WI-CO-KKPAN_01

Product Cost Controlling

Last Update: 10/11/17 4:35 PM

Create Material Cost Estimate without KKPAN


Quantity Structure

Publisher Information

File
368417281.doc
Link 1

Link 2

Link 3

Link 4

Job Role

PC Cost est maintain (w/o qs)

Insert Job Role rows as necessary.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 1 of 15
WI-CO-KKPAN_01
Product Cost Controlling

CHANGE HISTORY
Update the following table as necessary when this document is changed.

Date Name Change Description

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 2 of 15
WI-CO-KKPAN_01
Product Cost Controlling

KKPAN - Create Material Cost Estimate without


Quantity Structure

TOPIC OBJECTIVES

Business Process Procedure Overview


Background
The cost estimate without quantity structure is a tool for planning costs and
establishing prices for materials without reference to quantity structure data from
Production Planning (PP and PP-PI). It is intended for materials with insufficient or
no quantity structure data produced in plants not covered by implementation of
Production Planning module.

Scenario
You want to create the cost estimate for the top-level material 22000223 without
quantity structure in the plant 1001

Prerequisites
Material master data with Costing and Accounting Views were created and planning
process for Cost centers / Activity types was proceeded. Valid Cost Estimate without
Quantity Structure should have not been created and saved.

PROCEDURAL STEPS

Menu Path Accounting Controlling Product Cost Controlling


Product Cost Planning Controlling Material Costing
Cost Estimate Without Quantity Structure KKPAN
Create
Transaction Code KKPAN

CASE FLOW DIAGRAM


Last changed on: 10/11/17 Work Instruction
SAP 4.6C
Version: Final Page: 3 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Costing (without
quantity structure)
Prepared

Standared Cost Estimate


without Quantity Structure

Product Costs are


Allocated

Cost Analysis

xor

Cost Estimate
Result Completed: Need to be
Costing Released Revised Due to
Variance

Price Marking

Costing Result
Recorded in Material
Master as Future
Standard Price

Price Release with


Standard Cost
Estimate

and

Standard Price
Updated in Stock Revaluated
Material Master

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 4 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Perform the following steps of how to Create Cost Estimate without Quantity Structure
using the information below:

Menu Path: Accounting Controlling Product Cost Controlling Product Cost Planning
Controlling Material Costing Cost Estimate Without Quantity Structure KKPAN
Create

Transaction Program Screen Sequenc Description


e
KKPAN Create Material Cost Estimate without Quantity Structure
Client Language User Data Job Role
WI-CO-KKPAN_01 PC Cost est maintain (w/o qs)

SAP Easy Access

1. Double click on KKPAN Create.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 5 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Create Material Cost Estimate Without Quantity Structure

2. Update the following required and optional fields:

Field Name Description Values


Material Code identifying the material Example: 22000223
number
Plant Code identifying the operational Example: 1001
unit of the company where the
material is manufactured and
stored
Costing variant The Costing variant for Legal Example: SPC1
Valuation.

Note: 'Costing lot size' will be copied from the 'Costing view 1' of the material
master.

3. Click the Dates tab button.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 6 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Create Material Cost Estimate Without Quantity Structure

4. Press the Enter button or click on the Default values button.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 7 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Create Material Cost Estimate Without Quantity Structure

5. Update the following required and optional fields:

Field Name Description Values


Costing date from Validity date of cost estimate. Example: 13.11.2003
Valuation date Date to valuate the materials & Example: 13.11.2003
activity type prices

6. Press the Enter button.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 8 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Create Unit Cost Estimate: List Screen - 1

7. Click the Category Search button.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 9 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Item category (2) 11 Entries found

8. Select the entry M Material from the list box.

Create Unit Cost Estimate: List Screen 1

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 10 of 15
WI-CO-KKPAN_01
Product Cost Controlling

9. Update the following required and optional fields:

Field Name Description Values


Resource Number key identifying a Example: 9000041
resource, i.e. material.
Plant/Activity Plant Example: 1001
Quantity Required quantity of the Example: 300
resource.

Category Category of the resource, i.e. Example: E
internal activity.
Resource Number key identifying a Example: 1017025
resource, i.e. cost center.
Plant/Activity Activity Example: 1PDH01
Quantity Required quantity of the Example: 400.000
resource.

10. Press the Enter button.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 11 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Create Unit Cost Estimate: List Screen 1

11. Click the Save button.

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 12 of 15
WI-CO-KKPAN_01
Product Cost Controlling

Create Material Cost Estimate Without Quantity Structure

12. The message bar displays Cost estimate saved temporarily.

13. Click the Save button.

Create Material Cost Estimate Without Quantity Structure


Last changed on: 10/11/17 Work Instruction
SAP 4.6C
Version: Final Page: 13 of 15
WI-CO-KKPAN_01
Product Cost Controlling

14. The message bar displays Cost estimate was saved for 01.11.2003.

15. Click the Back button.

Create Material Cost Estimate Without Quantity Structure

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 14 of 15
WI-CO-KKPAN_01
Product Cost Controlling

16. Click the Back button to go back to SAP Easy Access screen.

The system task is complete.

Launch WEB HELP

Last changed on: 10/11/17 Work Instruction


SAP 4.6C
Version: Final Page: 15 of 15