A1.7 ALL UTI Shifting of Charted Utilities including Design and LS 2.00% 100.00
on Approval by Local Authority.
Utility Investigation Work 30.00%
LS UTI Launching Shaft at Apparel Park. LS 20.00% 100.00
KKES UTI Kankaria East Station LS 40.00% 100.00
KPMS UTI Kalupur Metro Station LS 40.00% 100.00
ALL PMIS Obtain NoNO for Design Co-ordination Plan from LS 20.00% 100.00
Engineer
Tunnel 25.00%
TUN DDE Tunnel Ring LS 70.00% 100.00
TUN DDE Cross Passage LS 30.00% 100.00
Tunnel 25.00%
TUN DDE Tunnel Ring LS 70.00% 100.00
TUN DDE Cross Passage LS 30.00% 100.00
A2.4 (a) ALL CIP Co-ordinated Installation Plan (CIP). LS 0.25% 100.00
Tunnel 25.00%
TUN CRD Tunnel Ring LS 70.00% 100.00
TUN CRD Cross Passage LS 30.00% 100.00
Tunnel 25.00%
TUN CRD Tunnel Ring LS 70.00% 100.00
TUN CRD Cross Passage LS 30.00% 100.00
Tunnel 25.00%
TUN GFC Tunnel Ring LS 70.00% 100.00
TUN GFC Cross Passage LS 30.00% 100.00
Tunnel 25.00%
TUN GFC Tunnel Ring LS 70.00% 100.00
TUN GFC Cross Passage LS 30.00% 100.00
SCHEDULE A-3 Open cut and cut & cover tunnels section in 8.00%
Receiving Shaf
RS DWALL 800mm Thk Diaphragm Wall RM 20.00% 90.1
RS G-wall M20 Concrete for Guide wall, Grade M15 cum 75.7
RS G-wall REFE500 Reinforcement for Guide Wall MT 15.7
RS DWALL GRAB Trenching for 800 mm thick sqm 1803.3
Diaphragm wall
SCY PRE Construction of Casting yard bed & Steel Yard LS 20.00% 100.00
TUN CP NOS Construction and complete finishing of Cross Nos 80.00% 3.00
passage
TUN MISC Drainage System and Balance Tunnel Finishing LS 15.00% 100.00
Work
KKES TP M35 Concrete for pile, Grade M35 Main Station cum 497.6
KPMS TP M35 Concrete for pile, Grade M35 Main Station cum 452.4
KKES BWORK BLOCK Block Work / Brick Work Cum 25.00% 600.00
OTE Duct
KKES OTE M40 Casting of OTE Duct Cum 10.00% 384.21
KKES OTE REFE500 OTE Duct Reinforcement, FE500 MT 42.26
KPMS BWORK BLOCK Block Work / Brick Work Cum 25.00% 600.00
OTE Duct
SAP
BOQ Locat Cost Mat % BOQ Rate BOQ
S No WBS Description Unit
NO. ion Code Code Allocation (Rs) Quantity
Code
KPMS OTE M40 Casting of OTE Duct Cum 10.00% 373.68
KPMS OTE REFE500 OTE Duct Reinforcement, FE500 MT 41.10
KKES EE-BS Concouse Slab Construction- Entry / Exit Sqm 23.00% 1583.0
(Base Slab)
KKES EE-BS M40 Concreting for Concourse Slab, M40 Cum 1005.9
KKES EE-BS REFE500 Reinforcement for Concourse Slab, FE500 MT 150.9
KKES EE-BS PCC M15 PCC, Grade M10/M15 Cum 61.4
KKES EE-BS Coup32 Couplers - 32mm Dia Nos 0.0
KKES EE-BS Coup25 Couplers - 25mm Dia Nos 1556.0
KKES EE-BS Coup20 Couplers - 20mm Dia Nos 1038.0
KKES EE-BS HILTI DB Chemical Hilti Drilled Bars (Assuming 5%) Nos 130.0
of Various Dia
KKES EE-BS HACK Concrete Surface Hacking Sqm 141.6
KKES EE-BS BULG Chipping of Bulging Sqm 0.0
KKES EE-BS W Proofing Waterproofing of Base Slab kg/m3 1583.0
KPMS EE-BS Concouse Slab Construction- Entry / Exit Sqm 30.00% 2418.5
(Base Slab)
KPMS EE-BS M40 Concreting for Concourse Slab, M40 Cum 1451.1
KPMS EE-BS REFE500 Reinforcement for Concourse Slab, FE500 MT 217.7
KPMS EE-BS PCC M15 PCC, Grade M10/M15 Cum 241.8
KPMS EE-BS Coup32 Couplers - 32mm Dia Nos 0.0
KPMS EE-BS Coup25 Couplers - 25mm Dia Nos 2074.0
KPMS EE-BS Coup20 Couplers - 20mm Dia Nos 2074.1
Chemical Hilti Drilled Bars (Assuming 5%)
KPMS EE-BS HILTI DB of Various Dia Nos 208.0
KPMS EE-BS HACK Concrete Surface Hacking Sqm 266.0
KPMS EE-BS BULG Chipping of Bulging Sqm 0.0
KPMS EE-BS W Proofing Waterproofing of Base Slab kg/m3 2418.5
KKES EE-WALLS M35 RCC Wall, Lift Wall etc.- Entry / Exit Cum 30.00% 623.7
KKES EE-WALLS REFE500 Reinforcement for Wall, FE500 - MT 93.6
External Wall
KKES EE-WALLS W Stoper PVC water stopper in retaining wall Rm 660.0
KKES BWORK BLOCK Block Work / Brick Work Cum 30.00% 1200.0
KPMS EE-WALLS M35 RCC Wall, Lift Wall etc.- Entry / Exit Cum 30.00% 989.5
Reinforcement for Wall, FE500 -
KPMS EE-WALLS REFE500 External Wall MT 148.4
KPMS EE-WALLS W Stoper PVC water stopper in retaining wall Rm 1604.0
KPMS BWORK BLOCK Block Work / Brick Work Cum 30.00% 1200.0
KKES EE-RFS Roof Slab Construction- Entry / Exit (Base Sqm 25.00% 1763.0
Slab)
KKES EE-RFS M40 Concreting for Roof Slab, M40 Cum 1050.9
KKES EE-RFS REFE500 Reinforcement for Roof Slab, FE500 MT 338.5
KKES EE-RFS PCC M15 PCC, Grade M10/M15 Cum 79.4
KKES EE-RFS Coup32 Couplers - 32mm Dia Nos 2075.0
KKES EE-RFS Coup25 Couplers - 25mm Dia Nos 1556.0
KKES EE-RFS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KKES EE-RFS HILTI DB of Various Dia Nos 182.0
KKES EE-RFS HACK Concrete Surface Hacking Sqm 208.6
KKES EE-RFS BULG Chipping of Bulging Sqm 0.0
KPMS EE-RFS Roof Slab Construction- Entry / Exit (Base Sqm 25.00% 2418.5
Slab)
KPMS EE-RFS M40 Concreting for Roof Slab, M40 Cum 1451.1
KPMS EE-RFS REFE500 Reinforcement for Roof Slab, FE500 MT 464.3
KPMS EE-RFS PCC M15 PCC, Grade M10/M15 Cum 241.8
KPMS EE-RFS Coup32 Couplers - 32mm Dia Nos 4149.0
KPMS EE-RFS Coup25 Couplers - 25mm Dia Nos 3112.0
KPMS EE-RFS Coup20 Couplers - 20mm Dia Nos 0.0
Chemical Hilti Drilled Bars (Assuming 5%)
KPMS EE-RFS HILTI DB of Various Dia Nos 364.0
KPMS EE-RFS HACK Concrete Surface Hacking Sqm 266.0
KPMS EE-RFS BULG Chipping of Bulging Sqm 0.0
KKES BKF BKF-MS Backfilling upto Ground Level - Cum 13.00% 13809.1
Main Station Box
Backfilling upto Ground Level -
KKES BKF BKF-EE Entry / Exit Cum 7.00% 7454.2