You are on page 1of 10

SAP

BOQ Locat Cost Mat % BOQ Rate BOQ


S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code

1 2 3 4 5

A-1 SCHEDULE A-1 - Preliminaries and general requirements inclu 5.00%

Supply, Erection and Maintenance all through


the Contract Period and removal upon
A1.1 Completion of Fencing/barrier including Sound 0.25%
Proof Fencing/Barrier on all periphery of the
Area allotted for the Work.

ALL BB Supply & Erection of Barricade Board LS 50.00% 100.00


LS BB Launching Shaft at Apparel Park LS 30.00% 100.00
KKES BB Kankaria Station LS 35.00% 100.00
KPMS BB Kalupur Station LS 35.00% 100.00

Maintenance of Barricade Board 50.00%


LS BB Launching Shaft at Apparel Park LS 30.00% 100.00
KKES BB Kankaria Station LS 35.00% 100.00
KPMS BB Kalupur Station LS 35.00% 100.00

Construction and maintenance of offices for


Contractor, MEGA and GEC including all
supporting staff, secondary offices, off-site
A1.2 accommodation, with all furnitures and 0.50%
equipment complete. Provide, erect and equip
Site Laboratory. Demolition of the above upon
Completion.

Construction of Office 50.00%


ALL OFF MEGA / GEC Office at RC Technical Area LS 50.00% 100.00
ALL OFF Contractor Office at RC Tecnical Area LS 25.00% 100.00
ALL OFF QC Lab at Casting Yard LS 25.00% 100.00

ALL OFF Maintenance of Office 25.00%


ALL OFF MAIN MEGA / GEC Office Month 100.00% 39.00

Provide and Installation of Lab Equipment 25.00%


ALL OFF Provide & Installation of Lab equipment LS 100.00% 100.00

Conduct, submit and obtain the Notice of No


objection or Notice of No Objection Subject to
conditional No Objection from the Engineer for
A1.3 Geological Investigations, building conditions 0.25%
surveys, monitoring scheme, optical targets,
piezometer, inclinometer, load cells, crack meter,
tilt meter, etc.

Conduction additional Geotechnical


Investigation 35.00%
ALL GI Geotechnical Investigation Nos 100.00% 40.00

Conduction Pre Condition Building Survey 30.00%


ALL BCS Conduct Precondition Building Survey LS 70.00% 100.00
ALL BCS Submission of Report LS 30.00% 100.00

Instrumentation and Monitoring Scheme 35.00%


ALL INST Station Area LS 40.00% 100.00
TUN INST Tunnel Portion LS 60.00% 100.00

Submit and obtain the Notice of No objection


or Notice of No Objection Subject to
A1.4 conditional No Objection from the Engineer for 0.25%
Work Programme, Site Quality Plan, Site Safety
Plan, Site Environmental Plan.

Work Program 40.00%


ALL IWP Submission of Initial Work Program LS 40.00% 100.00
ALL IWP Obtaining NoNO from Engineer for IWP LS 10.00% 100.00
ALL DWP Submission of Detiled Work Program LS 40.00% 100.00
ALL DWP Obtaining NoNO from Engineer for DWP LS 10.00% 100.00

Site Quality Plan 20.00%


ALL SQP Submit Site Quality Plan LS 80.00% 100.00
ALL SQP Obtain NoNO from Engineer for Site Quality Plan LS 20.00% 100.00

Site Safety Plan 20.00%


ALL SSP Submit Site Safety Plan LS 80.00% 100.00
ALL SSP Obtain NoNO from Engineer for Site Safety Plan LS 20.00% 100.00

Site Environment Paln 20.00%


ALL SEP Submit Site Environmental Plan LS 80.00% 100.00
ALL SEP Obtain NoNO from Engineer for Site LS 20.00% 100.00
Environmental Plan

Furnish undertaking, guarantee and warranty as


A1.5 per GCC clause 4.2 Procure Insurance Policy as 0.25%
per GC Clause 18.
ALL BG Submission of BG and Policy Documents LS 100.00% 100.00

Contractors supervision and other on-going


contract obligation. Compliance with contract
provision for Safety, Security, Environment,
Quality Assurance and Testing. Provision of site
A1.6 services. (To be paid monthly through the 1.50%
Construction Period. If the Construction period
is extended, then the subsequent payment shall
be adjusted through the remaining construction
period)

ALL REPT Submission of Monthly Quality Report Months 50.00% 39.00


ALL REPT Submission of Monthly HSE Report Months 50.00% 39.00

A1.7 ALL UTI Shifting of Charted Utilities including Design and LS 2.00% 100.00
on Approval by Local Authority.
Utility Investigation Work 30.00%
LS UTI Launching Shaft at Apparel Park. LS 20.00% 100.00
KKES UTI Kankaria East Station LS 40.00% 100.00
KPMS UTI Kalupur Metro Station LS 40.00% 100.00

Diversion of Utility and getting approval from 70.00%


Concerened Authorities
LS UTI Launching Shaft at Apparel Park. LS 20.00% 100.00
KKES UTI Kankaria East Station LS 40.00% 100.00
KPMS UTI Kalupur Metro Station LS 40.00% 100.00

SCHEDULE A-2 DESIGN OF TEMPORARY AND PERMANENT 3.00%

A2.1 Preliminary Design and Drawings submission as 0.10%


BIM model (Key Date KD-1).
ALL PD Submission of Preliminary Design LS 80.00% 100.00
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
ALL PD Obtain NoNO from Engineer For Preliminary LS 20.00% 100.00
Design Submission

A2.2 Design Co-ordination submission and Execution 0.10%


plan in PMIS (Key Date KD2).

ALL PMIS Submission of Design Co-ordination and LS 80.00% 100.00


Execution Plan in PMIS

ALL PMIS Obtain NoNO for Design Co-ordination Plan from LS 20.00% 100.00
Engineer

A2.3 Definitive Design and Drawing Submission as 0.15%


BIM model (Key Date KD3).
Submission of Definative Design with BIM 80.00%
Model
Launching Shaft & C/C at Apparel Park 15.00%
LS DDE Dwall / Retaining Structure LS 40.00% 100.00
LS DDE Roof Slab LS 20.00% 100.00
LS DDE Wall LS 20.00% 100.00
LS DDE Base Slab LS 20.00% 100.00

Kankaria Station 30.00%


KKES DDE Dwall / Retaining Structure LS 30.00% 100.00
KKES DDE Slab LS 60.00% 0.00
KKES DDE Roof Slab LS 20.00% 100.00
KKES DDE Concourse Slab LS 20.00% 100.00
KKES DDE Base Slab LS 20.00% 100.00
KKES DDE Entry / Exit LS 10.00% 100.00

Kalupur Station 30.00%


KPMS DDE Dwall / Retaining Structure LS 30.00% 100.00
KPMS DDE Slab LS 60.00% 0.00
KPMS DDE Roof Slab LS 20.00% 100.00
KPMS DDE Concourse Slab LS 20.00% 100.00
KPMS DDE Base Slab LS 20.00% 100.00
KPMS DDE Entry / Exit LS 10.00% 100.00

Tunnel 25.00%
TUN DDE Tunnel Ring LS 70.00% 100.00
TUN DDE Cross Passage LS 30.00% 100.00

Obtain NoNO from Engineer for Definative


Design with BIM Model 20.00%
Launching Shaft & C/C at Apparel Park 15.00%
LS DDE Dwall / Retaining Structure LS 40.00% 100.00
LS DDE Roof Slab LS 20.00% 100.00
LS DDE Wall LS 20.00% 100.00
LS DDE Base Slab LS 20.00% 100.00

Kankaria Station 30.00%


KKES DDE Dwall / Retaining Structure LS 30.00% 100.00
KKES DDE Slab LS 60.00% 0.00
KKES DDE Roof Slab LS 20.00% 100.00
KKES DDE Concourse Slab LS 20.00% 100.00
KKES DDE Base Slab LS 20.00% 100.00
KKES DDE Entry / Exit LS 10.00% 100.00

Kalupur Station 30.00%


KPMS DDE Dwall / Retaining Structure LS 30.00% 100.00
KPMS DDE Slab LS 60.00% 0.00
KPMS DDE Roof Slab LS 20.00% 100.00
KPMS DDE Concourse Slab LS 20.00% 100.00
KPMS DDE Base Slab LS 20.00% 100.00
KPMS DDE Entry / Exit LS 10.00% 100.00

Tunnel 25.00%
TUN DDE Tunnel Ring LS 70.00% 100.00
TUN DDE Cross Passage LS 30.00% 100.00

A2.4 (a) ALL CIP Co-ordinated Installation Plan (CIP). LS 0.25% 100.00

3rd Party Independent Detailed Design Checks


A2.4 (b) (Lead Design Checker Level-4). 0.50%
ALL LDC Submission of I-LDC Report Month 100.00% 39.00

A2.4 (c) Construction Reference Design, Drawings as BIM 1.30%


model.
Submission of CRD with BIM Model 80.00%
Launching Shaft & C/C at Apparel Park 15.00%
LS CRD Dwall / Retaining Structure LS 40.00% 100.00
LS CRD Roof Slab LS 20.00% 100.00
LS CRD Wall LS 20.00% 100.00
LS CRD Base Slab LS 20.00% 100.00

Kankaria Station 30.00%


KKES CRD Dwall / Retaining Structure LS 30.00% 100.00
KKES CRD Slab LS 60.00% 0.00
KKES CRD Roof Slab LS 20.00% 100.00
KKES CRD Concourse Slab LS 20.00% 100.00
KKES CRD Base Slab LS 20.00% 100.00
KKES CRD Entry / Exit LS 10.00% 100.00

Kalupur Station 30.00%


KPMS CRD Dwall / Retaining Structure LS 30.00% 100.00
KPMS CRD Slab LS 60.00% 0.00
KPMS CRD Roof Slab LS 20.00% 100.00
KPMS CRD Concourse Slab LS 20.00% 100.00
KPMS CRD Base Slab LS 20.00% 100.00
KPMS CRD Entry / Exit LS 10.00% 100.00

Tunnel 25.00%
TUN CRD Tunnel Ring LS 70.00% 100.00
TUN CRD Cross Passage LS 30.00% 100.00

Obtain NoNO from Engineer for CRD with BIM 20.00%


Model
Launching Shaft & C/C at Apparel Park 15.00%
LS CRD Dwall / Retaining Structure LS 40.00% 100.00
LS CRD Roof Slab LS 20.00% 100.00
LS CRD Wall LS 20.00% 100.00
LS CRD Base Slab LS 20.00% 100.00

Kankaria Station 30.00%


KKES CRD Dwall / Retaining Structure LS 30.00% 100.00
KKES CRD Slab LS 60.00% 0.00
KKES CRD Roof Slab LS 20.00% 100.00
KKES CRD Concourse Slab LS 20.00% 100.00
KKES CRD Base Slab LS 20.00% 100.00
KKES CRD Entry / Exit LS 10.00% 100.00

Kalupur Station 30.00%


KPMS CRD Dwall / Retaining Structure LS 30.00% 100.00
KPMS CRD Slab LS 60.00% 0.00
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
KPMS CRD Roof Slab LS 20.00% 100.00
KPMS CRD Concourse Slab LS 20.00% 100.00
KPMS CRD Base Slab LS 20.00% 100.00
KPMS CRD Entry / Exit LS 10.00% 100.00

Tunnel 25.00%
TUN CRD Tunnel Ring LS 70.00% 100.00
TUN CRD Cross Passage LS 30.00% 100.00

Good for Construction Reference Design and


A2.4 (d) Drawings Working Design and Drawings, as 0.30%
BIM model (level of detailing 400).

Submission of GFC Design with BIM Model 80.00%


Launching Shaft & C/C at Apparel Park 15.00%
LS GFC Dwall / Retaining Structure LS 40.00% 100.00
LS GFC Roof Slab LS 20.00% 100.00
LS GFC Wall LS 20.00% 100.00
LS GFC Base Slab LS 20.00% 100.00

Kankaria Station 30.00%


KKES GFC Dwall / Retaining Structure LS 30.00% 100.00
KKES GFC Slab LS 60.00% 0.00
KKES GFC Roof Slab LS 20.00% 100.00
KKES GFC Concourse Slab LS 20.00% 100.00
KKES GFC Base Slab LS 20.00% 100.00
KKES GFC Entry / Exit LS 10.00% 100.00

Kalupur Station 30.00%


KPMS GFC Dwall / Retaining Structure LS 30.00% 100.00
KPMS GFC Slab LS 60.00% 0.00
KPMS GFC Roof Slab LS 20.00% 100.00
KPMS GFC Concourse Slab LS 20.00% 100.00
KPMS GFC Base Slab LS 20.00% 100.00
KPMS GFC Entry / Exit LS 10.00% 100.00

Tunnel 25.00%
TUN GFC Tunnel Ring LS 70.00% 100.00
TUN GFC Cross Passage LS 30.00% 100.00

Obtain NoNO from Engineer for GFC Design


with BIM Model 20.00%
Launching Shaft & C/C at Apparel Park 15.00%
LS GFC Dwall / Retaining Structure LS 40.00% 100.00
LS GFC Roof Slab LS 20.00% 100.00
LS GFC Wall LS 20.00% 100.00
LS GFC Base Slab LS 20.00% 100.00

Kankaria Station 30.00%


KKES GFC Dwall / Retaining Structure LS 30.00% 100.00
KKES GFC Slab LS 60.00% 0.00
KKES GFC Roof Slab LS 20.00% 100.00
KKES GFC Concourse Slab LS 20.00% 100.00
KKES GFC Base Slab LS 20.00% 100.00
KKES GFC Entry / Exit LS 10.00% 100.00

Kalupur Station 30.00%


KPMS GFC Dwall / Retaining Structure LS 30.00% 100.00
KPMS GFC Slab LS 60.00% 0.00
KPMS GFC Roof Slab LS 20.00% 100.00
KPMS GFC Concourse Slab LS 20.00% 100.00
KPMS GFC Base Slab LS 20.00% 100.00
KPMS GFC Entry / Exit LS 10.00% 100.00

Tunnel 25.00%
TUN GFC Tunnel Ring LS 70.00% 100.00
TUN GFC Cross Passage LS 30.00% 100.00

As-Built Drawings submission and acceptance by


A2.5 Employer. (level of detailing 400). 0.30%

Submission of As Built Drawing 80.00%


LS ABD Launching Shaft & C/C LS 15.00% 100.00
KKES ABD Kankaria Station LS 30.00% 100.00
KPMS ABD Kalupur Station LS 30.00% 100.00
TUN ABD Tunnel LS 25.00% 100.00

Obtain NoNO from Engineer for As Built


Drawing 20.00%
LS ABD Launching Shaft & C/C LS 15.00% 100.00
KKES ABD Kankaria Station LS 30.00% 100.00
KPMS ABD Kalupur Station LS 30.00% 100.00
TUN ABD Tunnel LS 25.00% 100.00

SCHEDULE A-3 Open cut and cut & cover tunnels section in 8.00%

Construction of diaphragm walls as part of


permanent structure. (Mode of Payment in
A3.1 Interim Payment will be made on proportionate 2.00%
basis based on actual work progress in Linear
Metre on plan divided by total length in plan)

Cut & Cover Ramp


C&C SPile Boring Soldier Pile with wooden RM 20.00% 2656.2
lagging /Sheet Pile
Structural Steel for soldier
C&C SPile S Steel pile/sheet pile, Grade Fe410 MT 265.6
(Including ISMB450, ISMB250,
NPB450, NPB 600)
Wooden legging, timber section
C&C SPile Wlegging 125x125x1500mm sqm 1673.8
C&C KP Temporary King Post 0.0
C&C KP Boring Boring 1000mm dia pile RM 600.0
C&C KP M35 Concrete for pile, Grade M35 cum 471.2
TMT Steel reinforcement for pile,
C&C KP REFE500 Grade Fe500, including laps, MT 25.9
wastage, spacer&lifting bars etc.

C&C KP S Steel Plunge Column for King Post (UC MT 47.2


305 X 305 X 118)

Receiving Shaf
RS DWALL 800mm Thk Diaphragm Wall RM 20.00% 90.1
RS G-wall M20 Concrete for Guide wall, Grade M15 cum 75.7
RS G-wall REFE500 Reinforcement for Guide Wall MT 15.7
RS DWALL GRAB Trenching for 800 mm thick sqm 1803.3
Diaphragm wall

RS DWALL M40 Concrete for 800mm thick cum 1732.8


Diaphragm Wall,Grade M40
RS DWALL REFE500 Dwall Reinforcement MT 375.2
RS DWALL GFRP GFRP Bar - 25mm Dia RM 3000.0
RS DWALL GFRP GFRP Bar - 40mm Dia RM 1500.0
RS DWALL GFRP GFRP Bar - 16mm Dia RM 3000.0
RS DWALL W Stoper PVC water stopper in Diaphragm RM 229.8
wall
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
Launch Shaf
LS DWALL 800mm Thk Diaphragm Wall RM 60.00% 84.8
LS G-wall M20 Concrete for Guide wall, Grade M15 cum 185.0
LS G-wall REFE500 Reinforcement for Guide Wall MT 14.8
Trenching for 800 mm thick
LS DWALL GRAB Diaphragm wall sqm 2550.1

LS DWALL M40 Concrete for 800mm thick cum 1889.9


Diaphragm Wall,Grade M40
LS DWALL REFE500 Dwall Reinforcement MT 353.2
LS DWALL GFRP GFRP Bar - 25mm Dia RM 3000.0
LS DWALL GFRP GFRP Bar - 40mm Dia RM 1500.0
LS DWALL GFRP GFRP Bar - 16mm Dia RM 3000.0
LS DWALL W Stoper PVC water stopper in Diaphragm RM 660.4
wall
Structural steel for king post, Grade
LS DWALL S Steel Fe410 MT 25.6

Excavation including strut/waller/anchor


supports. Including temporary decking as
required (Mode of payment in Interim Payment
A3.2 will be made on proportionate basis based on 1.20%
actual work progress in Volume of earthwork
excavated on plan divided by total volume in
plan)

C&C EXC Cut & Cover Ramp Cum 44.60% 38292.0


Structural steel for Strut and waler, Grade
C&C EXC S Steel Fe410 MT 362.7

RS EXC Receiving Shaf Cum 12.14% 10423.0


Structural steel for Strut and waler, Grade
RS EXC S Steel Fe410 MT 66.4

LS EXC Launch Shaf Cum 43.26% 37142.0


LS EXC S Steel Structural steel for Strut and waler, Grade MT 146.0
Fe410

Construction of Base slab. (Mode of payment in


Interim Payment will be made on proportionate
A3.3 basis based on actual work progress in square 1.20%
meter (Sq. m) on plan divided by total area in Sq.
m on plan)
C&C BS M40 Cut & Cover Ramp Cum 68.00% 1691.8
C&C BS PCC M15 PCC M15 cum 368.4
C&C BS W Proofing Crystalline Waterproofing kg/m3 1691.8
C&C BS REFE500 Base Slab Reinforcement MT 356.5
C&C BS W Stoper PVC water stopper in base slab RM 2869.6

RS BS M40 Receiving Shaf Cum 7.00% 550.9


RS BS PCC M15 PCC M15 cum 288.4
Providing and applying waterproofing
RS BS W Proofing treatment to base slab using crystalline sqm 550.9
type admixture in concrete
RS BS REFE500 Base Slab Reinforcement MT 116.1
RS BS W Stoper PVC water stopper in base slab RM 39.4
RS BS Coup25 Coupler - 25mm Dia Nos 296.5
RS BS Coup32 Coupler - 32mm Dia Nos 148.0
No. of Drilled Bars (Assuming 5% to be
RS BS chemically anchored) Nos 22.2

LS BS M40 Launch Shaf Cum 25.00% 1612.8


LS BS PCC M15 PCC M15 cum 2134.4
Providing and applying waterproofing
LS BS W Proofing treatment to base slab using crystalline kg/m3 1612.8
type admixture in concrete
LS BS REFE500 Base Slab Reinforcement MT 339.8
LS BS W Stoper PVC water stopper in base slab RM 74.4
LS BS Coup25 Coupler - 25mm Dia Nos 1185.0
LS BS Coup32 Coupler - 32mm Dia Nos 592.5
No. of Drilled Bars (Assuming 5% to be
LS BS chemically anchored) Nos 88.9

Construction of Internal Tunnel wall. (Mode of


payment in interim payment will be made on
A3.4 proportionate basis based on actual work 0.50%
progress in running meter on plan divided by
total running meter on plan)
C&C WALLS M35 Cut & Cover Ramp Cum 63.00% 1029.0
C&C WALLS REFE500 Wall Reinforcement MT 158.5

RS WALLS M35 Receiving Shaf Cum 7.00% 184.8


RS WALLS REFE500 Wall Reinforcement MT 30.5
RS WALLS W Stoper PVC water stopper in retaining wall RM 15.4

LS WALLS M35 Launch Shaf Cum 30.00% 628.8


LS WALLS REFE500 Wall Reinforcement MT 103.8
LS WALLS W Stoper PVC water stopper in retaining wall RM 26.2

Construction of Tunnel Roof slab. (Mode of


payment in Interim Payment will be made on
A3.5 proportionate basis based on actual work 1.50%
progress in square meter (Sq. m) on plan divided
by total area in Sq. m on plan)
C&C RFS M40 Cut & Cover Ramp Cum 63.00% 1126.2
C&C RFS REFE500 Reinforcement MT 216.2

RS RFS M40 Receiving Shaf Cum 7.00% 259.2


RS RFS REFE500 Reinforcement MT 49.8

LS RFS M40 Launch Shaf Cum 30.00% 888.0


LS RFS REFE500 Reinforcement MT 170.5

Construction of Ramp including walls, concrete


works, earthworks, fencing, grille, handrail and
A3.6 others. (Mode of payment in Interim Payment 0.30%
will be made on proportionate basis as decided
by the Engineer)

C&C RAMP Cut & Cover Ramp 100.00% 400.0


C&C RAMP Railing in ramp RM 4220.0
C&C RAMP S Steel Structural steel for railing MT 147.7
C&C RAMP JBolt 12 Dia. J bolts nos 11253.3
C&C RAMP M35 Bedding Mortar cum 2.8

Construction including backfilling, waterproofing


and complete works on the approach ramp and
A3.7 cut and cover Tunnel. (The mode of payment in 0.90%
Interim Payment will be made on proportionate
basis as decided by the Engineer).
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
C&C WP Cut & Cover Ramp Sqm 68.00% 100.0
C&C WP LWP Water Proofing of Wall and Slab Sqm 2414.0
C&C BKF BKF Backfilling between Wall Cum 3180.6

RS WP Receiving Shaf Sqm 7.00% 100.0


RS WP LWP Water Proofing of Wall and Slab Sqm 316.8
RS BKF BKF Backfilling between Wall Cum 1638.6
RS BKF BKF Backfilling above Roof slab Cum 6460.3

LS WP Launch Shaf Sqm 25.00% 100.0


LS WP LWP Water Proofing of Wall and Slab Sqm 2455.2
LS BKF BKF Backfilling between Wall Cum 3982.4
LS BKF BKF Backfilling above Roof slab Cum 3815.2

Completion of all other balance work of Open


A3.8 Cut and Cut & Cover Tunnel Section including 0.20%
Ramps. (25% Payment will be made in last
interim payment)
C&C MISC Cut & Cover Ramp 68.00% 100.0
C&C MISC S Steel Structural steel for walkway in ramp MT 26.4
C&C MISC Shear Shear connector in rail Plinth MT 4.9

RS MISC Receiving Shaf 7.00% 100.0


RS MISC S Steel Structural steel for walkway in ramp MT 40.0
RS MISC Shear Shear connector in rail Plinth MT 0.6

LS MISC Launch Shaf 25.00% 100.0


LS MISC S Steel Structural steel for walkway in ramp MT 160.0
LS MISC Shear Shear connector in rail Plinth MT 2.5

A3.9 Site Clearance and Area Hand Over 0.20%


(a) Site clearance and area handover 50% LS 50.00%
completed.
C&C AHO Cut & Cover Ramp LS 68.00% 100.0
RS AHO Receiving Shaft LS 7.00% 100.0
LS AHO Launch Shaft LS 25.00% 100.0

(b) Site clearance and area handover 100% LS 50.00%


completed.
C&C AHO Cut & Cover Ramp LS 68.00% 100.0
RS AHO Receiving Shaft LS 7.00% 100.0
LS AHO Launch Shaft LS 25.00% 100.0
SCHEDULE A-4 Bored tunnels/NATM/Cross passages. 33.00%
Commissioning of segment casting yard.
A4.1 (Progressive Payment will be made till minimum 1.50%
100 rings are cast).

SCY PRE Construction of Casting yard bed & Steel Yard LS 20.00% 100.00

SCY PRE Erection & Commissioning of Batching Plant LS 10.00% 100.00

Erection & Commissioning of other Casting


SCY PRE related Equipment (Gantry & EOT) LS 10.00% 100.00
SCY PRE Erection & Commissioning of Ring Moulds LS 15.00% 100.00
SCY SEG PRO M50C Casting and Assembly of Trial Rings Rings 20.00% 3.00
SCY SEG PRO M50C Casting and Permanent Rings Rings 25.00% 100.00

Assembly of TBM at site and Initial Drive (Mode


A4.2 of payment in Interim payment will be made on
completion of initial drive by the TBM on pro
rata basis.)

TBM No.1 (Refurbished) 2.00%


TUN FAT Factory Testing of TBM-1 LS 50.00% 100.00

TUN ASS Launching Of TBM -1 LS 25.00% 100.00

TUN ID Intial Drive of TBM -1 RM 25.00% 75.00

TBM No. 2 (New) 2.00%

TUN FAT Factory Testing of TBM-2 LS 50.00% 100.00

TUN ASS Launching Of TBM -2 LS 25.00% 100.00


TUN ID Intial Drive of TBM -2 RM 25.00% 75.00

Construction of Tunnel by TBM/NATM and Cross


Passages. (Mode of payment in Interim payment
will be made on proportionate basis based on
actual work progress in running meter of single
A4.3 tunnel on plan, for the portion in which lining 24.00%
segment are precast, erected and accepted by
the Engineer and the cavity grouting have been
successfully executed, divided by total running
meter on plan.)

SCY SEG PRO M50C Segment Casting Rings 20.00% 2602


TUN MD Tunnel boring RM 80.00% 3722.00 3572
2,658.57

Construction of invert concrete, walkway and


grouting other than cavity grouting. (Mode of
A4.4 payment in Interim Payment will be made on 1.50%
proportionate basis based on actual work
progress in running meter of single Tunnel
divided by total running meter on plan.)

TUN Invt Con M35 Laying of invert concrete Rm 50.00% 3202.00


TUN WW Erection of Walkway Rm 50.00% 3202.00

Completion of all other balance works of Bored


A4.5 Tunnels/NATM, Cross Passages, drainage system 2.00%
in the tunnel, including wriggle survey of as-built
tunnel and tunnel cleaning, clearing, etc.;

TUN CP NOS Construction and complete finishing of Cross Nos 80.00% 3.00
passage

TUN MISC Drainage System and Balance Tunnel Finishing LS 15.00% 100.00
Work

TUN MISC Conducting Wringle Survey and Submission of LS 5.00% 100.00


Report to Engineer

SCHEDULE A-5 Station boxes and entry/exit structure in stat 41.00%

Construction of sheet pile/soldier pile/


diaphragm wall complete for station box and
A5.1 5.1 other structures. (Mode of payment in Interim
payment will be made on proportionate basis
based on actual progress in Linear Meter on Plan
divided by total length in Plan)
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
Kankaria East Station 2.70%
KKES SPILE Soldier Pile with wooden lagging /Sheet Rm 10.00% 1644.3
Pile
Structural Steel for soldier pile/sheet pile,
KKES SPILE S Steel Grade Fe410 ( excluding ISMB450, MT 211.5
ISMB250, NPB450, NPB 600)
Structural steel for Strut and waler, Grade
KKES SPILE S Steel Fe410 MT 86.0
KKES SPILE Boring 750mm dia boring for soldier pile Rm 1644.3
KKES SPILE Wlegging Wooden legging, timber section sqm 1758.5
125x125x1500mm

KKES TP Temporary column 5.00% 18.0


KKES TP Boring Boring 1200mm dia pile for Main Station Rm 829.1

KKES TP M35 Concrete for pile, Grade M35 Main Station cum 497.6

TMT Steel reinforcement for pile, Grade


KKES TP REFE500 Fe500, excluding laps, wastage, MT 24.9
spacer&lifting bars etc.

KKES TP S Steel Structural steel for Plunge-in-steel MT 239.9


column, over D-wall, Grade Fe410

Diaphragm Wall - Main Station


KKES DWALL 800mm thk Dwall Rm 35.00% 298.4
KKES G-wall M20 Concrete for Guide wall, Grade M15 Cum 250.7
Reinforcement for Guide wall, FE
KKES G-wall REFE500 500 MT 52.1
KKES DWALL Grab Trenching Sqm 6699.1
Concrete for 800mm thick
KKES DWALL M40 Diaphragm Wall,Grade M40 Cum 5359.3

Reinforcement for 800mm thick


KKES DWALL REFE500 Diaphragm Wall, FE 500 including MT 1242.8
Couplers
KKES DWALL W Stoper PVC water stopper in Diaphragm Rm 1202.4
wall
KKES DWALL GFRP GFRP - 25mm dia bars Rm 4500.0
KKES DWALL GFRP GFRP - 40mm dia bars Rm 5500.0

1000mm thk Dwall Rm 40.00% 280.0


KKES G-wall M20 Concrete for Guide wall, Grade M15 Cum 235.2
KKES G-wall REFE500 Reinforcement for Guide wall, FE MT 48.9
500
KKES DWALL Grab Trenching Sqm 6286.0
KKES DWALL M40 Concrete for 1000mm thick Cum 6286.0
Diaphragm Wall,Grade M40
Reinforcement for 1000mm thick
KKES DWALL REFE500 Diaphragm Wall, FE 500 including MT 1166.2
Couplers
KKES DWALL W Stoper PVC water stopper in Diaphragm Rm 1128.3
wall

Diaphragm Wall - Entry / Exit


KKES EE-DW 800mm thk Dwall Rm 10.00% 140.0
KKES EE-GW M20 Concrete for Guide wall, Grade M15 Cum 117.6
KKES EE-GW REFE500 Reinforcement for Guide wall, FE 500 MT 4.7
KKES EE-DW Grab Trenching Sqm 1950.9
Concrete for 800mm thick Diaphragm
KKES EE-DW M40 Wall,Grade M40 Cum 1560.7

Reinforcement for 800mm thick


KKES EE-DW REFE500 Diaphragm Wall, FE 500 including MT 583.1
Couplers
KKES EE-DW W Stoper PVC water stopper in Diaphragm wall Rm 312.1

Kalupur Station 2.50%


KPMS SPILE Soldier Pile with wooden lagging /Sheet Rm 12.00% 3225.1
Pile
Structural Steel for soldier pile/sheet pile,
KPMS SPILE S Steel Grade Fe410 ( excluding ISMB450, MT 414.8
ISMB250, NPB450, NPB 600)
Structural steel for Strut and waler, Grade
KPMS EE-EXC S Steel Fe410 MT 301.5
KPMS SPILE Boring 750mm dia boring for soldier pile Rm 3225.1
Wooden legging, timber section
KPMS SPILE Wlegging 125x125x1500mm sqm 3571.7

KPMS TP Temporary column 3.00% 14.0


KPMS TP Boring Boring 1200mm dia pile for Main Station Rm 782.2

KPMS TP M35 Concrete for pile, Grade M35 Main Station cum 452.4

TMT Steel reinforcement for pile, Grade


KPMS TP REFE500 Fe500, excluding laps, wastage, MT 22.6
spacer&lifting bars etc.

KPMS TP S Steel Structural steel for Plunge-in-steel MT 560.4


column, over D-wall, Grade Fe410

Diaphragm Wall - Main Station


KPMS DWALL 800mm thk Dwall Rm 35.00% 381.0
KPMS G-wall M20 Concrete for Guide wall, Grade M15 Cum 320.0
KPMS G-wall REFE500 Reinforcement for Guide wall, FE 500 MT 66.5
KPMS DWALL Grab Trenching Sqm 9156.4
KPMS DWALL M40 Concrete for 800mm thick Diaphragm Cum 5378.2
Wall,Grade M40
Reinforcement for 800mm thick
KPMS DWALL REFE500 Diaphragm Wall, FE 500 including MT 1586.9
Couplers
KPMS DWALL W Stoper PVC water stopper in Diaphragm wall Rm 1243.3
KPMS DWALL GFRP GFRP - 25mm dia bars Rm 4500.0
KPMS DWALL GFRP GFRP - 40mm dia bars Rm 5500.0

KPMS DWALL 1000mm thk Dwall Rm 40.00% 112.0


KPMS G-wall M20 Concrete for Guide wall, Grade M15 Cum 94.1
KPMS G-wall REFE500 Reinforcement for Guide wall, FE 500 MT 19.5
KPMS DWALL Grab Trenching Sqm 2736.2
Concrete for 1000mm thick Diaphragm
KPMS DWALL M40 Wall,Grade M40 Cum 2665.6

Reinforcement for 1000mm thick


KPMS DWALL REFE500 Diaphragm Wall, FE 500 including MT 466.5
Couplers
KPMS DWALL W Stoper PVC water stopper in Diaphragm wall Rm 365.5

Diaphragm Wall - Entry / Exit


KPMS EE-DW 800mm thk Dwall Rm 10.00% 280.0
KPMS EE-GW M20 Concrete for Guide wall, Grade M15 Cum 235.2
KPMS EE-GW REFE500 Reinforcement for Guide wall, FE 500 MT 9.5
KPMS EE-DW Grab Trenching Sqm 4279.8
KPMS EE-DW M40 Concrete for 800mm thick Diaphragm Cum 3423.8
Wall,Grade M40
Reinforcement for 800mm thick
KPMS EE-DW REFE500 Diaphragm Wall, FE 500 including MT 1166.2
Couplers
KPMS EE-DW W Stoper PVC water stopper in Diaphragm wall Rm 684.8
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code

Excavation including strut/ waller/anchor


supports, for station box and other structures
including temporary decking as required (Mode
A5.2 5.2 of payment in Interim payment will be made on
proportionate basis based on actual work
progress in volume of earthwork excavated on
plan divided by total volume in plan)

Kankaria East Station 2.60%


Main Station Building
KKES EXC-R S Steel Excavation for Roof Slab Cum 18.00% 20753.7
KKES EXC-C S Steel Excavation for Concourse Level Slab Cum 28.00% 32853.3
KKES EXC-B S Steel Excavation for Base Slab Cum 41.00% 48455.2
Entry / Exit Structure
KKES EE-EXC-R S Steel Excavation for Roof Slab Cum 5.00% 6332.0
KKES EE-EXC-B S Steel Excavation for Base Slab Cum 8.00% 9238.1
Kalupur Station 2.10%
Main Station Building
KPMS EXC-R S Steel Excavation for Roof Slab Cum 20.00% 31294.1
KPMS EXC-C S Steel Excavation for Concourse Level Slab Cum 22.00% 34259.4
KPMS EXC-B S Steel Excavation for Base Slab Cum 35.00% 53139.3
Entry / Exit Structure
KPMS EE-EXC-R S Steel Excavation for Roof Slab Cum 9.00% 13628.0
KPMS EE-EXC-B S Steel Excavation for Base Slab Cum 14.00% 21291.9

Construction of Base slab, lowered base slab for


retrieval shaft, etc. and rebuilding to required
level including waterproofing, cable galleries,
A5.3 5.3 etc. for station box and other structures (Mode
of payment in Interim payment will be made on
proportionate basis based on actual work
progress in square meter (Sq. m) on plan divided
by total area in Sq. m on plan).

Kankaria East Station 2.60%


KKES BS Base Slab Construction Sqm 100.00% 5342.0
KKES BS M40 Concreting for Base Slab, M40 Cum 7034.7
KKES BS REFE500 Reinforcement for Base Slab, FE500 MT 1125.6
KKES BS M40 Concrete for Track Bed, M40 Cum 208.0
KKES BS REFE500 Shear Reinforcement for Track Bed, FE500 MT
KKES BS W Proofing Crystalline Waterproofing kg/m3 5342.0
KKES BS PCC M15 PCC, Grade M10/M15 Cum 552.5
KKES BS EMAT Earthmat - Structural steel MS/GI Inserts MT 10.0
KKES BS Coup32 Couplers - 32mm Dia Nos 8569.0
KKES BS Coup25 Couplers - 25mm Dia Nos 5713.0
KKES BS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KKES BS HILTI DB of Various Dia Nos 715.0

Chipping / Breaking for Plung Column


KKES BS CHIP Extra Concrete Cum 12.2
KKES BS HACK Concrete Surface Hacking Sqm 1302.1
KKES BS BULG Chipping of Bulging Sqm 0.0

Kalupur Station 2.20%


KPMS BS Base Slab Construction Sqm 100.00% 5770.3
KPMS BS M40 Concreting for Base Slab, M40 Cum 6561.0
KPMS BS REFE500 Reinforcement for Base Slab, FE500 MT 1215.8
KPMS BS M40 Concrete for Track Bed, M40 Cum 176.0
KPMS BS REFE500 Shear Reinforcement for Track Bed, FE500 MT
KPMS BS W Proofing Crystalline Waterproofing kg/m3 5770.3
KPMS BS PCC M15 PCC, Grade M10/M15 cum 470.0
KPMS BS EMAT Earthmat - Structural steel MS/GI Inserts MT 10.0
KPMS BS Coup32 Couplers - 32mm Dia Nos 7304.0
KPMS BS Coup25 Couplers - 25mm Dia Nos 4870.0
KPMS BS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KPMS BS HILTI DB of Various Dia Nos 609.0

KPMS BS CHIP Chipping / Breaking for Plung Column Cum 9.5


Extra Concrete
KPMS BS HACK Concrete Surface Hacking Sqm 1089.5
KPMS BS BULG Chipping of Bulging Sqm 0.0

Construction of Platform wall and slab. (Mode of


payment in Interim payment will be made on
A5.4 5.4 proportionate basis based on actual work
progress in square meter (Sq. m) on plan divided
by total area in Sq. m in plan).

Kankaria East Station 1.50%


KKES PS Platform Slab Sqm 100.00% 3120.0
KKES PS M40 Concreting for Base Slab, M40 Cum 1169.7
KKES PS REFE500 Reinforcement for Base Slab, FE500 MT 156.5

Kalupur Station 1.50%


KPMS PS Platform Slab Sqm 100.00% 3368.4
KPMS PS M40 Concreting for Base Slab, M40 Cum 1097.0
KPMS PS REFE500 Reinforcement for Base Slab, FE500 MT 147.0

Construction of RCC walls, Blockwork, brickwork,


staircases, OTE duct, smoke down panel,
columns, fireman staircases and other RCC
A5.5 5.5 works up to concourse levels (Mode of payment
in Interim payment will be made on
proportionate basis based on actual work
progress in volume of concrete on plan divided
by total volume on plan)

Kankaria East Station 1.45%


KKES WALLS M35 RCC Wall, Lift Wall etc. Cum 20.00% 91.80
KKES WALLS REFE500 Reinforcement for Wall, FE500 MT 10.10

KKES BWORK BLOCK Block Work / Brick Work Cum 25.00% 600.00

KKES STR M35 Stair Case Cum 15.00% 126.60


KKES STR REFE500 Starcase Reinforcement, FE500 MT 18.99

OTE Duct
KKES OTE M40 Casting of OTE Duct Cum 10.00% 384.21
KKES OTE REFE500 OTE Duct Reinforcement, FE500 MT 42.26

KKES OTE ERECT Erection of OTE Duct Cum 10.00% 384.21


KKES COL M35 Column Cum 20.00% 101.48
KKES COL REFE500 Column Reinforcement, FE500 MT 25.06

Kalupur Station 1.35%


KPMS WALLS M35 RCC Wall, Lift Wall etc. Cum 20.00% 91.80
KPMS WALLS REFE500 Reinforcement for Wall, FE500 MT 10.10

KPMS BWORK BLOCK Block Work / Brick Work Cum 25.00% 600.00

KPMS STR M35 Stair Case Cum 15.00% 114.27


KPMS STR REFE500 Starcase Reinforcement, FE500 MT 17.14

OTE Duct
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
KPMS OTE M40 Casting of OTE Duct Cum 10.00% 373.68
KPMS OTE REFE500 OTE Duct Reinforcement, FE500 MT 41.10

KPMS OTE ERECT Erection of OTE Duct Cum 10.00% 373.68


KPMS COL M35 Column Cum 20.00% 287.03
KPMS COL REFE500 Column Reinforcement, FE500 MT 78.59

Construction of concourse slab. (Mode of


payment in Interim payment will be made on
A5.6 5.6 proportionate basis based on actual work
progress in square meter (Sq. m) on plan divided
by total area in Sq. m in plan)
Kankaria East Station 1.90%
KKES CS Concouse Slab Construction- Main Station Sqm 77.00% 5342.0
KKES CS M40 Concreting for Concourse Slab, M40 Cum 3716.5
KKES CS REFE500 Reinforcement for Concourse Slab, FE500 MT 557.5
KKES CS PCC M15 PCC, Grade M10/M15 Cum 494.2
KKES CS Coup32 Couplers - 32mm Dia Nos 0.0
KKES CS Coup25 Couplers - 25mm Dia Nos 5713.0
KKES CS Coup20 Couplers - 20mm Dia Nos 4284.4
KKES CS HILTI DB Chemical Hilti Drilled Bars (Assuming 5%) Nos 500.0
of Various Dia
KKES CS HACK Concrete Surface Hacking Sqm 853.1
KKES CS BULG Chipping of Bulging Sqm 0.0

KKES EE-BS Concouse Slab Construction- Entry / Exit Sqm 23.00% 1583.0
(Base Slab)
KKES EE-BS M40 Concreting for Concourse Slab, M40 Cum 1005.9
KKES EE-BS REFE500 Reinforcement for Concourse Slab, FE500 MT 150.9
KKES EE-BS PCC M15 PCC, Grade M10/M15 Cum 61.4
KKES EE-BS Coup32 Couplers - 32mm Dia Nos 0.0
KKES EE-BS Coup25 Couplers - 25mm Dia Nos 1556.0
KKES EE-BS Coup20 Couplers - 20mm Dia Nos 1038.0
KKES EE-BS HILTI DB Chemical Hilti Drilled Bars (Assuming 5%) Nos 130.0
of Various Dia
KKES EE-BS HACK Concrete Surface Hacking Sqm 141.6
KKES EE-BS BULG Chipping of Bulging Sqm 0.0
KKES EE-BS W Proofing Waterproofing of Base Slab kg/m3 1583.0

Kalupur Station 1.90%


KPMS CS Concouse Slab Construction Sqm 70.00% 5758.0
KPMS CS M40 Concreting for Concourse Slab, M40 Cum 3420.0
KPMS CS REFE500 Reinforcement for Concourse Slab, FE500 MT 468.0
KPMS CS PCC M15 PCC, Grade M10/M15 Cum 457.0
KPMS CS Coup32 Couplers - 32mm Dia Nos 0.0
KPMS CS Coup25 Couplers - 25mm Dia Nos 4870.0
KPMS CS Coup20 Couplers - 20mm Dia Nos 3651.9
Chemical Hilti Drilled Bars (Assuming 5%)
KPMS CS HILTI DB of Various Dia Nos 427.0
KPMS CS HACK Concrete Surface Hacking Sqm 713.8
KPMS CS BULG Chipping of Bulging Sqm 0.0

KPMS EE-BS Concouse Slab Construction- Entry / Exit Sqm 30.00% 2418.5
(Base Slab)
KPMS EE-BS M40 Concreting for Concourse Slab, M40 Cum 1451.1
KPMS EE-BS REFE500 Reinforcement for Concourse Slab, FE500 MT 217.7
KPMS EE-BS PCC M15 PCC, Grade M10/M15 Cum 241.8
KPMS EE-BS Coup32 Couplers - 32mm Dia Nos 0.0
KPMS EE-BS Coup25 Couplers - 25mm Dia Nos 2074.0
KPMS EE-BS Coup20 Couplers - 20mm Dia Nos 2074.1
Chemical Hilti Drilled Bars (Assuming 5%)
KPMS EE-BS HILTI DB of Various Dia Nos 208.0
KPMS EE-BS HACK Concrete Surface Hacking Sqm 266.0
KPMS EE-BS BULG Chipping of Bulging Sqm 0.0
KPMS EE-BS W Proofing Waterproofing of Base Slab kg/m3 2418.5

Construction of RCC walls, Blockwork, brickwork,


staircases, ventilation duct, columns, fireman
staircases and other RCC works up to roof slab.
A5.7 5.7 (Mode of payment in Interim payment will be
made on proportionate basis based on actual
work progress in volume of concrete on plan
divided by total volume on plan).

Kankaria East Station 1.40%


KKES WALLS M35 RCC Wall, Lift Wall etc.- Main Cum 15.00% 304.6
Station
KKES WALLS REFE500 Reinforcement for Wall, FE500 MT 33.5

KKES EE-WALLS M35 RCC Wall, Lift Wall etc.- Entry / Exit Cum 30.00% 623.7
KKES EE-WALLS REFE500 Reinforcement for Wall, FE500 - MT 93.6
External Wall
KKES EE-WALLS W Stoper PVC water stopper in retaining wall Rm 660.0

KKES BWORK BLOCK Block Work / Brick Work Cum 30.00% 1200.0

KKES STR M35 Stair Case- Entrance Cum 15.00% 212.0


KKES STR REFE500 Starcase Reinforcement, FE500 MT 31.8

KKES COL M35 Column- Main Station Cum 8.00% 86.7


KKES COL REFE500 Column Reinforcement, FE500 MT 25.1

KKES COL M35 Column- Entry / Exit Cum 2.00% 10.0


KKES COL REFE500 Column Reinforcement, FE500 MT 2.0

Kalupur Station 1.40%


KPMS WALLS M35 RCC Wall, Lift Wall etc.- Main Cum 10.00% 286.0
Station
KPMS WALLS REFE500 Reinforcement for Wall, FE500 MT 31.5

KPMS EE-WALLS M35 RCC Wall, Lift Wall etc.- Entry / Exit Cum 30.00% 989.5
Reinforcement for Wall, FE500 -
KPMS EE-WALLS REFE500 External Wall MT 148.4
KPMS EE-WALLS W Stoper PVC water stopper in retaining wall Rm 1604.0

KPMS BWORK BLOCK Block Work / Brick Work Cum 30.00% 1200.0

KPMS STR M35 Stair Case- Entrance Cum 20.00% 324.0


KPMS STR REFE500 Starcase Reinforcement, FE500 MT 5.9

KPMS COL M35 Column- Main Station Cum 8.00% 254.0


KPMS COL REFE500 Column Reinforcement, FE500 MT 78.6

KPMS COL M35 Column- Entry / Exit Cum 2.00% 10.0


KPMS COL REFE500 Column Reinforcement, FE500 MT 2.0
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code

Construction of all roof slabs including roof slab


for ventilation shafts, RCC work above roof slab
if any, Entry/Exit Structures up to 450 mm from
the designed ground level, etc. (Mode of
A5.8 5.8 payment in Interim payment will be made on
proportionate basis based on actual work
progress in square meter (Sq. m) on plan divided
by total area in Sq. m in plan).

Kankaria East Station 2.50%


KKES RFS Roof Slab Construction- Main Station Sqm 70.00% 5342.0
KKES RFS M40 Concreting for Roof Slab, M40 Cum 6410.4
KKES RFS REFE500 Reinforcement for Roof Slab, FE500 MT 1025.7
KKES RFS M40 Concreting for Traffic Diversion Retaining Cum 268.8
Wall, M40

KKES RFS REFE500 Reinforcement for Traffic Diversion MT


Retaining Wall, FE500
KKES RFS PCC M15 PCC, Grade M10/M15 Cum 534.2
KKES RFS Coup32 Couplers - 32mm Dia Nos 8569.0
KKES RFS Coup25 Couplers - 25mm Dia Nos 8569.0
KKES RFS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KKES RFS HILTI DB of Various Dia Nos 857.0
KKES RFS HACK Concrete Surface Hacking Sqm 1257.2
KKES RFS BULG Chipping of Bulging Sqm 0.0

KKES EE-RFS Roof Slab Construction- Entry / Exit (Base Sqm 25.00% 1763.0
Slab)
KKES EE-RFS M40 Concreting for Roof Slab, M40 Cum 1050.9
KKES EE-RFS REFE500 Reinforcement for Roof Slab, FE500 MT 338.5
KKES EE-RFS PCC M15 PCC, Grade M10/M15 Cum 79.4
KKES EE-RFS Coup32 Couplers - 32mm Dia Nos 2075.0
KKES EE-RFS Coup25 Couplers - 25mm Dia Nos 1556.0
KKES EE-RFS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KKES EE-RFS HILTI DB of Various Dia Nos 182.0
KKES EE-RFS HACK Concrete Surface Hacking Sqm 208.6
KKES EE-RFS BULG Chipping of Bulging Sqm 0.0

KKES WALLS M35 Ventilation Shaf Cum 5.00% 341.3


KKES WALLS REFE500 Reinforcement for Internal Wall MT 37.5

Kalupur Station 2.50%


KPMS RFS Roof Slab Construction- Main Station Sqm 70.00% 5757.9
KPMS RFS M40 Concreting for Roof Slab, M40 Cum 6384.0
KPMS RFS REFE500 Reinforcement for Roof Slab, FE500 MT 1105.5
Concreting for Traffic Diversion Retaining
KPMS RFS M40 Wall, M40 Cum 351.0

KPMS RFS REFE500 Reinforcement for Traffic Diversion MT


Retaining Wall, FE500
KPMS RFS PCC M15 PCC, Grade M10/M15 Cum 455.0
KPMS RFS Coup32 Couplers - 32mm Dia Nos 7304.0
KPMS RFS Coup25 Couplers - 25mm Dia Nos 4870.0
KPMS RFS Coup20 Couplers - 20mm Dia Nos 0.0
KPMS RFS HILTI DB Chemical Hilti Drilled Bars (Assuming 5%) Nos 609.0
of Various Dia
KPMS RFS HACK Concrete Surface Hacking Sqm 1145.2
KPMS RFS BULG Chipping of Bulging Sqm 0.0

KPMS EE-RFS Roof Slab Construction- Entry / Exit (Base Sqm 25.00% 2418.5
Slab)
KPMS EE-RFS M40 Concreting for Roof Slab, M40 Cum 1451.1
KPMS EE-RFS REFE500 Reinforcement for Roof Slab, FE500 MT 464.3
KPMS EE-RFS PCC M15 PCC, Grade M10/M15 Cum 241.8
KPMS EE-RFS Coup32 Couplers - 32mm Dia Nos 4149.0
KPMS EE-RFS Coup25 Couplers - 25mm Dia Nos 3112.0
KPMS EE-RFS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KPMS EE-RFS HILTI DB of Various Dia Nos 364.0
KPMS EE-RFS HACK Concrete Surface Hacking Sqm 266.0
KPMS EE-RFS BULG Chipping of Bulging Sqm 0.0

KPMS WALLS M35 Ventilation Shaf Cum 5.00% 170.2


KPMS WALLS REFE500 Reinforcement for Internal Wall MT 20.4

Construction of complete Ancillary buildings


including ventilation shaft, cable gallery,
A5.9 5.9 substations and finishes (Mode of payment in
Interim payment will be made on proportionate
basis as decided by the Engineer)

Kankaria East Station 0.60% 100.00


KKES AB-EXC EXC-AB Excavation Cum 8.00% 4000.00
KKES AB-SLAB M40 Base Slab Cum 17.00% 297.00
KKES AB-SLAB PCC M15 PCC for Base Slab, M10/15 Cum 59.40
KKES AB-SLAB REFE500 Reinforcement for Base Slab MT 44.55

KKES AB-SLAB M40 Grade Slab Cum 14.00% 237.60


KKES AB-SLAB REFE500 Reinforcement for Grade Slab MT 35.64

KKES AB-SLAB M40 Intermidiate Slab Cum 8.00% 132.30


KKES AB-SLAB REFE500 Reinforcement for Intermediate MT 19.85
Slab

KKES AB-SLAB M40 Roof Slab Cum 8.00% 132.30


KKES AB-SLAB REFE500 Reinforcement for Roof Slab MT 19.85

KKES AB-WALLS M35 Internal Wall Cum 19.00% 310.00


KKES AB-WALLS REFE500 Reinforcement for Internal Wall MT 34.00

KKES AB-WALLS M35 Water Tank Cum 5.00% 80.00


KKES AB-WALLS REFE500 Reinforcement for Water Tank Wall MT 9.00

KKES AB-COL M35 Columns Cum 6.00% 100.80


KKES AB-COL REFE500 Reinforcement for Columns MT 30.24

KKES AB-STR M35 Staircase Cum 2.00% 31.32


KKES AB-STR REFE500 Reinforcement for Staircase MT 4.70

KKES AB-WALLS M35 Utility Gallery Cum 13.00% 216.00


KKES AB-WALLS PCC M15 PCC for Utility gallery, M10/15 Cum 9.72
KKES AB-WALLS REFE500 Reinforcement for Utility gallery MT 25.92

Kalupur Station LS 0.60% 100.00


KPMS AB-EXC EXC-AB Excavation Cum 8.00% 4000.00
KPMS AB-SLAB M40 Base Slab Cum 18.00% 267.3
KPMS AB-SLAB PCC M15 PCC for Base Slab, M10/15 Cum 59.4
KPMS AB-SLAB REFE500 Reinforcement for Base Slab MT 40.1

KPMS AB-SLAB M40 Grade Slab Cum 17.00% 237.6


KPMS AB-SLAB REFE500 Reinforcement for Grade Slab MT 35.6
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
KPMS AB-SLAB M40 Intermidiate Slab Cum 9.00% 132.3
KPMS AB-SLAB REFE500 Reinforcement for Intermediate MT 19.8
Slab

KPMS AB-SLAB M40 Roof Slab Cum 9.00% 132.3


KPMS AB-SLAB REFE500 Reinforcement for Roof Slab MT 19.8

KPMS AB-WALLS M35 Internal Wall Cum 21.00% 310.0


KPMS AB-WALLS REFE500 Reinforcement for Internal Wall MT 34.0

KPMS AB-WALLS M35 Water Tank Cum 5.00% 80.0


KPMS AB-WALLS REFE500 Reinforcement for Water Tank Wall MT 9.0

KPMS AB-COL M35 Columns Cum 7.00% 100.8


KPMS AB-COL REFE500 Reinforcement for Columns MT 30.2

KPMS AB-STR M35 Staircase Cum 2.00% 31.3


KPMS AB-STR REFE500 Reinforcement for Staircase MT 4.7

KPMS AB-WALLS M35 Utility Gallery Cum 4.00% 60.0


KPMS AB-WALLS PCC M15 PCC for Utility gallery, M10/15 Cum 11.3
KPMS AB-WALLS REFE500 Reinforcement for Utility gallery MT 7.2

Construction- back filling and water proofing all


A5.10 5.10 complete. (Mode of payment in interim
payment will be made on proportionate basis as
decided by the Engineer.)

Kankaria East Station 0.65%


Waterproofing of Roof Slab - Main
KKES WP LWP Station Box Sqm 60.00% 5342.0

KKES WP LWP Waterproofing of Roof Slab - Entry / Sqm 20.00% 1763.0


Exit

KKES BKF BKF-MS Backfilling upto Ground Level - Cum 13.00% 13809.1
Main Station Box
Backfilling upto Ground Level -
KKES BKF BKF-EE Entry / Exit Cum 7.00% 7454.2

Kalupur Station 0.65%


KPMS WP LWP Waterproofing of Roof Slab - Main Sqm 56.00% 5757.88
Station Box
Waterproofing of Roof Slab - Entry /
KPMS WP LWP Exit Sqm 24.00% 2418.46
KPMS BKF BKF-MS Backfilling upto Ground Level Cum 11.00% 22945.13
KPMS BKF BKF-EE Backfilling upto Ground Level - Cum 9.00% 17690.51
Entry / Exit

Completion of Architectural Finishes in non-


public area, under croft, all system rooms,
A5.11 5.11 intermediate shaft, etc. All complete. (Mode of
payment in interim payment will be made on
proportionate basis as decided by the Engineer).

KKES ARCH ARCH Kankaria East Station LS 1.60% 100.00


KPMS ARCH ARCH Kalupur Station LS 1.60% 100.00

Completion of earth mat, anti-static membrane


at platform of both stations, water supply,
plumbing and drainage services and all other
A5.12 5.12 balance works to complete the entire work as 1.60%
per the scope and specification (payment will be
made in last Interim Payment).

KKES MISC MISC Kankaria East Station LS 50.00% 100.00


KPMS MISC MISC Kalupur Station LS 50.00% 100.00

A5.13 5.13 Site Clearance and Area Hand Over


(a) Site clearance and area handover 50% 0.80%
completed.
KKES AHO AHO Kankaria East Station LS 50.00% 100.0
KPMS AHO AHO Kalupur Station LS 50.00% 100.0

(b) Site clearance and area handover 100% 0.80%


completed.
KKES AHO AHO Kankaria East Station LS 50.00% 100.0
KPMS AHO AHO Kalupur Station LS 50.00% 100.0

SCHEDULE A-6 Reinstatement works and handing over the c 8.00%


3.00%

Construction of roads, footpath, kerb, storm


water drain, medians, compound wall, traffic
signal, street light above cut and cover area of
A6.1 ramps, launching and receiving shaft, etc. LS 3.00% 100.0
landscaping, lawn where required. (The mode of
payment in Interim Payment will be made on
proportionate basis as decided by the Engineer).

C&C REIN Cut & Cover Ramp LS 1.00% 100.0


RS REIN Receiving Shaft LS 1.00% 100.0
LS REIN Launch Shaft LS 1.00% 100.0

Construction of roads, footpath, kerb,


compound wall, landscape, lawn, trees, storm
A6.2 water drain, medians, street light, traffic signal, 5.00%
landscape, above Station Box, etc. (The mode of
payment in Interim Payment will be made on
proportionate basis as decided by the Engineer).

KKES REIN Kankaria East Station LS 2.50% 100.0


KPMS REIN Kalupur Station LS 2.50% 100.0
SCHEDULE A-8 After completion of all work related to defect 2.00%

(a) Support services during testing and


commissioning till statutory inspection by CMRS
and up to revenue operation date such as
cleaning, regular housekeeping of Stations,
Tunnels, Entry/Exit Structures, other Structures,
A8.1 (a) ALL DLP1 temporary barricading at Stations, Platforms, LS 0.50% 100.0
Tunnels, ramps, etc. to prevent trespassing into
the Railway Envelop, security arrangements at
Stations, Structures and Tunnels, temporary
lighting, water availability and sanitary
arrangements, etc.

(b) For completion of all works related to defects


A8.1 (b) ALL DLP2 liability and on final certificate of the LS 1.50% 100.0
Engineer/Employer