You are on page 1of 10

Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

DETAIL DRAWING SERVICES


Beside on our main scope on EPC ( Engineering Procurement and Construction ), we also provide
your requirement on Detailed Drawing to easier your fabrication and installation process.

OUR FACILITY TO SATISFY YOUR REQUIREMENT :

1. Skilled drafter is 20 person


to full fill your requirement capacity regarding with detailed drawing
2. Software : Tekla Structure, Staad pro v8i, Pro Steel v8i, Ram connection v8i, and Auto cad also
flexible, depend on type of costumer's software used.
3. Data base of AUSTRALIAN, AMERICAN, AND JAPANSE, etc of profile section material
to speed up drawing process base on costumer requirement
Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

PREVIOUS PROJECT

Double Tower Machine Rickerman Ind

Ware House Dupon


Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction
Conveyor Frame Structure
Mearest Soputan Meaning

Piping Air Compressor - Dupont


Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

40 M Thailings Thickener - FLSMidth


Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

Air Craft Hangar


66 Meter Span

Air Craft Hangar


66 Meter Span

Air Craft Hangar


66 Meter Span

Air Craft Hangar


66 Meter Span
Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction
Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

ON GOING PROJECT
Steel Structure Martabe Project AUSENCO
Scope of Work : Supply, fabrication and delivery
Tonage : +/- 1500 Ton

Arrangement drawing of Grinding Area

Marking Number
Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

Detail Drawing

Sample of Documentation number drawing


D raw ing Proggres Martabe Project
Drawing Proggres
NO Asenco Drawing No. Drawing Tittle 3D Model GAAssem bly DetailTotal 3D Subm itted AR Subm itted Detail Subm itted Rem ark
% % % %
1 1929 0201 S 001 Pipe Rack No.1(Running East-W est & North of Leach Area) 100 100 100 100 11/5/2011 11/5/2011 11/5/2011
2 1929 0201 S 002 Pipe Rack No.2(Running North-Shouth & W est of Leach Area) 65 0 0 22
3 1929 0201 S 003 Pipe Rack No.3(South-W est Corner of Leach Area) 50 0 0 17
4 1929 0201 S 004 Pipe Rack No.4(South-East Corner of Leach Area) 50 0 0 17
5 1929 0201 S 005 Pipe Rack No.5(Raw W ater Area-East of Leach Area) 50 0 0 17
1929 0201 S 006 Piperack No.6 0 0 0 0
29

6 1929 0210 S 001 Prim ary Crushing 0


7 1929 0210 S 003 Transfer Tower CV-004 to CV-002 0
8 1929 0210 S 004 Pebble Crushing CV-003 to CV-004 0
9 1929 0210 S 005 Reclaim cham ber 0
10 1929 0210 S 006 Reclaim cham ber Escape Tunnel 0
12 1929 0210 S 008 Conveyor CV-001 Trestles, Take-Up Tower & Stacker 0
13 1929 0210 S 009 Conveyor CV-002 Trestles, Take-Up Tower 0
14 1929 0210 S 010 Conveyor CV-003 Trestles, Take-Up Tower 0
15 1929 0210 S 011 Conveyor CV-004 Trestles,Head end Gantry & Hor. Take Up Fram e 0
16 1929 0210 S 012 Pebble Crushing Cast In 0
17 1929 0210 S 013 0

18 1929 0220 S 001 Grinding Feed End 100 100 35 78 4/4/2011 4/4/2011 4/5/2011
19 1929 0220 S 002 Grinding Discharge End 100 100 20 73 11/4/2011 11/4/2011 11/4/2011
20 1929 0220 S 003 Grinding Discharge Screen 100 100 100 100 11/4/2011 11/4/2011 11/4/2011
21 1929 0220 S 004 Guard 100 100 50 83 11/4/2011 11/4/2011 11/4/2011
84

22 1929 0230 S 001 Leach/Cil Platform 85 0 0 28


23 1929 0230 S 002 Leach/Cil Feed 80 0 0 27
24 1929 0230 S 003 Leach/Cil Platform handrail 90 0 0 30
25 1929 0230 S 004 Leach/Cil Bunded Area Stair and Handrail 0 0 0 0
21

26 1929 0240 S 001 Desorption 70 0 0 23


27 1929 0240 S 002 Desorption Tank W alkway 0 0 0 0
28 1929 0240 S 003 Heaters 80 0 0 27
17

29 1929 0250 S 001 Carbon Regen 100 100 100 100 11/5/2011 11/5/2011 11/5/2011

30 1929 0260 S 001 Gold Room

31 1929 0280 S 001 Carbon Safety Screen And Inter tank Screen Maintenance (detox) 85 0 0 28
32 1929 0280 S 002 Tank Platform 0 0 0 0
14

33 1929 0290 S 002 Regents-SMBS


34 1929 0290 S 003 Regents-Lim e
35 1929 0290 S 005 Regents
36 1929 0290 S 006 Regents
37 1929 0290 S 007 Regents-Sodium Hydroxide

38 1929 0310 S 001 Air Services-oxgen plant (stair to mm c)


39 1929 0310 S 002 Air Services-com pressor

40 1929 0320 S 001 W ater Services

41 1929 0455 S 001 W ater Polishing

42 1929 0460 S 001 Solid W aste Treatm ent


Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

Controlled progress sheet document


Oil & Gas, Marine, Mining & Industrial Engineering - Fabrication Construction

For inquiry and further information, please contact us at :

PT. LINTECH DUTA PRATAMA


"We Offer Integrated Engineering, Procurement, Construction (EPC) and
Fabrication (ONSHORE & SEASIDE facilities) for Industry, Mining and Oil & Gas"

Office/Workshop: Graha Lintech Wira Jatim Industrial Estate Mastrip70 Surabaya- Indonesia
Seaside Facility: Daendels Street - Paciran Cape Lamongan - 60km from Surabaya - Indonesia
Phone: +62-31-7666891 (Hunting 6 lines) Fax: +62-31-7664604
E-MAIL : admin@lintech.co.id HOMEPAGE: http://www.Lintech.co.id ; http://www.LSF.CO.ID

You might also like