of
Pondy Hex plant
SH - TQM
SH -HR
SH - Finance
Safety U & SM
USI - 3 Executives 5
executives Nos.
Production Tools in- Design in-
in-charge charge charge
Engineering
Exe - 3 Cell
leader
OEM & Exp. Retail sales PPC Sub-contract
sales
1.8 Get price increase from customer 1.5% of sales Div Head Mktg
Div Head
1.10 Reduce other Fixed cost to sales 11.70% Finance
President's Policy 2014-15 Issue No. 1 , 05.06.2014
(FORM 1)
Sl Target Last PD Ref
Policy MOP Major Measures Target Deployed to Pondy
No. 2014-15 Year No.
2.3 Generate RFQ for new business 400 parts Div Head Mktg
Farm Implements -
Entry into adjacent Project report and Jan'15 CFT - Mktg,
- 6.2 Carryout survey, Identify customers, As per time line
business Business case D&D, R&D
prepare business case
a. Formed parts
b. Farm implements
6 c. SS speciality
fasteners Proto production Work on retail business, market
d. Aggregates & CFT - Mktg,
and sensitise retail Mar'15 - 6.3 survey, costing work out for selected As per time line
Assemblies D&D, R&D
market products
New processes
Enhance R&D 2 process Implement projects identified as per
8 and Materials - 8.1 100% GM - R&D
capability in FD 1 mtl time line
developed
KPM Padi
Policy Deployment Matrix for 2014-15 (FORM 2) 16:45 pm
Unit Head - Pondy Hex plant Issue: 1; date: 16.06.2014
FD
Sl PD Target Last
Managing Point Target1 PD ref Major Measures Checking Point Target Deployed to
No. Ref 2014-15 year
4-15
Reduce RM cost as a ratio of 1. RM procurement mix adherence 100% Hex Head USI
2 1.7 Improve Operating 27.80% 28.30% 27.3% dispatch ( Rs. / MT) by ensuring 2. RM Yield 90.5% Hex Mfg 1 Head
Contribution procurement mix & RM yield 3. Internal rejection - Forging 0.7% Hex Mfg 1 Head
4. Internal rejection - Process 0.2% Hex Mfg 2 Head
Tool material reclamation Tools cost (Rs /MT) 3600 Hex Mfg1 Head
Head count Bought-out service (Rs /MT) 2948 Hex Mfg2 Head
Pondy HR Head
Life improvement of specified Spares cost (Rs /MT) 1739 Hex Mfg2 Head
spares
Improve Delivery
perfomance Improve service level in OEM
6 3.4 80% 80% 72% segment by better scheduling OEM service level 80% Hex PPC Head
(service level as per
SAP) of long lead item
Suggestions per - 7/M/E 7/M/E Maintain suggestion Suggestions pending beyond target Zero Hex Mfg Heads
Employee implementaiton rate date for implementation
To understand requirements
and execute improvement
Green co rating for 100% as >750 projects in the areas of
8 5.1 the Plant per points (in - 1. Energy conservation No of improvement projects Nos to be Pondy Safety
(preparation for next guide internal 2. Hazardous waste reduction executed arrived Officer
year) lines audit)
3. Material consumption
reduction
9 5.2 CSR projects 100% 5 5 Prepare calendar and adhere Schedule adherence 100% Pondy HR Head
Compliance to Sustain compliance to schedule Schedule adherence to Vital Activity Pondy HR Head
10 5.30 statutory requirements 0 0 0 100%
- Notices received of submission Monitoring chart (VAM) Pondy Fin Head
11 7.1 QCC, QIT projects Nos 11 2 Training of members and Members trained in QC methods Nos TQM
periodic review of QCCs coordinator