S. No. Table of Contents Page
1. INTRODUCTION 1
3. OBJECTIVES 3
The Directorate of Town and Country Planning functions as per the Town
and Country Planning Act, 1971. This act covers the entire state and provides the
preparation of Regional Plan, Master Plan and Detailed Development Plan, and the
constitution of Regional Planning Authorities, SLPAs, CLPAs and NTDAs. There is a
provision for the constitution of State Town and Country Planning Board. The
Director of Town and Country Planning is the Head of the Directorate. The HO is
located at Chennai, with 14 Regional Deputy Directors (RDD), 27 Composite Local
Planning Authorities (CLPA) and 8 New Town Development Authorities (NTDA)
under its control.
DTCP does the plan approval adhering to Developemnt Regulations (DR). The
scrutiny has two parts namely 1. Document Scrutiny 2. Plan Scrutiny. Apart from that
validation of documents, verification of the site, land use classification, building
plan parameters, Parking, Reservations and various No Objection Certificates are to
be produced wherever necessary are being done.
All the feasible parameters in the drawing are verified against specifications
in DR like land use, Building Activity and various types of Building parameters such
as Special Building, Multi-storied Building, Industries & Institutional Buildings etc.
The following are the core activities of the DTCP, however current scope is to
facilitate Building plan Application Scrutiny only.
1. Land Planning
2. Technical approval for Layout plan
3. Building plan Application Scrutiny
4. Change of land use approval
To bring transformation in the plan scrutiny processing system with speed, accuracy,
consistency and transparency in the entire scrutiny process. To achieve the goal, it is
proposed to automate the planning scrutiny process by customization with the help
of technically competitive software.
4. SCOPE OF THE SYSTEM
The Automation helps to increase the Productivity and Accuracy of the Drawing
Result.
Speed up the Scrutiny process.
Easier Public Interaction with Online System.
Reduce the Time consumption and Manual Errors of Scrutiny Process.
Savings on the infrastructure required to store paper drawings.
Easy to retrieve data since the data is stored in digital format.
FLOOR-STILT / FLOOR-
25. Physically Challenged Ramp 170 Polyline
GROUND / FLOOR-BF1..
Physically Challenged Ramp Landing
26. 171 Polyline FLOOR-STILT / FLOOR-BF1..
(Dimension)
DTCP-Vinzas-eDCR-User Manual Version_1.4 7 of 98
27. Vehicular Ramp One way 107 Polyline FLOOR-STILT / FLOOR-BF1..
28. Vehicular Ramp Two way 108 Polyline FLOOR-STILT / FLOOR-BF1..
FLOOR-STILT / FLOOR-
29. Septic Tank 112 Polyline
GROUND
FLOOR-STILT / FLOOR-
30. Sewage Treatment Plan 120 Polyline
GROUND
FLOOR-STILT / FLOOR-
31. Waste Management Provision 55 Polyline
GROUND
FLOOR-STILT / FLOOR-
32. Rain water Harvesting Trench 42 Polyline
GROUND
Rain water Harvesting Dimension FLOOR-STILT / FLOOR-
33. 175 Polyline
(RWH Dimension) GROUND
FLOOR-STILT / FLOOR-
34. Transformer Yard 20 Polyline
GROUND
35. Staircase Area 115 Polyline Applicable floor layer*
36. Staircase Ventilation Area 105 Polyline Applicable floor layer*
37. Lift 22 Polyline Applicable floor layer*
FLOOR-STILT / FLOOR-
38. Gifted Road 118 Polyline
GROUND
39. Non FSI Area 4 Polyline Applicable floor layer*
40. Solar Energy Capture 95 Polyline FLOOR-TERRACE
Habitation Room Area (Hall, Living,
41. 23 Polyline Applicable floor layer*
Bedroom, Bets etc.,)
Window for Habitation Room
42. 103 Polyline Applicable floor layer*
(Hall,Living,Bedroom,etc.,)
Ventilator for Water
43. 102 Polyline Applicable floor layer*
Closet,Bathroom,Toilet
Mechanical Ventilation for
44. 104 Polyline Applicable floor layer*
Habitation Room
45. Water Closet Area 80 Polyline Applicable floor layer*
46. Toilet Area 81 Polyline Applicable floor layer*
47. Bath Area 83 Polyline Applicable floor layer*
48. Voids, Ducts, Shafts (Deductions) 3 Polyline Applicable floor layer*
49. OTS within FSI Area 11 Polyline Applicable floor layer*
Open
50. Staircase Access Distance 194 Applicable floor layer*
Polyline
Parking Area (only for Hill Station
51. 111 Polyline Applicable floor layer*
and Hill Area only)
FLOOR-STILT / FLOOR-
52. Setback (Front) 4 Line
GROUND
FLOOR-STILT / FLOOR-
53. Setback (Side1) 6 Line
GROUND
10. Angular Car Parking Stalls 140 Polyline Applicable floor layer*
11. Parallel Car Parking Stalls 147 Polyline Applicable floor layer*
12. Perpendicular Car Parking Stalls 146 Polyline Applicable floor layer*
13. Two Wheeler Parking Stalls 101 Polyline Applicable floor layer*
Physically Challenged Car Parking FLOOR-STILT / FLOOR-
14. 231 Polyline
Stalls GROUND
Physically Challenged Access Open FLOOR-STILT / FLOOR-
15. 231
Distance Polyline GROUND
FLOOR-STILT / FLOOR-
16. Single Driveway 34 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
17. Double Driveway 39 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
18. Column (only for parking area) 145 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
19. Physically Challenged Ramp 170 Polyline
GROUND / FLOOR-BF1..
Physically Challenged Ramp Landing
20. 171 Polyline FLOOR-STILT / FLOOR-BF1..
(Dimension)
21. Vehicular Ramp One way 107 Polyline FLOOR-STILT / FLOOR-BF1..
12. Angular Car Parking Stalls 140 Polyline Applicable floor layer*
13. Parallel Car Parking Stalls 147 Polyline Applicable floor layer*
14. Perpendicular Car Parking Stalls 146 Polyline Applicable floor layer*
15. Two Wheeler Parking Stalls 101 Polyline Applicable floor layer*
Physically Challenged Car Parking
16. 231 Polyline Applicable floor layer*
Stalls
Physically Challenged Access Open
17. 231 Applicable floor layer*
Distance Polyline
FLOOR-STILT / FLOOR-
18. Column (only for parking area) 145 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
19. Single Driveway 34 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
20. Double Driveway 39 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
11. Column (only for parking area) 145 Polyline
GROUND / FLOOR-BF1..
15. Vehicular Ramp Two way 108 Polyline Applicable floor layer*
FLOOR-STILT / FLOOR-
16. Septic Tank 112 Polyline
GROUND
FLOOR-STILT / FLOOR-
17. Sewage Treatment Plan 120 Polyline
GROUND
FLOOR-STILT / FLOOR-
18. Waste Management Provision 55 Polyline
GROUND
FLOOR-STILT / FLOOR-
19. Rain water Harvesting Trench 42 Polyline
GROUND
Rain water Harvesting Dimension FLOOR-STILT / FLOOR-
20. 175 Polyline
(RWH Dimension) GROUND
FLOOR-STILT / FLOOR-
21. Transformer Yard 20 Polyline
GROUND
22. Staircase Area 115 Polyline Applicable floor layer*
29. Window for Habitation room 103 Polyline Applicable floor layer*
Ventilator for Water Closet,
30. 102 Polyline Applicable floor layer*
Bathroom, Toilet
Mechanical Ventilation for
31. 104 Polyline Applicable floor layer*
Habitation Room
32. Water Closet Area 80 Polyline Applicable floor layer*
12. Angular Car Parking Stalls 140 Polyline Applicable floor layer*
13. Parallel Car Parking Stalls 147 Polyline Applicable floor layer*
14. Perpendicular Car Parking Stalls 146 Polyline Applicable floor layer*
15. Two Wheeler Parking Stalls 101 Polyline Applicable floor layer*
Physically Challenged Car Parking
16. 231 Polyline Applicable floor layer*
Stalls
Physically Challenged Access Open
17. 231 Applicable floor layer*
Distance Polyline
FLOOR-STILT / FLOOR-
18. Single Driveway 34 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
19. Double Driveway 39 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
20. Column (only for parking area) 145 Polyline
GROUND / FLOOR-BF1..
FLOOR-STILT / FLOOR-
21. Physically Challenged Ramp 170 Polyline
GROUND / FLOOR-BF1..
Physically Challenged Ramp Landing
22. 171 Polyline FLOOR-STILT / FLOOR-BF1..
(Dimension)
23. Vehicular Ramp One way 107 Polyline FLOOR-STILT / FLOOR-BF1..
FLOOR-STILT / FLOOR-
34. Gifted Road 118 Polyline
GROUND
35. Non FSI Area 4 Polyline Applicable floor layer*
FLOOR-STILT / FLOOR-
48. Setback (Side1) 6 Line
GROUND
FLOOR-STILT / FLOOR-
49. Setback (Side2) 2 Line
GROUND
FLOOR-STILT / FLOOR-
50. Setback (Rear) 3 Line
GROUND
FLOOR-STILT / FLOOR-
51. Height of the Building 151 Line
GROUND
FLOOR-STILT / FLOOR-
52. Total Height of the Building 233 Line
GROUND
53. Stilt Floor Height 21 Line FLOOR-STILT
FLOOR-BF1, FLOOR-BF2
54. Basement Floor Height 123 Line
etc.
Basement Floor Height above Ground
55. 105 Line FLOOR-GROUND
Level
FLOOR-STILT / FLOOR-
56. Electrical Transformer Room Height 160 Line
GROUND
Water closet
Office Park
11 Precheck Software
Precheck is the software given for finding out all the polyline, line, and
text related problems in the drawing. When the Applicant submits the
building map proposal, this software enables the applicant to rectify the
defects in the drawing and make it suitable to run in the Scrutiny
software. It reads the drawing elements and lists all the discrepancies in
the drawing. It will process the file and gives the output with various
parameters as listed below. If errors are found in the drawing, the
drawing will be populated with hyperlinks to the errors and will be
returned to the Applicant via dashboard.
1. Setback Boundary
2. Multiple Polyline Geometry Problems
3. Invalid object colour
4. Misplaced OTS
5. Existence of Blocks, Regions, Wipeouts & External references in Floor layers
6. Mandatory requirements and
7. Other critical errors
The disqualified items will be marked and a reference will be placed as text in
the Return drawing. Details will be displayed such as disqualified object name;
floor name and drawing coordinate position. It will also draw a crossed grey line
on all the disqualified objects throughout the drawing. The disqualified object
can be viewed on holding the Ctrl key and selecting the coordinate position
of the hyper-linked text (error text) in the drawing.
To submit the drawing file, enter all the Mandatory fields and then upload the Drawing
file in .dwg format.
Super-Imposed plot extent (Color No. 7). After drawing AOS and
PLR/FMB one over the other, the Super imposed plot extent shall be
generated to be the minimum of the Two said before.
FMB/PLR
Plot Extent
Polyline
Color
Number 30
SITE PLAN
SETBACK BOUNDARY
Setback
Boundary
Polyline
Color
Number 10
EXIT
D4
12.00 M
WIDE R
MDW
WATER CLOSET
OAD
D4
NING LINE
ROAD WIDE
ENTRY
FSI (INDUSTRIAL)
Super imposed
plot boundary Third party land
Polyline Polyline
Color Color
Number 7 Number 199
a c a
V V
Servants
V
Toilet
D1
O.S.R
Plot
Frontage
Open Polyline
Color
Number 96
Site area before plot frontage situated beside a third party FLOOR-GROUND
land shall be drawn as Polyline in Color No. 180. (or)
FLOOR-STILT
9m
Block - C
Block - A
O.S.R
Polyline
Color
Number 36
Parking Area boundary shall be drawn as polyline in the Color No. 5. FLOOR-GROUND
(or)
FLOOR-STILT
Deduction shall be drawn as polyline in the Color No. 3. (or)
FLOOR-BF1
Staircase shall be drawn as polyline in the Color No. 115. (or)
FLOOR-BF2
Lift shall be drawn as polyline in the Color No. 22. (or)
Any Suitable Layer
PARKING AREA, DEDUCTION
STAIRCASE AND LIFT
Parking
Boundary Deduction
Polyline Polyline
Color Color
Number 5 Number 3
Rolling Shutter
Lift
Shaft
Duct GENERATOR ROOM
PUMP ROOM
Staircase
Lobby UP
LUMBER ROOM
Color Color
7.2 M DRIVEWAY
7.2 M DRIVEWAY
7.2 M DRIVEWAY
PROPOSED BUILDING
7.2 M DRIVEWAY
In
Polyline
Color
Number 140
Lift
Shaft Shaft
0.91m
5 x 1.82m 4
5 +0.15m Lvl
D2
Passage
Meter Room Tread - 0.25m
Riser - 0.15m
Width - 1.00m
UP
6 4
+0.15m Lvl
Electrical
Room 2
7 V V
2
Servants
V
Toilet
D1 +0.15m Lvl
Lift
Shaft
Shaft
0.91m
5 5 x 1.82m
+0.15m Lvl 4
D2
Passage
Meter Room
UP
6
3.04 m wide
driveway for +0.15m Lvl
electrical Electrical
panel room Room 2
7 2
V V
Servants
V
Toilet
D1
Lorry Parking stall shall be drawn as Polyline in Color No. 144. FLOOR-GROUND
(or)
Lorry Driveway shall be drawn as polyline using the Color No. 43. FLOOR-STILT
(or)
FLOOR-BF1
(or)
FLOOR-BF2.
*Driveway is compulsory for lorry parking.
Color
Number 144
7.50 M. DRIVEWAY
7.50 M. DRIVEWAY
GODOWN
RS
ENTRY
EXIT
3.5M DRIVEWAY
3.5M DRIVEWAY
3.5M DRIVEWAY
In
7.20 M. DRIVEWAY
OFFICE
7.20 M. DRIVEWAY
7.20 M. DRIVEWAY
G + 12
Double
Driveway
Polyline
Color
Number 39
IT GATE
ENTRY & EXW E
10.00 M. ID
SHOP
R.S.
Physically
challenged
Ramp Landing
Dimension
Polyline
Color
Number 171
Vehicular Ramp-One Way shall be drawn as polyline in the Color No. FLOOR-STILT
107 and Text as specified is to be kept inside the Polyline. (or)
FLOOR-BFx
(or)
Any Suitable Layer.
37 38 39 40 41 42
(8)CAR PAR.(RESI.)
8.16+8.42/2X 64.84 = 537.52
(10)SCOOTER PARK.
(RESI.)
6.49+9.09/2X18.47=143.88
Vehicular Ramp-Two Way shall be drawn as polyline in the Color No. FLOOR-STILT
108 and Text as specified is to be kept inside the Polyline. (or)
FLOOR-BFx
(or)
Any Suitable Layer.
(1:8 SLOPE)
Vehicular Ramp
Two Way
Polyline and Text
Color
Number 108
Septic tank shall be drawn as polyline in the Color No. 112. FLOOR-STILT
(or)
FLOOR-GROUND
SEPTIC TANK
EXIT
D4
12.00 M
WIDE R
MDW
WATER CLOSET
OAD
D4
NING LINE
ROAD WIDE
ENTRY
Septic Tank
Polyline SITE CUM STILT FLOOR PLAN
Color
Number 112
Waste management provision shall be drawn as polyline in the Color No. FLOOR- STILT
55. The space shall abut road or gate. (or)
FLOOR-GROUND
Waste
Management
Provision
Polyline
Color
Number 55
SITE PLAN
Rain water harvesting trench shall be drawn as polyline in the Color No. FLOOR- STILT
42. (or)
FLOOR-GROUND
Water
Harvesting
Rainwater Harvesting Trench
Trench
Polyline
Color
R.C.C. Beam
9.9 [0.25]
Rain
39.4 [1.00]
118.3 [3.01]
98.6 [2.50]
INSIDE
Water
49.3 [1.25]
14.8 [0.38]
Slope 1 in 20
Harvesting
5 to 7.5 c.m.
size pebbles
Plinth beam Pit Dimension
98.6 [2.50]
Number 175
Percolation pit
Scale 1:1
Open transformer yard shall be drawn as polyline in the Color No. 20. FLOOR- STILT
(or)
FLOOR-GROUND
EXIT
12.00 M
D4
WID
E ROAD
MDW
WATER CLOSET
E NING LIN
D4
ROAD WIDE
ENTRY
TOILET TOILET
V
V
W1 W1
D1 MAIN STAIRCASE D1
Staircase
Polyline
Color BED ROOM-2 BED ROOM-2
Number 115
SD SD
LIFT
COM.SHAFT
FIRE SHAFT
LIFT
Fire Escape
Polyline and Text SHAFT
FIRE ESCAPE
Color
Number 115
TOILET TOILET
V V
D1 D1
Stair Ventilation shall be drawn as polyline in the Color No. 105. The size The same Floor
of the rectangle shall be equal to the size of the actual window or layer where
ventilator. staircase exists.
STAIR VENTILATION
TOILET TOILET
Staircase V
V
Ventilation W1 W1
Polyline D1 MAIN STAIRCASE D1
Color
Number 105
BED ROOM-2 BED ROOM-2
SD SD
LIFT
COM.SHAFT
FIRE SHAFT
LIFT
SHAFT
FIRE ESCAPE
TOILET TOILET
V V
D1 D1
Open staircase shall be drawn as a Polyline in the Color No. 114 and In all the floors
Text as 'FIRE ESCAPE' is to be kept inside the Polyline in the same wherever
color. applicable
TOILET
W
HALL
D 13.68 X 6.37
FIRE ESCAPE
Ver.
BED ROOM
12.05 X 7.40 W
MD
W W
UP
LIFT
DN
UP
DW2
LIFT
LIFT
W5
Lift
Polyline
Color
Number 22
Sewage Treatment Plant shall be drawn as polyline in the Color No. 120. FLOOR- STILT
(or)
FLOOR-GROUND
SEW
A
[BEL GE TR
OW EA
GRO TMEN
UND T PLA
LEV N
EL] T
32
31 13 14
15 16
Gifted roads, i.e. those areas within the site gifted to Local Body or FLOOR-GROUND
Authority for connectivity purpose shall be drawn as polyline using the (or)
Color No. 118. FLOOR-STILT
GIFTED ROAD
To be Gifted
for Road
Polyline
A-Block B-Block Color
Number 118
C-Block
Incidental structures for a building shall be drawn as polyline in Color No. In all the floors
4 with a text in the same Color. These are also referred to as Non FSI wherever applicable.
area. The text shall be strictly one from the Incidental Structure Names.
Otherwise software will mark the text as wrong.
Non FSI
Text
Color
Number 4
Rolling Shutter
Lift
Shaft
OTS
Duct
PUMP ROOM GENERATOR
ROOM
Staircase
Lobby UP
LUMBER
ROOM
FSI area for a Residential building shall be drawn as polyline in the Color In all the floors
no. 181. wherever
applicable.
The deductions such as OTS shall be drawn in Polyline in the Color No.
11.
FSI AREA
W/R W/R
Bath Bath
Bal. 1.98x1.20 1.98x1.20 Bal.
Terrace
Bed Bed
3.05x3.05 W.C. W.C. 3.05x3.05
1.20x1.20 1.20x1.20
Bal.
Kitchen
3.05x1.935
Liv/Din Liv/Din
3.43x5.645 3.43x5.645
A.H.U
3.43x5.645
Bed
3.05x3.05
W/R
4.19x1.20 Lift
1.98x1.75
Liv/Din
5.18x2.82
W.C.
1.20x1.20
Lobby
Bath OTS. 3.81x2.07
1.30x1.41
DN UP
Bed Bed
3.05x3.05 2.44x3.05 Kitchen
3.54x2.13
W/R W/R
Bal.
Dwelling units boundary shall be drawn as polyline in the Color No. 230 In the same layer as
with Dwelling unit number or name as text in the same Color. Additionally the Residential FSI
another text 'KITCHEN' shall be placed. Both the text mentioned above Polyline.
shall be completely enclosed inside the dwelling unit of polyline.
W/R W/R
Bath Bath
Bal. 1.98x1.20 1.98x1.20 Bal.
Bed Terrace Bed
3.05x3.05 W.C. W.C. 3.05x3.05
1.20x1.20 1.20x1.20
KITCHEN KITCHEN
Bal. Bal.
3.05x1.935
A2 3.05x1.935
A1 Duct Duct
Liv/Din Liv/Din
Bed 3.43x5.645 3.43x5.645 Bed
3.05x3.05 3.05x3.05
W/R W/R
Kitchen
W/R W/R
Text Bal.
Dwelling Units
Text Polyline
Color Color
Number 230 Number 230
If a Duplex unit exists combining FLOOR-GROUND and FLOOR1, the lower Base floor of
floor's dwelling unit polyline shall be drawn in FLOOR-GROUND and the upper the duplex unit.
floor's dwelling unit ployline shall also be placed in FLOOR-GROUND,with a
cutout of deduction Color No. 11 corresponding to any open area in the upper
floor shall be drawn in FLOOR1, Additionally 'KITCHEN" text shall be given in
lower floor and 'KITCHEN-BELOW' text shall be given in the upper floor. There is
no change in FSI polyline layers. The Dwelling unit names should also be the
same. In this example, below A2 is Duplex, whereas A1 and B1 are single units.
D1 D1 LIVING D1 D1
V1
V1
V1
OTS OTS OTS OTS
W1 W1 D1 D1 W1 W1 D1 D1
D1 D1
W1 W1
KITCHEN DINING KITCHEN DINING
D1 D1
D1 D1 HALL D1 D1 HALL
W1
BED ROOM - 1 BED ROOM - 2 A1 W1
BED ROOM - 1 BED ROOM - 2 B1
D2 D2 D2 D2
V1
V1
V1
KITCHEN KITCHEN-BELOW
A2 A2
CORRIDOR
CORRIDOR
KITCHEN KITCHEN
A1 B1
FLOOR-GROUND[LAYER] FLOOR01[LAYER]
Cantilevered balconies shall be drawn as polyline in the Color No. 35. In all the floors
The Residential FSI polyline and dwelling unit polyline shall completely wherever
enclose the Balcony polyline. applicable.
RESIDENTIAL BALCONY
W/R W/R
Bath Bath
Balcony
1.98x1.20 1.98x1.20
Balcony
Bed Terrace Bed
3.05x3.05 W.C. W.C. 3.05x3.05
1.20x1.20 1.20x1.20
Balcony
Balcony
Kitchen Kitchen
3.05x1.935
A2 3.05x1.935
A1 Duct Duct
Liv/Din Liv/Din
Bed 3.43x5.645 3.43x5.645 Bed
3.05x3.05 3.05x3.05
W/R W/R
A3 4.19x1.20 Lift
1.98x1.75
Liv/Din
5.18x2.82
W.C.
1.20x1.20
Lobby
Bath Duct 3.81x2.07
1.30x1.41
1.20x.95 DN UP
Bed Bed
3.05x3.05 2.44x3.05 Kitchen
3.54x2.13
Cantilevered
W/R W/R
Balcony Balcony
Polyline
Color
Number 35
Corridor for residential building shall be drawn as polyline in the Color No. In all the floors
31. The width shall be the inner space between the walls. wherever
applicable.
V
W
Corridor
TOILET
M.D M.D
5'X8' OTS
OTS V
V V W
D2 W1 W1
HALL HALL TOILET
11'31 2 "X16'4" 11'3"X16'4" 5'X8' W
D1 D2
BED ROOM
KITCHEN KITCHEN BED ROOM
12'81 2"X10'31 2 " D1 D1
8'6"X7'4" 8'6"X7'4" 11'41 2"X10'31 2"
D1 D1
D2 D2
DINING V DINING
W 6'6"X10' V 6'6"X10' W
F/D UTILITY UTILITY F/D
D2 BED ROOM D2
1 "
11'6"X10'32 V BED ROOM
BALCONY D2 D2 BALCONY BALCONY D2 1 " D2 BALCONY
V 11'6"X10'32
C.TOILET
C.TOILET
BALCONY 4'101 2 "X7'0" W
Corridor
BALCONY
W 4'101 2 "X7'
V
FLOOR PLAN
Polyline
Color
Corridor(Commercial or Educational) Number 51
W W
OTS
M.D
W
M.D M.D D1
V
W
Corridor
TOILET
5'X8'
D2
Office Office
D2 D2
W
F/D
V W Corridor
D2
D2 D2 V Polyline
W
W
Color
FLOOR PLAN V
Number 51
Corridor for Hospital building shall be drawn as polyline in the Color No.
243. The width shall be the inner space between the walls.
HOSPITAL
FSI(Hospital) Corridor
Polyline Polyline
Color Color
Number 110 Number 243
W W
OTS
W
M.D M.D
V
W
Corridor
TOILET
5'X8'
D2 General ward OTS
W
BED SPACE - 15 UP
entrance looby
D2 D2
W V W
F/D
D2 D2
D2 D2 V D2
W
W
V
FLOOR PLAN
FSI area for a Hotel building shall be drawn as polyline in the Color No. 122. In all the floors
wherever
Hotel rooms boundary shall be drawn as polyline in the Color No. 32 . applicable.
The hotel rooms and numbers as text shall be completely enclosed in
the hotel room polyline boundary.
OTS shall be drawn as polyline in the Color No. 11 for Deduction.
DUCT DUCT
OTS
BALCONY
BALCONY
ROOM - 6
ROOM - 6
ROOM - 5 OTS
ROOM - 5
Polyline
CORRIDOR
DUCT DUCT
BALCONY
ROOM - 7 ROOM - 4
ROOM - 7 ROOM - 4 Number 11
Polyline
Color
DUCT DUCT
ROOM - 3 Duct
BALCONY
BALCONY
ROOM - 8 ROOM - 3
BALCONY
ROOM - 9 ROOM - 2
Number 3
ROOM - 9 ROOM - 2
Rooms Text
Text
DUCT
BALCONY
Color
ROOM - 1
ROOM - 1 Balcony
CORRIDOR
CAFETERIA
Number 32
Polyline
LOOBY
Color
UP
Number 35
DN
LIFT
LIFT
COFFEE SHOP
Hotel FSI
L.TOI.
Polyline
Color
Number 122
Reception
G.TOI.
ED
Residential FSI polyline for LIG (EWS) Blocks shall be drawn as polyline in the Color In all the floors
No. 15. wherever
applicable.
balcony balcony
Bath Bath
W.C.
W.C.
1.20x1.20
Kitchen Kitchen
3.05x1.935 3.05x1.935
3.05x1.935 3.05x1.935
Kitchen Kitchen
3.05x3.05 3.05x3.05
1.20x1.20
1.20x1.20
Bed Bed
W.C.
W.C.
Bath Bath
Deduction Boundary
Polyline Polyline
Color Color
Number 3 Number 15
Residential FSI polyline for LIG (EWS) Dwelling Unit shall be drawn as polyline in the In all the floors
Color No. 211 wherever
applicable.
Bath Bath
W.C.
W.C.
1.20x1.20
1.20x1.20
Bed Bed
3.05x3.05 3.05x3.05
01 02
Kitchen Kitchen
3.05x1.935 3.05x1.935
3.05x1.935 3.05x1.935
Kitchen Kitchen
03 04
3.05x3.05 3.05x3.05
1.20x1.20
1.20x1.20
Bed Bed
W.C.
W.C.
Bath Bath
balcony balcony
LIG (EWS)
Kitchen text
Dwelling units
Text
Color POLYLINE
For Commercial building, FSI area shall be clearly marked with a polyline In all the floors
in the Color No. 6 and the Text shall be completely enclosed inside the wherever
polyline boundary. The text shall be strictly one from the Commercial applicable.
Building Use text. Otherwise software will mark the text as wrong.
FSI (Commercial)
FSI
(Commercial)
Polyline and Text
Color
Number 6
W W
OTS
M.D
W
M.D M.D D1
V
W
Corridor
TOILET
5'X8'
D2
Office
D2 D2
W V W
F/D
D2
D2 D2 V
W
W
V
FLOOR PLAN
For Commercial buildings like Auditorium, kalyana mandapam and cinema halls, the In all the floors
seating area shall be clearly marked with a polyline in the Color No. 106 wherever
applicable.
FSI
Polyline,Text
Color
Number 6
KALYANA MANDAPAM
SEATING AREA
Polyline
Color
Number 106
FSI
Deduction
Polyline
Color
Number 3
FLOOR PLAN
Building blocks shall be distinguished from each other in case Group Developments. FLOOR-STILT
Distinguishing of blocks shall be done by drawing polylines in the Color No. 50 along (or)
with individual text in the same Color for identifying block names such as Block-A,
FLOOR-GROUND
Block-B etc. Individual floor plans shall be drawn completely within the Color No. 50
rectangle.
DISTINGUISHING
Block distinguishers BLOCKS
Polyline and Text
Color
Number 50
FLOOR - GROUND
FLOOR02 to FLOOR11
FLOOR01
BLOCK-A
Solar energy capture for Hotels, Lodges etc. shall be drawn as polylines in Color No. FLOOR-TERRACE
95.
Solar energy
HERMATICALLY SEALED
SIZE-2640X6355X1200 HT
CAPACITY 21000 LITS
SCIENTIFICALLY CLOSED
OVER HEAD TANK OF INNER
capture
OPEN TERRACE
Polyline
Color
UP
Number 95
ROOM ABOVE
LIFT MACHINE
LIFT
LIFT
DN
TREAD - 305
WIDTH -1220
RISER - 150
ROOM ABOVE
LIFT MACHINE
SERVICE
LIFT
UP
OPEN TERRACE
Habitation rooms shall be drawn as rectangular polylines in Color No. 23. In all the floors
wherever
applicable.
HABITATION ROOMS
BATH
1385X1740
BED ROOM
4085X2455
D
D
BED ROOM
4640X2850
D1
STORE
Windows for Habitation room shall be drawn as Polyline in the Color No. In all the floors
103. The size of the rectangle shall be equal to the size of the actual wherever
window. applicable.
BATH
1385X1740
BED ROOM
D 4085X2455
D
BED ROOM
4640X2850
D1
STORE
Toilet room shall be drawn as Polyline in the Color No. 81. In all the floors
wherever
applicable.
SERVICE VERANDAH
D1 W2
D D
BATH V
LIVING & DINING
V
TOILET O
KITCHEN W1
FOYER
D
MD D1 V
Toilet WC
Polyline BED ROOM-2
Color
Number 81 W1 Water Closet
Polyline
Color
Number 80
Ventilator for Toilet, Bath and Water closet shall be drawn as Polyline in In all the floors
the Color No. 102. The size of the rectangle shall be equal to the size of wherever
the actual window or ventilator. applicable.
W W
SERVICE VERANDAH
D1 W2
D D
BATH V
LIVING & DINING
V TOILET O
KITCHEN W1
FOYER
D
MD D1 V
WC
BED ROOM-2
Ventilation for
W1
Habitation
Room
Polyline
Color
Number 102
Mechanical ventilation shall be drawn as Polyline in the Color No. 104. In all the floors
wherever
applicable.
MECHANICAL VENTILATION
Mechanical
Ventilation
Polyline
Color
Number 104
W
W2
D1
D D
D1
TOILET
V
O
LIVING & DINING TOILET V
KITCHEN
W1
FOYER
D
D1 MD
V TOILET
BED ROOM-2
W1
SETBACK
Rear Setback
Line
Color
Number 3
Side2 Setback
Side1 Setback
Line
Line
Color
Color
Number 2
Number 6 SETBACK DETAILS
Road
Front Setback
Line
Color
Number 4
Stilt Floor Height shall be drawn as line in the Color No. 21. FLOOR-STILT
Parapet
Second Floor
Stilt Floor
GL GL
SECTION
Height of the building is the height measured generally from the formed FLOOR-STILT
ground level abutting the road to the roof level of the topmost floor. (or)
Architectural features and parapet walls up to one metre shall not be FLOOR-GROUND
included in calculating the height of the building. It shall be drawn as line
in the Color No. 151.
Parapet Wall
G.L G.L
SECTION
Basement floor clear height is the distance measured between the bottom FLOOR-BFx
of the basement floor and roof of the same basement floor level. It shall where 'x' is the
be drawn as line in the Color No. 123. If there is more than one basement basement floor
floor, its height shall be given in the corresponding basement floor layer. number.
Parapet
Basement
Ground Floor
Floor
Height
Line
Color
Number 123
GL
Basement 1
Basement 2
SECTION
Parapet
First Floor
Basement
Floor Height
Ground Floor
Above GL
Line
Color
Number 105
GL
Basement Floor
SECTION
Electrical transformer room height shall be drawn as a line in the Color FLOOR-STILT
No. 160 (or)
FLOOR-GROUND
Electrical
Transformer
Room Height L.M.R
Water Tank
Line
Color
Number 160 Parapet Wall
Liv/Din Kitchen
Bal.
Liv/Din Kitchen
Bal.
G.L. G.L.
SECTION
Entry and Exit gates shall be drawn as lines in the Color No. 161. FLOOR-STILT
(or)
FLOOR-GROUND
Road Width shall be drawn as line in the Color No. 41 and Scale should
be 1:1.
D4
12.00 M
WIDE R
MDW
WATER CLOSET
OAD
D4
ENTRY
Entry and
Exit Gate
Line
Color
Number 161 SITE CUM STILT FLOOR PLAN
Room Clear height shall be drawn as line in the Color No. 210. In all the floors
wherever
applicable.
Kitchen Room Clear height shall be drawn as line in the Color No. 25.
Only for Hill Station and Hill Area.
Head Room Clear height shall be drawn as line in the Color No. 211.
Parapet Wall
Liv/Din Kitchen
Liv/Din Kitchen
Height
Line
Color
Number 210
G.L G.L
SECTION
Mezzanine Floor Height shall be drawn as line in the Color No. 23. FLOOR-
MFstartfloorTOendfloor
LIFT
STAIR
RESTAURANT
11.20. x 16.86
LIFT
A/C BAR
RESTAURANT
Main Door width shall be drawn as line in the Color No. 84. In all the floors
wherever
applicable.
Habitation room Door width shall be drawn as line in the Color No. 22.
W W
SERVICE VERANDAH
D D
D1
D1 BATH V
LIVING & DINING
V TOILET O
W1
KITCHEN
FOYER
D
MD D1
V
WC
BED ROOM-2
Main Habitation room
W1
Door width Door width
Line Line
Color Color
Number 84 Number 22
Non Habitation room Door width shall be drawn as line in the Color No. In all the floors
82. wherever
applicable.
SERVICE VERANDAH
D D
D1
D1 BATH V
LIVING & DINING
V TOILET O
W1
KITCHEN
FOYER
D
MD D1
V
WC
Staircase width shall be drawn as line in the Color No. 191. All staircase In all the floors
lines shall be drawn in 1:1 scale. wherever
applicable.
MD
Dn
Up
MD
Riser
Handrail Line
Line Color
Color Number 192
Number 193
STAIRCASE SECTION
Staircase Access Distance shall be drawn as open polyline in the Color In all the floors
No. 194. for Individual dwelling units. It is the distance between the main wherever
door of the dwelling unit and the nearest stair case. applicable.
Liv/Din Liv/Din
A.H.U
Lift
1.98x1.75
Liv/Din
W.C.
Lobby
Bath Duct
DN UP
Bed
Kitchen
W/R
Bal.
Staircase
Access
Distance
Open Polyline
Color
Number 194
FSI (INSTITUTIONAL)
Mid Landing Class Room FSI (INSTITUTIONAL)
Polyline Polyline and Text
Polyline and Text
Color Color
Color
Number 172 Number 23
Number 33
OTS Duct
A
Polyline Polyline
Color Color
Number 11 Number 3
DETAIL - A
Wall width
Line
Color
Number 73
FSI area for Industrial building shall be drawn as polyline using the Colour In all the floors
No. 134. wherever
applicable.
Deduction such as OTS (in Color No. 11), Ducts (in Color No. 3) within
FSI shall be drawn as polyline.
FSI (INDUSTRIAL)
FACTORY
Parapet wall height shall be drawn as a line in the Color No. 17. FLOOR-STILT
Applicable for Schools only (or)
FLOOR-GROUND
Parapet wall width shall be drawn as a line in the Color No. 71.
Applicable for Schools only
F.G.L.
G.L.
Total height of the building is the height measured from the formed FLOOR-STILT
ground level along with the staircase head room, lift rooms water tanks, (or)
WC above topmost floor, lightning arrestor, architectural features and FLOOR-GROUND
parapet walls. The top most height will be taken as total height of the
building. it shall be drawn as line in the colour No. 233.
LIGHTNING ARRESTOR
L.M.R
Water Tank
Parapet Wall
Liv/Din Kitchen
Liv/Din Kitchen
G.L G.L
SECTION