AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016

POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
-Work Program
Kibungan Hydroelectric Power
LUZON CAR Benguet Kibungan Hydropower Corporation - Posting of performance bond 1,000.00
Project
Non-Compliant With:
RESHERR
Ambuklao Hydroelectric Power Compliant With:Work Program,
Ambuklao SN Aboitiz Power - Benguet, Inc. 104.55
Project Performance Bond
Non-Compliant With:
Cattubo I Hydroelectric Power Green Indigenous Environment Work Program
Atok 2.00
Project Development Corporation - Posting of performance bond
- RESHERR
Non-Compliant With:
Cattubo II Hydroelectric Power Green Indigenous Environment Work Program
3.00
Project Development Corporation - Posting of performance bond
- RESHERR
Lon-oy Hydroelectric Power
Bakun HEDCOR, Inc. Compliant With:RESHERR 3.60
Project
F. L. Singit Hydroelectric Power
HEDCOR, Inc. Compliant With:RESHERR 5.90
Project
Lower Labay Hydroelectric
HEDCOR, Inc. Compliant With:RESHERR 2.40
Power Project
Bakun & Mankayan 1 Hydroelectric Non-Compliant With:
HEDCOR, Inc. 12.70
Mankayan Power Project RESHERR
Compliant With:
Bokod & Kabayan 3 Hydroelectric Power Work Program, Performance Bond
Hedcor Benguet, Inc. 14.30
Kabayan Project Non-Compliant With:
RESHERR

Compliant With:
Man-asok Hydroelectric Power -Work Plan
Buguias Benguet Electric Cooperative, Inc. 3.00
Project - RESHERR
-Performance Bond

Compliant With:
Buguias & Kabayan 1 Hydroelectric Power Work Program, Performance Bond
Hedcor Benguet, Inc. 20.00
Kabayan Project Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:-Work Program
San Roque Upper East Pump
LUZON CAR Benguet Itogon Strategic Power Development Corp. - Posting of performance bond 600.00
Storage
- RESHERR
Compliant With:RESHERR , Work
San Roque West Pump Storage Strategic Power Development Corp. 400.00
Plan, PB
Sal-angan Hydroelectric Power
HEDCOR, Inc. Compliant With:RESHERR 2.40
Project
Binga Hydroelectric Power Compliant With:Work Program,
SN Aboitiz Power - Benguet, Inc. 140.00
Project Performance Bond
Non-Compliant With:
Eddet Adaoay 2 Hydroelectric
Kabayan United Hydro Power Builders Work Program, Performance Bond, 1.80
Power Project
RESHERR
Non-Compliant With:
Eddet Adaoay 1 Hydroelectric
United Hydro Power Builders Work Program, Performance Bond, 1.00
Power Project
RESHERR
Compliant With:
-Work Plan
Natalang B Hydroelectric Power
Kabayan Hedcor Cordillera, Inc. Non-Compliant With: 38.00
Project
-Posting of performance bond
-RESHERR
Compliant With:
-PERFORMANCE BOND
Kapangan & Kapangan Hydroelectric Power Cordillera Hydro Electric Power
Non-Compliant With: 60.00
Kibungan Project Corporation
-WORKPLAN
-RESHERR
Compliant With:
Posting of performance bond
Bineng 1-2B Combination
La Trinidad HEDCOR, Inc. -Work Program 16.50
Hydroelectric Power Project
-RESHERR

Bineng 3 Hydroelectric Power


HEDCOR, Inc. Compliant With:RESHERR 4.50
Project
Compliant With:
Sabangan Hydroelectric Power Work Plan
Sabangan Hedcor Sabangan, Inc. 14.00
Project Non-Compliant With:
RESHERR
Ampohaw Hydroelectric Power
Sablan HEDCOR, Inc. Compliant With:RESHERR 8.00
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Abdao Hydroelectric Power
LUZON CAR Benguet Tabaan Sur, Tuba AV Garcia Power Systems Corp. Compliant With: -RESHERR 2.00
Project
Kanggas Hydroelectric Power Non-Compliant With:
Tuba Goldlink Global Energy Corporation 3.00
Project RESHERR
Tadiangan Hydroelectric Power Non-Compliant With:
Goldlink Global Energy Corporation 4.70
Project RESHERR
Irisan 3 Hydroelectric Power
HEDCOR, Inc. Compliant With:RESHERR 1.20
Project
Compliant With:
Irisan 1 Hydroelectric Power Work Plan
Tuba HEDCOR, Inc. 3.80
Plant Non-Compliant With:
RESHERR
Compliant With:
-PERFORMANCE BOND
Tublay 1 Hydroelectric Power
Tublay AT Dinum Company Non-Compliant With: 0.90
Project
-RESHERR
-WORK PROGRAM

Compliant With:
Tublay 2 Hydroelectric Power Work Program, Performance Bond
AT Dinum Company 6.00
Project Non-Compliant With:
RESHERR

Tublay 3 Hydroelectric Power Compliant With:Work Program,


AT Dinum Company 1.00
Project Performance Bond
Maris Main Canals 2
Ifugao Alfonso Lista SN Aboitiz Power - Magat Compliant With:RESHERR 1.75
Hydroelectric Power Project
Compliant With:
Asipulo & Likud Hydroelectric Power Work Program
Provincial Government of Ifugao 0.82
Kiangan Project Non-Compliant With:
RESHERR, Performance Bond
Asin Hydroelectric Power
Kiangan Kiangan Mini Hydro Corporation Compliant With:Work Program 4.00
Project
Compliant With:
Ibulao 1 Hydroelectric Power Work Program
Kiangan Mini Hydro Corporation 6.75
Project Non-Compliant With:
Performance Bond, RESHERR
Compliant With:-PERFORMANCE
Ibulao 2 Hydroelectric Power
Enerhighlands Corporation BOND 8.80
Project
-WORKPLAN
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Hungduan Hydroelectric Power Work Program
LUZON CAR Ifugao Kiangan Kiangan Mini Hydro Corporation 4.00
Project Non-Compliant With:
Performance Bond, RESHERR
Ambangal Hydroelectric Power Non-Compliant With:
Kiangan Provincial Government of Ifugao 0.20
Plant RESHERR
Compliant With:
Alimit Hydroelectric Power Work Program
Lagawe SN Aboitiz Power - Ifugao, Inc. 100.00
Project Non-Compliant With:
RESHERR, Performance Bond
Compliant With:
- RESHERR
Ibulao Hydroelectric Power
Lagawe Hydrocore, Inc. - Posting of performance bond 4.50
Project
Non-Compliant With:
- Work Plan
Compliant With:
Lagawe & Olilicon Hydroelectric Power Work Program
SN Aboitiz Power - Ifugao, Inc. 10.00
Mayoyao Project Non-Compliant With:
RESHERR, Performance Bond
Compliant With:
Alimit Pumped-Storage Work Program
SN Aboitiz Power - Ifugao, Inc. 240.00
Hydroelectric Power Project Non-Compliant With:
RESHERR, Performance Bond
Compliant With:
Lamut Hydroelectric Power RESHERR
Lamut Enerhighlands Corporation 9.00
Project Non-Compliant With:
Work Program
Compliant With:
-RESHERR
Tinoc 1 Hydroelectric Power
Tinoc Quadriver Energy Corporation Non-Compliant With: 4.10
Project
- Work Plan
- Posting of performance bond
Compliant With:
-RESHERR
Tinoc 2 Hydroelectric Power
Quadriver Energy Corporation Non-Compliant With: 6.50
Project
-Work Plan
-Posting of performance bond
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
-RESHERR
Tinoc 3 Hydroelectric Power
LUZON CAR Ifugao Tinoc Quadriver Energy Corporation Non-Compliant With: 5.00
Project
- Work Plan
- Posting of performance bond
Non-Compliant With:
Tinoc 4 Hydroelectric Power
Philnew Hydro Power Corp Performance Bond; Work Plan; 6.00
Project
RESHERR
Non-Compliant With:
Tinoc 5 Hydroelectric Power
Philnewriver Power Corp. Performance Bond; Work Plan; 6.90
Project (Lower Luhong)
RESHERR
Non-Compliant With:
Tinoc 6 Hydroelectric Power
Philnewriver Power Corp. Performance Bond; Work Plan; 8.00
Project (Wangwang)
RESHERR

Compliant With:
Chico Hydroelectric Power San Lorenzo Ruiz Piat Energy and Work Program, Performance Bond
Kalinga 150.00
Project Water, Inc. Non-Compliant With:
RESHERR
Biyao Hydroelectric Power Non-Compliant With:
Balbalan Biyao Hydro Power Corporation 0.80
Project RESHERR, PB
Pasil B Hydroelectric Power I-Magat Renewable Energy Compliant With:Work Program,
Lubuagan 14.00
Project Corporation Performance Bond
Pasil C Hydroelectric Power I-Magat Renewable Energy Compliant With:Work Program,
Pasil 11.00
Project Corporation Performance Bond
Bulanao Hydroelectric Power Non-Compliant With:
Tabuk DPJ Engineers and Consultants 1.00
Project RESHERR
Non-Compliant With:
Chico River Hydroelectric Power San Lorenzo Ruiz Builders &
Work Program, Performance Bond, 45.00
Project Developers Group, Inc.
RESHERR
Compliant With:
Tinglayan Hydroelectric Power Pan Pacific Renewable Power - Work Program - RESHERR
Tinglayan 4.32
Project Philippine Corp. Non-Compliant With:
- Posting of performance bond
Compliant With:
Apayao-Abulog Hydroelectric Pan Pacific Renewable Power - Work Program - RESHERR
Apayao Kabugao 150.00
Power Project Philippine Corp. Non-Compliant With:
- Posting of performance bond
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Mountain Enodey-Abit 1 Hydroelectric - Work Program
LUZON CAR Bauko Kadipo Bauko Hydropower Corp. 2.00
Province Power Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Enodey-Abit 2 Hydroelectric - Work Program
Kadipo Bauko Hydropower Corp. 1.20
Power Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Enodey-Abit 3 Hydroelectric - Work Program
Kadipo Bauko Hydropower Corp. 2.00
Power Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Ampassit Hydroelectric Power - Work Program
Kadipo Bauko Hydro Power Corp. 1.20
Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Enodey 1A Hydroelectric Power - Work Program
Kadipo Bauko Hydro Power Corp. 1.80
Project - Posting of performance bond
- RESHERR
Compliant With:
BIMAKA Renewable Energy - Work Program
Besao 1 Hydroelectric Power
Besao Development Corporation - Posting of performance bond 4.50
Project
(BREDCO) Non-Compliant With:
RESHERR
Compliant With:
BIMAKA Renewable Energy - Work Program
Besao 2 Hydroelectric Power
Development Corporation - Posting of performance bond 7.00
Project
(BREDCO) Non-Compliant With:
RESHERR
Compliant With:
BIMAKA Renewable Energy - Work Program
Besao 3 Hydroelectric Power
Development Corporation - Posting of performance bond 4.00
Project
(BREDCO) Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
BIMAKA Renewable Energy - Work Program
Mountain Besao 1A Hydroelectric Power
LUZON CAR Besao Development Corporation - Posting of performance bond 2.60
Province Project
(BREDCO) Non-Compliant With:
RESHERR
Compliant With:
BIMAKA Renewable Energy - Work Program
Besao 1B Hydroelectric Power
Development Corporation - Posting of performance bond 1.70
Project
(BREDCO) Non-Compliant With:
RESHERR
Compliant With:
BIMAKA Renewable Energy - Work Program
Besao 2A Hydroelectric Power
Development Corporation - Posting of performance bond 1.10
Project
(BREDCO) Non-Compliant With:
RESHERR
Compliant With:
Talubin Hydroelectric Power Mountain Province Electric Work Program
Bontoc 5.40
Project Cooperative, Inc. Non-Compliant With:
RESHERR, Performance Bond
Non-Compliant With:
Mabungao Hydroelectric Power Southeast Asia Renewable Power - Work Program
Mabungao 5.70
Project Corporation - Posting of performance bond
- RESHERR
Non-Compliant With:
Malecom Hydroelectric Power Southeast Asia Renewable Power
Malecom Work Plrogram -Posting of 0.80
Project Corporation
Performance Bond - RESHERR
Non-Compliant With:
Malig Hydroelectric Power Southeast Asia Renewable Power
Malig Work Plrogram -Posting of 1.10
Project Corporation
Performance Bond - RESHERR
Lower Siffu Hydroelectric Power Asiapac Green Renewable Energy Non-Compliant With:
Natonin 8.00
Project Corporation RESHERR
Upper Siffu Hydroelectric Power Asiapac Green Renewable Energy Non-Compliant With:
8.00
Project Corporation RESHERR
Non-Compliant With:
Pantor Hydroelectric Power Southeast Asia Renewable Power
Work Plrogram -Posting of 1.20
Project Corporation
Performance Bond - RESHERR
Dicapan Hydroelectric Power Asiapac Green Renewable Energy Non-Compliant With:
Tadian 3.00
Project Corporation RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Tineg Hydroelectric Power Non-Compliant With:
LUZON CAR Abra Lagayan Sta. Clara Power Corp. 16.00
Project RESHERR
Three Rivers Hydroelectric Non-Compliant With:
Manabo Sta. Clara Power Corp. 10.00
Power Project RESHERR
Amtuagan Hydroelectric Power Non-Compliant With:
Tubo Sta. Clara Power Corp. 8.50
Project RESHERR, PB
Gayaman (Tubo) Hydroelectric Non-Compliant With:
Sta. Clara Power Corp. 8.50
Power Project -PERFORMANCE BOND
Non-Compliant With:
Benguet & Bakun & Mankayan 2 Hydroelectric -PERFORMANCE BOND
HEDCOR, Inc. 20.30
Ilocos Sur Cervantes Power Project -RESHERR
-WORK PROGRAM
Boga Hydroelectric Power Non-Compliant With:
Mt. Province Bauko Kadipo Bauko Hydro Power Corp. 1.00
Project -PERFORMANCE BOND

Upper Chico Hydroelectric


Kadipo Bauko Hydro Power Corp. Non-Compliant With: 2.10
Power Project
RESHERR
Compliant With:
-Posting of performance bond -
Lower Chico Hydroelectric
Kadipo Bauko Hydro Power Corp. Work Program 3.40
Power Project
Non-Compliant With:
RESHERR
Alilem Hydroelectric Power
I Ilocos Sur Alilem Philnewriver Power Corp. Compliant With:Work Plan 16.20
Project
Bakun AC Hydroelectric Power
Luzon Hydro Corporation Compliant With:RESHERR 70.00
Plant
Compliant With:
Work Plan
Quirino Hydroelectric Power
Quirino Philnewriver Power Corp. Non-Compliant With: 11.50
Project
- Posting of performance bond
- RESHERR
Non-Compliant With:
Matibuey Hydroelectric Power - Work Program
San Emilio Sta. Clara Power Corp. 6.50
Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Danac Hydroelectric Power
Sugpon Philnewriver Power Corp. Work Program, Performance Bond, 3.00
Project
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Baroro 1 Hydroelectric Power Team (Philippines) Renewable -Posting of performance bond
LUZON I La Union Bagulin 1.00
Project Energy Corporation - Work Program
Non-Compliant With: - RESHERR

Compliant With:
Baroro 2 Hydroelectric Power Team (Philippines) Renewable Work Program, Performance Bond
3.00
Project Energy Corporation Non-Compliant With:
RESHERR

Compliant With:
Posting of performance bond
Baroro 3 Hydroelectric Power Team (Philippines) Renewable
Non-Compliant With: 1.50
Project Energy Corporation
- Work Program
- RESHERR
Non-Compliant With:
Bagulin I Hydroelectric Power Green Indigenous Environment Work Program
9.00
Project Development Corporation - Posting of performance bond
- RESHERR
Non-Compliant With:
Naguilian Hydroelectric Power Naguilian Mini-Hydro Electric
Naguilian Work Program; RESHERR; 6.10
Project Corporation
Performance Bond
Compliant With:
Work Plan
Tubao Hydroelectric Power Tubao Mini-Hydro Electric
Tubao Non-Compliant With: 1.50
Project Corporation
- Posting of performance bond
- RESHERR
Compliant With:
- Work Program
Baua 1 Hydroelectric Power Pan Pacific Renewable Power
II Cagayan Gonzaga - RESHERR 4.44
Project Philippine Corp.
Non-Compliant With:
- Posting of performance bond
Non-Compliant With:
Pinacanauan River Hydroelectric Sunwest Water & Electric Company, -Work Plan
Peablanca 6.00
Power Project Inc. -Posting of performance bond
-RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Santa Praxedes Hydroelectric Work Program
LUZON II Cagayan Santa Praxedes Phildane Resources Corporation 4.00
Power Project Non-Compliant With:
RESHERR, Performance Bond
Compliant With:
- Work Plan
Isabela / Dibuluan Hydroelectric Power
San Augustin Greenpower Resources Corporation - Posting of performance bond 5.50
Quirino Project
Non-Compliant With:
RESHERR
Non-Compliant With:
Balasig 2 Hydroelectric Power
Isabela Balasig Greenpower Resources Corporation Work Program, Performance Bond, 7.00
Project
RESHERR
Non-Compliant With:
Balasig 1 Hydroelectric Power
Cabagan Greenpower Resources Corporation Work Program, Performance Bond, 9.00
Project
RESHERR
Compliant With:
Compliant
Magat F Hydroelectric Power
Cordon PhilCarbon Inc. Non-Compliant With: 0.60
Project
Work Program, Performance Bond,
RESHERR
Ilaguen 2 Hydroelectric Power Non-Compliant With:
Dinapigue Isabela Power Corporation 14.00
Project RESHERR
Compliant With:
- Work Program
Ilaguen 3 Hydroelectric Power
Echague Isabela Power Corporation - Posting of performance bond 11.00
Project
Non-Compliant With:
RESHERR
Compliant With:
- Work Program
Ilaguen 4 Hydroelectric Power
Isabela Power Corporation - Posting of performance bond 10.00
Project
Non-Compliant With:
RESHERR
Compliant With:
Abuan River 1 Hydroelectric Work Program
Ilagan Greenpower Resources Corporation 10.80
Power Project Non-Compliant With:
RESHERR, Performance Bond
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Ilagan Hydroelectric Power Trans-Asia Oil and Energy Work Program
LUZON II Isabela Ilagan, 10.00
Project Development Corp, Non-Compliant With:
RESHERR, Performance Bond
Maris Main Canals 1
Ramon SN Aboitiz Power - Magat Compliant With:RESHERR 6.00
Hydroelectric Power Project
Non-Compliant With:
Magat A Hydroelectric Power I-Magat Renewable Energy
Work Program, Performance Bond, 1.44
Project Corporation
RESHERR
Non-Compliant With:
Magat B Hydroelectric Power I-Magat Renewable Energy
Work Program -Posting of 1.08
Project Corporation
Performance Bond - RESHERR
Compliant With:
- Work Program
San Augustin / Dabubu Hydroelectric Power
Greenpower Resources Corporation - Posting of performance bond 4.50
Madella Project
Non-Compliant With:
RESHERR
Compliant With:
- Work Plan
Disabungan Hydroelectric Power
San Mariano Greenpower Resources Corporation - Posting of performance bond 5.50
Project
Non-Compliant With:
RESHERR
Compliant With:
- Work Plan
San Mariano & Ilaguen Hydroelectric Power
Isabela Power Corp. - Posting of performance bond 19.00
San Guillermo Project
Non-Compliant With:
RESHERR
Compliant With:
Lateral B Hydroelectric Power Work Program
San Mateo National Irrigation Administration 0.05
Project Non-Compliant With:
RESHERR, Performance Bond
Non-Compliant With:
San Pablo Hydroelectric Power
San Pablo Greenpower Resources Corporation Work Program, Performance Bond, 8.00
Project
RESHERR
San Pablo Site 2 Hydroelectric
Greenpower Resources Corporation Compliant With:PB, Work Program 3.00
Power Project
Non-Compliant With:
Tumauini Hydroelectric Power
Tumauini Quadriver Energy Corporation Performance Bond; Work Plan; 7.80
Project (Lower Cascade)
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Tumauini Hydroelectric Power
LUZON II Isabela Tumauini Philnew Hydro Power Corp Performance Bond; Work Plan; 14.00
Project (Upper Cascade)
RESHERR
Compliant With:
Alfonso Mangayngay Hydroelectric Work Program
Nueva Vizcaya United Hydro Power Builders 1.60
Castaeda Power Project Non-Compliant With:
RESHERR , PB
Denip Hydroelectric Power Non-Compliant With:
JRV Renewable Energy Corporation 2.30
Project Work Program; RESHERR
Compliant With:
Abaca Hydroelectric Power Work Program
Alfonzo JRV Renewable Energy Corporation 3.20
Project Non-Compliant With:
RESHERR
Compliant With:
-WORKPLAN
Matuno 1 Hydroelectric Power
Ambaguio Smith Bell Mini-Hydro Corp. Non-Compliant With: 7.40
Project
-RESHERR
-PERFORMANCE BOND
Compliant With:
-WORKPLAN
Matuno 2 Hydroelectric Power
Bambang Smith Bell Mini-Hydro Corp. Non-Compliant With: 7.90
Project
-RESHERR
-PERFORMANCE BOND
Compliant With:
-WORKPLAN
Matuno Hydroelectric Power
Epower Technologies Corp. -RESHERR 8.00
Project
Non-Compliant With:
-PERFORMANCE BOND
Compliant With:
Dupax del Norte
Casignan Hydroelectric Power Work Program
and Alfonzo JRV Renewable Energy Corporation 5.00
Project Non-Compliant With:
Castaeda
RESHERR
Didipio 1 Hydroelectric Power
Kasibu AT Dinum Company Compliant With:Work Program 2.50
Project
Didipio 2 Hydroelectric Power
Alimit Hydro Corp. Compliant With:Work Program 6.60
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Namanaan Hydroelectric Power - Work Program
LUZON II Nueva Vizcaya Kasibu AT Dinum Company 0.60
Project - Posting of performance bond
-RESHERR
Compliant With:
-Work Program
Edralin Hydroelectric Power
AT Dinum Company - Posting of performance bond 1.20
Project
Non-Compliant With:
RESHERR
Commonal-Uddiawan Non-Compliant With:
Solano Smith Bell Mini-Hydro Corp. 1.80
Hydroelectric Power Plant RESHERR
Non-Compliant With:
Addalam Hydroelectric Power
Quirino Aglipay Quirino Power Energy Corporation Work Program 3.60
Project
- Posting of performance bond
Compliant With:
- Work Program
Addalam Hydroelectric Power Quirino Resources Development
Cabbaroguis - Posting of performance bond 26.00
Project Corp.
Non-Compliant With:
RESHERR

Compliant With:
Cabbaroguis and Diduyon Hydroelectric Power Green Energy Management (GEM) Work Program, Performance Bond
320.00
Dingasan Project & Holdings, Inc. Non-Compliant With:
RESHERR

Compliant With:
Dibuluan 2 Hydroelectric Power Work Program, Performance Bond
Maddela Greenpower Resources Corporation 3.20
Project Non-Compliant With:
RESHERR

Geblem 1 Hydroelectric Power Non-Compliant With:


Nagtipunan Gawagan Hydro Power Corp. 0.70
Project RESHERR
Gawagan 1 Hydroelectric Power Non-Compliant With:
Gawagan Hydro Power Corp. 4.30
Project RESHERR, Work Program, PB
Gawagan 2 Hydroelectric Power Non-Compliant With:
Gawagan Hydro Power Corp. 2.60
Project RESHERR
Non-Compliant With:
Dakgan 1 Hydroelectric Power -Work Program
Asiapacific Renewables Corporation 9.00
Project - Posting of performance bond
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Dakgan 2 Hydroelectric Power -Work Program
LUZON II Quirino Nagtipunan Asiapacific Renewables Corporation 12.00
Project - Posting of performance bond
RESHERR

Compliant With:
Dagkan Hydroelectric Power Work Program, Performance Bond
United Hydro Power Builders 142.00
Project Non-Compliant With:
RESHERR
Abuan 2 Hydroelectric Power
Isabela Ilagan Greenpower Resources Corporation Compliant With:PB, Work Program 8.10
Project
Magat Hydroelectric Power Compliant With:Work Program,
Ramon SN Aboitiz Power - Magat, Inc. 360.00
Project Performance Bond
San Pablo Site 3 Hydroelectric
San Pablo Greenpower Resources Corporation Compliant With:PB, Work Program 4.90
Power Project
Compliant With:
-WORK PROGRAM
Talaytay Hydroelectric Power PTC Energy, Inc. (Aurora Energy
III Aurora Dinalungan -PERFORMANCE BOND 1.45
Project Corporation)
Non-Compliant With:
-RESHERR
Compliant With:
Davildavilan Hydroelectric RESHERR
Dingalan PTC Energy, Inc. 1.00
Power Project Non-Compliant With:
PB
Compliant With:
-WORK PROGRAM
Diteki Hydroelectric Power PTC Energy, Inc. (Aurora Energy
San Luis -PERFORMANCE BOND 1.67
Project Corporation)
Non-Compliant With:
-RESHERR
Compliant With:
- Work Program
Calaanan Hydroelectric Power
Nueva Ecija Bongabon Hydrokinetic Corp. - Posting of performance bond 2.00
Project
Non-Compliant With:
RESHERR
Non-Compliant With:
Dupinga Hydroelectric Power
Gabaldon Constellation Energy Corporation Performance Bond; Work Plan; 3.00
Project
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Rio Chico Hydroelectric Power
LUZON III Nueva Ecija General Tinio LGU of Gen. Tinio Posting of Performance Bond; 2.00
Project
RESHERR
Non-Compliant With:
Balintingon Hydroelectric Power
General Tio First Gen Luzon Power Corporation Work Plrogram -Posting of 30.00
Project
Performance Bond - RESHERR
Compliant With:
Pantabangan (Pump -Work Program -
Pantabangan Storage)Hydroelectric Power First Gen Prime Energy Corporation Perfromance Bond 300.00
Project Non-Compliant With:
RESHERR

Compliant With:
Sampaloc Hydroelectric Power San Lorenzo Ruiz Builders & Work Program, Performance Bond
14.00
Project Developers Group, Inc. Non-Compliant With:
RESHERR

Compliant With:
Diaman Hydroelectric Power Work Program
United Hydro Power Builders 1.80
Project Non-Compliant With:
RESHERR
PRISMC Hydroelectric Power Non-Compliant With:
Rizal PNOC-Renewables Corporation 1.00
Project RESHERR
Compliant With:
-RESHERR
- Posting of performance bond
San Jose SDC Hydroelectric Power Project PNOC-Renewables Corporation 0.50
Non-Compliant With:
- Work Program

Mariveles Hydroelectric Power Southeast Asia Renewable Power Non-Compliant With:


Bataan Mariveles 1.10
Project Corporation RESHERR
Compliant With:
-Work Program
Camiling 1 Hydroelectric Power
Tarlac Mayantoc Northgreen Energy Corporation - Posting of performance bond 5.40
Project
Non-Compliant With:
RESHERR
Compliant With:
Camiling River 3 Hydroelectric Work Program
Northgreen Energy Corporation 3.40
Power Project Non-Compliant With:
RESHERR, Performance Bond
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Coto 1 Hydroelectric Power Work Program
LUZON III Zambales Masinloc Coto Hydro Corp. 6.50
Project Non-Compliant With:
RESHERR, Performance Bond
Coto 3 Hydroelectric Power Compliant With:Work Program,
At Dinum Co. 2.20
Project Performance Bond
Compliant With:
South Lauis & Coto 2 Hydroelectric Power Work Program
Coto Hydro Corp. 2.80
Mabininal Project Non-Compliant With:
RESHERR, Performance Bond
Compliant With:
-Work Program
Nueva Ecija / Gabaldon / San Lingod River Hydroelectric
United Hydro Power Builders Non-Compliant With: 2.50
Aurora Luis Power Project
- Posting of performance bond
-RESHERR
Non-Compliant With:
Laguna / Pangil / Real & Siniloan Hydroelectric Power - Posting of performance bond
IV-A Sierra Madre Water Corporation 35.00
Quezon Mauban Project -Work Program
- RESHERR
Compliant With:
Kanan B-1 Hydroelectric Power Performance Bond
Quezon General Nakar Energy World Kanan River, Inc. 150.00
Project Non-Compliant With:
Work Program, RESHERR
Compliant With:
Umiray 1 Hydroelectric Power Work Program
Laguna Hydroenergy Corporation 6.00
Project Non-Compliant With:
RESHERR
Umiray Site 2 River Compliant With:Work Program,
Laguna Hydroenergy Corporation 3.90
Hydroelectric Power Project Performance Bond
Umiray Site 4 River Compliant With:Work Program,
Laguna Hydroenergy Corporation 2.80
Hydroelectric Power Project Performance Bond
Compliant With:- Work Plan
Maapon Hydroelectric Power
Lucban Renesons Energy Corporation - Posting of performance bond 2.60
Project
- RESHERR

Compliant With:
Dabubu 2 Hydroelectric Power Work Program, Performance Bond
Maddela Greenpower Resources Corporation 4.30
Project Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Calmenue Hydroelectric Power - Work Program
LUZON IV-A Quezon Mauban Sta. Clara Power Corp. 2.00
Project - Posting of performance bond
- RESHERR
Compliant With:
- Work Program
(Laguio) Laginbayan Malaki 2
Enervantage Supplier's Co., Inc. - Posting of performance bond 3.10
Hydroelectric Power Project
Non-Compliant With:
RESHERR
Non-Compliant With:
Mauban Hydroelectric Power -Work Program
Aurora All Asia Energy Corporation 10.00
Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Kinanliman Hydroelectric Power - Work Program
Real Municipality of Real, Quezon 1.60
Project - Posting of performance bond
- RESHERR

Compliant With:
Labayat River (Upper Cascade) Repower Energy Development Work Program, Performance Bond
3.00
Hydroelectric Power Project Corporation Non-Compliant With:
RESHERR

Compliant With:
-WORKPLAN
Piapi River Hydroelectric Power Repower Energy Development
Non-Compliant With: 3.30
Project Corporation
-RESHERR
-PERFORMANCE BOND
Compliant With:
-WORKPLAN -
Labayat River (Lower Cascade) Repower Energy Development PERFORMANCE BOND
2.80
Hydroelectric Power Project Corporation Non-Compliant With:
-RESHERR
-PERFORMANCE BOND

Compliant With:
Tignoan River (Upper Cascade) Repower Energy Development Work Program, Performance Bond
3.50
Hydroelectric Power Project Corporation Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
- Work Program - Posting of
Tibag Hydroelectric Power Repower Energy Development
LUZON IV-A Quezon Real performance bond 5.00
Project Corporation
Non-Compliant With:
RESHERR
Non-Compliant With:
Tignoan Hydroelectric Power
Aurora All Asia Energy Corporation Performance Bond; Work Program; 20.00
Project
RESHERR
Compliant With:
- Work Program - Posting of
Lalawinan Hydroelectric Power Repower Energy Development
performance bond 3.00
Project Corporation
Non-Compliant With:
RESHERR
Compliant With:
-Work Program
Laguio (Laginbayan) Malaki 1
Rizal Enervantage Supplier's Co., Inc. - Posting of performance bond 1.60
Hydroelectric Power Project
Non-Compliant With:
RESHERR
Compliant With:
Pililia Pumped Storage Trans-Asia Oil and Energy Work Program
Pililia, 300.00
Hydroelectric Power Project Development Corp, Non-Compliant With:
RESHERR, Performance Bond
Wawa Pumped Storage 1 Olympia Violago Water & Power, Non-Compliant With:
Rodriguez 500.00
Hydroelectric Power Project Inc RESHERR
Non-Compliant With:
Wawa Pumped Storage 3 Olympia Violago Water & Power,
Work Program, Performance Bond, 50.00
Hydroelectric Power Project Inc
RESHERR

Wawa Pumped Storage 2 Olympia Violago Water & Power, Non-Compliant With:
100.00
Hydroelectric Power Project Inc RESHERR

Majayjay Hydroelectric Power Majayjay Hydropower Company, Compliant With:Work Program, but
Laguna Majayjay 3.00
Project Inc. has Right of Way Problem
Compliant With:
Balanac (Middle) Hydroelectric Repower Energy Development Work Program
5.00
Power Project Corporation Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
-RESHERR
Indang and Indang Hydroelectric Power
LUZON IV-A Cavite Energywise Corporation Non-Compliant With: 1.50
Maragondon Project
- Work Program
- Posting of performance bond
Non-Compliant With:
Oriental San Ignacio Hydroelectric Power Alpaparay Resort & Development - Work Program
IV-B Baco 0.50
Mindoro Project Corporation - Posting of performance bond
- RESHERR
Compliant With:
-RESHERR
Dulangan Hydroelectric Power
Baco PNOC - Renewables Corp. Non-Compliant With: 8.25
Project
-Posting of performance bond
-Work Program

Linao-Cawayan (Lower Cascade) Oriental Mindoro Electric Compliant With:-Work Plan


2.10
Hydroelectric Power Plant Cooperative, Inc. -RESHERR

Linao-Cawayan (Upper Cascade) Oriental Mindoro Electric


Compliant With:RESHERR; Work Plan 3.00
Hydroelectric Power Project Cooperative, Inc.

Bansud Hydroelectric Power Non-Compliant With:


Bansud Sunwest Water and Electric Co., Inc. 1.50
Project RESHERR
Bongabong Hydroelectric Power Non-Compliant With:
Bongabong S&B Power Corporation 2.60
Project Performance Bond, RESHERR
Catuiran (Upper Cascade) Non-Compliant With:
Naujan Philnew Hydro Power Corp 8.00
Hydroelectric Power Project RESHERR , Work Program, PB
Catuiran Hydroelectric Power Compliant With:RESHERR , Work
Catuiran Hydro Power Corp. 8.00
Project Plan, PB
Non-Compliant With:
Mag-asawang Tubig B Philippine Hybrid Energy Systems,
Work Program, Performance Bond, 1.00
Hydroelectric Power Project Inc.
RESHERR
Inabasan Hydroelectric Power Non-Compliant With:
San Teodoro Ormin Power, Inc 10.00
Project Performance Bond, RESHERR
Compliant With:
Linao Cawayan Hydroelectric - Work Program
Power Project (Phase 2 - tail - Mindoro Grid Corporation - Posting of performance bond 1.00
end) Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
-Posting of performance bond
Oriental Alag Tributary 1 Hydroelectric
LUZON IV-B San Teodoro Constellation Energy Corporation Non-Compliant With: 2.80
Mindoro Power Project
- Work Program
- RESHERR
Compliant With:
Alag Tributary 2 Hydroelectric Work Program
Constellation Energy Corporation 2.80
Power Project Non-Compliant With:
RESHERR, Performance Bond
Non-Compliant With:
San Teodoro & Inabasan Phase II Hydroelectric
Ormin Power, Inc. Work Program, Performance Bond, 10.00
Puerto Gallera Power Project
RESHERR
Non-Compliant With:
Marangas River Hydroelectric -WORK PROGRAM
Palawan Bataraza AQA Global Power Inc. 12.00
Power Project -PERFORMANCE BOND
-RESHERR
Sologon River Hydroelectric Non-Compliant With:
Brooke's Point AQA Global Power Inc. 12.00
Power Project Work Program
Non-Compliant With:
Busuanga River 1 Hydroelectric - Work Program
Busuanga AQA Global Power Inc. 8.00
Power Project - Posting of performance bond
- RESHERR
Compliant With:- Work Program
Bulalakao-1 North River Alternergy Viento Partners
El Nido - Posting of performance bond 0.34
Hydroelectric Power Project Corporation
- RESHERR
Compliant With:- Work Program
Bulalakao-2 South River Alternergy Viento Partners
- Posting of performance bond 0.44
Hydroelectric Power Project Corporation
- RESHERR
Bato-Bato (Kaliwa) Hydroelectric Non-Compliant With:
Narra AQA Global Power Inc. 12.00
Power Project Work Program; RESHERR
Estrella River Hydroelectric Non-Compliant With:
AQA Global Power Inc. 8.00
Power Project Work Program; RESHERR
Non-Compliant With:
Malasgao (Kaliwa) Hydroelectric -WORK PROGRAM
AQA Global Power Inc. 10.00
Power Project -PERFORMANCE BOND
-RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Batang-Batang Hydroelectric - Work Plan
LUZON IV-B Palawan Narra Langongan Power Corporation 3.50
Power Project - Posting of performance bond
- RESHERR
Compliant With:
Langogan Hydroelectric Power Work Program
Puerto Princesa Langongan Power Corporation 6.80
Project Non-Compliant With:
Performance Bond, RESHERR
Puerto Princesa Inaguan River Hydroelectric Non-Compliant With:
AQA Global Power Inc. 12.00
City Power Project WorkProgram
Non-Compliant With:
Culasian River Hydroelectric - Work Program
Rizal AQA Global Power Inc. 10.00
Power Project - Posting of performance bond
- RESHERR
Cantingas Hydroelectric Power Non-Compliant With:
Romblon Romblon Romblon Electric Cooperative, Inc. 0.90
Plant RESHERR
Non-Compliant With:
Upper Botocan River
Laguna Majayjay Aurora All Asia Energy Corporation Performance Bond; Work Program; 8.64
Hydroelectric Power Project
RESHERR
Compliant With:
-Posting of performance bond
Barit 2 Hydroelectric Power
V Camarines Sur Buhi People's Energy Services Inc. - Work Program 0.60
Project
Non-Compliant With:
-RESHERR
Compliant With:
Barit 1 Hydroelectric Power Work Program
People's Energy Services Inc. 1.80
Plant Non-Compliant With:
RESHERR, Performance Bond
Non-Compliant With:
Barit (Irrigation Discharge)
Buhi NASCENT Technologies Corp. Performance Bond; Work Plan 0.40
Hydroelectric Power Project
RESHERR
Non-Compliant With:
Ranggas Hydroelectric Power Clean and Green Energy Solutions,
Goa & Tigaon, Work Program, Performance Bond, 1.50
Project Inc.
RESHERR
Hitoma 1 Hydroelectric Power Sunwest Water & Electric Company,
Catanduanes Caramoran Compliant With:RESHERR 1.50
Plant Inc.
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
- Posting of performance bond
Kapipian Hydroelectric Power Sunwest Water & Electric Company,
LUZON V Catanduanes San Miguel Non-Compliant With: 2.40
Project Inc.
-RESHERR
- Work Plan
Solong Hydroelectric Power Sunwest Water & Electric Company,
Compliant With:RESHERR; Work Plan 2.10
Plant Inc.
Non-Compliant With:
Camarines Colasi Hydroelectric Power Colasi Mini Hydro Electric Power
Mercedes Work Program, Performance Bond, 0.96
Norte Project Plant Corporation
RESHERR
Compliant With:
Sunwest Water and Electric Co., Inc.
Upper Cawayan 1 Hydroelectric Work Program
Sorsogon - Sorsogon II Electric Cooperative, 0.60
Power Plant Non-Compliant With:
Inc. (SUWECO-SORECO II)
RESHERR
Compliant With:
- Work Program
Cawayan 2 Hydroelectric Power
Sorsogon Sunwest Water and Electric Co., Inc. - Posting of performance bond 0.99
Project
Non-Compliant With:
-RESHERR
LUZON Sum 5,695.90 739.735
Main Aklan River Hydroelectric Sunwest Water & Electric Company, Non-Compliant With:
VISAYAS VI Aklan Libacao 15.00
Power Project Inc. Work Plan; RESHERR
Compliant With:
Timbaban Hydroelectric Power Oriental Energy and Power -Performance
Madalag 18.00
Project Generation Corporation Bond
Non-Compliant With:
Compliant With:
Aklan Pumped-Storage Work Program; Performance Bond
Nabaoy Strategic Power Development Corp. 200.00
Hydroelectric Power Project Non-Compliant With:
RESHERR

Non-Compliant With:
Villasiga 2 Hydroelectric Power - Work Program
Antique Bugasong Sunwest Water and Electric Co., Inc. 9.40
Project - Posting of performance bond
- RESHERR
Villasiga Hydroelectric Power Sunwest Water & Electric Company,
Bugasong Compliant With:RESHERR 8.00
Project Inc. 2
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Maninila (Lower Cascade) Work Plan
VISAYAS VI Antique San Remegio Century Peak Energy Corporation 4.50
Hydroelectric Power Project Non-Compliant With:
RESHERR , PB
Compliant With:
Maninila (Upper Cascade) Work Plan
Century Peak Energy Corporation 3.10
Hydroelectric Power Project Non-Compliant With:
RESHERR , PB
Non-Compliant With:
Sibalom (Upper Cascade)
Century Peak Energy Corporation Work Program, Performance Bond, 4.20
Hydroelectric Power Project
RESHERR
Non-Compliant With:
Sibalom (Middle Cascade) -Work Plan
Century Peak Energy Corporation 4.00
Hydroelectric Power Project -Posting of performance bond
-RESHERR
Non-Compliant With:
Sibalom (Lower Cascade) -Work Plan
Century Peak Energy Corporation 3.30
Hydroelectric Power Project -Posting of performance bond
-RESHERR
Compliant With:
Work Plan
Caro-an Hydroelectric Power
Sebaste Antique Electric Cooperative, Inc. -Posting of performance bond 0.84
Project
Non-Compliant With:
RESHERR
Compliant With:
-Work Plan
Ipayo Hydroelectric Power
Antique Electric Cooperative, Inc. -Posting of performance bond 1.30
Project
Non-Compliant With:
-RESHERR

Igbulo (Bais) Hydroelectric Compliant With:Work Plan -Posting


Iloilo Igbaras Century Peak Energy Corporation 5.10
Power Project of Performance Bond - RESHERR

Non-Compliant With:
Negros Bago 4 Hydroelectric Power Alsons Energy Development
Bago & Murcia Work Program, Performance Bond, 11.00
Occidental Project Corporation
RESHERR
Compliant With:
Don Salvador Bago 2 Hydroelectric Power Alsons Energy Development Work Program
10.00
Benedicto Project Corporation Non-Compliant With:
Performance Bond, RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Negros Hilabangan (Upper Cascade) -Work Plan
VISAYAS VI Kabankalan Century Peak Energy Corporation 4.80
Occidental Hydroelectric Power Project -Posting of performance bond
-RESHERR
Non-Compliant With:
Hilabangan (Lower Cascade) -Work Plan
Century Peak Energy Corporation 3.00
Hydroelectric Power Project -Posting of performance bond
-RESHERR
Compliant With:
Work Plan
Lower Himogaan Hydroelectric
Sagay LGU of Sagay Non-Compliant With: 4.00
Power Project
- Posting of performance bond
- RESHERR
Compliant With:
Bago 1 Hydroelectric Power Alsons Energy Development Work Program
San Carlos City 4.00
Project Corporation Non-Compliant With:
Performance Bond, RESHERR
Compliant With:
WORK PROGRAM
Initihan Hydroelectric Power Bago River Hydro Power
Non-Compliant With: 3.00
Project Corporation
-PERFORMANCE BOND
-RESHERR
Compliant With:
-WORK PROGRAM
Bago-Prosperidad 2 Bago River Hydro Power
Non-Compliant With: 2.00
Hydroelectric Power Project Corporation
-PERFORMANCE BOND
-RESHERR
Compliant With:
Malugo Hydroelectric Power Posting of performance bond
Silay Vivant-Malogo Hydropower, Inc. 6.00
Project - Work Plan
- RESHERR
Compliant With:
Silay & E. B Malogo Phase 3 Hydroelectric -Posting of performance bond
Vivant-Malogo Hydropower, Inc. 2.00
Magalona Power Project -Work Program
- RESHERR
Compliant With:
Malogo Phase 2 Hydroelectric -Posting of performance bond
Victorias & Cadiz Vivant-Malogo Hydropower, Inc. 5.00
Power Project -Work Program
- RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
-RESHERR
Cantakoy Hydroelectric Power
VISAYAS VII Bohol Danao Quadriver Energy Corporation Non-Compliant With: 8.00
Project
- Work Plan
- Posting of performance bond
Non-Compliant With:
Loboc (Expansion) Hydroelectric
Loboc Sta. Clara Power Corp. Work Program, Performance Bond, 1.20
Power Project
RESHERR
Compliant With:
-Work Plan
Loboc Loboc Hydroelectric Power Plant Sta. Clara Power Corporation 1.20
Non-Compliant With:
-RESHERR
Sevilla Hydroelectric Power Non-Compliant With:
Sevilla BOHECO 1 Sevilla Mini Hydro Corp. 2.50
Plant RESHERR
Non-Compliant With:
Kawasan Waterfalls
Cebu Alegria T.A.G Mineral Resources, Inc. Work Program, Performance Bond, 0.50
Hydroelectric Power Project
RESHERR
Non-Compliant With:
Argao Hydroelectric Power
Argao Universal Hydrotechnologies, Inc. Work Plrogram -Posting of 0.80
Project
Performance Bond - RESHERR
Basak II Hydroelectric Power Non-Compliant With:
Badian Rapids Innoenergy, Inc. 0.50
Project Work Plan; RESHERR
Negros Limalima-Sacop Phase 1 Compliant With:Work Program,
Isabela 888 Blue Energy Corporation 2.00
Occidental Hydroelectric Power Project Performance Bond
Limalima-Sacop Phase 2 Compliant With:Work Program,
888 Blue Energy Corporation 8.00
Hydroelectric Power Project Performance Bond
Compliant With:
-Work Plan
Negros Amlan Hydroelectric Power Amlan Hydroelectric Power
Amlan - Posting of performance bond 0.86
Oriental Plant Corporation
Non-Compliant With:
RESHERR
Non-Compliant With:
Amlan (Plant A) Hydroelectric Natural Power Sources - Work Plan
Amlan 3.20
Power Project Intergration,Inc. - Posting of performance bond
- RESHERR
Non-Compliant With:
Amlan (Plant B) Hydroelectric Natural Power Sources
Work Program, Performance Bond, 1.50
Power Project Intergration,Inc.
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Negros Amlan (Plant C) Hydroelectric Natural Power Sources - Work Plan
VISAYAS VII Amlan 0.80
Oriental Power Project Intergration,Inc. - Posting of performance bond
- RESHERR
Non-Compliant With:
Pacuan -Guinobaan
La Libertad PNOC - Renewables Corp. Work Plan; Performance Bond; 33.00
Hydroelectric Power Project
RESHERR
Compliant With:-RESHERR
Canaway 1 Hydroelectric Power
Siaton Orbysy Holdings, Inc. -WORK PROGRAM 1.60
Project
-PERFORMANCE BOND
Compliant With:-RESHERR
Canaway 2 Hydroelectric Power
Orbysy Holdings, Inc. -WORK PROGRAM 1.40
Project
-PERFORMANCE BOND
Compliant With:
Senona Hydroelectric Power Work Program
Siquijor Lazi AQA Global Power Inc. 3.20
Project Non-Compliant With:
RESHERR
Gabangan Hydroelectric Power Non-Compliant With:
AQA Global Power Inc. 4.14
Project RESHERR

Compliant With:
Pumped Storage Bolusao San Lorenzo Ruiz Samar Energy and Work Program, Performance Bond
VIII Eastern Samar Lawaan 300.00
Hydroelectric Power Project Water, Inc. Non-Compliant With:
RESHERR
Compliant With:
Work Program
Run-of-River Bolusao San Lorenzo Ruiz Samar Energy and
Non-Compliant With: 12.00
Hydroelectric Power Project Water, Inc.
- Posting of performance bond
- RESHERR

Compliant With:
Maslog Hydroelectric Power Work Program, Performance Bond
Maslog Iraya Energy Corporation 40.00
Project Non-Compliant With:
RESHERR
Upper Maslog Hydroelectric Non-Compliant With:
Iraya Energy Corporation 9.00
Power Project RESHERR, Work Program, PB
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Caminto River Hydroelectric Work Program
VISAYAS VIII Leyte Inopacan Leyte IV Electric Cooperative, Inc. 0.50
Power Project Non-Compliant With:
RESHERR, Performance Bond
Compliant With:
Binaha-an River Hydroelectric Engineering & Development RESHERR
Jaro & Pastrana 2.20
Power Project Corporation of the Philippines Non-Compliant With:
Work Program
Compliant With:
-Posting of performance bond
Leyte V Electric Cooperative, Inc
Kananga Bao Hydroelectric Power Project Non-Compliant With: 1.50
(LEYECO V)
- Work Program
- RESHERR
Non-Compliant With:
Dumagocdoc River - Work Program
Matalom Leyte IV Electric Cooperative, Inc. 0.60
Hydroelectric Power Project - Posting of performance bond
- RESHERR

Southern Hinabian Hydroelectric Power Southern Leyte Electric Compliant With:Work Program,
St. Bernard 0.81
Leyte Project Cooperative, Inc. Performance Bond

Non-Compliant With:
Western Calbiga Hydroelectric Power - Work Program
Calbiga Meadowland Developers, Inc. 15.00
Samar Project - Posting of performance bond
- RESHERR
VISAYAS Sum 782.18 5.37

Zamboanga Bayog Hydroelectric Power Non-Compliant With:


MINDANAO IX Bayog Global Sibagat Hydro Power Corp. 6.00
del Sur Project RESHERR

Non-Compliant With:
Dumingag & Sindangan 4 Hydroelectric Alsons Energy Development
Work Program, Performance Bond, 8.00
Midsalip Power Project Corporation
RESHERR
Non-Compliant With:
Pasonanca (Upstream) - Work Plan
Zamboanga City PhilCarbon Inc. 1.00
Hydroelectric Power Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Pasonanca Hydroelectric Power
PhilCarbon Inc. Performance Bond; Work Plan; 0.05
Project
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Zamboanga Saaz Hydroelectric Power - Work Program
MINDANAO IX Zamboanga City Meadowland Developers, Inc. 1.00
del Sur Project - Performance bond
- RESHERR
Zamboanga Polandoc Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant With:Work Plan -
Leon Postigo 2.00
del Norte Project Inc. RESHERR

Dapitan River (Middle) Euro Hydro Power (Asia) Holdings, Compliant With:-WORK PROGRAM
Mutia 3.60
Hydroelectric Power Project Inc. -PERFORMANCE BOND

Dapitan River (Upper) Euro Hydro Power (Asia) Holdings, Compliant With:-WORK PROGAM
3.60
Hydroelectric Power Project Inc. -PERFORMANCE BOND

Compliant With:
-Work Program
Zamboanga
Alimpaya Everhydro Corporation -Posting of performance bond 0.50
City
Non-Compliant With:
-RESHERR
Patalon Hydroelectric Power Non-Compliant With:
Everhydro Corporation 0.50
Project Work Program
Compliant With:
-Work Program
Tagpangi Hydroelectric Power
Everhydro Corporation - Posting of performance bond 0.50
Project
Non-Compliant With:
RESHERR
Compliant With:
Ayala Hydroelectric Power Work Program
Everhydro Corporation 1.00
Project Non-Compliant With:
RESHERR
Katipunan River Hydroelectric Repower Energy Development
X Bukidnon Compliant With:Work Program 2.10
Power Project Corporation
Pulanai River Hydroelectric Repower Energy Development
Compliant With:Work Program 10.60
Power Project Corporation
Compliant With:
-Work Program
Rio Verde Inline (Phase I)
Baungon Rio Verde Water Constortium, Inc. Non-Compliant With: 0.50
Hydroelectric Power Project
- Posting of performance bond
-RESHERR
Baungon and Bubunawan Hydroelectric FGEN Bubunawan Hydro Non-Compliant With:
23.00
Libona Power Project Corporation Work Plan; RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Baungon and Bubunawan Hydroelectric Non-Compliant With:
MINDANAO X Bukidnon Bubunawan Power Company, Inc. 7.00
Libonan Power Plant RESHERR

Kitaotao 1 Hydroelectric Power Non-Compliant With:


Dancagan Hedcor Bukidnon, Inc. 35.00
Project -Work Program
-Posting of performance bond
-RESHERR
Panoon Hydroelectric Power Non-Compliant With:
Impasugong Gerphil Renewable Energy, Inc. 0.22
Plant RESHERR
Non-Compliant With:
Gakaon Hydroelectric Power - Work Program
LGU of Impasugong 2.23
Project - Posting of performance bond
- RESHERR
Compliant With:
-Work Program
Atugan 1 River Hydroelectric
Gerphil Renewable Energy, Inc. Non-Compliant With: 2.40
Power Project
- Posting of performance bond
-RESHERR
Compliant With:
-Work Program
Atugan 4 Hydroelectric Power
Gerphil Renewable Energy, Inc. Non-Compliant With: 3.50
Project
- Posting of performance bond
-RESHERR
Compliant With:
-Posting of performance bond
Impasugong and Tagoloan Hydroelectric Power
FGEN Tagoloan Hydro Corporation Non-Compliant With: 39.00
Sumilao Project
-Work Plan
-RESHERR
Compliant With:
Maladugao River (Lower -WORK PLAN
Kalilangan & Bukidnon Maladugao Hydro Power
Cascade) Hydroelectric Power -RESHERR 10.00
Wao Corporation
Project Non-Compliant With:
-PERFORMANCE BOND
Compliant With:
Posting of performance bond
Umalag 1 Hydroelectric Power
Libona Meadowland Developers, Inc. Non-Compliant With: 1.80
Project
- Work Program
- RESHERR2
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Sawaga Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant With:-WORK PROGRAM
MINDANAO X Bukidnon Malaybalay 1.20
Project Inc. -PREFORMANCE BOND

Compliant With:
Repower Energy Development Work Program, Performance Bond
2.00
Corporation Non-Compliant With:
RESHERR

Non-Compliant With:
Middle Canayan Hydroelectric - Work Program
Sta. Clara Power Corp. 3.00
Power Project - Posting of performance bond
- RESHERR
Compliant With:
Malitbog Hydroelectric Power Posting of performance bond
Malitbog Philnewriver Power Corp. 3.40
Project Non-Compliant With:
Work Plan; RESHERR
Compliant With:
Work Plan
Silo-o Hydroelectric Power
Philnewriver Power Corp. Non-Compliant With: 4.50
Project
- Posting of performance bond
- RESHERR
Compliant With:
- RESHERR
Culaman Hydroelectric Power Oriental Energy and Power - Posting of performance bond
Manolo 10.00
Project Generation Corporation Non-Compliant With:
-Work Plan

Agusan River Hydroelectric


Manolo Fortich FG Bukidnon Power Corp. Compliant With:RESHERR; Work Plan 1.60
Power Plant
Non-Compliant With:
Mangima Hydroelectric Power
Philnewriver Power Corp. Performance Bond; Work Plan; 10.00
Project
RESHERR
Maramag Hydroelectric Power Non-Compliant With:
Maramag Maramag Mini-Hydro Corporation 2.00
Project RESHERR , Work Program, PB
Compliant With:
-Work Program
Pulangui IV Hydroelectric Power Repower Energy Development
- Posting of performance bond 10.00
Project Corporation
Non-Compliant With:
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Manolo Fortich 1 Hydroelectric Compliant With:Work Plan -
MINDANAO X Bukidnon Santiago Hedcor Bukidnon, Inc. 43.40
Power Project RESHERR
Manolo Fortich 2 Hydroelectric Compliant With:Work Plan -
Hedcor Bukidnon, Inc. 25.40
Power Project RESHERR
Non-Compliant With:
Manupali Hydroelectric Power
Valencia Matic Hydropower Corporation Work Program, Performance Bond, 9.00
Project
RESHERR
Upper Manupali Hydroelectric Bukidnon II Electric Cooperative, Compliant With:-WORKPLAN
2.00
Power Project Inc. -RESHERR
Compliant With:
Maladugao River (Upper -WORK PLAN
UHPC Bukidnon Hydro Power I
Wao Cascade) Hydroelectric Power -RESHERR 5.50
Corporation
Project Non-Compliant With:
-PERFORMANCE BOND
Non-Compliant With:
Cagayan de Mat-i 1 Hydroelectric Power
Claveria Philnew Hydro Power Corp Work Plan -Posting of Performance 4.85
Oro Project
Bond - RESHERR
Compliant With:
Work Program
Misamis Langaran Hydroelectric Power
Calamba Kaltimex Langaran Hydro Inc. Non-Compliant With: 3.64
Occidental Project
- Posting of performance bond
- RESHERR
Non-Compliant With:
Clarin Hydroelectric Power
Clarin Philnew Hydro Power Corp Work Plan -Posting of Performance 6.20
Project
Bond - RESHERR

Misamis Cagayan de Oro Limbatangon Hydroelectric Turbines Resource & Development Compliant With:Work Plan -Posting
9.00
Oriental City Power Project Corp. of Performance Bond - RESHERR

Non-Compliant With:
Mat-i 2 Hydroelectric Power
Philnewriver Power Corp. Performance Bond; Work Plan; 1.60
Project
RESHERR
Non-Compliant With:
Mat-i 3 Hydroelectric Power
Philnewriver Power Corp. Performance Bond; Work Plan; 3.25
Project
RESHERR
Compliant With:
Posting of performance bond
Umalag 2 Hydroelectric Power
Meadowland Developers, Inc. Non-Compliant With: 2.50
Project
- Work Program
- RESHERR2
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Misamis Cabulig Hydroelectric Power Non-Compliant With:
MINDANAO X Claveria Mindanao Energy Systems, Inc. 8.00
Oriental Plant RESHERR
Non-Compliant With:
Lower Cabulig Hydroelectric - Work Program
Jasaan Mindanao Energy Systems, Inc. 10.00
Power Project - Posting of performance bond
- RESHERR
Odiongan, Odiongan River A Mini- Non-Compliant With:
JE Hydropower Ventures, Inc. 0.25
Gingoog City Hydroelectric Power Project RESHERR

Compliant With:
Lanao del Liangan Hydroelectric Power Work Program, Performance Bond
Bacolod Liangan Power Corporation 11.90
Norte Project Non-Compliant With:
RESHERR

Compliant With:Work Program -


Bayug Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Iligan City Posting of Performance Bond - 1.00
Project Inc.
RESHERR
Lower Bayug Hydroelectric Euro Hydro Power (Asia) Holdings, Non-Compliant With:
4.00
Power Project Inc. Work Program; RESHERR
Upper Bayug Hydroelectric Euro Hydro Power (Asia) Holdings, Non-Compliant With:
3.30
Power Project Inc. Work Program; RESHERR
Compliant With:
-Work Program
Bulanog-Batang Hydroelectric Bukidnon Hydro Energy
-Posting of performance bond 150.00
Power Project Corporation
Non-Compliant With:
-RESHERR
Compliant With:-Work Program
Agus VIII Modular Hydroelectric
Fu-Tai Philippines, Inc. - Posting of performance bond - 12.00
Power Project
RESHERR
Compliant With:Work Program -
Titunod Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Kolambogan Posting of Performance Bond - 1.00
Project Inc.
RESHERR
Lanao del
Pantar & Agus III Hydroelectric Power Non-Compliant With:
X/ARMM Norte/Lanao Maranao Energy Corp. 225.00
Baloi/Saguiaran Project RESHERR
del Sur
Non-Compliant With:
Tamugan Hydroelectric Power - Work Program
XI Davao del Sur Davao City HEDCOR, Inc. 11.50
Project - Posting of performance bond
- RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Talomo 2 Hydroelectric Power
MINDANAO XI Davao del Sur Davao City HEDCOR, Inc. Compliant With:RESHERR 0.60
Project
Talomo 3 Hydroelectric Power
HEDCOR, Inc. Compliant With:RESHERR 1.92
Project
Talomo 2A Hydroelectric Power
Davao City HEDCOR, Inc. Compliant With:RESHERR 0.65
Project
Talomo 2B Hydroelectric Power
HEDCOR, Inc. Compliant With:RESHERR 0.30
Project
Compliant With:
Work Program
Ruparan Hydroelectric Power Davao de Sur Electric Cooperative,
Digos City Non-Compliant With: 5.00
Project Inc.
- Posting of performance bond
- RESHERR
Compliant With:
Guma River Hydroelectric Power Euro Hydro Power (Asia) Holdings, Work Program
1.70
Project Inc. Non-Compliant With:
RESHERR, Performance Bond
Malita Hydroelectric Power Non-Compliant With:
Malita LGU of Malita, Davao del Sur 2.50
Project RESHERR , Work Program, PB
Tudaya 2 Hydroelectric Power
Sta. Cruz Hedcor Tudaya, Inc. Compliant With:RESHERR 7.00
Plant
Tudaya 1 Hydroelectric Power Compliant With:Work Plan -
Hedcor Sibulan, Inc . 6.60
Plant RESHERR
Sibulan A Hydroelectric Power Compliant With:Work Program,
Hedcor Sibulan, Inc . 16.50
Project Performance Bond
Sibulan B Hydroelectric Power
Hedcor Sibulan, Inc . Compliant With:RESHERR 26.00
Project
Non-Compliant With:
Compostela Upper Maco Hydroelectric - Work Program
Maco Sta. Clara Power Corp. 4.00
Valley Power Project - Posting of performance bond
- RESHERR
Mt. Leonard Hydroelectric Non-Compliant With:
Sta. Clara Power Corp. 2.00
Power Project PERFORMANCE BOND
Non-Compliant With:
Tagum R Hydroelectric Power - Work Program
Sta. Clara Power Corp. 4.00
Project - Posting of performance bond
- RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Compostela Hijo R. I Hydroelectric Power - Work Program
MINDANAO XI Maco Sta. Clara Power Corp. 3.00
Valley Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Hijo R. II Hydroelectric Power - Work Program
Sta. Clara Power Corp. 3.00
Project - Posting of performance bond
- RESHERR
New Bataan Hydroelectric Euro Hydro Power (Asia) Holdings,
New Bataan Compliant With:Work Program 2.40
Power Project Inc.
Compliant With:
Davao Baganga River Hydroelectric RESHERR
Baganga Global Sibagat Hydro Power Corp. 11.00
Oriental Power Project Non-Compliant With:
Work Program

Compliant With:
Cateel River Hydroelectric Work Program; Performance Bond
Global Sibagat Hydro Power Corp. 16.00
Power Project Non-Compliant With:
RESHERR

Non-Compliant With:
Osmea Hydroelectric Power LGS Renewable Energies - Work Program
Caraga 2.00
Project Corporation - Posting of performance bond
- RESHERR
Manorigao Hydroelectric Power LGS Renewable Energies Non-Compliant With:
17.00
Project Corporation Performance Bond, RESHERR

Compliant With:
Caraga 4 Hydroelectric Power LGS Renewable Energies Work Program, Performance Bond
35.00
Project Corporation Non-Compliant With:
RESHERR

Compliant With:
Governor Tibanban Hydroelectric Power LGS Renewable Energies Work Program, Performance Bond
2.00
Generoso Project Corporation Non-Compliant With:
RESHERR
Non-Compliant With:
Sumlog 2 Hydroelectric Power Alsons Energy Development
Lupon Work Program, Performance Bond, 15.00
Project Corporation
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Non-Compliant With:
Davao Sumlog 1 Hydroelectric Power Alsons Energy Development
MINDANAO XI Lupon Work Program, Performance Bond, 8.00
Oriental Project Corporation
RESHERR
Compliant With:
Casauman Hydroelectric Power Work Program
Manay Global Sibagat Hydro Power Corp. 34.00
Project Non-Compliant With:
RESHERR, Performance Bond

Compliant With:
Davao Hydroelectric Power San Lorenzo Ruiz Olympia Energy Work Program, Performance Bond
Davao del Sur Davao City 140.00
Project and Water, Inc. Non-Compliant With:
RESHERR

Non-Compliant With:
North Alamada Hydroelectric Power Euro Hydro Power (Asia) Holdings,
XII Alamada Work Program, Performance Bond, 1.00
Cotabato Project Inc.
RESHERR
Compliant With:
Work Program
Magpet 1 Hydroelectric Power
Magpet Universal Hydrotechnologies, Inc. Non-Compliant With: 9.80
Project
- Posting of performance bond
- RESHERR2
Compliant With:
Work Program
Magpet 2 Hydroelectric Power
Universal Hydrotechnologies, Inc. Non-Compliant With: 1.30
Project
- Posting of performance bond
- RESHERR2
Makilala-1 Hydroelectric Power Non-Compliant With:
Makilala Universal Hydrotechnologies, Inc. 2.00
Project Work Program; RESHERR
Non-Compliant With:
Kabulnan 2 Hydroelectric Power
Sultan Kudarat Isulan Philnewriver Power Corp. Work Program, Performance Bond, 110.00
Project
RESHERR
Compliant With:
Work Program
Siguil 1 Hydroelectric Power Alsons Energy Development
Sarangani Maasim Non-Compliant With: 8.70
Project Corporation
-Posting of performance bond
- RESHERR2
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
Work Program
Siguil 2 Hydroelectric Power Alsons Energy Development
MINDANAO XII Sarangani Maasim Non-Compliant With: 3.20
Project Corporation
-Posting of performance bond
- RESHERR2
Compliant With:
-Work Program
Siguil 3 Hydroelectric Power Alsons Energy Development
Non-Compliant With: 4.80
Project Corporation
-Posting of performance bond
- RESHERR
Non-Compliant With:
Kalaong 3 Hydroelectric Power Alsons Energy Development
Maitum Work Program, Performance Bond, 4.00
Project Corporation
RESHERR

Kalaong 1 Hydroelectric Power Alsons Energy Development Compliant With:-WORK PROGRAM


Saranggani Maitum 12.00
Project Corporation -PERFORMANCE BOND

Compliant With:
Kalaong 2 Hydroelectric Power Alsons Energy Development Work Program, Performance Bond
6.00
Project Corporation Non-Compliant With:
RESHERR
South Koronadal & Marbel 1 Hydroelectric Power Euro Hydro Power (Asia) Holdings, Non-Compliant With:
0.50
Cotabato Tampakan Project Inc. RESHERR
Lanon (Lam-alu) Hydroelectric Euro Hydro Power (Asia) Holdings, Non-Compliant With:
Lake Sebu 9.00
Power Project Inc. RESHERR, PB
Takbo Hydroelectric Power South Cotabato I Electric Non-Compliant With:
Sebu, 15.00
Project Cooperative, Inc. Work Program; RESHERR
Compliant With:
Work Program
Agusan del Taguibo 1 Hydroelectric Power
XIII Butuan Equi-Parco Construction Co. Non-Compliant With: 2.00
Norte Project
- Posting of performance bond
- RESHERR
Compliant With:
Work Program
Taguibo 2 Hydroelectric Power
Equi-Parco Construction Co. Non-Compliant With: 2.00
Project
Posting of performance bond;
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Compliant With:
-Posting of performance bond -
Agusan del Bugsukan Hydroelectric Power
MINDANAO XIII Butuan City Global Sibagat Hydro Power Corp. RESHERR 5.00
Norte Project
Non-Compliant With:
- Work Program
Compliant With:
-Posting of performance bond
Cabadbaran Hydroelectric FGEN Cabadbaran Hydro
Cabadbaran Non-Compliant With: 9.75
Power Project Corporation
-Work Plan
-RESHERR
Compliant With:
- Work Plan - RESHERR - Posting of
Lake Mainit Hydroelectric Power
Jabonga Agusan Power Corporation performance bond 25.00
Project
Non-Compliant With:

Compliant With:
-Work Plan
Puyo Hydroelectric Power
Jabonga FGEN Puyo Hydro Corporation -Posting of performance bond 30.00
Project
Non-Compliant With:
-RESHERR

Compliant With:
Asiga Hydroelectric Power Work Program, Performance Bond
Santiago Asiga Green Energy Corporation 8.00
Project Non-Compliant With:
RESHERR

Non-Compliant With:
Surigao del Lower Carac-an Hydroelectric
Cantilan Meadowland Developers, Inc. Work Program, Performance Bond, 5.00
Sur Power Project
RESHERR
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Surigao del Carac-an Hydroelectric Power Non-Compliant With:
MINDANAO XIII Madrid Hydro Link Projects Corporation 25.00
Sur Project RESHERR
Carromata Hydroelectric Power Surigao del Sur II Electric Compliant With:Work Program,
San Miguel 5.60
Project Cooperative, Inc. Performance Bond

Compliant With:
Sagbayan Hydroelectric Power Surigao del Sur II Electric Work Program, Performance Bond
0.64
Project Cooperative, Inc. Non-Compliant With:
RESHERR

Non-Compliant With:
Agusan Del Wawa 1 Hydroelectric Power - Work Program
Sibagat Equi-Parco Construction Co. 7.70
Sur Project - Posting of performance bond
- RESHERR
Wawa 2 Hydroelectric Power Non-Compliant With:
Equi-Parco Construction Co. 7.00
Project Performance Bond, RESHERR
Non-Compliant With:
Wawa 3 Hydroelectric Power - Work Program
Equi-Parco Construction Co. 5.60
Project - Posting of performance bond
- RESHERR
Managong Hydroelectric Power Global Sibagat Hydropower Non-Compliant With:
6.00
Project Corporation Performance Bond, RESHERR
Wawa Hydroelectric Power Global Sibagat Hydropower Compliant With:Posting of
13.00
Project Corporation performance bond
Non-Compliant With:
Malabang & Maitling River Hydroelectric
ARMM Lanao del Sur AQA Global Power Inc. Work Program, Performance Bond, 50.00
Tubaran Power Project
RESHERR
Non-Compliant With:
Baras River Hydroelectric Power - Work Program
AQA Global Power Inc. 30.00
Project - Posting of performance bond
- RESHERR
Non-Compliant With:
Matadi River Hydroelectric
AQA Global Power Inc. Work Plrogram -Posting of 27.00
Power Project
Performance Bond - RESHERR
Lake Dapao Hydroelectric Power Non-Compliant With:
AQA Global Power Inc. 50.00
Project RESHERR , Work Plan, PB
MINDANAO Sum 1,558.96 76.89
Grand Total 8,037.04 822.00