You are on page 1of 11

QA/QC DOCUMENT LOG REGISTER

INDEX
SL
DOCUMENT DESCRIPTION DOCUMENT NUMBER REV STATUS REMARKS
No.

1 PROCEDURE FOR RADIOGRAPHY APPROVED/


ONSHORE/ RT/ PR-01 1
TESTING OF PIPING WELD JOINTS QA QC-OCLLC-0231 dtd. 26.11.2016

PROCEDURE FOR RADIOGRAPHY APPROVED/


ONSHORE/RT/PR-01 2
TESTING OF PIPING WELD JOINTS QA QC-OCLLC-0280 dtd. 10.04.2017

PROCEDURE FOR WELD NUMBERING APPROVED/


2 ONSHORE/WN/PR/02 0 QA QC-OCLLC-018 dtd.25.06.2015

PROCEDURE FOR MANUAL ULTRASONIC APPROVED/


3 TESTING OF WELD JOINTS ONSHORE/UT/PR-03 0 QA QC-OCLLC-036 dtd.31.08.2015

4 PROCEDURE FOR PHASED ARRAY APPROVED/


ONSHORE/UT/PR-03-A 3
ULTRASONIC TESTING OF WELD JOINTS QA QC-OCLLC-0158 dtd.03.06.2015

5 PROCEDURE FOR PHASED ARRAY APPROVED/


ONSHORE/PAUT/PR-03-A 5
ULTRASONIC TESTING OF WELD JOINTS QA QC-OCLLC-0258 dtd. 08.03.2017

PROCEDURE FOR LIQUID PENETRANT APPROVED/


6 TESTING ONSHORE/ LPT/ PR-04 0 dtd.15.08.2015

PROCEDURE FOR MAGNETIC PARTICLE APPROVED/


7 TESTING ONSHORE/ MPT/ PR-05 0 dtd.15.08.2015

8 PROCEDURE FOR HEAT TREATMENT APPROVED/


ONSHORE/HT-CS/ PR-06 0
CARBON STEEL PIPING WELD JOINTS dtd.15.08.2015

PROCEDURE FOR SELECTION & APPROVED/


9 HANDLING OF WELDING CONSUMABLE ONSHORE/SHWC/PR-07 1 dtd.09.12.2016

PROCEDURE FOR REWIED WITH NO COMMENT/


WELDER QUALIFICATION,
10 PERFORMANCE MONITORING AND ONSHORE/WQPMC/PR-08 0 QA/QC-OCLLC-052,
20.10.2015
CONTROL

REVIEWED WITH NO COMMENT/


11 PROCEDURE TO REPAIR WELD JOINT ONSHORE/WJPUW/PR-09 1 QA/QC-OCLLC-054,
PERFORMED BY UNQUALIFIED WELDER 21.10.2015

PROCEDURE FOR REPAIRING BY REVIEWED WITH NO COMMENT/


12 WELDING OF DAMAGED BEVELS OF ONSHORE/RDBP/PR-010 0 QA/QC-OCLLC-054,
PIPES AND PIPING ELEMENTS 21.10.2015

PROCEDURE TO WELD RF PAD FALLING APPROVED/


13 ON WELD SEAM ONSHORE/RDBP/PR-011 0 QAQC-OCLLC-0076, 04.01.2016

REVIEWED WITH NO COMMENT/


PNEUMATIC TEST PROCEDURE FOR
14 REINFORCEMENT PAD ONSHORE/RDBP/PR-012 2 QA/QC-OCLLC-0143,
19.04.2016

15 PROCEDURE FOR POSITIVE MATERIAL APPROVED/


ONSHORE/PMI/PR-13 0
IDENTIFICATION QAQC-OCLLC-0101, 03.02.2016

APPROVED/
16 PROCEDURE FOR PWHT OF ALLOY STEEL ONSHORE/HT-AS/PR-14 0 QAQC-OCLLC-0134,23.03.2016

APPROVED/
17 PROCEDURE FOR HARDNESS TEST ONSHORE/HRD/PR-15 0 QAQC-OCLLC-0163,13.06.2016

PRE HEATING PROCEDURE FOR


18 AUTOMATIC WELDING ONSHORE/PHAW/PR-16 0 COMMENTED

APPROVED/
19 PROCEDURE FOR FERRITE TEST ONSHORE/FT/PR-17 2 QAQC-OCLLC-0222,07.11.2016
METHOD STATEMENT DOCUMENT LOG REGISTER
SL
NO DOCUMENT DESCRIPTION DOCUMENT NUMBER REV

METHOD STATEMENT FOR PIPING


1 PRE-FABRICATION ONSHORE/PIPING/PRE-FAB/MS-02 5
METHOD STATEMENT FOR EXTERNAL
COATING ON CARBON STEEL FOR
2 UNDER GROUND SERVICE ONSHORE/EC/MS-04 3

3 METHOD STATEMENT FOR PAINTING ONSHORE/PAINTING/MS-05 4


METHOD STATEMENT FOR HYDRO STATIC
4 TESTING ONSHORE/HST/MS-06 2

METHOD STATEMENT FOR UNDER GROUND


5 PIPING HYDROSTATIC TESTING ONSHORE/HST/MS-06A 3

METHOD STATEMENT FOR UNDER GROUND


6 PIPING LINES SYSTEM HYDRO STATIC PRESSURE TESTING ONSHORE/HST/MS-06A 4

METHOD STATEMENT FOR MITER BEND PRE-


7 FABRICATION ONSHORE/MBP/MS-19 2

METHOD STATEMENT FOR ASSEMBLY & ERECTION OF


8 STEEL STRUCTURE ONSHORE/AESS/MS-21 2

9 METHOD STATEMENT FOR PIPING ERECTION ONSHORE/PE/MS-24 1

METHOD STATEMENT FOR PIPING ERECTION ONSHORE/PE/MS-24 2

10 METHOD STATEMENT FOR STORAGE TANK LINING ONSHORE/STL/MS-27 1

11 METHOD STATEMENT FOR GOLDEN JOINT ONSHORE/GJ/MS-30 1

12 METHOD STATEMENT FOR PICKLING & PASSIVATION ONSHORE/PP/MS-39 3

13 METHOD STATEMENT FOR PICKLING & PASSIVATION ONSHORE/PP/MS-39 4

METHOD STATEMENT FOR PICKLING & PASSIVATION BY


14 TIG BRUSH TECHNIQUE ONSHORE/PP/MS-39A 1

15 METHOD STATEMENT FOR WELD JOINT REPAIR ONSHORE/WJR/MS-40 1

METHOD STATEMENT FOR PIPING MATERIAL


16 TRACEABILITY ONSHORE/PMT/MS-41 2

17 METHOD STATEMENT FOR UG PIPING LAYING ONSHORE/UGPL/MS-42 1

METHOD STATEMENT FOR PLUGGING INCORRECT HOLES


18 WITH WELDING FOR STRUCTURAL COMPONENTS ONSHORE/PHWS/MS-44 0
METHOD STATEMENT FOR COOLING TOWER PRE-
19 ASSEMBLY AND ERECTION ONSHORE/CTE/MS-46 1

METHOD STATEMENT FOR PRE-FABRICATION OF


20 STAINLESS STEEL PIPING ONSHORE/PFSS/MS-46 3

METHOD STATEMENT FOR PRE-FABRICATION OF ALLOY


21 STEEL PIPING ONSHORE/PFAS/MS-55 2

METHOD STATEMENT FOR WASTE HEAT BOILER PACKAGE


22 ERECTION ONSHORE/MS-062 4

METHOD STATEMENT FOR RECFIFICATION OF WELD


DEFECTS IN AUXILIARY BOILER FLUE GAS DUCT (13-B-01) ONSHORE/AB-FG/MS-71 1
23
METHOD STATEMENT FOR REFCTIFICATION OF WELD
24 DEFECTS IN EXHAUST STEAM EXPANSION JOINT ONSHORE/AB-FG/MS-72 0
METHOD STATEMENT FOR PRE ASSEMBLY AND
25 ERECTION OF STEEL STRUCTURES IN 32-BH-201 ONSHORE/AEBH/MS-73 4
METHOD STATEMENT FOR HYDROSTATIC PRESSURE
TESTING FOR FLARE STACK SERVICE PIPING (25-PK- ONSHORE/HST/MS-77 0
01/25-PK-02)
26

METHOD STATEMENT FOR ASSEMBLY OF WASTE HEAT


BOILER AND SECONDARY REFORMER WITH NOZZLE FIT ONSHORE/AWHBSR/MS-081 3
UP AND WELDING (TRAIN 1 & TRAIN 2)
27

METHOD STASTEMENT FOR REPAIRING ONSHORE/AB-STACK/MS-92 0


BY WELDING FOR DEFECT WELDS OF AUXILIARY
28 BOILERS STACKS 13-B-01, 13-B-02, 13-B-03

METHOD STATEMENT FOR REFRACTORY REPAIR IN ONSHORE/CM/MS-93 3


29 CONVECTION MODULE (11/21 -F-201)

METHOD STATEMENT FOR RECTIFICATION OF


ANCHOR BASE PLATE OF SCRAPER RECLAIMER ONSHORE/AB-STACK/MS-94 1
(BULK AREA) BY GRINDING & ZRE APPLICATION (32-
30 PK-02)
OG REGISTER

STATUS REMARKS

APPROVED/
QA QC-OCLLC-044 dtd. 17.09.2015

APPROVED/
QA QC-OCLLC-012 dtd. 08.06.2015
APPROVED/
QA QC-OCLLC-0190 dtd. 31.08.2016
APPROVED/
QA QC-OCLLC-0058 dtd. 30.10.2016

APPROVED/
QA QC-OCLLC-0075 dtd. 04.01.2016

APPROVED/
QA QC- dtd. 27.04.2017

APPROVED/
QA QC-OCLLC-0017 dtd. 22.06.2015

APPROVED/
QA QC-OCLLC-0112 dtd. 16.02.2016

APPROVED/
QA QC-OCLLC-0100 dtd. 03.02.2016

APPROVED/
QA QC-OCLLC-0294 dtd. 02.06.2017
APPROVED/
QA QC-OCLLC-0122 dtd. 25.02.2016

APPROVED/
QA QC-OCLLC-0024 dtd. 06.08.2015

APPROVED BY SAIPEM ON 19.09.2016


QA QC-OCLLC-0198

APPROVED/
QA QC-OCLLC-0302 dtd. 11.07.2017

APPROVED/
QA QC-OCLLC-0214 dtd. 24. 10.2016
APPROVED/
QA QC-OCLLC-011 dtd. 01. 06.2015

APPROVED/
QA QC-OCLLC-058 dtd. 30.10.2015
APPROVED/
QA QC-OCLLC-018 dtd. 25.06.2015

APPROVED/
QA QC-OCLLC- dtd. 13.03.2016
APPROVED/
QA QC-OCLLC-098 dtd. 03.02.2016
APPROVED/
QA QC-OCLLC- dtd. 28.06.2016

APPROVED/
QA QC-OCLLC- dtd. 12.12.2016

APPROVED BY CENTER STAGE


06-05-2017

APPROVED/
QA QC-OCLLC-0263 dtd. 21.03.2017

APPROVED/
QA QC-OCLLC-0265 dtd. 21.03.2017
APPROVED/
QA QC- dtd 26.08.2017

APPROVED/
QA QC-OCLLC- dtd. 04.04.2017

APPROVED BY CENTER STAGE

APPROVED/
QA QC dtd. 28.06.2017

APPROVED/
QA QC dtd. 26.08.2017

APPROVED/
QA QC-OCLLC-0507dtd. 01.08.2017
QA/QC DOCUMENT LOG REGISTER
INDEX

SL SUBMISSION
DOCUMENT DESCRIPTION DOCUMENT NUMBER REV.
No. DATE

1 QCP FOR STEEL STRUCTURE ONSHORE/QCP/SS/001 1 26.09.2014

2 QCP FOR LINING AND COATING ONSHORE/QCP/LC/002 7 12.09.2017

3 QCP FOR WELDING ONSHORE/QCP/WELDING/003 5 25.09.2015

4 QCP FOR PAINTING ONSHORE/QCP/PAINTING/004 6 03.05.2016

QCP FOR PIPING PREFABRICATION AND


5 ONSHORE/QCP/PFE/005 6 24.10.2016
ERECTION

QCP FOR PIPING PREFABRICATION AND


6 ERECTION ONSHORE/QCP/PFE/005 7 24.03.2017

QCP FOR PIPING PREFABRICATION AND


7 ONSHORE/QCP/PFE/005 8 27.03.2017
ERECTION

QCP FOR PIPING PREFABRICATION AND


8 ONSHORE/QCP/PFE/005 9 5/25/2017
ERECTION

9 QCP FOR INSULATION WORK ONSHORE/QCP/IW/006 2

10 QCP FOR PRESSURE VESSEL ONSHORE/QCP/PV/007 3 04.07.2016

11 QCP FOR HEAT EXCHANGER ONSHORE/QCP/HE/008 3 06.09.2016

QCP FOR STORAGE & LOW PRESSURE


12 ONSHORE/QCP/ST/009 2 26.07.2016
TANK

13 QCP FOR FIRE FIGHTING EQUIPMENT ONSHORE/QCP/FEI/010 1 9/26/2014

14 QCP FOR ELECTRICAL WORK ONSHORE/QCP/EW/011 3 6/15/2016


QCP FOR MATERIAL CATHODIC
15 ONSHORE/QCP/MCP/012 3 3/24/2016
PROTECTION

16 QCP FOR INSTRUMENTATION ONSHORE/QCP/INS/013 1 2/26/2015

17 QCP FOR AUTOMATION ONSHORE/QCP/AS/014 2 9/1/2016

18 QCP FOR TELECOMMUNICATION ONSHORE/QCPTELECOMM/015 1 2/20/2015

19 QCP FOR ROTARY MACHINARIES ONSHORE/QCP/RM/016 4 16.11.2016


QCP FOR HEATERS,FLARES &
20 ONSHORE/QCP/HFI/017 3 02.08.2017
INCENERATORS

21 QCP FOR ENERGY PACKAGES ONSHORE/QCP/EP/018 3 27.07.2017

22 QCP FOR AUXILIARY BOILER ONSHORE/QCP/EP/018A 3 23.08-2016

23 QCP FOR COOLING TOWERS ONSHORE/QCP/CT/019 4 29.07.2017

24 QCP FOR PACKAGE SYSTEM ONSHORE/QCP/PACKAGE/020 1 02.06.2016

25 QCP FOR PACKAGE SYSTEM ONSHORE/QCP/PS-020 2 21.04.2017

QCP FOR ELECTRICAL WORK OF CIVIL


26 ONSHORE/QCP/EWCP/021 1 24.04.2015
WORK BUILDING

27 PROJECT QUALITY MANUAL ONSHORE/PQM 2 5/18/2015

QCP FOR OTHER MACHINERIES


28 (BRIDGE CRANE AND HOIST AND ONSHORE/QCP/OM/022 1 11.03.2017
SUBMERSIBLE PUMP)
OG REGISTER

STATUS REMARKS

APPROVED
QAQC-OCLLC-0113 DATED 16-02-2016

APPROVED/
QA QC-OCLLC-0325 dtd.12.09.2017

APPROVED/
QA QC-OCLLC-047 dtd.26.09.2015

APPROVED/
QA QC-OCLLC-0147 dtd.05.06.2016

APPROVED/
QA QC-OCLLC-0217 dtd.26.10.2016

APPROVED/
QA QC-OCLLC-0272 dtd.25.03.2017

APPROVED/
QA QC-OCLLC-0275 dtd.29.03.2017

APPROVED/
QA QC-OCLLC-0290 dtd.26.05.2017

Rev-03 will be submitted after


incorporating the comments.
APPROVED/
QA QC-OCLLC-0175 dtd.21.07.2016

APPROVED/
QA QC-OCLLC-0196 dtd.07.09.2016

APPROVED/
QA QC-OCLLC-0179 dtd.30.07.2016
Approved by Saipem Milan on 13-10-2014 SPM-OC-INT-MNG-0091

Approved

Approved

Approval awaited from saipem E-mail


Transmittal Ref. No.
IFC Copy submitted to SPM site for final
approval Dt. 01.09.2016

Approved by Saipem Milan on 28.04.2015

APPROVED
(QA QC-OCLLC-0229 DATED 17-11-2016
APPROVED/
QA QC-OCLLC-0511 dtd 02.08.2017

APPROVED
QA QC-OCLLC-0508 dtd 01.08.2017

Awaiting for approval

APPROVED
QAQC-OCLLC-0509 DATED 02-08-2017

APPROVED
QA QC-OCLLC-161 dtd 11.06.2016

APPROVED
QA QC-OCLLC-0286 dtd 03.05.2017

Approved

IFC COPY APPROVED/


QA QC-OCLLC-010 dtd 01.06.2015

APPROVED
QA QC-OCLLC-0261 dtd 13.03.2017
QA/QC APPROVED WPS AND PQR LOG REGISTER

INDEX

SL
WPS NO. DOCUMENT NUMBER REV STATUS REMARKS
No.

PREQUALIFIED WELDING PROCEDURE ONSHORE/STRUCTURE/CS/ APPROVED/


1 SPECIFICATION PREQ WPS-01 0 QA QC-OCLLC-0321 dtd.30.08.2017

APPROVED/
2 ONSHORE/PIPING/CS/WPS-001+PQR ONSHORE/ 001 6 QA QC-OCLLC-041 dtd. 07.09.2015

APPROVED/
3 ONSHORE/PIPING/CS/WPS-01A+PQR-62 ONSHORE/WPS-01A 1 QA QC-OCLLC-0230 dtd. 23.11.2016

4 ONSHORE/PIPING/CS/WPS-002+PQR ONSHORE/002 5 APPROVED/


QA QC-OCLLC-041 dtd. 07.09.2015

APPROVED/
5 ONSHORE/PIPING/CS/WPS-03+PQR-3 ONSHORE/003 4 QA QC-OCLLC-0230 dtd. 23.11.2016

APPROVED/
6 WPS-ONSHORE/PIPING/AS/WPS-009 ONSHORE/AUTO/009 6 QA QC-OCLLC-0082 dtd. 12.01.2016

APPROVED/
7 WPS-ONSHORE/PIPING/AS/WPS-0010 ONSHORE/ AUTO/010 9 QA QC-OCLLC-0083 dtd. 12.01.2016

8 ONSHORE/PIPING/AS/WPS-011 ONSHORE/ 011 5 APPROVED/


dtd. 15.12.2015

ONSHORE/PIPING/WPS-012 APPROVED/
9 ONSHORE/PIPING/AS/PQR-012 Rev. 01 ONSHORE/WPS/PQR-012 5 QA QC-OCLLC-045 dtd. 25.09.2015

APPROVED/
10 ONSHORE/PIPING/SS/WPS-013+PQR ONSHORE/013 2 dtd. 18.07.2014

11 ONSHORE/PIPING/SS/WPS-014+PQR ONSHORE/014 2 APPROVED/


dtd. 18.07.2014

APPROVED/
12 ONSHORE/PIPING/SS/WPS-016+PQR ONSHORE/016 2 dtd. 18.07.2014

APPROVED/
13 ONSHORE/PIPING/SS/WPS-017+PQR ONSHORE/017 2 dtd. 09.10.2014

14 ONSHORE/PIPING/SS-WPS-018 & PQR-14 ONSHORE/018 0 APPROVED/


QA QC-OCLLC-0209 dtd. 18.10.2016

15 ONSHORE/PIPING/SS/WPS-019 ONSHORE/019 2 APPROVED/


QA QC-OCLLC-0269 dtd. 23.03.2017

APPROVED/
16 WPS-ONSHORE/PIPING/CS/WPS-024+PQR ONSHORE/AUTO/024 4 QA QC-OCLLC-0078 dtd. 07.01.2016

APPROVED/
17 WPS+PQR (ONSHORE/PIPING/LTCS/WPS-025) ONSHORE/WPS/PQR-025 2 QA QC-OCLLC-0153 dtd. 20.05.2016

18 ONSHORE/PIPING/LTCS/WPS-026+PQR ONSHORE/AUTO/026 2 APPROVED/


QA QC-OCLLC-0174 dtd. 18.07.2016

APPROVED/
19 ONSHORE/PIPING/LTC/WPS-027 & PQR ONSHORE/AUTO/027 3 QA QC-OCLLC-0170 dtd. 06.07.2016

APPROVED/
20 ONSHORE/PIPING/LTCS/WPS-028+PQR ONSHORE/AUTO/028 2 QA QC-OCLLC-0174 dtd. 18.07.2016

21 ONSHORE/PIPING/LTCS/WPS-029+PQR ONSHORE/AUTO/029 2 APPROVED/


QA QC-OCLLC-0177 dtd. 27.07.2016

APPROVED/
22 ONSHORE/PIPING/LTCS/WPS-030+PQR ONSHORE/AUTO/030 2 QA QC-OCLLC-0177 dtd. 27.07.2016

APPROVED/
23 ONSHORE/PIPING/AS/WPS-032+PQR ONSHORE/AUTO/032 6 QA QC-OCLLC-0202 dtd. 01.10.2016

APPROVED/
24 ONSHORE/PIPING/AS/WPS-033+PQR ONSHORE/AUTO/033 8 QA QC-OCLLC-0202 dtd. 01.10.2016

25 ONSHORE/PIPING/AS/WPS-33A ONSHORE/AUTO/33A 0 APPROVED/


QA QC-OCLLC-0170 dtd. 13.07.2016

APPROVED/
26 ONSHORE/PIPING/SS/WPS-036+PQR ONSHORE/AUTO/036 4 QA QC-OCLLC-0124 dtd. 27.02.2016

APPROVED/
27 ONSHORE/PIPING/SS/WPS-037+PQR-036 ONSHORE/WPS-037 2 QA QC-OCLLC-0157 dtd. 26.05.2016

28 ONSHORE/PIPING/SS/WPS-039 ONSHORE/039 2 APPROVED/


QA QC-OCLLC-0269 dtd. 23.03.2017
QA/QC APPROVED WPS AND PQR LOG REGISTER

INDEX
SL
WPS NO. DOCUMENT NUMBER REV STATUS REMARKS
No.

REVIEWED WITH COMMENT


1 ONSHORE/PIPING/SS/WPS-043 ONSHORE/ 43 1 dtd. 04.05.2017 WORK MAY PROCEED

2 ONSHORE/PIPING/SS/WPS-044 ONSHORE/044 1 REVIEWED WITH COMMENT WORK MAY PROCEED


dtd. 04.05.2017

3 ONSHORE/TANK/CS/WPS-045+PQR ONSHORE/ 45 3 APPROVED/


dtd. 30.09.2015

APPROVED/
4 ONSHORE/TANK/CS/WPS-047+PQR ONSHORE/047 3 dtd. 30.09.2015

APPROVED/
5 ONSHORE/TANK/CS/WPS-047+PQR ONSHORE/047 4 QA QC-OCLLC-0297 dtd. 12.06.2017

6 ONSHORE/TANK/CS/WPS-050+PQR ONSHORE/050 3 REVIEWED WITH NO COMMENT


QA QC-OCLLC-049 dtd. 03.10.2015

APPROVED/
7 ONSHORE/STRUCTURE/CS/WPS-053 ONSHORE/053 4 QA QC-OCLLC-0198 dtd.19.09.2016

APPROVED/
8 ONSHORE/PIPING/DS/WPS-055+PQR ONSHORE/055 2 QA QC-OCLLC-0183 dtd. 16.08.2016

APPROVED/
9 ONSHORE/PIPING/LTCS/WPS-060+PQR ONSHORE/ 005 5 QA QC-OCLLC-0175 dtd. 21.07.2016

10 ONSHORE/PIPING/LTCS/WPS-061+PQR ONSHORE/ 061 2 APPROVED/


QA QC-OCLLC-0173 dtd. 13.07.2016

ONSHORE/PIPING/LTCS/WPS-062+PQR APPROVED/
11 ONSHORE/062 1 QA QC-OCLLC-0177dtd. 27.07.2016

APPROVED/
12 ONSHORE/PIPING/LTCS/WPS+PQR-063 ONSHORE/063 0 QA QC-OCLLC-0216 dtd. 25.10.2016

13 ONSHORE/PIPING/LTCS/WPS-064+PQR ONSHORE/064 1 APPROVED/


QA QC-OCLLC-0187 dtd. 25.08.2016

APPROVED/
14 ONSHORE/PIPING/CS/WPS-073+PQR ONSHORE/073 1 QA QC-OCLLC-0079 dtd. 07.01.2016

REVIEWED WITH NO COMMENT


15 ONSHORE/PIPING/CS/WPS-074 ONSHORE/074 1 QA QC-OCLLC-0129 dtd. 07.03.2016

16 ONSHORE/PIPING/CS/WPS-075+PQR ONSHORE/075 1 APPROVED/


QA QC-OCLLC-0124 dtd. 27.02.2016

17 ONSHORE/PIPING SUPPORT/CS/WPS-076 ONSHORE/076 1 APPROVED/


QA QC-OCLLC-0198 dtd. 19.09.2016

APPROVED/
18 ONSHORE/PIPING/SS/WPS-077+PQR ONSHORE/AUTO/077 0 QA QC-OCLLC-0168 dtd. 02.07.2016

APPROVED/
19 ONSHORE/PIPING/SS/WPS-077 ONSHORE/077 1 QA QC-OCLLC-0234 dtd. 03.12.2016

20 ONSHORE/INCOLOY800 HT/WPS-078+PQR ONSHORE/078 2 APPROVED/


QA QC-OCLLC-0512 dtd. 07.08.2017

APPROVED/
21 ONSHORE/PIPING/AS/WPS-080 + PQR ONSHORE/080 2 QA QC-OCLLC-0228 dtd. 16.11.2016

APPROVED/
22 ONSHORE/PIPING/AS/WPS-81 + PQR ONSHORE/081 2 QA QC-OCLLC-0228 dtd. 16.11.2016

23 ONSHORE/PIPING/AS/WPS-082 +PQR ONSHORE/082 2 APPROVED/


QA QC-OCLLC-0228 dtd. 16.11.2016

APPROVED/
24 ONSHORE/PIPING/AS/WPS-84 + PQR ONSHORE/084 0 QA QC-OCLLC-0221 dtd. 01.11.2016

APPROVED/
25 ONSHORE/PIPING/AS/WPS-84 + PQR ONSHORE/084 1 QA QC-OCLLC-0254 dtd. 24.02.2017

PROPOSED WPS (ONSHORE/16Mo3/WPS APPROVED/


26 -086) ONSHORE/086 PROPOSAL 1 QA QC-OCLLC-0257 dtd. 06.03.2017

27 ONSHORE/STRUCTURE/AS/WPS-087 ONSHORE/087 0 APPROVED/


(PROPOSED) QA QC-OCLLC-0270 dtd. 01.10.2016

APPROVED/
28 ONSHORE/STRUCTURE/AS/WPS-087 ONSHORE/087 2 QA QC-OCLLC-0283 dtd. 20.04.2017

You might also like