8
9
10
9
10
4
5
6
7
8
9
10
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
6
7
8
9
10
Note:- When opening the excel sheet, if a text box File in Use pop up, this mean other senior is
currently using the excel sheet. Do not open the file, wait for few minutes until other senior save and
closed the file.
2.Please note that this excel sheet is protected, you will be required to unlock the excel sheet first
before any amendment to the sheet.
3.To unlock the excel spread sheet for update, go to command bar <Review> <Unprotect Sheet>.
Unprotect Sheet box will pop up requesting for password. Type in password to unlock the spreadsheet
(only team leader/senior know the password, do not disclose password to others)
4.To lock the excel sheet after any amendment to the sheet, go to command bar <Review> <Protect
Sheet>. Protect Sheet box will pop up requesting for password. Type in password and select ok, retype
password for confirmation, select ok then save.
NOTE:
In case where update to Attendance Tracking is necessary while the document is still in use by others,
you may select either of the option Read Only / Notify.
**Notify A duplicated (read only) worksheet opened in your desktop + receive notification
when the document is no longer in use.
Currently using by
However, please note that any amendment(s) made to the duplicated worksheet and saved will be a copy
to the original Attendance Tracking (do not ever replace the original Attendance Tracking worksheet,
otherwise other seniors update will be lost).
The Senior who created the copy of Attendance Tracking will be required to transfer the
amendments back to the original Attendance Tracking worksheet, and delete the
duplicate copy.
YONG DAN MOHAMAD FAIZ SDN BHD
CPD RECORD
4
4
6
2
8
8
10
6
4
6
4
4
18
4
4
4
4
YONG DAN MOHAMAD FAIZ SDN BHD
NAME OF QS
MONTH Thursday, December 01, 2016
1 SUM