Title : FGD Absorber Date : 28/12/06 Page : 1

ITEM DESCRIPTION UNIT LENGTH WIDTH DEPTH MULTIPLY SUB-TOTAL TOTAL


(m) (m) (m) NO. OF QTY. QUANTITY

A. EXCAVATION

FL 0.00 (GL)

2160mm 1800mm 8000mm


FL -1.700 (OGL)

B Water Basin
0 to 1500mm B 864mm 300mm
A A
FL -3.500
FGD Absorber
1500mm to
3000mm FL -4.200

3000mm to 28450mm
4500mm
FL -6.140

Excavation area
SECTION 1-1

1. From 0.00 to 1.50m

Excavation for A m3 28.45 13.80 1.50 1 588.92


m3 9.50 5.25 1.50 1 74.81
Excavation for B m3 82.91 1.51 1.50 1 188.04
Ddt. Water basin for A m3 8.00 13.80 1.50 -1 (165.60)
m3 8.00 5.25 1.50 -1 (63.00)
Ddt. Water basin for B m3 38.65 1.05 1.50 -1 (60.87)
Total quantity for excavation from 0.00 to 1.50m : 562.29

2. From 1.50 to 3.00m

Excavation for A m3 28.45 13.80 1.00 1 392.61


m3 9.50 5.25 1.00 1 49.88
Excavation for B m3 80.32 0.43 1.00 1 34.70
Ddt. Water basin for A m3 8.00 13.80 0.30 -1 (33.12)
m3 8.00 5.25 0.30 -1 (12.60)
Ddt. Water basin for B m3 36.85 0.15 0.30 -1 (1.66)
Total quantity for excavation from 0.00 to 1.50m : 429.80
PEMBINAAN JBBS SDN. BHD.

JIMAH 2 X 700MW COAL FIRED THERMAL POWER PLANT PROJECT - (CIVIL AND BUILDING WORKS)

Title : FGD Absorber Date : 28/12/06 Page : 2

ITEM DESCRIPTION UNIT LENGTH WIDTH DEPTH MULTIPLY SUB-TOTAL TOTAL


(m) (m) (m) NO. OF QTY. QUANTITY

A. 75mm thick Lean Concrete grade 15 OPC as


shown on drawing. m3 14.34 13.80 0.08 1 14.84
m3 8.00 5.00 0.08 1 3.00 17.84

B. Ground Slab

Concrete m3 14.34 13.80 0.50 1 98.95


m3 8.00 5.00 0.50 1 20.00 118.95

Formwork m2 26.61 0.50 1 13.31


m2 13.80 0.50 1 6.90
m2 22.61 0.50 1 11.31
m2 5.00 0.50 1 2.50
m2 10.32 0.50 1 5.16 39.17
PEMBINAAN JBBS SDN. BHD.

JIMAH 2 X 700MW COAL FIRED THERMAL POWER PLANT PROJECT - (CIVIL AND BUILDING WORKS)

Title : FGD Absorber Date : 28/12/06 Page : 3

Location Bar Bar Spacing No. of No. in Length Bar a b c d Bend Concrete TOTAL HIGH TENSILE BAR MILD STEEL BAR
Reference Mark Size Member each (m) Shape (m) (m) (m) (m) (m) Cover LENGTH T10 T12 T16 T20 T25 T32 R6 R8 R10
Member

Reinforcement

Ground Slab
- - - - - - - - - - -
Section A - A
T T16 1 147 19.68 a b c 0.50 18.98 0.50 0.30 2,892.96 - - 2,892.96 - - - - - -
- - - - - - - - - - -
50D
Laps T16 2 147 0.80 0.80 235.20 - - 235.20 - - - - - -
a
- - - - - - - - - - -
B T16 1 147 19.68 a b c 0.50 18.98 0.50 0.30 2,892.96 - - 2,892.96 - - - - - -
- - - - - - - - - - -
50D
Laps T16 2 147 0.80 0.80 235.20 - - 235.20 - - - - - -
a
- - - - - - - - - - -
Section B - B - - - - - - - - - - -
T T16 1 100 11.61 a b c 0.50 10.91 0.50 0.30 1,161.00 - - 1,161.00 - - - - - -
- - - - - - - - - - -
B T16 1 100 11.61 a b c 0.50 10.91 0.50 0.30 1,161.00 - - 1,161.00 - - - - - -
- - - - - - - - - - -
Section E - E - - - - - - - - - - -
T T32 1 106 15.26 a b c 0.50 14.56 0.50 0.30 1,617.56 - - - - - 1,617.56 - - -
- - - - - - - - - - -
50D
Laps T32 2 106 1.60 1.60 339.20 - - - - - 339.20 - - -
a
- - - - - - - - - - -
B T32 1 106 15.26 a b c 0.50 14.56 0.50 0.30 1,617.56 - - - - - 1,617.56 - - -
- - - - - - - - - - -
50D
Laps T32 2 106 1.60 1.60 339.20 - - - - - 339.20 - - -
a
- - - - - - - - - - -
Section D - D - - - - - - - - - - -
T T32 1 55 20.81 a b c 0.50 20.11 0.50 0.30 1,144.55 - - - - - 1,144.55 - - -
- - - - - - - - - - -
50D
Laps T32 2 55 1.60 1.60 176.00 - - - - - 176.00 - - -
a
- - - - - - - - - - -
B T32 1 55 20.81 a b c 0.50 20.11 0.50 0.30 1,144.55 - - - - - 1,144.55 - - -
- - - - - - - - - - -
50D
Laps T32 2 55 1.60 1.60 176.00 - - - - - 176.00 - - -
a
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
TOTAL LENGTH /M - - 8,578.32 - - 6,554.62 - - -
KG PER M 0.616 0.888 1.579 2.466 3.854 6.313 0.222 0.395 0.616
- - 13,545.17 - - 41,379.32 - - -
TOTAL KG CARRIED FORWARD : - 54,924.48 -

PEMBINAAN JBBS SDN. BHD.

JIMAH 2 X 700MW COAL FIRED THERMAL POWER PLANT PROJECT - (CIVIL AND BUILDING WORKS)

Title : FGD Absorber Date : 28/12/06 Page : 4

Location Bar Bar Spacing No. of No. in Length Bar a b c d Bend Concrete TOTAL HIGH TENSILE BAR MILD STEEL BAR
Reference Mark Size Member each (m) Shape (m) (m) (m) (m) (m) Cover LENGTH T10 T12 T16 T20 T25 T32 R6 R8 R10
Member

Reinforcement

Ground Slab (Cont'd)


- - - - - - - - - - -
Section D - D
T T32 1 64 10.76 a b c 0.50 10.06 0.50 0.30 688.64 - - - - - - - - -
- - - - - - - - - - -
50D
Laps T32 2 64 1.60 1.60 204.80 - - - - - 204.80 - - -
a
- - - - - - - - - - -
B T32 1 64 10.76 a b c 0.50 10.06 0.50 0.30 688.64 - - - - - 688.64 - - -
- - - - - - - - - - -
50D
Laps T32 2 64 1.60 1.60 204.80 - - - - - 204.80 - - -
a
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
TOTAL LENGTH /M - - - - - 1,098.24 - - -
KG PER M 0.616 0.888 1.579 2.466 3.854 6.313 0.222 0.395 0.616
- - - - - 6,933.19 - - -
TOTAL KG BACK FORWARD : - 54,924.48