You are on page 1of 2

Installation Instructions

(Using Spikes and Spike Anchoring Adaptors)

Using a straight edge spade, make a trench along the bed area
where edging is to be installed. Trench should be approx. 4”
deep, depending on desired finished edging height.

Slide spike-anchoring adaptors into track system prior to


connecting pieces. Recommended spacing between spikes is 32”
(max.). Use extra adaptors at or near curves or for additional
support when holding back heavier types of decorative stone.

Slide connectors into track system with locking pegs facing


toward pre-drilled holes on each edging piece. Locking pegs
should click into pre-drilled holes on each of the edging pieces,
providing a clean, locked joint without overlapping.

Place edging in the trench with the track groove toward the
planting bed. Installers may find it easier to connect all pieces
before placing edging in trench.

Drive spikes vertically, through loops on spike adaptor until spike


head is against the adaptor. Recommended spacing between
spikes is 32” (maximum). Use extra adaptors at or near curves or
for additional support when holding back heavier types of
decorative stone.

Tightly pack soil around edging and install landscape fabric


and ground cover (decorative stone, mulch, etc.) to the top of
the edging.

28305 State Route 7, Marietta, OH 45750


P: 800.334.3776 F: 740.374.2700
www.edgepro.com
Installation Instructions
(Using Landscape Stakes and Pre-drilled Slots)

Using a straight edge spade, make a trench along the


bed area where edging is to be installed. Trench
should be approx. 4” deep, depending on desired
finished edging height.

Slide connectors into track system with locking pegs


facing toward pre-drilled holes on each edging piece.
Locking pegs should click into pre-drilled holes on
each of the edging pieces, providing a clean, locked
joint without overlapping.

Place edging in the trench with the track groove


toward the planting bed. Installers may find it easier
to connect all pieces before placing edging in trench.

Pound stakes, flange pointed downward, through the


pre-drilled slots at a 45-degree angle. Use extra
stakes at curves , spaced evenly throughout.

Tightly pack soil around edging and install landscape


fabric and ground cover (decorative stone, mulch,
etc.) to the top of the edging.

28305 State Route 7, Marietta, OH 45750


P: 800.334.3776 F: 740.374.2700
www.edgepro.com

You might also like