You are on page 1of 3

kg COD /m3/d 20

kg COD/d 19200

g 9.8 m2/s m3 960.00


dp 0.002 m 2 mm
p 1020 kg/m3 D 14.27 m (4V / H)1/2
m 980 kg/m3 H 6 m
0.001002 kg/m/s D:H 2.38 Desired 2
v 1.022449E-06 m2/s / Base Area 160.00 =D2/4 m2
settling velocity 0.09 m/s velocity 0.13 =F/(D2/4) m/h
5.22 m/min 0.0021 m/min
312.97 m/h 0.0000 m/sec
velocity up 68.53% %
0.0005958097 m/s recycle ratio (based on % of settling velocity) 17.16
recycle ratio (based on minimum fluidization velocity) 1.4591444
F 20 m3/h F 20
COD 40 kg COD/m3 40000 mg/L 40000 g/m3 3.142
800 kg COD/hr D2 203.69192
F/(D2/4) 0.125
Limit 2500 mg/L
Required Conversion 93.75%

Re uD/ TRIAL CALCULATION


f kg/m3 g 9.8 m2/s
u m/s dp 0.025 m
Dp m/s p 1500 kg/m3
f Ns/m2 m 994 kg/m3
v / m2/s 0.000693 kg/m/s

(fumf2/
(ps-
Dpf)g
mf3)*(150(1-mf)f/(fDpumff)+1.75)

(p-f)g 4958.8
mf 0.425
smf3 1/14
s 0.9304759966
1.75(fumf2/sDpmf3) 960400 umf2
150(1-mf)fumf/(s2Dp2mf3) 26006.37 umf

B= 960400 umf2 + 26006.37 umf - 4958.8 = 0

umf 0.0595809679 m/s OK


B= 0.000524
Goal Seek B=0 By Changing C45
100

90

80

70
% conversion
60

50

40

30

20

10

0
0 10 20 30 40 50 60 70 80
kg COD/m3/d