Professional Documents
Culture Documents
Wt. (kg/m-beam)
Materials
(kg/m2-ply)
M (kNm) EI (kNm2) V. (kN)
Ply Face
3mm Steel Sheet 23.6 0.28 0.45
4mm Steel Sheet 31.4 0.50 1.07
5mm Steel Sheet 39.3 0.78 2.08
6mm Steel Sheet 47.1 1.13 3.6
12mm Steel Sheet 94.2 4.50 28.8
12mm F14 Ply 11 0.27 0.96
12mm F17 Ply 11 0.33 1.12
12mm F22 Ply 11 0.43 1.28
17mm F11 Ply 16 0.43 2.45
17mm F14 Ply 16 0.55 2.92
17mm F17 Ply 16 0.67 3.26
17mm F22 Ply 16 0.87 3.73
Beam
S/Slim Soldier 20 29.90 4020.00
Twin 90x45 (F5) Timber 12 4.32 28.24
Megashor 60 102 12542.00 419.58
Alform Beam 5.6 9.90 385.00 38.00
Scaffold Tube 8g 4.4 0.79 27.60 66.84
100x75 (F7) Timber 4 1.22 39.50 5.76
150x75 (F7) Timber 6 2.58 140.50 8.66
150x100 (F7) Timber 8 3.90 190.70 11.55
200x100 (F7) Timber 11 7.06 463.70 15.40
102x45 RSJ 7.2 4.87 304.00 37.00
RM 12 13 4.00 N/A N/A
RM 18 13 5.60 N/A N/A
95x65 (LVL) Truform 3.8 2.50 56.30 11.20
130x65 (LVL) Truform 5.2 4.68 144.20 15.30
130x77 (LVL) Truform 6.1 5.57 171.60 18.20
150x77 (LVL) Truform 7.1 7.43 263.70 21.00
50x50x4mm SHS 5.35 2.11 45.80 51.80
75x50x3mm RHS 5.42 3.21 104.40 58.28
75x50x4mm RHS 6.92 3.88 126.00 77.70
H.F. 200 Lam 'I' Beam 4.7 5.00 420.00 11.00
90x45 (F5) Timber 6 2.16 14.12