You are on page 1of 92

Project: REFINERA FRANCISCO I.

MADERO ETAP Page: 1


12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Short-Circuit Summary Report

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
3-HV-0305 13.80 2.214 -14.098 14.271 0.335 -0.969 1.025 12.559 2.263 12.761 -12.635 -2.013 12.795
3-HV-0306 13.80 2.065 -12.927 13.091 0.332 -0.957 1.013 10.746 1.812 10.898 -10.842 -1.553 10.953
3-MV-BA01 2.40 1.527 -15.773 15.847 0.000 0.000 0.000 14.137 1.519 14.218 14.137 1.519 14.218
3-MV-BB01 2.40 1.569 -15.789 15.867 0.000 0.000 0.000 13.969 1.531 14.052 13.969 1.531 14.052
04-CCM-01 BA 4.16 1.466 -15.756 15.824 0.399 -0.009 0.399 13.606 1.352 13.673 -13.707 -1.350 13.773
04-CCM-01 BB 4.16 1.535 -16.636 16.707 0.399 -0.008 0.399 15.008 1.555 15.089 -15.104 -1.551 15.184
04-CCM-02 BA 0.48 3.464 -15.050 15.443 0.000 0.000 0.000 13.026 3.009 13.369 13.026 3.009 13.369
04-CCM-02 BB 0.48 3.462 -15.022 15.415 0.000 0.000 0.000 13.058 3.035 13.406 13.058 3.035 13.406
04-CCM-03 BA 0.48 3.581 -15.528 15.936 0.000 0.000 0.000 13.555 3.157 13.917 13.555 3.157 13.917
04-CCM-03 BB 0.48 3.635 -16.035 16.442 0.000 0.000 0.000 14.268 3.305 14.646 14.268 3.305 14.646
04-CCM-04 BA 0.48 3.487 -15.128 15.524 0.000 0.000 0.000 13.093 3.031 13.440 13.093 3.031 13.440
04-CCM-04 BB 0.48 3.630 -15.830 16.241 0.000 0.000 0.000 13.927 3.245 14.301 13.927 3.245 14.301
04-TDB-01 BA 0.22 2.366 -7.017 7.405 2.747 -7.103 7.615 6.076 2.050 6.413 -7.653 1.530 7.804
04-TDB-01 BB 0.22 2.366 -7.014 7.402 2.749 -7.105 7.618 6.079 2.053 6.416 -7.652 1.526 7.803
6-LV-SERV. PROPIOS 0.48 1.454 -2.272 2.697 0.000 0.000 0.000 1.967 1.260 2.336 1.967 1.260 2.336
6-MV-2.4 kV 2.40 1.498 -14.044 14.124 0.000 0.000 0.000 12.225 1.348 12.299 12.225 1.348 12.299
07-CCM-01 BA 4.16 1.529 -15.653 15.728 0.399 -0.009 0.399 13.517 1.405 13.590 -13.618 -1.404 13.690
07-CCM-01 BB 4.16 1.605 -16.524 16.602 0.399 -0.008 0.399 14.903 1.617 14.991 -14.999 -1.613 15.086
07-CCM-02 BA 0.48 3.564 -15.495 15.900 0.000 0.000 0.000 13.539 3.154 13.902 13.539 3.154 13.902
07-CCM-02 BB 0.48 3.620 -15.665 16.078 0.000 0.000 0.000 13.745 3.232 14.120 13.745 3.232 14.120
07-CCM-03 BA 0.48 3.544 -15.394 15.796 0.000 0.000 0.000 13.429 3.116 13.786 13.429 3.116 13.786
07-CCM-03 BB 0.48 3.522 -15.353 15.751 0.000 0.000 0.000 13.459 3.133 13.819 13.459 3.133 13.819
07-CCM-04 BA 0.48 3.457 -15.000 15.393 0.000 0.000 0.000 12.983 3.005 13.326 12.983 3.005 13.326
07-CCM-04 BB 0.48 3.522 -15.421 15.818 0.000 0.000 0.000 13.599 3.160 13.962 13.599 3.160 13.962
07-MV-BA01 2.40 2.226 -15.350 15.511 0.000 0.000 0.000 13.474 2.020 13.625 13.474 2.020 13.625
07-MV-BB01 2.40 2.226 -15.350 15.511 0.000 0.000 0.000 13.474 2.020 13.625 13.474 2.020 13.625
07-TDB-01 BA 0.22 1.975 -5.442 5.789 2.207 -5.482 5.909 4.719 1.716 5.021 -5.934 1.033 6.024
07-TDB-01 BB 0.22 1.980 -5.451 5.800 2.213 -5.490 5.919 4.730 1.723 5.034 -5.945 1.027 6.033
8-MJW-LV-CCM1 0.48 1.221 -4.441 4.606 0.000 0.000 0.000 3.844 1.057 3.987 3.844 1.057 3.987
8-MJW-MV-BABB 2.40 2.678 -12.574 12.856 0.000 0.000 0.000 10.814 2.313 11.059 10.814 2.313 11.059
8-MJW-MV-IEM 4.16 1.024 -5.330 5.428 0.000 0.000 0.000 4.593 0.886 4.678 4.593 0.886 4.678
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 2
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
8-MJW-MV-SQ-D 4.16 1.024 -5.330 5.428 0.000 0.000 0.000 4.593 0.886 4.678 4.593 0.886 4.678
10-BUS-2.4 2.40 1.219 -7.265 7.367 0.000 0.000 0.000 6.296 1.060 6.384 6.296 1.060 6.384
10-CCM-2.4 KV 2.40 1.235 -7.227 7.332 0.000 0.000 0.000 6.263 1.075 6.354 6.263 1.075 6.354
10-CCM-10 0.48 1.960 -9.511 9.711 0.000 0.000 0.000 8.238 1.700 8.412 8.238 1.700 8.412
010-HV-2121A 13.80 1.960 -21.596 21.685 1.540 -0.153 1.547 19.824 2.160 19.941 -20.191 -2.115 20.301
010-HV-2121B 13.80 1.648 -18.045 18.120 1.536 -0.239 1.554 16.061 1.822 16.164 -16.442 -1.763 16.537
10-HV-CCM-13.8 13.80 1.118 -3.842 4.001 0.684 -0.148 0.700 3.332 0.978 3.472 -3.512 -0.953 3.639
010-LV-2151A 0.48 2.972 -20.533 20.747 0.000 0.000 0.000 18.173 2.729 18.376 18.173 2.729 18.376
010-LV-2151B 0.48 2.983 -20.440 20.656 0.000 0.000 0.000 18.079 2.745 18.286 18.079 2.745 18.286
010-LV-2152A 0.48 3.119 -20.927 21.158 0.000 0.000 0.000 18.497 2.883 18.721 18.497 2.883 18.721
010-LV-2152B 0.48 3.016 -20.131 20.356 0.000 0.000 0.000 17.710 2.771 17.925 17.710 2.771 17.925
010-LV-2153A 0.48 2.953 -20.888 21.095 0.000 0.000 0.000 18.385 2.720 18.586 18.385 2.720 18.586
010-LV-2153B 0.48 2.932 -20.560 20.768 0.000 0.000 0.000 18.051 2.667 18.247 18.051 2.667 18.247
010-LV-2154A 0.48 2.915 -20.189 20.398 0.000 0.000 0.000 17.560 2.568 17.746 17.560 2.568 17.746
010-LV-2154B 0.48 2.909 -20.350 20.557 0.000 0.000 0.000 17.751 2.593 17.939 17.751 2.593 17.939
010-LV-2161A 0.22 2.762 -12.592 12.891 3.313 -13.720 14.114 10.918 2.403 11.179 -12.916 5.108 13.890
010-LV-2161B 0.22 2.773 -12.576 12.878 3.347 -13.627 14.032 10.913 2.419 11.178 -12.926 4.981 13.853
010-MV-2131A 4.16 1.218 -18.265 18.305 0.479 -0.011 0.479 16.406 1.232 16.452 -16.522 -1.227 16.568
010-MV-2131B 4.16 1.172 -17.431 17.470 0.479 -0.012 0.479 15.425 1.172 15.470 -15.543 -1.168 15.587
11-CCM-BUS1 2.40 1.026 -10.361 10.412 0.000 0.000 0.000 9.577 1.003 9.630 9.577 1.003 9.630
11-CCM-BUS2 2.40 1.007 -10.235 10.284 0.000 0.000 0.000 9.506 0.997 9.558 9.506 0.997 9.558
11-LV-BA01 0.48 3.559 -20.495 20.801 0.000 0.000 0.000 18.194 3.394 18.508 18.194 3.394 18.508
11-LV-BB01 0.48 3.626 -20.835 21.148 0.000 0.000 0.000 18.470 3.413 18.782 18.470 3.413 18.782
11-LV-CCM1 0.48 7.723 -10.339 12.905 0.000 0.000 0.000 9.286 6.911 11.575 9.286 6.911 11.575
11-LV-CCM2 0.48 7.401 -5.559 9.256 0.000 0.000 0.000 4.947 6.541 8.201 4.947 6.541 8.201
11-LV-CCM3 0.48 7.331 -5.726 9.302 0.000 0.000 0.000 5.217 6.546 8.371 5.217 6.546 8.371
11-LV-CCM4 0.48 7.338 -5.531 9.189 0.000 0.000 0.000 4.943 6.511 8.174 4.943 6.511 8.174
12-BARRAS2.4A 2.40 1.962 -16.781 16.895 0.000 0.000 0.000 14.634 1.793 14.744 14.634 1.793 14.744
12-BARRAS2.4B 2.40 1.886 -16.140 16.250 0.000 0.000 0.000 13.939 1.669 14.038 13.939 1.669 14.038
12-CCM-440 0.48 1.051 -1.462 1.800 1.070 -1.301 1.684 1.266 0.910 1.559 -1.801 -0.331 1.831
13-HV-BA 13.80 1.825 -14.436 14.551 0.328 -0.992 1.045 12.909 1.914 13.050 -12.983 -1.660 13.088
13-HV-BB 13.80 2.156 -15.838 15.984 0.327 -1.002 1.054 13.153 1.900 13.290 -13.248 -1.631 13.348
15-LV-BA01-480 0.48 3.735 -25.891 26.159 4.059 -27.714 28.009 22.770 3.389 23.021 20.634 17.754 27.221
15-LV-BA02-480 0.48 2.582 -12.025 12.299 0.000 0.000 0.000 10.405 2.238 10.643 10.405 2.238 10.643
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 3
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
15-LV-BB01-480 0.48 3.083 -21.311 21.533 3.273 -22.495 22.732 18.612 2.745 18.813 16.912 14.417 22.223
15-LV-BB02-220 0.22 2.431 -5.421 5.941 2.715 -5.797 6.401 4.694 2.104 5.144 -6.226 1.009 6.308
15-MV-BA01 2.40 2.387 -30.564 30.657 0.000 0.000 0.000 26.220 2.192 26.312 26.220 2.192 26.312
15-MV-BB01 2.40 2.547 -31.035 31.139 0.000 0.000 0.000 26.503 2.293 26.602 26.503 2.293 26.602
18 -MV-BA01 2.40 0.928 -9.675 9.719 0.000 0.000 0.000 8.805 0.874 8.848 8.805 0.874 8.848
18-LV-220 0.22 1.804 -6.851 7.085 1.982 -7.284 7.549 5.957 1.578 6.162 -7.023 2.283 7.385
18-LV-480 BA 0.48 2.732 -19.085 19.279 0.000 0.000 0.000 16.938 2.527 17.125 16.938 2.527 17.125
18-LV-480 BB 0.48 2.911 -17.172 17.417 0.000 0.000 0.000 15.623 2.802 15.872 15.623 2.802 15.872
18-LV-TR5-EXT 0.22 1.804 -6.851 7.085 1.982 -7.284 7.549 5.957 1.578 6.162 -7.023 2.283 7.385
18-MV-BB01 2.40 0.855 -8.216 8.261 0.000 0.000 0.000 7.366 0.790 7.408 7.366 0.790 7.408
19-HV-4160 BA1 4.16 0.309 -1.054 1.099 0.000 0.000 0.000 0.917 0.270 0.956 0.917 0.270 0.956
19-HV-4160 BA2 4.16 0.319 -1.461 1.496 0.000 0.000 0.000 1.353 0.288 1.384 1.353 0.288 1.384
19-HV-4160 BA3 4.16 1.943 -11.203 11.370 0.396 -0.014 0.396 9.715 1.692 9.861 -9.814 -1.690 9.958
19-HV-4160 BB 4.16 1.120 -7.647 7.728 0.395 -0.018 0.395 6.630 0.979 6.702 -6.729 -0.977 6.800
19-LV-480 BA 0.48 1.135 -4.336 4.482 0.891 -1.839 2.044 3.763 0.987 3.891 -4.081 -0.414 4.102
19-LV-480 BB 0.48 1.646 -7.332 7.515 0.000 0.000 0.000 6.350 1.427 6.509 6.350 1.427 6.509
020-HV-22A21A 13.80 1.519 -22.764 22.814 1.569 -0.141 1.575 20.997 1.755 21.071 -21.369 -1.712 21.437
020-HV-22A21B 13.80 1.346 -18.801 18.849 1.541 -0.233 1.559 16.766 1.575 16.840 -17.148 -1.517 17.215
020-HV-22B21 13.80 1.915 -21.792 21.876 1.564 -0.147 1.571 20.042 2.105 20.153 -20.414 -2.061 20.518
020-HV-22B21 BB 13.80 1.631 -18.095 18.168 1.536 -0.238 1.554 16.110 1.808 16.211 -16.492 -1.748 16.584
020-LV-22A51A 0.48 3.179 -19.019 19.283 0.000 0.000 0.000 16.527 2.787 16.760 16.527 2.787 16.760
020-LV-22A51B 0.48 3.203 -19.158 19.424 0.000 0.000 0.000 16.763 2.889 17.010 16.763 2.889 17.010
020-LV-22A52 BA 0.48 3.227 -19.304 19.572 0.000 0.000 0.000 16.891 2.891 17.137 16.891 2.891 17.137
020-LV-22A52 BB 0.48 3.371 -20.247 20.525 0.000 0.000 0.000 18.190 3.288 18.485 18.190 3.288 18.485
020-LV-22A53 BA 0.48 4.030 -21.718 22.088 0.000 0.000 0.000 18.927 3.560 19.258 18.927 3.560 19.258
020-LV-22A53 BB 0.48 4.009 -21.616 21.985 0.000 0.000 0.000 18.860 3.562 19.194 18.860 3.562 19.194
020-LV-22B52 BA 0.48 3.249 -19.586 19.853 0.000 0.000 0.000 17.399 3.060 17.666 17.399 3.060 17.666
020-LV-22B52 BB 0.48 3.270 -19.941 20.208 0.000 0.000 0.000 17.841 3.071 18.103 17.841 3.071 18.103
020-LV-22B55A 0.48 3.192 -18.988 19.254 0.000 0.000 0.000 16.495 2.799 16.731 16.495 2.799 16.731
020-LV-22B55B 0.48 3.181 -18.926 19.191 0.000 0.000 0.000 16.434 2.781 16.668 16.434 2.781 16.668
020-MV-22A31A 4.16 1.208 -15.218 15.266 0.479 -0.014 0.479 13.516 1.128 13.563 -13.633 -1.124 13.679
020-MV-22A31B 4.16 1.200 -14.573 14.622 0.479 -0.014 0.479 12.988 1.195 13.043 -13.105 -1.190 13.159
020-MV-22B31A 4.16 1.166 -14.194 14.242 0.479 -0.015 0.479 12.523 1.099 12.571 -12.641 -1.095 12.688
020-MV-22B31B 4.16 1.154 -14.027 14.074 0.479 -0.015 0.479 12.413 1.124 12.463 -12.530 -1.120 12.580
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 4
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
22-TDA-1 13.80 3.362 -6.414 7.242 0.330 -0.885 0.945 5.448 2.832 6.141 5.362 3.076 6.182
22-TDA-2 13.80 3.816 -12.978 13.527 0.331 -0.980 1.035 10.809 3.206 11.275 -10.904 -2.942 11.294
22-TDA-4A 4.16 2.677 -10.459 10.796 0.199 -0.003 0.199 8.969 2.302 9.260 -9.020 -2.302 9.309
22-TDA-4B 4.16 1.770 -13.233 13.351 0.200 -0.003 0.200 11.327 1.543 11.432 -11.378 -1.543 11.482
23-HV-CCM-13.8A 13.80 2.174 -12.651 12.837 0.333 -0.952 1.008 10.509 1.898 10.679 -10.605 -1.641 10.731
23-HV-CCM-13.8B 13.80 2.726 -15.134 15.377 0.335 -0.973 1.029 12.560 2.344 12.777 -12.656 -2.083 12.827
023-LV-2451A 0.48 3.037 -11.674 12.062 0.000 0.000 0.000 10.121 2.642 10.460 10.121 2.642 10.460
023-LV-2451B 0.48 3.019 -11.628 12.014 0.000 0.000 0.000 10.074 2.625 10.411 10.074 2.625 10.411
23-LV-CCM-220A 0.22 1.842 -3.420 3.884 1.894 -3.425 3.914 2.967 1.602 3.372 -3.930 0.110 3.932
23-LV-CCM-480A 0.48 2.816 -16.947 17.179 0.000 0.000 0.000 14.647 2.441 14.849 14.647 2.441 14.849
23-LV-CCM-480B 0.48 3.632 -17.343 17.719 0.000 0.000 0.000 15.397 3.307 15.748 15.397 3.307 15.748
23-MV-CCM-4.16A 4.16 1.198 -11.491 11.553 0.399 -0.013 0.399 9.840 1.057 9.897 -9.941 -1.056 9.997
23-MV-CCM-4.16B 4.16 1.300 -12.768 12.834 0.399 -0.012 0.399 11.177 1.184 11.239 -11.276 -1.182 11.338
25-CCM-1 BUS A 0.48 3.519 -18.123 18.462 0.000 0.000 0.000 16.105 3.250 16.430 16.105 3.250 16.430
25-CCM-1 BUS B 0.48 3.410 -17.296 17.629 0.000 0.000 0.000 15.001 2.975 15.294 15.001 2.975 15.294
25-TDBT-1 BA 0.22 2.857 -5.273 5.998 2.891 -4.556 5.395 4.577 2.494 5.213 -5.980 -0.508 6.002
25-TDBT-1 BB 0.22 2.264 -4.537 5.070 2.325 -4.019 4.643 3.929 1.962 4.392 -5.091 -0.171 5.094
28-LV-28G41 BA 0.48 0.940 -4.529 4.625 0.000 0.000 0.000 3.926 0.815 4.010 3.926 0.815 4.010
28-LV-28G41 BB 0.48 0.806 -3.757 3.842 0.000 0.000 0.000 3.294 0.703 3.368 3.294 0.703 3.368
30-LV-30F42 0.48 1.313 -4.940 5.112 0.000 0.000 0.000 4.356 1.156 4.507 4.356 1.156 4.507
030-LV-1151A 0.48 3.060 -20.396 20.624 0.000 0.000 0.000 17.866 2.746 18.076 17.866 2.746 18.076
030-LV-1151B 0.48 2.998 -20.102 20.324 0.000 0.000 0.000 17.602 2.696 17.807 17.602 2.696 17.807
030-LV-1152A 0.48 3.054 -19.953 20.185 0.000 0.000 0.000 17.353 2.677 17.558 17.353 2.677 17.558
030-LV-1152B 0.48 3.020 -19.797 20.026 0.000 0.000 0.000 17.206 2.652 17.409 17.206 2.652 17.409
030-LV-1153A 0.48 2.980 -20.250 20.468 0.000 0.000 0.000 17.618 2.613 17.811 17.618 2.613 17.811
030-LV-1153B 0.48 3.001 -20.477 20.695 0.000 0.000 0.000 17.967 2.712 18.171 17.967 2.712 18.171
030-LV-1161A 0.22 2.482 -11.866 12.123 2.881 -12.531 12.858 10.289 2.156 10.512 -11.955 4.461 12.760
030-LV-1161B 0.22 2.489 -11.902 12.159 2.901 -12.575 12.906 10.341 2.178 10.568 -11.996 4.443 12.792
030-MV-1131A 4.16 1.503 -20.046 20.102 0.479 -0.010 0.479 18.055 1.464 18.114 -18.170 -1.460 18.229
030-MV-1131B 4.16 1.421 -18.737 18.791 0.479 -0.011 0.479 16.748 1.387 16.805 -16.864 -1.383 16.921
040-HV-2521A 13.80 2.396 -20.256 20.397 1.513 -0.166 1.522 18.519 2.533 18.691 -18.881 -2.486 19.044
040-HV-2521B 13.80 1.999 -17.044 17.160 1.528 -0.247 1.548 15.136 2.103 15.281 -15.517 -2.043 15.651
040-LV-2551 BA 0.48 3.040 -20.281 20.508 0.000 0.000 0.000 17.837 2.738 18.046 17.837 2.738 18.046
040-LV-2551 BB 0.48 3.040 -20.309 20.536 0.000 0.000 0.000 17.918 2.785 18.133 17.918 2.785 18.133
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 5
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
040-LV-2552 BA 0.48 3.073 -19.694 19.932 0.000 0.000 0.000 17.214 2.741 17.431 17.214 2.741 17.431
040-LV-2552 BB 0.48 3.024 -19.397 19.632 3.423 -19.576 19.873 16.840 2.646 17.046 -18.710 7.188 20.043
040-LV-2561 BA 0.22 2.743 -12.293 12.595 3.238 -12.631 13.040 10.673 2.393 10.938 -12.534 4.061 13.175
040-LV-2561 BB 0.22 2.727 -12.240 12.540 3.214 -12.578 12.982 10.607 2.367 10.868 -12.475 4.080 13.126
040-MV-2531A 4.16 1.553 -18.294 18.360 0.479 -0.011 0.479 16.417 1.509 16.486 -16.533 -1.504 16.601
040-MV-2531B 4.16 1.504 -17.339 17.404 0.479 -0.012 0.479 15.323 1.454 15.392 -15.441 -1.450 15.509
050-LV-1351A 0.48 3.156 -18.526 18.793 0.000 0.000 0.000 16.396 2.898 16.651 16.396 2.898 16.651
050-LV-1351B 0.48 3.075 -17.931 18.193 0.000 0.000 0.000 15.558 2.689 15.789 15.558 2.689 15.789
050-LV-1352A 0.48 3.129 -18.316 18.581 0.000 0.000 0.000 16.090 2.812 16.334 16.090 2.812 16.334
050-LV-1352B 0.48 3.075 -17.931 18.192 0.000 0.000 0.000 15.558 2.688 15.788 15.558 2.688 15.788
050-LV-1361A 0.22 2.296 -8.583 8.885 2.541 -7.837 8.239 7.454 2.003 7.719 -8.777 1.573 8.917
050-LV-1361B 0.22 2.313 -8.639 8.944 2.557 -7.883 8.287 7.485 2.007 7.749 -8.832 1.599 8.976
050-MV-1331A 4.16 2.011 -12.944 13.099 0.477 -0.017 0.477 11.530 1.899 11.685 -11.646 -1.894 11.799
050-MV-1331B 4.16 1.928 -12.473 12.622 0.477 -0.017 0.477 10.930 1.764 11.072 -11.049 -1.760 11.188
060-LV-1451A 0.48 3.084 -18.327 18.584 0.000 0.000 0.000 16.101 2.773 16.338 16.101 2.773 16.338
060-LV-1451B 0.48 3.071 -18.182 18.439 0.000 0.000 0.000 15.898 2.762 16.136 15.898 2.762 16.136
060-LV-1452A 0.48 3.155 -18.276 18.546 0.000 0.000 0.000 16.122 2.876 16.376 16.122 2.876 16.376
060-LV-1452B 0.48 3.029 -17.941 18.195 0.000 0.000 0.000 15.567 2.648 15.791 15.567 2.648 15.791
060-LV-1461A 0.22 2.298 -8.578 8.881 2.546 -7.838 8.241 7.456 2.010 7.723 -8.776 1.565 8.914
060-LV-1461B 0.22 2.309 -8.641 8.944 2.555 -7.885 8.288 7.486 2.003 7.750 -8.834 1.604 8.978
060-MV-1431A 4.16 1.806 -12.981 13.106 0.477 -0.017 0.478 11.573 1.712 11.699 -11.689 -1.707 11.813
060-MV-1431B 4.16 1.736 -12.507 12.627 0.477 -0.017 0.477 10.965 1.594 11.080 -11.084 -1.590 11.197
070-HV-1521A 13.80 2.763 -20.307 20.494 1.512 -0.167 1.522 18.560 2.883 18.783 -18.923 -2.836 19.134
070-HV-1521B 13.80 2.323 -17.097 17.255 1.525 -0.245 1.545 15.165 2.401 15.354 -15.546 -2.341 15.721
070-LV-1551A 0.48 3.010 -18.661 18.902 0.000 0.000 0.000 16.430 2.717 16.653 16.430 2.717 16.653
070-LV-1551B 0.48 2.952 -18.212 18.449 0.000 0.000 0.000 15.803 2.581 16.012 15.803 2.581 16.012
070-LV-1552A 0.48 2.975 -18.320 18.560 0.000 0.000 0.000 15.935 2.614 16.148 15.935 2.614 16.148
070-LV-1552B 0.48 2.952 -18.211 18.449 0.000 0.000 0.000 15.802 2.579 16.011 15.802 2.579 16.011
070-LV-1561A 0.22 2.435 -10.919 11.187 2.837 -11.240 11.593 9.467 2.116 9.701 -11.097 3.653 11.683
070-LV-1561B 0.22 2.429 -10.901 11.169 2.830 -11.223 11.574 9.446 2.108 9.678 -11.077 3.659 11.666
070-MV-1531A 4.16 1.313 -14.233 14.293 0.479 -0.015 0.479 12.717 1.279 12.781 -12.833 -1.274 12.896
070-MV-1531B 4.16 1.272 -13.683 13.742 0.478 -0.015 0.479 12.015 1.194 12.074 -12.133 -1.191 12.192
080-HV-1621A 13.80 2.963 -19.804 20.025 1.504 -0.171 1.513 18.040 3.067 18.299 -18.402 -3.019 18.648
080-HV-1621B 13.80 2.456 -16.794 16.972 1.523 -0.247 1.542 14.876 2.512 15.087 -15.257 -2.452 15.453
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 6
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
080-LV-1651A 0.48 2.966 -18.270 18.510 0.000 0.000 0.000 15.854 2.586 16.063 15.854 2.586 16.063
080-LV-1651B 0.48 2.944 -18.157 18.394 0.000 0.000 0.000 15.739 2.566 15.946 15.739 2.566 15.946
080-LV-1652A 0.48 2.966 -18.271 18.510 0.000 0.000 0.000 15.854 2.587 16.063 15.854 2.587 16.063
080-LV-1652B 0.48 2.964 -18.271 18.510 0.000 0.000 0.000 15.894 2.622 16.109 15.894 2.622 16.109
080-LV-1653A 0.48 2.966 -18.270 18.510 0.000 0.000 0.000 15.854 2.586 16.063 15.854 2.586 16.063
080-LV-1653B 0.48 3.004 -12.189 12.554 0.000 0.000 0.000 10.562 2.610 10.879 10.562 2.610 10.879
080-LV 1661A 0.22 2.570 -10.440 10.752 3.159 -11.270 11.704 9.046 2.229 9.316 -11.003 3.871 11.664
080-LV 1661B 0.22 2.456 -9.215 9.537 3.010 -10.277 10.708 7.982 2.129 8.261 -9.874 3.667 10.532
080-MV-1631A 4.16 1.302 -13.981 14.041 0.478 -0.016 0.479 12.274 1.193 12.332 -12.392 -1.190 12.449
080-MV-1631B 4.16 1.270 -13.424 13.484 0.478 -0.016 0.479 11.702 1.168 11.760 -11.821 -1.165 11.879
090-HV-1721A 13.80 2.966 -19.757 19.978 1.500 -0.173 1.510 18.019 3.051 18.276 -18.380 -3.002 18.624
090-HV-1721B 13.80 2.520 -16.641 16.831 1.521 -0.248 1.541 14.738 2.564 14.959 -15.118 -2.503 15.324
090-LV-1751A 0.48 2.589 -16.515 16.717 0.000 0.000 0.000 14.429 2.310 14.613 14.429 2.310 14.613
090-LV-1751B 0.48 2.591 -16.521 16.723 0.000 0.000 0.000 14.412 2.299 14.594 14.412 2.299 14.594
090-LV-1752A 0.48 1.267 -16.695 16.743 0.000 0.000 0.000 14.571 1.159 14.617 14.571 1.159 14.617
090-LV-1752B 0.48 1.247 -16.533 16.580 0.000 0.000 0.000 14.351 1.099 14.393 14.351 1.099 14.393
090-LV-1761A 0.22 3.217 -8.825 9.393 3.588 -9.785 10.422 7.652 2.803 8.149 5.647 8.269 10.014
090-LV-1761B 0.22 2.727 -6.183 6.758 2.844 -5.561 6.246 5.356 2.365 5.855 -6.796 0.145 6.798
090-MV-1731A 4.16 0.794 -7.874 7.914 0.476 -0.027 0.477 6.912 0.726 6.950 -7.030 -0.721 7.067
090-MV-1731B 4.16 0.796 -7.814 7.854 0.476 -0.027 0.477 6.832 0.725 6.870 -6.950 -0.721 6.988
100-HV-1821A 13.80 2.366 -20.365 20.502 1.515 -0.165 1.524 18.626 2.511 18.795 -18.989 -2.464 19.149
100-HV-1821B 13.80 1.965 -17.148 17.260 1.529 -0.246 1.548 15.237 2.076 15.377 -15.617 -2.016 15.747
100-LV-1851A 0.48 3.472 -20.706 20.995 0.000 0.000 0.000 18.679 3.358 18.979 18.679 3.358 18.979
100-LV-1851B 0.48 3.383 -19.978 20.263 0.000 0.000 0.000 17.668 3.139 17.944 17.668 3.139 17.944
100-LV-1852A 0.48 3.422 -20.132 20.421 0.000 0.000 0.000 17.850 3.216 18.137 17.850 3.216 18.137
100-LV-1852B 0.48 3.316 -19.538 19.817 0.000 0.000 0.000 17.057 2.954 17.311 17.057 2.954 17.311
100-LV-1853A 0.48 3.371 -19.965 20.247 0.000 0.000 0.000 17.648 3.087 17.916 17.648 3.087 17.916
100-LV-1853B 0.48 3.327 -19.717 19.996 0.000 0.000 0.000 17.324 2.993 17.581 17.324 2.993 17.581
100-LV-1854A 0.48 3.311 -19.449 19.729 0.000 0.000 0.000 16.913 2.910 17.162 16.913 2.910 17.162
100-LV-1854B 0.48 3.292 -19.371 19.649 0.000 0.000 0.000 16.823 2.885 17.069 16.823 2.885 17.069
100-LV-1861A 0.22 3.152 -11.155 11.592 3.722 -11.660 12.240 9.670 2.739 10.050 -11.852 3.343 12.314
100-LV-1861B 0.22 2.843 -7.297 7.831 3.048 -6.216 6.923 6.322 2.466 6.786 -7.858 0.209 7.861
100-MV-1831A 4.16 1.570 -18.041 18.109 0.479 -0.011 0.479 16.195 1.565 16.270 -16.311 -1.560 16.385
100-MV-1831B 4.16 1.525 -17.481 17.547 0.479 -0.012 0.479 15.510 1.499 15.583 -15.628 -1.495 15.699
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 7
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
110-HV-3221A 13.80 1.759 -15.605 15.704 0.328 -0.996 1.048 13.035 1.636 13.137 -13.127 -1.369 13.198
110-HV-3221B 13.80 1.702 -14.721 14.819 0.330 -0.991 1.044 13.149 1.819 13.274 -13.224 -1.565 13.316
110-HV-3321A 13.80 1.865 -15.276 15.389 0.328 -0.993 1.046 12.768 1.715 12.882 -12.860 -1.449 12.941
110-HV-3321B 13.80 1.879 -14.142 14.266 0.330 -0.986 1.040 12.608 1.959 12.759 -12.683 -1.706 12.797
110-LV-3351A 0.48 2.870 -17.609 17.841 0.000 0.000 0.000 15.255 2.504 15.459 15.255 2.504 15.459
110-LV-3351B 0.48 2.895 -17.858 18.091 0.000 0.000 0.000 15.691 2.605 15.905 15.691 2.605 15.905
110-LV-3352A 0.48 2.910 -17.787 18.023 0.000 0.000 0.000 15.534 2.595 15.749 15.534 2.595 15.749
110-LV-3352B 0.48 2.875 -17.483 17.718 0.000 0.000 0.000 15.177 2.518 15.385 15.177 2.518 15.385
110-LV-3361A 0.22 2.857 -8.293 8.771 3.274 -8.074 8.713 7.192 2.486 7.610 -9.004 1.417 9.115
110-LV-3361B 0.22 2.842 -8.263 8.738 3.256 -8.050 8.684 7.158 2.465 7.571 -8.972 1.433 9.086
110-MV-3331A 4.16 0.938 -9.675 9.720 0.477 -0.022 0.478 8.398 0.852 8.441 -8.517 -0.849 8.560
110-MV-3331B 4.16 0.943 -9.485 9.532 0.005 0.000 0.005 8.315 0.872 8.360 -8.316 -0.872 8.361
120-LV-35A51A 0.48 3.293 -17.147 17.461 0.000 0.000 0.000 15.037 2.953 15.324 15.037 2.953 15.324
120-LV-35A51B 0.48 3.342 -17.457 17.774 0.000 0.000 0.000 15.459 3.052 15.757 15.459 3.052 15.757
120-LV-35A61A 0.22 3.958 -8.635 9.499 4.858 -7.408 8.859 7.495 3.452 8.252 -10.121 -0.358 10.127
120-LV-35A61B 0.22 2.770 -9.176 9.586 3.304 -8.659 9.268 7.989 2.430 8.350 -9.803 1.602 9.933
120-LV-35B51A 0.48 3.773 -16.708 17.129 0.000 0.000 0.000 14.694 3.385 15.079 14.694 3.385 15.079
120-LV-35B51B 0.48 3.873 -17.334 17.761 0.000 0.000 0.000 15.547 3.623 15.964 15.547 3.623 15.964
120-LV-35B52A 0.48 3.900 -16.221 16.683 0.000 0.000 0.000 14.320 3.527 14.748 14.320 3.527 14.748
120-LV-35B52B 0.48 3.854 -15.819 16.282 0.000 0.000 0.000 13.775 3.388 14.186 13.775 3.388 14.186
120-MV-35A41A 2.40 2.391 -14.069 14.271 0.000 0.000 0.000 12.617 2.263 12.819 12.617 2.263 12.819
120-MV-35A41B 2.40 2.448 -14.040 14.252 0.000 0.000 0.000 12.478 2.274 12.683 12.478 2.274 12.683
120-MV-35B41A 2.40 3.844 -10.077 10.786 0.000 0.000 0.000 8.924 3.523 9.594 8.924 3.523 9.594
120-MV-35B41B 2.40 3.848 -10.114 10.822 0.000 0.000 0.000 8.944 3.483 9.598 8.944 3.483 9.598
120-MV-35B42A 2.40 3.839 -10.097 10.803 0.000 0.000 0.000 8.948 3.520 9.616 8.948 3.520 9.616
120-MV-35B42B 2.40 3.874 -10.028 10.751 0.000 0.000 0.000 8.818 3.505 9.489 8.818 3.505 9.489
130-LV-3651A 0.48 3.363 -18.687 18.988 0.000 0.000 0.000 16.249 2.944 16.513 16.249 2.944 16.513
130-LV-3651B 0.48 3.335 -18.565 18.862 0.000 0.000 0.000 16.114 2.916 16.376 16.114 2.916 16.376
130-LV-3652A 0.48 3.398 -19.019 19.320 0.000 0.000 0.000 16.729 3.047 17.004 16.729 3.047 17.004
130-LV-3652B 0.48 3.335 -18.565 18.862 0.000 0.000 0.000 16.114 2.916 16.376 16.114 2.916 16.376
130-LV-3661A 0.22 2.572 -12.719 12.977 2.926 -14.215 14.513 11.067 2.251 11.294 -12.700 5.729 13.933
130-LV-3661B 0.22 2.555 -12.624 12.880 2.894 -14.094 14.388 10.941 2.219 11.163 -12.595 5.747 13.844
130-MV-3631A 4.16 3.129 -15.056 15.378 0.477 -0.014 0.477 13.407 2.916 13.721 -13.524 -2.911 13.834
130-MV-3631B 4.16 2.943 -14.395 14.693 0.476 -0.015 0.477 12.654 2.703 12.939 -12.772 -2.699 13.054
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 8
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
140-LV-3461A 0.22 2.873 -11.119 11.484 3.181 -12.796 13.185 9.692 2.521 10.015 7.944 9.924 12.712
140-LV-3461B 0.22 2.820 -11.011 11.367 3.160 -12.744 13.130 9.642 2.499 9.960 7.899 9.840 12.618
140-LV-3751A2 0.48 4.126 -19.941 20.364 0.000 0.000 0.000 17.731 3.757 18.125 17.731 3.757 18.125
140-MV-3741A 2.40 4.961 -14.209 15.050 0.000 0.000 0.000 12.645 4.453 13.406 12.645 4.453 13.406
140-MV-3741B 2.40 4.689 -13.630 14.414 0.000 0.000 0.000 11.972 4.115 12.659 11.972 4.115 12.659
140-MV-3751B 0.48 3.846 -19.192 19.573 0.000 0.000 0.000 17.361 3.636 17.738 17.361 3.636 17.738
140-TR-3731A 0.48 4.495 -13.323 14.061 0.000 0.000 0.000 11.729 4.030 12.402 11.729 4.030 12.402
150-LV-3851A 0.48 3.396 -11.056 11.566 0.000 0.000 0.000 9.776 3.023 10.233 9.776 3.023 10.233
150-LV-3851B 0.48 3.321 -10.820 11.318 0.000 0.000 0.000 9.530 2.948 9.975 9.530 2.948 9.975
150-LV-3861A 0.22 1.969 -4.365 4.788 2.046 -4.136 4.615 3.793 1.716 4.163 -4.830 0.235 4.835
150-LV-3861B 0.22 1.959 -4.348 4.769 2.038 -4.125 4.601 3.776 1.705 4.144 -4.812 0.243 4.818
150-MV-3841A 2.40 4.734 -12.158 13.047 0.000 0.000 0.000 10.809 4.238 11.610 10.809 4.238 11.610
150-MV-3841B 2.40 4.505 -11.695 12.533 0.000 0.000 0.000 10.260 3.953 10.995 10.260 3.953 10.995
160-HV-41A21 13.80 0.700 -18.153 18.167 1.569 -0.160 1.577 15.989 0.719 16.005 -16.379 -0.689 16.394
160-HV-41A22 (TD-7) 13.80 1.283 -23.299 23.334 1.571 -0.137 1.577 21.502 1.558 21.558 -21.873 -1.516 21.926
160-HV-41A23 13.80 1.132 -19.282 19.315 1.545 -0.229 1.562 17.211 1.400 17.268 -17.593 -1.342 17.644
160-HV-41C21A 13.80 1.998 -22.008 22.099 1.547 -0.150 1.555 20.219 2.212 20.340 -20.588 -2.167 20.702
160-HV-41C21B 13.80 1.675 -18.382 18.458 1.537 -0.235 1.555 16.369 1.859 16.474 -16.751 -1.800 16.847
160-LV-41A51A 0.48 3.544 -19.339 19.662 0.000 0.000 0.000 17.170 3.278 17.480 17.170 3.278 17.480
160-LV-41A51B 0.48 3.465 -18.597 18.917 0.000 0.000 0.000 16.169 3.057 16.455 16.169 3.057 16.455
160-LV-41A52A 0.48 3.439 -18.608 18.924 0.000 0.000 0.000 16.180 3.009 16.457 16.180 3.009 16.457
160-LV-41A52B 0.48 3.441 -18.806 19.118 0.000 0.000 0.000 16.516 3.083 16.801 16.516 3.083 16.801
160-LV-41A61A 0.22 2.681 -13.199 13.469 0.000 0.000 0.000 11.446 2.330 11.681 11.446 2.330 11.681
160-LV-41A61B 0.22 2.683 -13.247 13.516 0.000 0.000 0.000 11.526 2.350 11.763 11.526 2.350 11.763
160-LV-41C51A 0.48 2.791 -18.309 18.521 0.000 0.000 0.000 16.526 2.666 16.740 16.526 2.666 16.740
160-LV-41C51B 0.48 2.740 -17.879 18.088 0.000 0.000 0.000 15.975 2.560 16.179 15.975 2.560 16.179
160-LV-41C61A 0.22 0.906 -0.739 1.169 0.775 -0.465 0.904 0.639 0.786 1.013 -0.967 -0.627 1.152
160-LV-41C61B 0.22 0.905 -0.739 1.168 0.775 -0.465 0.904 0.639 0.785 1.012 -0.967 -0.626 1.152
160-LV-41D51A 0.48 4.135 -14.710 15.280 0.000 0.000 0.000 13.126 3.726 13.644 13.126 3.726 13.644
160-LV-41D51B 0.48 4.121 -14.723 15.289 0.000 0.000 0.000 13.105 3.697 13.616 13.105 3.697 13.616
160-LV-41E51A 0.48 3.307 -18.986 19.271 0.000 0.000 0.000 16.793 3.011 17.061 16.793 3.011 17.061
160-LV-41E51B 0.48 3.255 -18.703 18.984 0.000 0.000 0.000 16.436 2.916 16.692 16.436 2.916 16.692
160-LV-41E61A 0.22 1.347 -2.410 2.761 1.399 -2.454 2.824 2.089 1.170 2.394 -2.811 0.078 2.812
160-LV-41E61B 0.22 1.345 -2.408 2.758 1.397 -2.452 2.822 2.086 1.167 2.391 -2.809 0.081 2.810
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 9
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
160-LV-41F51A 0.48 2.989 -12.725 13.072 0.000 0.000 0.000 11.449 2.754 11.775 11.449 2.754 11.775
160-LV-41F51B 0.48 2.940 -12.346 12.692 0.000 0.000 0.000 10.938 2.649 11.254 10.938 2.649 11.254
160-LV-41F61A 0.22 0.973 -1.065 1.443 0.953 -0.812 1.252 0.923 0.845 1.251 -1.370 -0.530 1.469
160-LV-41F61B 0.22 0.971 -1.064 1.441 0.952 -0.812 1.251 0.922 0.842 1.249 -1.369 -0.528 1.467
160-MV-41C31A 4.16 0.928 -10.695 10.735 0.478 -0.020 0.478 9.625 0.903 9.668 -9.741 -0.897 9.782
160-MV-41C31B 4.16 0.904 -10.471 10.510 0.478 -0.020 0.478 9.439 0.892 9.481 -9.554 -0.886 9.595
160-MV-41D31A 4.16 1.890 -17.302 17.405 0.479 -0.012 0.479 15.513 1.847 15.622 -15.629 -1.842 15.737
160-MV-41D31B 4.16 1.826 -16.787 16.886 0.479 -0.012 0.479 14.886 1.758 14.989 -15.003 -1.754 15.105
160-MV-41E31 BA 4.16 2.633 -15.329 15.553 0.477 -0.014 0.477 13.709 2.456 13.928 -13.825 -2.451 14.041
160-MV-41E31 BB 4.16 2.483 -14.650 14.859 0.477 -0.015 0.477 12.936 2.285 13.136 -13.054 -2.281 13.251
160-MV-41F31A 4.16 1.254 -9.904 9.983 0.476 -0.022 0.477 8.907 1.191 8.986 -9.022 -1.185 9.100
160-MV-41F31B 4.16 1.221 -9.707 9.783 0.476 -0.022 0.477 8.739 1.170 8.817 -8.854 -1.164 8.931
160-MV-4131A 4.16 1.160 -19.584 19.618 0.479 -0.011 0.480 17.637 1.145 17.674 -17.752 -1.140 17.789
160-MV-4131B 4.16 1.101 -18.670 18.703 0.479 -0.011 0.479 16.767 1.117 16.804 -16.883 -1.113 16.919
171-LV-4251A 0.48 2.951 -11.356 11.733 0.000 0.000 0.000 9.865 2.573 10.195 9.865 2.573 10.195
171-LV-4251B 0.48 2.893 -11.190 11.558 0.000 0.000 0.000 9.679 2.504 9.998 9.679 2.504 9.998
171-LV-4261A 0.22 0.834 -1.455 1.678 0.838 -1.405 1.636 1.261 0.723 1.453 -1.680 -0.044 1.681
171-LV-4261B 0.22 0.833 -1.454 1.676 0.837 -1.404 1.635 1.259 0.721 1.451 -1.679 -0.043 1.680
171-MV-4231A 4.16 0.757 -8.499 8.533 0.477 -0.026 0.477 7.519 0.687 7.551 -7.637 -0.682 7.667
171-MV-4231B 4.16 0.749 -7.751 7.787 0.476 -0.028 0.477 6.668 0.655 6.700 -6.789 -0.652 6.820
172-LV-4351A 0.48 2.403 -13.649 13.859 0.000 0.000 0.000 12.186 2.293 12.400 12.186 2.293 12.400
172-LV-4351B 0.48 2.328 -13.113 13.318 0.000 0.000 0.000 11.423 2.075 11.610 11.423 2.075 11.610
180-HV-44C21A 13.80 3.794 -16.946 17.365 1.438 -0.200 1.452 15.275 3.751 15.729 -15.627 -3.698 16.059
180-HV-44C21B 13.80 3.190 -14.674 15.017 1.500 -0.265 1.523 12.929 3.095 13.294 -13.308 -3.033 13.649
180-HV-44G21A 13.80 3.987 -15.925 16.416 1.411 -0.211 1.427 14.305 3.893 14.825 -14.652 -3.838 15.146
180-HV-44G21B 13.80 3.385 -13.878 14.285 1.490 -0.272 1.514 12.199 3.241 12.622 -12.577 -3.178 12.972
180-HV-44I21 (TD-9) 13.80 0.918 -17.658 17.682 1.566 -0.163 1.575 15.348 0.817 15.370 -15.742 -0.792 15.762
180-LV-44A51A 0.48 3.276 -18.318 18.608 0.000 0.000 0.000 15.925 2.867 16.181 15.925 2.867 16.181
180-LV-44A51B 0.48 3.248 -18.202 18.490 0.000 0.000 0.000 15.799 2.839 16.052 15.799 2.839 16.052
180-LV-44A61A 0.22 1.576 -4.857 5.106 1.584 -4.204 4.493 4.208 1.367 4.424 -4.980 0.480 5.003
180-LV-44A61B 0.22 1.574 -4.853 5.102 1.582 -4.202 4.490 4.204 1.365 4.420 -4.976 0.482 4.999
180-LV-44C51A 0.48 2.964 -18.080 18.321 0.000 0.000 0.000 15.682 2.581 15.893 15.682 2.581 15.893
180-LV-44C51B 0.48 3.049 -18.787 19.033 0.000 0.000 0.000 16.653 2.808 16.888 16.653 2.808 16.888
180-LV-44C61A 0.22 1.630 -6.044 6.260 1.755 -6.366 6.604 5.235 1.413 5.422 -6.183 1.948 6.483
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 10
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
180-LV-44C61B 0.22 1.642 -6.079 6.297 1.774 -6.405 6.646 5.281 1.434 5.472 -6.222 1.932 6.515
180-LV-44E51A 0.48 3.111 -11.366 11.784 0.000 0.000 0.000 9.852 2.702 10.216 9.852 2.702 10.216
180-LV-44E51B 0.48 3.099 -11.333 11.749 0.000 0.000 0.000 9.821 2.695 10.184 9.821 2.695 10.184
180-LV-44E61A 0.22 0.871 -1.194 1.478 0.872 -1.014 1.337 1.034 0.755 1.280 -1.459 -0.321 1.494
180-LV-44E61B 0.22 0.875 -1.197 1.482 0.874 -1.015 1.339 1.036 0.758 1.284 -1.462 -0.324 1.497
180-LV-44F51A 0.48 3.464 -12.273 12.752 0.000 0.000 0.000 10.883 3.127 11.323 10.883 3.127 11.323
180-LV-44F51B 0.48 3.464 -12.273 12.752 0.000 0.000 0.000 10.883 3.127 11.323 10.883 3.127 11.323
180-LV-44F61A 0.22 0.907 -1.596 1.836 0.939 -1.629 1.880 1.384 0.787 1.592 -1.867 0.043 1.867
180-LV-44F61B 0.22 0.907 -1.596 1.836 0.939 -1.629 1.880 1.384 0.787 1.592 -1.867 0.043 1.867
180-LV-44G51A 0.48 3.044 -11.604 11.997 0.000 0.000 0.000 10.059 2.644 10.400 10.059 2.644 10.400
180-LV-44G51B 0.48 3.030 -11.561 11.951 0.000 0.000 0.000 10.016 2.631 10.356 10.016 2.631 10.356
180-LV-44G61A 0.22 0.887 -0.734 1.151 0.767 -0.466 0.897 0.635 0.768 0.997 -0.962 -0.609 1.139
180-LV-44G61B 0.22 0.887 -0.734 1.151 0.767 -0.466 0.897 0.635 0.768 0.997 -0.962 -0.609 1.139
180-LV-44H51A 0.48 3.435 -10.417 10.969 0.000 0.000 0.000 9.028 2.982 9.508 9.028 2.982 9.508
180-LV-44H51B 0.48 3.419 -10.383 10.931 0.000 0.000 0.000 8.995 2.968 9.472 8.995 2.968 9.472
180-LV-44H51B2 0.22 1.049 -0.780 1.307 0.866 -0.464 0.983 0.675 0.909 1.132 -1.033 -0.755 1.280
180-LV-44H61A 0.22 1.046 -0.780 1.304 0.865 -0.465 0.982 0.675 0.906 1.130 -1.033 -0.752 1.278
180-LV-44I51A 0.48 4.797 -14.080 14.875 0.000 0.000 0.000 12.195 4.155 12.883 12.195 4.155 12.883
180-LV-44I51B 0.48 4.797 -14.080 14.875 0.000 0.000 0.000 12.195 4.155 12.883 12.195 4.155 12.883
180-LV-44I61 0.22 0.927 -1.610 1.858 0.951 -1.637 1.893 1.394 0.803 1.609 -1.882 0.029 1.882
180-LV-44M51 BA 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
180-LV-44M51 BB 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
180-MV-44A31A 4.16 2.887 -14.297 14.585 0.476 -0.016 0.477 12.708 2.682 12.988 -12.824 -2.677 13.101
180-MV-44A31B 4.16 2.721 -13.709 13.977 0.476 -0.016 0.477 12.044 2.494 12.300 -12.162 -2.490 12.415
180-MV-44C31A 4.16 1.520 -13.449 13.535 0.478 -0.015 0.478 11.770 1.372 11.849 -11.888 -1.369 11.967
180-MV-44C31B 4.16 1.507 -13.054 13.141 0.478 -0.016 0.478 11.405 1.383 11.489 -11.525 -1.380 11.607
180-MV-44E31-A 4.16 1.789 -11.222 11.364 0.476 -0.020 0.477 9.801 1.596 9.930 -9.919 -1.592 10.046
180-MV-44E31-B 4.16 1.754 -10.944 11.084 0.476 -0.020 0.477 9.544 1.580 9.674 -9.663 -1.577 9.791
180-MV-44F31A 4.16 3.546 -13.626 14.080 0.475 -0.016 0.475 12.083 3.273 12.519 -12.200 -3.268 12.630
180-MV-44F31B 4.16 3.326 -13.121 13.536 0.475 -0.016 0.475 11.522 3.026 11.912 -11.640 -3.021 12.026
180-MV-44G31A 4.16 1.601 -13.268 13.364 0.478 -0.016 0.478 11.609 1.443 11.698 -11.727 -1.440 11.815
180-MV-44G31B 4.16 1.580 -12.796 12.893 0.478 -0.016 0.478 11.142 1.430 11.233 -11.261 -1.428 11.352
180-MV-44H31A 4.16 2.522 -7.295 7.719 0.468 -0.031 0.469 6.346 2.217 6.722 -6.464 -2.212 6.832
180-MV-44H31B 4.16 2.451 -7.152 7.561 0.467 -0.031 0.468 6.205 2.150 6.567 -6.323 -2.145 6.677
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 11
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
180B-CCM-CTOSAT 0.48 3.049 -18.787 19.033 0.000 0.000 0.000 16.653 2.808 16.888 16.653 2.808 16.888
181-LV-3951A 0.48 3.696 -15.864 16.289 0.000 0.000 0.000 13.959 3.325 14.350 13.959 3.325 14.350
181-LV-3951B 0.48 3.642 -15.599 16.018 0.000 0.000 0.000 13.507 3.162 13.872 13.507 3.162 13.872
181-LV-3961A 0.22 2.023 -7.285 7.561 2.214 -7.852 8.158 6.330 1.765 6.571 -7.524 2.467 7.918
181-LV-3961B 0.22 2.015 -7.259 7.534 2.197 -7.813 8.116 6.286 1.746 6.524 -7.492 2.484 7.893
181-MV-3941A 2.40 2.804 -13.925 14.205 0.000 0.000 0.000 12.207 2.500 12.461 12.207 2.500 12.461
181-MV-3941B 2.40 2.703 -13.397 13.667 0.000 0.000 0.000 11.596 2.359 11.833 11.596 2.359 11.833
330-CCM-1 BA 0.48 3.916 -15.366 15.857 0.000 0.000 0.000 13.420 3.466 13.861 13.420 3.466 13.861
330-CCM-1 BB 0.48 3.811 -15.031 15.506 0.000 0.000 0.000 13.036 3.317 13.451 13.036 3.317 13.451
330-CCM-2 BA 0.22 1.518 -1.566 2.181 1.409 -1.119 1.799 1.356 1.316 1.890 -1.989 -0.899 2.183
330-CCM-2 BB 0.22 1.515 -1.566 2.178 1.407 -1.119 1.798 1.356 1.312 1.887 -1.989 -0.896 2.181
330-TDA-1 BA 4.16 2.685 -9.618 9.985 0.778 -0.058 0.780 8.532 2.480 8.885 -8.725 -2.467 9.067
330-TDA-1 BB 4.16 2.397 -8.962 9.277 0.777 -0.062 0.779 7.820 2.128 8.105 -8.016 -2.119 8.291
330-TDBT-1 BA 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
330-TDBT-1 BB 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
ALIM-API-1 2.40 3.403 -5.262 6.266 0.000 0.000 0.000 4.544 2.934 5.409 4.544 2.934 5.409
API-LV-CCM-01 0.48 4.886 -5.813 7.594 0.000 0.000 0.000 5.032 4.227 6.571 5.032 4.227 6.571
API-LV-CCM-MJW 0.48 4.956 -6.831 8.440 0.000 0.000 0.000 5.912 4.287 7.303 5.912 4.287 7.303
Barra11 4.16 2.480 -1.890 3.118 0.189 -0.008 0.189 1.636 2.140 2.694 -1.685 -2.139 2.723
Barra12 0.22 5.438 -13.830 14.860 5.146 -15.134 15.985 11.969 4.706 12.860 9.640 13.023 16.203
Barra14 0.22 4.544 -9.856 10.853 4.348 -8.929 9.932 8.532 3.932 9.394 -10.612 0.148 10.613
BK4-CCM-04A 0.48 2.951 -10.325 10.738 0.000 0.000 0.000 8.952 2.567 9.313 8.952 2.567 9.313
BK4-CCM-04B 0.48 3.168 -10.330 10.805 0.000 0.000 0.000 8.963 2.760 9.379 8.963 2.760 9.379
BUS SE-19A CERO CORTES1 4.16 1.222 -8.739 8.824 0.396 -0.017 0.397 7.697 1.096 7.775 -7.795 -1.092 7.871
BUS TABLERO 28G31 4.16 0.464 -2.123 2.173 0.000 0.000 0.000 1.955 0.418 1.999 1.955 0.418 1.999
Bus TAR 2.40 4.301 -9.142 10.103 0.000 0.000 0.000 7.959 3.800 8.819 7.959 3.800 8.819
BUS TBT 0.48 7.226 -24.084 25.144 9.014 -30.485 31.790 21.660 6.401 22.586 -26.888 12.451 29.631
BUS TR-28G21 PRIM 13.80 2.373 -12.821 13.039 0.340 -0.931 0.991 10.742 2.041 10.934 -10.839 -1.792 10.986
BUS TR-28G21 SEC 4.16 0.918 -9.216 9.262 0.398 -0.016 0.398 8.112 0.832 8.154 -8.210 -0.829 8.252
BUS TR-28G41 0.22 1.242 -2.634 2.912 1.442 -2.871 3.213 2.282 1.077 2.523 -3.132 0.496 3.172
Bus2 4.16 1.496 -10.835 10.938 0.398 -0.014 0.398 9.283 1.306 9.374 -9.384 -1.305 9.474
Bus3 13.80 3.321 -14.481 14.857 0.330 -0.992 1.045 12.040 2.807 12.362 -12.135 -2.541 12.398
Bus4 13.80 2.350 -13.375 13.579 0.325 -0.979 1.032 11.226 2.076 11.417 -11.318 -1.814 11.462
Bus5 2.40 1.724 -16.827 16.915 0.000 0.000 0.000 14.671 1.600 14.757 14.671 1.600 14.757
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 12
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus6 0.22 1.537 -5.758 5.959 1.702 -6.174 6.404 5.013 1.353 5.193 -5.921 1.944 6.233
Bus7 2.40 2.127 -15.768 15.911 0.000 0.000 0.000 13.662 1.895 13.793 13.662 1.895 13.793
Bus8 0.48 2.126 -15.176 15.324 0.000 0.000 0.000 13.209 1.901 13.345 13.209 1.901 13.345
Bus9 0.48 2.201 -15.696 15.850 0.000 0.000 0.000 13.953 2.118 14.112 13.953 2.118 14.112
Bus10 2.40 2.102 -15.644 15.785 0.000 0.000 0.000 13.639 1.920 13.773 13.639 1.920 13.773
Bus12 2.40 6.189 -10.749 12.404 0.000 0.000 0.000 9.355 5.425 10.814 9.355 5.425 10.814
Bus15 2.40 6.189 -10.749 12.404 0.000 0.000 0.000 9.355 5.425 10.814 9.355 5.425 10.814
Bus19 2.40 6.231 -10.849 12.511 0.000 0.000 0.000 9.467 5.393 10.896 9.467 5.393 10.896
Bus21 2.40 1.738 -16.987 17.076 0.000 0.000 0.000 14.720 1.565 14.803 14.720 1.565 14.803
Bus22 13.80 2.560 -14.124 14.354 0.325 -0.990 1.042 11.745 2.208 11.951 -11.839 -1.941 11.997
Bus23 2.40 1.020 -9.027 9.084 0.000 0.000 0.000 7.907 0.914 7.960 7.907 0.914 7.960
Bus24 2.40 0.908 -9.090 9.135 0.000 0.000 0.000 7.964 0.815 8.005 7.964 0.815 8.005
Bus25 13.80 0.558 -4.992 5.023 0.756 -0.119 0.765 4.337 0.495 4.366 -4.531 -0.479 4.556
Bus26 2.40 4.608 -27.197 27.585 0.000 0.000 0.000 23.263 4.006 23.606 23.263 4.006 23.606
Bus27 2.40 4.413 -26.870 27.230 0.000 0.000 0.000 23.081 3.883 23.405 23.081 3.883 23.405
Bus32 13.80 1.973 -16.805 16.920 0.330 -1.002 1.055 13.873 1.779 13.987 -13.969 -1.509 14.050
Bus33 4.16 0.718 -7.821 7.854 0.476 -0.028 0.477 6.727 0.629 6.757 -6.848 -0.626 6.876
Bus34 4.16 0.867 -8.320 8.365 0.476 -0.027 0.477 7.357 0.785 7.399 -7.474 -0.780 7.515
Bus35 0.48 2.825 -12.511 12.825 0.000 0.000 0.000 10.872 2.464 11.147 10.872 2.464 11.147
Bus36 0.48 2.769 -12.308 12.616 0.000 0.000 0.000 10.645 2.396 10.912 10.645 2.396 10.912
Bus37 4.16 0.838 -7.601 7.647 0.475 -0.029 0.476 6.539 0.731 6.580 -6.660 -0.728 6.699
Bus39 4.16 1.221 -8.054 8.146 0.474 -0.027 0.475 7.140 1.079 7.221 -7.256 -1.074 7.335
Bus40 4.16 0.729 -8.564 8.595 0.477 -0.026 0.477 7.574 0.663 7.603 -7.692 -0.658 7.720
Bus41 13.80 1.627 -15.838 15.921 0.331 -0.993 1.046 13.228 1.534 13.316 -13.321 -1.267 13.381
Bus42 13.80 3.820 -6.123 7.217 0.345 -0.763 0.837 5.315 3.429 6.325 5.228 3.629 6.364
Bus43 13.80 3.613 -6.004 7.008 0.342 -0.760 0.833 5.119 3.041 5.954 5.028 3.249 5.986
bus45 13.80 1.122 -3.825 3.986 0.684 -0.149 0.700 3.317 0.982 3.459 -3.497 -0.957 3.625
Bus48 2.40 2.700 -7.440 7.915 0.000 0.000 0.000 6.571 2.360 6.982 6.571 2.360 6.982
Bus49 13.80 1.992 -1.767 2.663 0.336 -0.584 0.674 1.528 1.708 2.292 1.439 1.879 2.367
Bus53 2.40 1.161 -7.393 7.484 0.000 0.000 0.000 6.407 1.011 6.486 6.407 1.011 6.486
Bus58 13.80 0.741 -4.776 4.833 0.716 -0.132 0.728 4.146 0.654 4.197 -4.331 -0.633 4.377
Bus66 2.40 3.633 -7.642 8.462 0.000 0.000 0.000 6.619 3.155 7.332 6.619 3.155 7.332
Bus67 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus68 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 13
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus69 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus70 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus71 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus72 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus73 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus74 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus75 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus76 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus77 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus78 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus79 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus80 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus81 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus82 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus83 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus84 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus85 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus86 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus87 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus88 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus89 13.80 3.425 -6.953 7.750 0.331 -0.897 0.956 5.895 2.882 6.562 5.809 3.128 6.598
Bus90 13.80 3.424 -6.939 7.738 0.331 -0.897 0.956 5.884 2.881 6.551 5.798 3.127 6.588
Bus91 4.16 0.471 -2.349 2.396 0.465 -2.423 2.467 2.030 0.408 2.071 1.803 1.664 2.453
Bus92 13.80 3.433 -6.901 7.708 0.331 -0.896 0.955 5.852 2.889 6.527 5.766 3.136 6.563
Bus95 2.40 2.067 -8.727 8.968 0.000 0.000 0.000 7.674 1.817 7.886 7.674 1.817 7.886
Bus96 2.40 1.554 -9.882 10.004 0.000 0.000 0.000 8.664 1.381 8.773 8.664 1.381 8.773
Bus97 13.80 3.468 -7.744 8.485 0.330 -0.912 0.970 6.550 2.914 7.168 6.464 3.164 7.196
Bus98 2.40 1.526 -9.658 9.778 0.000 0.000 0.000 8.321 1.322 8.425 8.321 1.322 8.425
Bus99 13.80 3.470 -7.824 8.558 0.330 -0.913 0.971 6.614 2.915 7.228 6.528 3.165 7.255
Bus101 4.16 0.821 -5.556 5.616 0.000 0.000 0.000 4.787 0.712 4.839 4.787 0.712 4.839
Bus102 13.80 3.447 -8.695 9.353 0.330 -0.928 0.985 7.325 2.895 7.876 7.239 3.148 7.894
Bus104 2.40 2.152 -13.504 13.674 0.000 0.000 0.000 11.610 1.865 11.759 11.610 1.865 11.759
Bus105 13.80 3.453 -8.599 9.266 0.330 -0.926 0.983 7.246 2.900 7.805 7.160 3.153 7.824
Bus106 13.80 3.453 -8.600 9.267 0.330 -0.926 0.983 7.247 2.900 7.806 7.162 3.153 7.825
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 14
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus115 0.48 1.079 -5.070 5.184 0.000 0.000 0.000 4.388 0.934 4.487 4.388 0.934 4.487
BUS 115KV 115.00 0.007 -0.041 0.041 0.007 -0.036 0.037 0.040 0.008 0.041 0.037 0.020 0.042
Bus116 0.48 3.960 -10.454 11.179 0.000 0.000 0.000 9.042 3.425 9.670 9.042 3.425 9.670
Bus117 13.80 1.975 -21.648 21.738 1.564 -0.148 1.571 19.880 2.170 19.998 -20.252 -2.126 20.363
Bus118 13.80 2.436 -20.883 21.024 1.559 -0.152 1.566 19.119 2.589 19.293 -19.492 -2.545 19.657
Bus119 13.80 1.611 -18.136 18.207 1.536 -0.238 1.555 16.154 1.785 16.253 -16.536 -1.726 16.625
Bus120 13.80 1.940 -17.601 17.707 1.531 -0.242 1.550 15.652 2.063 15.787 -16.033 -2.004 16.158
Bus122 4.16 1.339 -18.904 18.951 0.479 -0.011 0.479 16.894 1.317 16.946 -17.011 -1.313 17.062
Bus123 4.16 1.413 -20.229 20.278 0.479 -0.010 0.479 18.217 1.386 18.270 -18.333 -1.381 18.385
Bus124 4.16 1.906 -19.173 19.267 0.479 -0.011 0.479 17.233 1.831 17.330 -17.349 -1.826 17.444
Bus125 4.16 1.906 -19.173 19.267 0.479 -0.011 0.479 17.233 1.831 17.330 -17.349 -1.826 17.444
Bus127 4.16 1.905 -19.175 19.270 0.479 -0.011 0.479 17.237 1.830 17.333 -17.352 -1.825 17.448
Bus129 4.16 1.772 -17.975 18.062 0.479 -0.012 0.479 16.042 1.701 16.131 -16.158 -1.697 16.247
Bus130 4.16 1.772 -17.976 18.063 0.479 -0.012 0.479 16.043 1.701 16.133 -16.160 -1.696 16.249
Bus131 4.16 1.773 -17.972 18.060 0.479 -0.012 0.479 16.038 1.702 16.128 -16.155 -1.698 16.244
Bus134 13.80 3.352 -9.747 10.307 0.343 -0.862 0.928 8.263 2.861 8.744 -8.358 -2.631 8.762
Bus135 4.16 4.145 -15.637 16.177 0.476 -0.013 0.476 13.903 3.786 14.410 -14.020 -3.782 14.521
Bus136 4.16 4.779 -16.212 16.901 0.476 -0.013 0.476 14.449 4.439 15.116 -14.565 -4.434 15.225
Bus137 2.40 2.802 -13.960 14.238 0.000 0.000 0.000 12.232 2.520 12.489 12.232 2.520 12.489
Bus138 4.16 4.778 -16.213 16.902 0.476 -0.013 0.476 14.451 4.438 15.117 -14.567 -4.433 15.227
Bus139 4.16 4.774 -16.219 16.906 0.476 -0.013 0.476 14.460 4.432 15.124 -14.576 -4.427 15.234
BUS 140-ALUMBRADO TR-1 0.22 1.603 -3.253 3.626 1.674 -3.333 3.730 2.821 1.394 3.147 -3.688 0.311 3.702
BUS 140-ALUMBRADO TR-2 0.22 1.594 -3.245 3.615 1.671 -3.330 3.725 2.818 1.390 3.142 -3.680 0.313 3.694
BUS 140-TR1 SEC 2.40 2.065 -21.560 21.658 0.000 0.000 0.000 19.097 1.983 19.200 19.097 1.983 19.200
BUS 140-TR3 SEC 2.40 1.955 -20.382 20.475 0.000 0.000 0.000 17.718 1.800 17.810 17.718 1.800 17.810
BUS 140-TR-3731B 0.48 4.277 -13.004 13.689 0.000 0.000 0.000 11.573 3.932 12.223 11.573 3.932 12.223
Bus141 4.16 4.688 -16.332 16.991 0.476 -0.013 0.476 14.574 4.346 15.208 -14.690 -4.340 15.318
Bus142 4.16 4.620 -16.420 17.057 0.476 -0.013 0.476 14.673 4.273 15.282 -14.788 -4.268 15.392
Bus143 4.16 3.443 -17.224 17.565 0.477 -0.013 0.477 15.436 3.206 15.765 -15.552 -3.202 15.878
Bus146 4.16 4.261 -15.492 16.067 0.476 -0.013 0.476 13.749 3.921 14.297 -13.866 -3.916 14.408
Bus147 4.16 4.338 -15.394 15.993 0.476 -0.013 0.476 13.656 3.995 14.229 -13.773 -3.990 14.339
Bus148 4.16 4.341 -15.390 15.990 0.476 -0.013 0.476 13.650 4.000 14.224 -13.767 -3.995 14.335
Bus150 4.16 4.349 -15.379 15.982 0.476 -0.013 0.476 13.632 4.012 14.210 -13.749 -4.007 14.321
Bus151 0.48 2.856 -21.190 21.382 0.000 0.000 0.000 18.552 2.573 18.729 18.552 2.573 18.729
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 15
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus152 0.48 2.914 -21.518 21.714 0.000 0.000 0.000 18.847 2.621 19.028 18.847 2.621 19.028
Bus153 0.48 2.884 -21.355 21.549 0.000 0.000 0.000 18.734 2.611 18.915 18.734 2.611 18.915
Bus154 0.48 2.861 -21.146 21.338 0.000 0.000 0.000 18.401 2.511 18.571 18.401 2.511 18.571
Bus155 13.80 4.695 -18.314 18.906 1.488 -0.187 1.499 16.539 4.664 17.184 -16.902 -4.611 17.520
Bus156 13.80 3.631 -15.794 16.206 1.458 -0.268 1.482 13.919 3.539 14.362 -14.287 -3.473 14.703
Bus157 0.48 2.902 -21.389 21.585 0.000 0.000 0.000 18.857 2.666 19.044 18.857 2.666 19.044
Bus158 4.16 1.793 -16.680 16.776 0.479 -0.012 0.479 14.727 1.705 14.825 -14.845 -1.701 14.942
Bus159 4.16 1.473 -18.465 18.524 0.479 -0.011 0.479 16.570 1.439 16.632 -16.686 -1.434 16.747
Bus160 13.80 2.445 -20.099 20.247 1.512 -0.167 1.521 18.366 2.575 18.546 -18.729 -2.528 18.898
Bus161 4.16 1.427 -17.504 17.562 0.479 -0.012 0.479 15.469 1.388 15.531 -15.587 -1.384 15.648
Bus162 13.80 2.035 -16.930 17.052 1.527 -0.248 1.547 15.032 2.131 15.182 -15.413 -2.071 15.551
Bus163 2.40 3.587 -11.061 11.628 0.000 0.000 0.000 9.736 3.183 10.243 9.736 3.183 10.243
Bus164 4.16 1.876 -17.561 17.661 0.479 -0.012 0.479 15.733 1.799 15.836 -15.849 -1.794 15.951
Bus165 0.48 2.900 -21.377 21.573 0.000 0.000 0.000 18.795 2.617 18.976 18.795 2.617 18.976
Bus166 4.16 1.877 -17.559 17.660 0.479 -0.012 0.479 15.731 1.800 15.833 -15.847 -1.795 15.948
Bus167 0.48 2.888 -21.200 21.396 0.000 0.000 0.000 18.530 2.582 18.709 18.530 2.582 18.709
Bus169 4.16 4.786 -14.742 15.500 0.475 -0.014 0.475 13.115 4.402 13.834 -13.232 -4.397 13.943
Bus170 4.16 1.795 -16.675 16.771 0.479 -0.012 0.479 14.720 1.706 14.819 -14.838 -1.702 14.935
Bus171 0.48 2.841 -20.883 21.076 3.042 -21.980 22.190 18.134 2.490 18.304 -19.711 9.055 21.692
Bus172 4.16 4.915 -14.581 15.387 0.475 -0.014 0.475 12.952 4.532 13.722 -13.069 -4.527 13.831
Bus176 2.40 2.188 -1.723 2.785 0.000 0.000 0.000 1.492 1.892 2.409 1.492 1.892 2.409
Bus177 13.80 2.710 -12.725 13.011 0.338 -0.943 1.002 11.266 2.664 11.577 -11.344 -2.420 11.599
Bus179 4.16 2.716 -14.073 14.332 0.477 -0.016 0.477 12.414 2.488 12.661 -12.532 -2.484 12.776
Bus180 0.48 3.076 -20.675 20.903 0.000 0.000 0.000 18.153 2.763 18.362 18.153 2.763 18.362
Bus181 4.16 3.052 -13.044 13.396 0.475 -0.017 0.476 11.511 2.767 11.839 -11.628 -2.763 11.952
Bus184 0.48 1.430 -2.850 3.188 0.000 0.000 0.000 2.468 1.240 2.762 2.468 1.240 2.762
Bus185 2.40 2.155 -13.112 13.287 0.000 0.000 0.000 11.404 1.917 11.564 11.404 1.917 11.564
Bus186 4.16 2.884 -14.697 14.977 0.477 -0.015 0.477 13.125 2.679 13.396 -13.241 -2.674 13.508
Bus187 0.48 3.127 -20.984 21.216 0.000 0.000 0.000 18.538 2.857 18.757 18.538 2.857 18.757
Bus188 4.16 4.683 -12.387 13.243 0.473 -0.017 0.473 11.018 4.262 11.814 -11.134 -4.257 11.920
Bus189 0.48 1.387 -6.079 6.235 0.000 0.000 0.000 5.266 1.206 5.402 5.266 1.206 5.402
Bus190 2.40 3.473 -9.980 10.567 0.000 0.000 0.000 8.662 3.048 9.182 8.662 3.048 9.182
Bus193 0.48 3.196 -20.740 20.985 0.000 0.000 0.000 18.043 2.802 18.259 18.043 2.802 18.259
Bus194 4.16 3.232 -14.498 14.854 0.476 -0.015 0.476 12.894 3.000 13.238 -13.010 -2.995 13.351
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 16
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus195 4.16 3.040 -13.886 14.215 0.476 -0.016 0.476 12.197 2.782 12.510 -12.315 -2.778 12.624
Bus196 0.48 3.169 -20.589 20.831 0.000 0.000 0.000 17.877 2.775 18.091 17.877 2.775 18.091
Bus197 4.16 3.040 -13.886 14.215 0.476 -0.016 0.476 12.197 2.782 12.510 -12.315 -2.778 12.624
Bus198 4.16 3.231 -14.501 14.857 0.476 -0.015 0.476 12.898 3.000 13.242 -13.015 -2.995 13.355
Bus199 2.40 1.569 -15.789 15.867 0.000 0.000 0.000 13.969 1.531 14.052 13.969 1.531 14.052
Bus200 13.80 2.109 -12.846 13.018 0.332 -0.957 1.013 10.682 1.846 10.840 -10.778 -1.588 10.894
Bus201 0.48 3.231 -21.070 21.316 0.000 0.000 0.000 18.519 2.905 18.746 18.519 2.905 18.746
Bus202 0.48 3.169 -20.589 20.831 0.000 0.000 0.000 17.877 2.775 18.091 17.877 2.775 18.091
Bus203 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus204 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus205 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus207 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus208 0.22 2.330 -4.087 4.705 2.385 -4.132 4.771 3.539 2.018 4.074 -4.760 0.071 4.760
Bus209 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus210 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus211 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus213 13.80 3.458 -8.505 9.181 0.330 -0.925 0.982 7.170 2.904 7.736 7.084 3.157 7.756
Bus214 13.80 2.267 -14.002 14.185 0.335 -0.968 1.025 12.470 2.307 12.681 -12.546 -2.058 12.713
Bus215 0.48 3.405 -12.497 12.953 0.000 0.000 0.000 10.873 2.993 11.277 10.873 2.993 11.277
Bus216 0.48 3.411 -12.497 12.954 0.000 0.000 0.000 10.852 2.988 11.256 10.852 2.988 11.256
Bus217 13.80 2.386 -16.867 17.035 1.523 -0.247 1.543 14.952 2.450 15.152 -15.333 -2.390 15.518
Bus218 4.16 1.209 -13.822 13.874 0.479 -0.015 0.479 12.136 1.140 12.190 -12.255 -1.137 12.308
Bus219 0.22 1.458 -2.607 2.987 1.538 -2.700 3.107 2.258 1.265 2.588 -3.069 0.135 3.072
Bus220 13.80 2.852 -19.983 20.186 1.511 -0.169 1.520 18.246 2.957 18.484 -18.609 -2.909 18.835
Bus221 4.16 1.246 -14.378 14.432 0.479 -0.014 0.479 12.846 1.221 12.904 -12.963 -1.216 13.019
Bus223 0.48 3.165 -12.692 13.081 0.000 0.000 0.000 11.207 2.851 11.564 11.207 2.851 11.564
Bus224 0.48 3.083 -12.752 13.119 0.000 0.000 0.000 11.239 2.770 11.576 11.239 2.770 11.576
Bus225 0.48 2.725 -20.136 20.320 0.000 0.000 0.000 17.477 2.387 17.639 17.477 2.387 17.639
Bus226 4.16 1.451 -13.265 13.344 0.478 -0.016 0.478 11.640 1.349 11.718 -11.759 -1.345 11.835
Bus227 4.16 3.319 -11.589 12.055 0.474 -0.017 0.474 10.147 2.975 10.574 -10.265 -2.972 10.687
Bus228 4.16 3.305 -11.605 12.067 0.474 -0.017 0.474 10.152 2.968 10.577 -10.270 -2.964 10.690
Bus230 0.48 2.725 -20.135 20.319 0.000 0.000 0.000 17.477 2.386 17.639 17.477 2.386 17.639
Bus231 0.48 2.607 -9.275 9.634 0.000 0.000 0.000 8.159 2.349 8.490 8.159 2.349 8.490
Bus232 4.16 1.451 -13.265 13.344 0.478 -0.016 0.478 11.640 1.349 11.718 -11.759 -1.345 11.835
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 17
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus234 2.40 4.441 -10.290 11.207 0.000 0.000 0.000 9.095 4.067 9.962 9.095 4.067 9.962
Bus235 0.48 2.781 -20.608 20.795 0.000 0.000 0.000 18.130 2.522 18.305 18.130 2.522 18.305
Bus236 4.16 1.506 -13.783 13.865 0.478 -0.015 0.478 12.301 1.449 12.386 -12.418 -1.444 12.501
Bus237 4.16 2.036 -12.105 12.275 0.476 -0.018 0.477 10.602 1.856 10.763 -10.720 -1.852 10.879
Bus238 4.16 3.510 -11.960 12.465 0.474 -0.017 0.474 10.606 3.243 11.091 -10.723 -3.238 11.201
Bus239 2.40 3.313 -14.156 14.539 0.000 0.000 0.000 12.460 3.073 12.833 12.460 3.073 12.833
Bus240 4.16 2.126 -12.550 12.729 0.476 -0.017 0.477 11.168 1.998 11.345 -11.285 -1.993 11.459
Bus241 4.16 2.036 -12.105 12.275 0.476 -0.018 0.477 10.602 1.856 10.763 -10.720 -1.852 10.879
Bus242 0.48 2.945 -20.211 20.424 0.000 0.000 0.000 17.746 2.656 17.944 17.746 2.656 17.944
Bus243 4.16 2.126 -12.548 12.727 0.476 -0.017 0.477 11.166 1.998 11.343 -11.283 -1.993 11.457
Bus244 0.48 3.009 -18.348 18.593 0.000 0.000 0.000 16.096 2.707 16.322 16.096 2.707 16.322
Bus245 0.48 3.062 -18.654 18.903 0.000 0.000 0.000 16.506 2.809 16.744 16.506 2.809 16.744
Bus246 0.22 2.502 -12.173 12.427 2.880 -13.785 14.082 10.620 2.205 10.847 -12.215 5.622 13.446
Bus247 0.22 2.489 -12.099 12.352 2.856 -13.689 13.984 10.522 2.180 10.746 -12.133 5.635 13.378
Bus248 2.40 2.938 -13.051 13.377 0.000 0.000 0.000 11.664 2.752 11.984 11.664 2.752 11.984
Bus249 2.40 2.980 -13.029 13.365 0.000 0.000 0.000 11.556 2.743 11.877 11.556 2.743 11.877
Bus251 2.40 3.376 -11.891 12.361 0.000 0.000 0.000 10.609 3.121 11.059 10.609 3.121 11.059
Bus252 2.40 3.400 -11.850 12.328 0.000 0.000 0.000 10.563 3.146 11.021 10.563 3.146 11.021
Bus253 2.40 3.433 -11.787 12.277 0.000 0.000 0.000 10.510 3.177 10.979 10.510 3.177 10.979
Bus256 0.48 2.877 -20.052 20.258 0.000 0.000 0.000 17.524 2.597 17.715 17.524 2.597 17.715
Bus258 4.16 1.855 -12.143 12.283 0.477 -0.018 0.477 10.641 1.696 10.775 -10.760 -1.692 10.892
Bus262 0.48 2.836 -19.813 20.015 0.000 0.000 0.000 17.196 2.484 17.375 17.196 2.484 17.375
Bus263 4.16 1.856 -12.141 12.282 0.477 -0.018 0.477 10.639 1.696 10.773 -10.757 -1.692 10.889
Bus264 0.48 2.888 -20.221 20.426 0.000 0.000 0.000 17.757 2.607 17.947 17.757 2.607 17.947
Bus265 4.16 1.934 -12.589 12.737 0.477 -0.017 0.477 11.211 1.824 11.359 -11.328 -1.818 11.473
Bus267 4.16 3.522 -10.927 11.481 0.473 -0.019 0.473 9.675 3.237 10.202 -9.792 -3.232 10.311
Bus268 2.40 3.479 -11.738 12.242 0.000 0.000 0.000 10.379 3.175 10.854 10.379 3.175 10.854
Bus269 2.40 3.478 -11.739 12.244 0.000 0.000 0.000 10.382 3.174 10.856 10.382 3.174 10.856
Bus270 4.16 2.139 -11.862 12.053 0.476 -0.019 0.476 10.545 2.000 10.733 -10.662 -1.994 10.847
Bus341 0.22 1.839 -3.308 3.785 1.999 -3.528 4.055 2.865 1.594 3.279 -3.956 0.295 3.967
bus342 13.80 2.728 -12.708 12.998 0.329 -0.977 1.031 11.290 2.673 11.602 -11.365 -2.421 11.620
Bus343 0.22 1.023 -1.206 1.581 1.044 -1.214 1.601 1.045 0.886 1.370 -1.577 -0.276 1.601
Bus344 2.40 2.193 -9.019 9.282 0.000 0.000 0.000 8.336 2.057 8.586 8.336 2.057 8.586
Bus346 4.16 2.610 -9.106 9.473 0.771 -0.062 0.774 8.086 2.403 8.436 -8.277 -2.390 8.615
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 18
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus347 4.16 1.392 -17.853 17.907 0.479 -0.012 0.479 16.020 1.388 16.080 -16.136 -1.383 16.195
Bus348 2.40 4.630 -11.477 12.376 0.000 0.000 0.000 10.192 4.141 11.001 10.192 4.141 11.001
Bus350 4.16 1.089 -14.163 14.205 0.479 -0.015 0.479 12.532 1.068 12.578 -12.650 -1.064 12.695
Bus351 0.22 2.723 -14.063 14.324 3.144 -15.821 16.130 12.189 2.366 12.416 -14.028 6.662 15.529
Bus352 0.22 0.902 -1.600 1.837 0.936 -1.631 1.881 1.387 0.784 1.593 -1.869 0.047 1.870
Bus353 2.40 3.487 -4.752 5.894 0.000 0.000 0.000 4.123 3.059 5.134 4.123 3.059 5.134
Bus354 0.22 0.981 -1.724 1.984 0.000 0.000 0.000 1.493 0.850 1.718 1.493 0.850 1.718
Bus355 0.22 2.182 -4.442 4.949 2.296 -4.590 5.132 3.846 1.889 4.285 -5.058 0.486 5.081
Bus356 13.80 2.522 -14.399 14.618 0.325 -0.992 1.044 11.958 2.181 12.155 -12.052 -1.914 12.203
Bus357 0.22 1.542 -2.766 3.167 1.614 -2.838 3.265 2.397 1.338 2.745 -3.239 0.118 3.241
Bus358 0.48 2.596 -9.403 9.755 0.000 0.000 0.000 8.136 2.247 8.441 8.136 2.247 8.441
Bus359 0.48 5.982 -9.397 11.140 0.000 0.000 0.000 8.196 5.335 9.779 8.196 5.335 9.779
Bus360 0.22 0.899 -1.592 1.828 0.931 -1.625 1.873 1.379 0.779 1.583 -1.861 0.051 1.862
Bus361 2.40 5.002 -13.150 14.070 0.000 0.000 0.000 11.688 4.486 12.519 11.688 4.486 12.519
Bus362 13.80 2.042 -21.454 21.551 1.563 -0.149 1.570 19.711 2.214 19.835 -20.083 -2.171 20.200
Bus363 0.22 0.902 -1.595 1.832 0.934 -1.627 1.876 1.382 0.781 1.587 -1.865 0.049 1.865
Bus364 0.48 4.086 -10.631 11.390 0.000 0.000 0.000 9.256 3.589 9.928 9.256 3.589 9.928
Bus365 0.48 5.765 -18.427 19.308 0.000 0.000 0.000 15.960 4.995 16.723 15.960 4.995 16.723
Bus366 0.22 2.653 -13.227 13.490 3.048 -14.935 15.242 11.469 2.308 11.699 -13.233 6.246 14.633
Bus367 13.80 0.711 -18.109 18.123 1.567 -0.161 1.576 15.950 0.729 15.966 -16.339 -0.699 16.354
Bus369 0.48 2.775 -20.612 20.798 0.000 0.000 0.000 18.034 2.519 18.209 18.034 2.519 18.209
Bus372 13.80 1.514 -14.565 14.643 1.759 -16.797 16.888 12.980 1.416 13.057 11.953 10.649 16.009
Bus373 0.48 4.911 -9.574 10.760 0.000 0.000 0.000 8.295 4.269 9.329 8.295 4.269 9.329
Bus374 4.16 1.448 -17.645 17.704 0.479 -0.011 0.479 15.655 1.433 15.721 -15.773 -1.429 15.837
Bus375 0.22 0.925 -1.633 1.877 0.952 -1.654 1.908 1.415 0.804 1.627 -1.902 0.033 1.902
Bus376 0.22 0.903 -1.594 1.832 0.935 -1.626 1.876 1.381 0.783 1.587 -1.864 0.047 1.865
Bus377 13.80 0.363 -1.121 1.178 0.209 -0.632 0.666 0.997 0.323 1.048 -1.064 -0.110 1.070
Bus378 13.80 2.241 -2.100 3.071 0.340 -0.614 0.702 1.814 1.918 2.640 1.725 2.096 2.714
Bus379 0.22 1.568 -3.499 3.835 1.867 -3.896 4.321 3.105 1.441 3.423 -4.077 0.675 4.132
Bus381 0.22 2.577 -10.621 10.929 3.163 -13.295 13.666 9.200 2.235 9.467 7.163 11.112 13.221
Bus383 0.22 1.023 -1.206 1.581 1.044 -1.214 1.601 1.045 0.886 1.370 -1.577 -0.276 1.601
Bus386 0.22 0.908 -1.171 1.481 0.974 -1.207 1.552 1.014 0.786 1.283 -1.539 -0.164 1.547
Bus387 4.16 2.609 -9.108 9.474 0.771 -0.062 0.774 8.088 2.402 8.437 -8.279 -2.389 8.617
Bus388 2.40 4.732 -12.674 13.529 0.000 0.000 0.000 11.141 4.154 11.890 11.141 4.154 11.890
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 19
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus389 0.48 2.759 -20.598 20.782 0.000 0.000 0.000 18.068 2.513 18.242 18.068 2.513 18.242
Bus390 0.22 2.013 -7.506 7.772 2.199 -8.007 8.303 6.505 1.747 6.735 -7.708 2.538 8.115
Bus391 2.40 4.414 -11.065 11.913 0.000 0.000 0.000 9.703 3.873 10.447 9.703 3.873 10.447
Bus392 0.48 2.892 -19.803 20.013 0.000 0.000 0.000 17.187 2.532 17.373 17.187 2.532 17.373
Bus393 0.22 3.448 -8.443 9.120 3.721 -9.756 10.441 7.345 3.024 7.943 5.396 8.708 10.245
Bus394 2.40 1.577 -8.182 8.333 0.000 0.000 0.000 7.445 1.451 7.585 7.445 1.451 7.585
Bus395 0.22 1.123 -1.995 2.289 1.175 -2.055 2.367 1.728 0.973 1.983 -2.344 0.086 2.345
Bus396 2.40 3.251 -4.554 5.595 0.000 0.000 0.000 3.935 2.804 4.832 3.935 2.804 4.832
Bus397 0.22 1.959 -3.584 4.085 2.074 -3.692 4.234 3.110 1.705 3.546 -4.197 0.194 4.201
Bus398 13.80 1.652 -15.770 15.856 0.330 -0.992 1.046 13.171 1.552 13.262 -13.264 -1.286 13.326
Bus399 0.48 4.138 -10.707 11.479 0.000 0.000 0.000 9.345 3.657 10.035 9.345 3.657 10.035
Bus400 0.22 2.647 -13.301 13.561 3.051 -15.007 15.314 11.543 2.311 11.772 -13.299 6.262 14.700
Bus401 13.80 0.708 -18.118 18.132 1.569 -0.160 1.577 15.959 0.726 15.975 -16.349 -0.696 16.364
Bus403 13.80 1.680 -22.388 22.451 1.567 -0.143 1.574 20.624 1.900 20.711 -20.995 -1.857 21.077
Bus404 10.35 0.880 -11.406 11.440 0.000 0.000 0.000 10.181 0.837 10.215 10.181 0.837 10.215
Bus406 0.22 3.292 -9.626 10.173 3.593 -11.424 11.976 8.348 2.870 8.828 6.444 9.842 11.763
Bus407 13.80 2.467 -20.047 20.198 1.514 -0.167 1.523 18.319 2.597 18.502 -18.682 -2.550 18.855
Bus409 2.40 1.321 -7.017 7.141 0.000 0.000 0.000 6.081 1.149 6.188 6.081 1.149 6.188
Bus410 2.40 1.321 -7.017 7.141 0.000 0.000 0.000 6.081 1.149 6.188 6.081 1.149 6.188
Bus411 13.80 0.363 -1.122 1.179 0.209 -0.633 0.667 0.998 0.322 1.049 -1.066 -0.109 1.071
Bus414 0.48 3.239 -12.512 12.924 0.000 0.000 0.000 10.829 2.808 11.188 10.829 2.808 11.188
Bus415 0.22 2.193 -3.867 4.446 2.249 -3.909 4.509 3.350 1.901 3.852 -4.501 0.073 4.501
Bus417 34.50 1.004 -12.891 12.930 0.134 -0.790 0.801 11.027 0.938 11.067 -11.063 -0.731 11.087
Bus418 2.40 2.158 -8.919 9.176 0.000 0.000 0.000 8.269 2.047 8.519 8.269 2.047 8.519
bus419 13.80 3.209 -13.694 14.065 0.328 -0.986 1.039 11.443 2.718 11.761 -11.537 -2.454 11.795
Bus421 2.40 3.276 -14.152 14.526 0.000 0.000 0.000 12.598 3.100 12.974 12.598 3.100 12.974
Bus422 4.16 1.351 -17.953 18.003 0.479 -0.012 0.479 16.114 1.351 16.171 -16.230 -1.346 16.286
Bus423 0.48 3.528 -15.667 16.060 4.050 -18.790 19.222 14.506 3.342 14.886 12.200 13.205 17.978
Bus425 0.48 2.758 -20.614 20.798 0.000 0.000 0.000 18.088 2.517 18.263 18.088 2.517 18.263
Bus426 0.22 1.062 -1.253 1.643 1.087 -1.263 1.666 1.085 0.921 1.424 -1.640 -0.285 1.664
Bus428 0.22 1.130 -2.003 2.300 1.180 -2.061 2.375 1.735 0.979 1.992 -2.352 0.082 2.353
Bus429 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus430 0.48 1.583 -7.101 7.275 0.000 0.000 0.000 6.145 1.370 6.296 6.145 1.370 6.296
Bus431 2.40 1.738 -7.816 8.007 0.000 0.000 0.000 7.035 1.623 7.220 7.035 1.623 7.220
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 20
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus432 0.48 3.007 -17.387 17.645 3.172 -18.321 18.593 15.031 2.605 15.255 13.363 12.322 18.177
Bus433 0.22 0.908 -1.171 1.481 0.974 -1.207 1.552 1.014 0.786 1.283 -1.539 -0.164 1.547
Bus434 0.22 1.959 -3.584 4.085 2.074 -3.692 4.234 3.110 1.705 3.546 -4.197 0.194 4.201
Bus436 13.80 1.996 -16.733 16.852 0.330 -1.002 1.055 13.817 1.796 13.933 -13.913 -1.526 13.996
Bus438 0.48 1.020 -1.751 2.026 1.033 -1.764 2.044 1.516 0.883 1.754 -2.039 0.006 2.039
Bus439 2.40 3.251 -4.554 5.595 0.000 0.000 0.000 3.935 2.804 4.832 3.935 2.804 4.832
Bus440 0.48 3.973 -10.424 11.156 0.000 0.000 0.000 9.023 3.445 9.658 9.023 3.445 9.658
Bus441 0.48 3.317 -18.717 19.008 0.000 0.000 0.000 16.272 2.914 16.531 16.272 2.914 16.531
Bus443 13.80 1.453 -18.544 18.600 1.540 -0.235 1.557 16.528 1.663 16.611 -16.909 -1.605 16.985
Bus445 4.16 3.666 -13.077 13.581 0.475 -0.017 0.475 11.581 3.372 12.062 -11.698 -3.367 12.173
Bus446 0.22 3.275 -9.602 10.145 3.565 -11.392 11.936 8.319 2.842 8.791 6.418 9.814 11.727
Bus447 4.16 1.489 -18.212 18.273 0.479 -0.011 0.479 16.347 1.495 16.415 -16.463 -1.490 16.531
Bus448 2.40 1.476 -6.850 7.008 0.000 0.000 0.000 5.936 1.283 6.073 5.936 1.283 6.073
Bus449 2.40 1.665 -6.621 6.827 0.000 0.000 0.000 5.736 1.447 5.916 5.736 1.447 5.916
Bus450 13.80 0.365 -1.119 1.177 0.209 -0.632 0.666 0.996 0.324 1.047 -1.063 -0.111 1.069
Bus452 0.22 1.098 -2.072 2.345 1.221 -2.194 2.511 1.819 0.985 2.068 -2.445 0.161 2.451
Bus454 34.50 0.954 -12.965 13.000 0.134 -0.790 0.802 11.091 0.896 11.127 -11.127 -0.689 11.148
Bus455 2.40 2.150 -8.928 9.184 0.000 0.000 0.000 8.284 2.036 8.531 8.284 2.036 8.531
Bus456 13.80 1.921 -15.093 15.215 0.328 -0.992 1.045 12.619 1.757 12.741 -12.711 -1.491 12.798
Bus458 0.22 2.044 -3.305 3.886 2.178 -3.566 4.178 2.861 1.770 3.365 1.696 3.706 4.076
Bus460 0.48 4.692 -13.524 14.314 0.000 0.000 0.000 11.732 4.091 12.425 11.732 4.091 12.425
Bus462 0.22 1.062 -1.253 1.643 1.087 -1.263 1.666 1.085 0.921 1.424 -1.640 -0.285 1.664
Bus463 4.16 2.518 -1.936 3.176 0.189 -0.008 0.189 1.676 2.173 2.744 -1.724 -2.171 2.773
Bus465 0.48 4.425 -11.591 12.407 0.000 0.000 0.000 10.025 3.827 10.731 10.025 3.827 10.731
Bus466 0.48 3.389 -12.127 12.592 0.000 0.000 0.000 10.711 3.017 11.128 10.711 3.017 11.128
Bus467 0.22 2.080 -7.878 8.148 2.272 -8.350 8.653 6.831 1.809 7.067 -8.066 2.622 8.482
Bus468 0.48 3.968 -10.410 11.141 0.000 0.000 0.000 9.035 3.462 9.676 9.035 3.462 9.676
Bus469 0.48 3.280 -19.023 19.304 0.000 0.000 0.000 16.583 2.912 16.836 16.583 2.912 16.836
Bus470 13.80 1.449 -22.912 22.958 1.565 -0.140 1.571 21.116 1.708 21.185 -21.487 -1.665 21.551
Bus472 0.22 5.995 -21.056 21.892 6.586 -22.622 23.562 18.270 5.225 19.003 -21.857 6.957 22.937
Bus473 10.35 0.817 -10.592 10.624 0.000 0.000 0.000 9.357 0.793 9.390 9.357 0.793 9.390
Bus474 0.48 3.404 -13.310 13.739 0.000 0.000 0.000 11.558 2.969 11.933 11.558 2.969 11.933
Bus475 0.22 2.437 -12.374 12.612 2.782 -13.809 14.086 10.730 2.120 10.938 -12.327 5.671 13.569
Bus476 0.48 4.376 -15.336 15.948 0.000 0.000 0.000 13.319 3.827 13.858 13.319 3.827 13.858
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 21
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus478 0.22 2.769 -12.985 13.277 2.939 -13.784 14.094 11.246 2.399 11.499 9.683 9.741 13.735
Bus479 0.22 3.020 -6.110 6.816 3.154 -6.277 7.025 5.292 2.616 5.903 -6.941 0.611 6.968
bus481 0.22 1.351 -2.941 3.236 1.534 -3.154 3.507 2.604 1.229 2.879 -3.376 0.415 3.402
Bus481 0.12 1.399 -1.682 2.188 1.571 -1.859 2.434 1.457 1.212 1.895 -2.352 -0.173 2.358
Bus482 0.48 1.389 -5.898 6.059 0.000 0.000 0.000 5.218 1.223 5.360 5.218 1.223 5.360
Bus483 0.44 3.183 -10.479 10.952 3.336 -11.472 11.948 9.090 2.777 9.505 7.369 9.079 11.693
Bus484 13.80 1.924 -13.983 14.115 0.329 -0.985 1.039 12.460 1.994 12.619 -12.535 -1.741 12.655
Bus486 2.40 2.750 -7.429 7.921 0.000 0.000 0.000 6.545 2.428 6.981 6.545 2.428 6.981
Bus488 4.16 1.331 -18.002 18.051 0.479 -0.012 0.479 16.160 1.333 16.215 -16.276 -1.328 16.331
Bus489 0.48 4.702 -13.540 14.333 0.000 0.000 0.000 11.744 4.094 12.437 11.744 4.094 12.437
Bus490 0.22 0.604 -1.522 1.637 0.617 -1.544 1.662 1.319 0.524 1.419 -1.633 0.259 1.653
Bus491 2.40 1.393 -6.980 7.118 0.000 0.000 0.000 6.310 1.247 6.432 6.310 1.247 6.432
Bus492 13.80 2.673 -12.812 13.088 0.338 -0.944 1.002 11.347 2.633 11.648 -11.425 -2.389 11.672
Bus493 13.80 3.622 -6.025 7.030 0.342 -0.760 0.833 5.136 3.048 5.972 5.046 3.256 6.005
Bus495 2.40 2.137 -9.047 9.296 0.000 0.000 0.000 7.928 1.892 8.150 7.928 1.892 8.150
Bus496 0.22 2.533 -6.644 7.111 2.652 -7.427 7.886 5.755 2.196 6.160 4.382 6.396 7.753
Bus497 0.48 3.313 -11.848 12.302 0.000 0.000 0.000 10.423 2.940 10.829 10.423 2.940 10.829
Bus498 0.22 2.711 -7.971 8.420 2.719 -8.374 8.804 6.900 2.347 7.289 5.543 6.759 8.741
Bus499 2.40 3.933 -7.852 8.782 0.000 0.000 0.000 6.773 3.391 7.575 6.773 3.391 7.575
Bus500 0.22 6.000 -21.133 21.968 6.596 -22.750 23.687 18.335 5.228 19.066 -21.933 7.053 23.040
Bus501 13.80 1.245 -19.016 19.056 1.538 -0.231 1.555 16.961 1.493 17.027 -17.342 -1.434 17.401
Bus502 0.48 2.852 -21.109 21.300 0.000 0.000 0.000 18.351 2.509 18.522 18.351 2.509 18.522
Bus503 0.22 2.431 -12.351 12.588 2.773 -13.783 14.059 10.703 2.111 10.909 -12.302 5.676 13.548
Bus504 0.48 4.353 -15.288 15.896 0.000 0.000 0.000 13.266 3.798 13.799 13.266 3.798 13.799
Bus505 0.22 1.069 -1.917 2.195 1.196 -2.077 2.396 1.681 0.957 1.934 -2.303 0.158 2.308
Bus506 13.80 0.365 -1.119 1.177 0.210 -0.632 0.666 0.996 0.324 1.047 -1.063 -0.111 1.069
Bus507 0.22 2.178 -9.187 9.441 2.176 -9.480 9.727 7.953 1.886 8.173 6.870 6.786 9.656
Bus508 0.22 3.079 -6.403 7.104 3.283 -6.661 7.426 5.543 2.666 6.151 -7.301 0.806 7.345
Bus509 2.40 2.283 -0.640 2.371 0.000 0.000 0.000 0.581 1.997 2.080 0.581 1.997 2.080
Bus510 0.22 2.264 -5.980 6.394 2.381 -6.693 7.104 5.191 1.971 5.553 3.958 5.741 6.973
Bus511 4.16 4.238 -15.397 15.970 0.476 -0.013 0.476 13.703 3.964 14.264 -13.819 -3.958 14.375
Bus512 0.22 3.128 -11.741 12.150 0.000 0.000 0.000 10.176 2.718 10.533 10.176 2.718 10.533
Bus513 0.22 1.064 -1.255 1.645 1.087 -1.264 1.667 1.087 0.922 1.425 -1.641 -0.286 1.666
Bus514 2.40 1.219 -7.265 7.367 0.000 0.000 0.000 6.296 1.060 6.384 6.296 1.060 6.384
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 22
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus516 0.48 4.198 -6.981 8.146 0.000 0.000 0.000 6.114 3.718 7.156 6.114 3.718 7.156
Bus518 13.80 1.128 -19.293 19.326 1.545 -0.229 1.562 17.217 1.399 17.274 -17.599 -1.341 17.650
Bus519 4.16 1.134 -15.366 15.408 0.479 -0.014 0.479 13.648 1.064 13.689 -13.765 -1.060 13.805
Bus520 0.48 2.885 -21.286 21.481 0.000 0.000 0.000 18.519 2.532 18.692 18.519 2.532 18.692
Bus521 4.16 3.442 -12.617 13.079 0.475 -0.017 0.475 11.073 3.122 11.504 -11.190 -3.117 11.617
Bus522 0.22 2.470 -12.371 12.615 2.823 -13.837 14.122 10.760 2.163 10.975 -12.345 5.620 13.564
Bus523 0.22 3.038 -12.677 13.036 3.393 -14.518 14.909 10.991 2.641 11.304 9.086 11.105 14.348
Bus524 0.28 0.159 -0.185 0.244 0.162 -0.186 0.246 0.160 0.138 0.211 -0.242 -0.045 0.246
Bus526 2.40 4.160 -10.652 11.435 0.000 0.000 0.000 9.180 3.590 9.857 9.180 3.590 9.857
Bus528 0.22 3.166 -11.855 12.270 0.000 0.000 0.000 10.274 2.749 10.636 10.274 2.749 10.636
Bus529 0.22 1.066 -1.256 1.647 1.090 -1.265 1.670 1.088 0.926 1.428 -1.642 -0.288 1.668
Bus533 0.48 4.110 -6.894 8.026 0.000 0.000 0.000 6.024 3.628 7.032 6.024 3.628 7.032
Bus535 4.16 1.133 -14.709 14.753 0.479 -0.014 0.479 13.108 1.137 13.157 -13.225 -1.132 13.273
Bus536 0.22 2.468 -12.754 12.991 2.808 -14.122 14.398 11.060 2.145 11.266 -12.667 5.744 13.908
Bus537 0.48 3.437 -13.688 14.113 0.000 0.000 0.000 12.110 3.106 12.502 12.110 3.106 12.502
Bus538 0.22 2.491 -12.488 12.734 2.840 -13.980 14.266 10.822 2.163 11.036 -12.459 5.767 13.729
Bus539 0.22 2.953 -12.299 12.648 3.307 -14.129 14.511 10.660 2.565 10.964 8.795 10.845 13.963
Bus540 4.16 0.192 -1.090 1.107 0.365 -0.078 0.374 1.091 0.223 1.114 -1.174 -0.207 1.192
Bus541 0.22 8.861 -27.295 28.697 10.405 -32.081 33.726 23.908 7.759 25.135 17.648 26.646 31.960
Bus542 34.50 1.005 -12.904 12.944 0.134 -0.791 0.802 11.037 0.944 11.077 -11.072 -0.737 11.097
Bus543 0.22 2.859 -10.708 11.083 3.172 -12.444 12.842 9.279 2.482 9.605 7.519 9.891 12.424
Bus544 0.22 3.642 -7.700 8.518 3.934 -8.078 8.985 6.666 3.153 7.374 -8.803 1.095 8.871
Bus545 4.16 4.241 -15.395 15.968 0.476 -0.013 0.476 13.700 3.966 14.263 -13.817 -3.961 14.373
Bus546 2.40 3.386 -13.425 13.846 0.000 0.000 0.000 11.938 3.180 12.355 11.938 3.180 12.355
Bus547 0.13 0.426 -0.389 0.576 0.432 -0.390 0.582 0.337 0.369 0.499 -0.556 -0.173 0.582
Bus548 0.48 5.369 -8.745 10.262 0.000 0.000 0.000 7.615 4.727 8.963 7.615 4.727 8.963
Bus549 0.22 2.288 -5.850 6.282 2.453 -6.698 7.134 5.091 1.997 5.469 3.795 5.857 6.979
Bus550 2.40 5.466 -26.764 27.317 0.000 0.000 0.000 22.883 4.731 23.367 22.883 4.731 23.367
Bus551 0.22 2.476 -12.795 13.032 2.831 -14.179 14.459 11.121 2.168 11.330 -12.713 5.727 13.943
Bus552 13.80 1.441 -22.930 22.975 1.565 -0.140 1.571 21.137 1.700 21.205 -21.507 -1.657 21.571
Bus553 0.22 2.475 -12.362 12.608 2.836 -13.843 14.130 10.766 2.176 10.984 -12.343 5.602 13.555
Bus554 4.16 1.890 -17.302 17.405 0.479 -0.012 0.479 15.513 1.847 15.622 -15.629 -1.842 15.737
Bus556 4.16 0.195 -1.086 1.103 0.365 -0.079 0.373 1.086 0.226 1.109 -1.169 -0.210 1.187
Bus557 34.50 0.967 -12.964 13.000 0.134 -0.791 0.802 11.087 0.913 11.124 -11.122 -0.706 11.145
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 23
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus558 0.22 1.102 -1.305 1.708 1.113 -1.297 1.709 1.130 0.955 1.479 -1.691 -0.310 1.719
Bus560 2.40 2.293 -8.329 8.639 0.000 0.000 0.000 7.314 2.031 7.591 7.314 2.031 7.591
Bus561 0.22 4.002 -12.348 12.980 4.289 -13.241 13.919 10.748 3.483 11.298 8.441 10.535 13.500
Bus563 0.48 5.369 -8.745 10.262 0.000 0.000 0.000 7.615 4.727 8.963 7.615 4.727 8.963
Bus564 0.22 2.273 -5.819 6.248 2.440 -6.667 7.100 5.060 1.982 5.434 3.769 5.835 6.947
Bus565 0.48 2.335 -13.280 13.484 0.000 0.000 0.000 11.487 2.023 11.663 11.487 2.023 11.663
Bus566 0.48 5.082 -17.869 18.578 0.000 0.000 0.000 15.543 4.464 16.172 15.543 4.464 16.172
Bus567 13.80 1.238 -19.031 19.071 1.538 -0.231 1.555 16.978 1.486 17.043 -17.359 -1.428 17.417
Bus568 0.22 2.481 -12.491 12.735 2.832 -13.983 14.267 10.824 2.154 11.036 -12.459 5.776 13.733
Bus569 4.16 1.826 -16.787 16.886 0.479 -0.012 0.479 14.886 1.758 14.989 -15.003 -1.754 15.105
Bus570 0.46 1.465 -8.803 8.924 2.567 -13.529 13.770 8.925 1.757 9.097 6.930 9.785 11.991
Bus571 13.80 1.804 -15.000 15.108 0.328 -1.012 1.064 13.395 1.926 13.533 -13.468 -1.667 13.571
Bus572 0.22 1.066 -1.260 1.650 1.088 -1.267 1.671 1.091 0.924 1.430 -1.646 -0.286 1.671
Bus573 0.22 2.211 -3.786 4.384 2.677 -4.571 5.297 3.278 1.915 3.796 -4.974 0.970 5.068
Bus575 2.40 2.889 -13.759 14.059 0.000 0.000 0.000 12.121 2.681 12.414 12.121 2.681 12.414
Bus576 2.40 3.185 -11.603 12.032 0.000 0.000 0.000 10.267 2.956 10.684 10.267 2.956 10.684
Bus577 0.22 1.729 -3.350 3.770 1.894 -3.521 3.998 2.901 1.498 3.265 -3.944 0.356 3.960
Bus578 13.80 2.697 -14.867 15.110 0.327 -0.995 1.047 12.376 2.320 12.592 -12.470 -2.054 12.638
Bus579 0.22 2.292 -4.836 5.352 2.518 -5.168 5.749 4.189 1.986 4.636 -5.581 0.786 5.636
Bus580 0.22 1.007 -1.749 2.018 1.028 -1.770 2.047 1.514 0.872 1.747 -2.040 0.024 2.040
Bus581 0.48 5.055 -17.808 18.511 0.000 0.000 0.000 15.501 4.456 16.129 15.501 4.456 16.129
Bus582 4.16 2.985 -13.795 14.115 0.476 -0.016 0.476 12.247 2.764 12.555 -12.364 -2.759 12.668
Bus583 0.46 1.434 -8.458 8.579 2.483 -12.949 13.185 8.487 1.687 8.653 6.556 9.577 11.606
Bus584 34.50 0.973 -12.955 12.992 0.134 -0.791 0.802 11.080 0.917 11.118 -11.116 -0.710 11.138
Bus585 2.40 4.790 -8.062 9.377 0.000 0.000 0.000 6.955 4.131 8.090 6.955 4.131 8.090
Bus586 0.22 1.003 -1.178 1.547 1.041 -1.207 1.594 1.020 0.869 1.340 -1.560 -0.249 1.580
Bus588 0.22 2.264 -5.980 6.394 2.381 -6.693 7.104 5.191 1.971 5.552 3.958 5.741 6.973
Bus589 4.16 2.815 -13.249 13.545 0.476 -0.017 0.476 11.631 2.571 11.912 -11.749 -2.567 12.027
Bus590 0.22 1.513 -2.666 3.065 1.562 -2.716 3.133 2.308 1.310 2.654 -3.116 0.075 3.117
Bus591 13.80 2.291 -13.642 13.833 0.329 -0.985 1.039 12.160 2.311 12.378 -12.235 -2.058 12.407
Bus592 2.40 3.276 -14.152 14.526 0.000 0.000 0.000 12.598 3.100 12.974 12.598 3.100 12.974
Bus593 4.16 4.235 -15.401 15.973 0.476 -0.013 0.476 13.709 3.959 14.269 -13.825 -3.953 14.379
Bus594 2.40 5.260 -26.441 26.959 0.000 0.000 0.000 22.688 4.605 23.151 22.688 4.605 23.151
Bus595 0.48 3.112 -20.285 20.522 0.000 0.000 0.000 17.644 2.728 17.853 17.644 2.728 17.853
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 24
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus596 115.00 0.007 -0.041 0.041 0.007 -0.036 0.037 0.040 0.008 0.041 0.037 0.020 0.042
Bus1181 4.16 1.970 -8.198 8.432 0.472 -0.027 0.472 7.358 1.827 7.581 -7.472 -1.820 7.691
Bus1182 4.16 2.323 -8.770 9.073 0.472 -0.024 0.472 7.863 2.145 8.150 -7.978 -2.138 8.259
Bus1183 4.16 1.284 -9.680 9.765 0.476 -0.023 0.476 8.699 1.216 8.784 -8.815 -1.210 8.897
Bus1184 0.48 3.026 -13.389 13.727 0.000 0.000 0.000 12.026 2.787 12.345 12.026 2.787 12.345
Bus1185 13.80 3.819 -16.702 17.133 1.436 -0.202 1.450 15.044 3.765 15.508 -15.396 -3.712 15.837
Bus1186 4.16 1.463 -13.591 13.669 0.478 -0.015 0.479 11.896 1.322 11.969 -12.014 -1.319 12.087
Bus1187 13.80 3.211 -14.492 14.844 1.498 -0.266 1.521 12.764 3.107 13.137 -13.143 -3.044 13.491
Bus1188 4.16 1.454 -13.186 13.266 0.478 -0.016 0.478 11.522 1.337 11.599 -11.641 -1.334 11.717
Bus1194 4.16 1.557 -12.696 12.791 0.478 -0.017 0.478 11.103 1.400 11.191 -11.222 -1.397 11.308
Bus1195 0.48 2.748 -19.977 20.165 0.000 0.000 0.000 17.331 2.396 17.496 17.331 2.396 17.496
Bus1196 0.48 2.837 -20.658 20.852 0.000 0.000 0.000 18.272 2.626 18.460 18.272 2.626 18.460
Bus1197 13.80 1.261 -14.725 14.779 0.327 -0.993 1.046 12.151 1.214 12.212 -12.247 -0.944 12.283
Bus1198 13.80 1.453 -16.447 16.511 0.330 -0.998 1.051 13.700 1.413 13.773 -13.793 -1.145 13.840
Bus1199 13.80 3.395 -13.713 14.127 1.488 -0.274 1.513 12.049 3.244 12.478 -12.427 -3.181 12.828
Bus1200 4.16 1.531 -12.925 13.016 0.478 -0.016 0.478 11.256 1.388 11.341 -11.376 -1.385 11.460
Bus1201 4.16 1.538 -12.352 12.447 0.478 -0.017 0.478 10.790 1.404 10.881 -10.909 -1.401 10.999
Bus1202 0.48 3.161 -13.237 13.609 0.000 0.000 0.000 11.470 2.747 11.794 11.470 2.747 11.794
Bus1203 4.16 1.797 -12.374 12.504 0.477 -0.017 0.478 10.771 1.617 10.892 -10.890 -1.614 11.009
Bus1206 13.80 3.998 -15.706 16.207 1.410 -0.213 1.426 14.099 3.895 14.627 -14.446 -3.840 14.948
Bus1207 4.16 1.547 -13.407 13.496 0.478 -0.015 0.478 11.732 1.396 11.815 -11.851 -1.393 11.932
Bus1211 4.16 1.836 -12.817 12.948 0.477 -0.016 0.478 11.208 1.648 11.329 -11.327 -1.645 11.446
Bus1212 0.48 3.177 -13.294 13.668 0.000 0.000 0.000 11.525 2.761 11.851 11.525 2.761 11.851
Bus1217 0.48 3.284 -12.091 12.529 0.000 0.000 0.000 10.476 2.852 10.857 10.476 2.852 10.857
Bus1218 4.16 2.463 -6.988 7.409 0.467 -0.032 0.468 6.062 2.160 6.435 -6.180 -2.154 6.545
Bus1221 4.16 2.534 -7.124 7.562 0.467 -0.032 0.468 6.196 2.227 6.584 -6.314 -2.221 6.693
Bus1222 0.48 3.300 -12.138 12.579 0.000 0.000 0.000 10.522 2.867 10.905 10.522 2.867 10.905
Bus1225 13.80 2.015 -21.450 21.544 1.539 -0.154 1.547 19.681 2.208 19.805 -20.048 -2.163 20.164
Bus1226 13.80 1.672 -17.981 18.059 1.535 -0.239 1.554 16.002 1.842 16.107 -16.383 -1.782 16.480
Bus1227 2.40 4.096 -6.101 7.348 0.000 0.000 0.000 5.403 3.594 6.489 5.403 3.594 6.489
Bus1228 4.16 2.601 -8.601 8.986 0.773 -0.064 0.776 7.500 2.305 7.847 -7.696 -2.295 8.031
Bus1229 0.48 3.361 -16.763 17.097 0.000 0.000 0.000 14.543 2.929 14.835 14.543 2.929 14.835
Bus1230 2.40 6.627 -13.317 14.875 0.000 0.000 0.000 11.470 5.720 12.817 11.470 5.720 12.817
Bus1231 0.48 5.185 -21.669 22.281 0.000 0.000 0.000 18.737 4.495 19.268 18.737 4.495 19.268
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 25
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1232 2.40 6.730 -13.370 14.969 0.000 0.000 0.000 11.502 5.783 12.874 11.502 5.783 12.874
Bus1233 0.48 5.225 -21.737 22.356 0.000 0.000 0.000 18.785 4.522 19.321 18.785 4.522 19.321
Bus1234 0.48 3.459 -17.150 17.495 0.000 0.000 0.000 14.982 3.072 15.294 14.982 3.072 15.294
Bus1235 4.16 2.910 -9.196 9.645 0.774 -0.060 0.777 8.143 2.677 8.572 -8.336 -2.664 8.751
Bus1236 4.16 3.151 -8.638 9.195 0.770 -0.062 0.772 7.637 2.882 8.163 -7.829 -2.869 8.338
Bus1237 4.16 2.824 -8.123 8.600 0.769 -0.066 0.771 7.084 2.495 7.511 -7.279 -2.484 7.692
Bus1238 0.48 3.050 -12.596 12.960 0.000 0.000 0.000 10.917 2.654 11.234 10.917 2.654 11.234
Bus1239 0.48 3.062 -12.636 13.002 0.000 0.000 0.000 10.954 2.661 11.273 10.954 2.661 11.273
Bus1240 4.16 1.941 -10.897 11.069 0.476 -0.021 0.476 9.514 1.728 9.669 -9.632 -1.724 9.786
Bus1241 4.16 1.898 -10.635 10.803 0.476 -0.021 0.476 9.271 1.704 9.426 -9.390 -1.701 9.543
Bus1242 13.80 1.881 -14.131 14.255 0.330 -0.986 1.040 12.620 1.956 12.770 -12.694 -1.703 12.808
Bus1243 4.16 1.470 -16.740 16.805 0.399 -0.008 0.399 15.100 1.499 15.174 -15.196 -1.495 15.269
Bus1244 4.16 2.832 -14.551 14.824 0.397 -0.010 0.397 12.554 2.517 12.804 -12.654 -2.516 12.902
Bus1245 0.48 2.940 -16.743 16.999 0.000 0.000 0.000 14.493 2.558 14.717 14.493 2.558 14.717
Bus1246 0.48 2.941 -16.709 16.966 0.000 0.000 0.000 14.534 2.585 14.762 14.534 2.585 14.762
Bus1247 4.16 3.048 -15.292 15.593 0.397 -0.009 0.397 13.712 2.941 14.023 -13.808 -2.936 14.117
Bus1249 4.16 4.372 -13.416 14.111 0.395 -0.010 0.395 11.977 4.087 12.655 -12.073 -4.082 12.744
Bus1250 4.16 4.383 -13.402 14.101 0.395 -0.010 0.395 11.954 4.104 12.639 -12.050 -4.100 12.728
Bus1254 4.16 1.403 -15.856 15.918 0.399 -0.009 0.399 13.690 1.300 13.752 -13.791 -1.298 13.852
Bus1255 13.80 1.745 -13.202 13.316 0.325 -0.980 1.033 10.964 1.562 11.075 -11.058 -1.297 11.134
Bus1256 4.16 2.338 -14.944 15.126 0.398 -0.009 0.399 12.897 2.095 13.066 -12.998 -2.093 13.165
Bus1257 4.16 2.503 -15.732 15.930 0.398 -0.009 0.399 14.137 2.443 14.346 -14.233 -2.439 14.441
Bus1258 0.22 2.228 -8.253 8.549 2.399 -9.372 9.674 7.146 1.931 7.403 5.861 7.350 9.401
Bus1259 0.22 2.228 -8.249 8.545 2.403 -9.376 9.679 7.151 1.935 7.408 5.863 7.348 9.401
Bus1260 4.16 3.037 -14.718 15.028 0.397 -0.009 0.397 12.698 2.693 12.981 -12.799 -2.691 13.079
Bus1261 0.48 3.048 -17.275 17.542 0.000 0.000 0.000 15.066 2.697 15.306 15.066 2.697 15.306
Bus1262 4.16 3.036 -15.305 15.603 0.397 -0.009 0.397 13.731 2.926 14.039 -13.827 -2.921 14.132
Bus1263 0.48 3.092 -17.804 18.070 0.000 0.000 0.000 15.810 2.837 16.063 15.810 2.837 16.063
Bus1264 4.16 3.041 -15.300 15.599 0.397 -0.009 0.397 13.722 2.932 14.032 -13.819 -2.928 14.126
Bus1265 0.48 3.081 -17.621 17.888 0.000 0.000 0.000 15.493 2.771 15.739 15.493 2.771 15.739
Bus1266 4.16 2.832 -14.551 14.824 0.397 -0.010 0.397 12.554 2.517 12.804 -12.654 -2.516 12.902
Bus1267 0.48 2.958 -16.840 17.097 0.000 0.000 0.000 14.576 2.576 14.801 14.576 2.576 14.801
Bus1268 4.16 2.869 -14.451 14.734 0.397 -0.010 0.397 12.468 2.548 12.726 -12.568 -2.546 12.824
Bus1269 0.48 2.938 -16.682 16.939 0.000 0.000 0.000 14.440 2.558 14.664 14.440 2.558 14.664
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 26
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1270 0.20 1.769 -5.627 5.898 1.906 -6.179 6.466 4.884 1.540 5.121 3.860 4.945 6.273
Bus1271 0.20 1.763 -5.616 5.886 1.899 -6.167 6.453 4.871 1.533 5.106 3.849 4.937 6.260
Bus1272 4.16 3.080 -15.191 15.500 0.397 -0.009 0.397 13.622 2.966 13.941 -13.718 -2.961 14.034
Bus1273 0.48 2.999 -17.123 17.384 0.000 0.000 0.000 15.086 2.708 15.328 15.086 2.708 15.328
Bus1274 4.16 3.071 -14.616 14.935 0.397 -0.009 0.397 12.610 2.722 12.900 -12.710 -2.720 12.998
Bus1275 0.48 3.023 -17.100 17.365 0.000 0.000 0.000 14.906 2.668 15.142 14.906 2.668 15.142
Bus1276 4.16 3.082 -15.189 15.499 0.397 -0.009 0.397 13.619 2.968 13.939 -13.716 -2.963 14.032
Bus1277 0.48 2.998 -17.055 17.317 0.000 0.000 0.000 14.947 2.681 15.186 14.947 2.681 15.186
Bus1278 4.16 3.083 -15.189 15.498 0.397 -0.009 0.397 13.619 2.969 13.939 -13.715 -2.964 14.032
Bus1279 0.48 3.073 -17.455 17.723 0.000 0.000 0.000 15.309 2.760 15.556 15.309 2.760 15.556
Bus1280 4.16 2.865 -14.456 14.737 0.397 -0.010 0.397 12.475 2.543 12.731 -12.575 -2.541 12.829
Bus1281 0.48 3.027 -17.242 17.505 0.000 0.000 0.000 15.050 2.692 15.289 15.050 2.692 15.289
Bus1287 4.16 4.406 -13.374 14.081 0.395 -0.010 0.395 11.909 4.136 12.607 -12.006 -4.132 12.697
Bus1296 4.16 3.290 -15.378 15.727 0.397 -0.009 0.397 13.802 3.154 14.157 -13.898 -3.149 14.250
Bus1302 4.16 3.936 -9.829 10.588 0.393 -0.015 0.393 8.707 3.616 9.428 -8.804 -3.611 9.515
Bus1303 0.48 2.116 -9.298 9.536 0.000 0.000 0.000 8.234 1.926 8.456 8.234 1.926 8.456
Bus1304 4.16 3.709 -9.592 10.284 0.393 -0.015 0.393 8.358 3.231 8.961 -8.456 -3.229 9.052
Bus1305 0.48 2.117 -9.258 9.497 0.000 0.000 0.000 8.119 1.886 8.335 8.119 1.886 8.335
Bus1307 4.16 4.009 -8.642 9.526 0.390 -0.016 0.391 7.564 3.473 8.323 -7.661 -3.471 8.411
Bus1308 4.16 4.119 -7.600 8.644 0.464 -0.026 0.465 6.636 3.689 7.592 -6.752 -3.683 7.692
Bus1309 4.16 3.262 -8.366 8.980 0.468 -0.027 0.469 7.293 2.908 7.851 -7.411 -2.902 7.959
Bus1310 4.16 1.188 -18.332 18.370 0.479 -0.011 0.479 16.466 1.206 16.510 -16.582 -1.201 16.625
Bus1311 4.16 1.144 -17.495 17.533 0.479 -0.012 0.479 15.482 1.148 15.524 -15.600 -1.144 15.642
BusESCUELA BJ 0.22 3.153 -4.842 5.778 3.291 -4.233 5.362 4.193 2.731 5.004 -5.856 -0.882 5.922
BusTAR 0.22 1.784 -5.525 5.806 1.904 -6.060 6.352 4.787 1.548 5.031 3.771 4.898 6.182
CASAVISITAS-CCM-480 0.22 2.598 -4.576 5.262 2.666 -4.633 5.345 3.963 2.250 4.557 -5.331 0.095 5.332
CASETAPALMAS-CCM-480 0.22 2.632 -4.639 5.334 2.702 -4.697 5.419 4.017 2.280 4.619 -5.404 0.099 5.405
CASETAPALMAS-CCM-480A 0.22 2.224 -3.894 4.485 2.274 -3.935 4.545 3.373 1.927 3.884 -4.535 0.062 4.536
CCM-1/3 SE-1 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
CCM-01 480 V 0.48 1.124 -3.846 4.007 1.274 -3.680 3.894 3.335 0.976 3.474 -4.030 0.776 4.105
CCM-1 B-1 0.48 2.551 -9.750 10.078 0.000 0.000 0.000 8.540 2.275 8.838 8.540 2.275 8.838
CCM-1 SE-1 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
CCM-01 SE-1 2.40 1.550 -13.307 13.397 0.000 0.000 0.000 11.757 1.460 11.848 11.757 1.460 11.848
CCM-1 SE-20 2.40 1.738 -16.987 17.076 0.000 0.000 0.000 14.720 1.565 14.803 14.720 1.565 14.803
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 27
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
CCM-2 A/A SE-1 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
CCM-2 B-1 0.48 2.546 -9.698 10.027 0.000 0.000 0.000 8.490 2.266 8.787 8.490 2.266 8.787
CCM-2 SE-1 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
CCM-02 SE-1 2.40 1.685 -14.955 15.049 0.000 0.000 0.000 13.171 1.572 13.264 13.171 1.572 13.264
CCM-2 SE-20 2.40 1.724 -16.827 16.915 0.000 0.000 0.000 14.671 1.600 14.757 14.671 1.600 14.757
CCM-3 SE-1 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
CCM-4 SE-1 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
CCM-5 SE-1 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
CCM-6 SE-1 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
CCM-190-1A 0.48 2.170 -8.387 8.663 0.000 0.000 0.000 7.364 1.933 7.614 7.364 1.933 7.614
CCM-190-1B 0.48 2.168 -8.453 8.726 0.000 0.000 0.000 7.500 1.970 7.754 7.500 1.970 7.754
CCM-480 SE-MFA 0.48 2.461 -12.222 12.468 0.000 0.000 0.000 10.844 2.253 11.076 10.844 2.253 11.076
CCM-4160 4.16 0.197 -1.083 1.100 0.365 -0.078 0.373 1.079 0.230 1.104 -1.163 -0.213 1.182
CCM-5207A-2 0.48 1.533 -8.592 8.728 2.835 -12.400 12.720 8.637 1.792 8.821 -9.601 5.470 11.050
CCM-5207B-1 0.46 1.591 -7.583 7.749 3.013 -8.611 9.123 7.714 1.822 7.926 -8.863 1.806 9.045
CCM-5207C-1 0.46 1.728 -6.582 6.805 2.856 -7.174 7.721 6.398 1.905 6.676 -7.589 1.310 7.701
CCM-5207C-2 0.46 1.658 -6.476 6.685 2.776 -7.118 7.641 6.308 1.816 6.564 -7.487 1.376 7.612
CCM-5207D-1 0.46 1.631 -6.835 7.027 2.849 -7.831 8.334 6.712 1.805 6.951 -7.934 1.789 8.133
CCM-5207E-1 0.46 1.733 -6.275 6.510 2.758 -6.589 7.143 6.059 1.889 6.347 -7.201 1.003 7.271
CCM-5420-2 0.48 1.553 -9.008 9.141 2.931 -13.026 13.351 9.170 1.852 9.355 -10.073 5.547 11.499
CCM-5420-3 0.46 2.020 -4.109 4.579 2.436 -3.202 4.023 3.786 2.036 4.299 -4.756 -0.804 4.824
CCM-BT-480 BA 0.48 2.196 -9.679 9.925 0.000 0.000 0.000 8.395 1.911 8.610 8.395 1.911 8.610
CCM-BT-480 BB 0.48 2.156 -9.809 10.043 0.000 0.000 0.000 8.508 1.877 8.713 8.508 1.877 8.713
CCM-BT-CB-1A 0.48 3.741 -11.096 11.710 0.000 0.000 0.000 9.646 3.281 10.189 9.646 3.281 10.189
CCM-BT-CB-1B 0.48 3.746 -11.096 11.711 0.000 0.000 0.000 9.630 3.274 10.171 9.630 3.274 10.171
CCM-CB-2 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
CCM-CB3-1 0.48 2.421 -1.499 2.848 0.000 0.000 0.000 1.293 2.105 2.471 1.293 2.105 2.471
CCM-CB3-2 0.22 2.476 -2.527 3.538 2.863 -3.256 4.336 2.188 2.151 3.068 0.550 4.384 4.419
CCM-DAF 0.48 4.352 -29.654 29.971 0.000 0.000 0.000 25.915 3.874 26.203 25.915 3.874 26.203
CCM-E BUS B 0.46 1.944 -4.386 4.797 2.458 -3.584 4.346 4.074 1.979 4.529 -5.062 -0.581 5.095
CCM-LV-BT-5414 0.22 4.069 -10.984 11.713 5.014 -10.213 11.377 9.513 3.525 10.145 -12.382 1.141 12.434
CCM-MZ-BA-1 0.48 4.352 -29.654 29.971 0.000 0.000 0.000 25.915 3.874 26.203 25.915 3.874 26.203
CCM-MZ-BB-1 0.48 4.260 -29.095 29.406 0.000 0.000 0.000 25.231 3.730 25.506 25.231 3.730 25.506
CCM-MZ-BC-1 0.48 4.352 -29.654 29.971 0.000 0.000 0.000 25.915 3.874 26.203 25.915 3.874 26.203
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 28
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
CCM-S.AUX-TG-4 BA 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
CCM-S.AUX-TG-4 BB 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
CCM-SA-01/SA-02 BA 0.48 4.352 -29.654 29.971 0.000 0.000 0.000 25.915 3.874 26.203 25.915 3.874 26.203
CCM-SA3 0.48 4.260 -29.095 29.406 0.000 0.000 0.000 25.231 3.730 25.506 25.231 3.730 25.506
CCM-SA-04 BB 0.48 4.260 -29.095 29.406 0.000 0.000 0.000 25.231 3.730 25.506 25.231 3.730 25.506
CCM-TD-102 BA 0.48 2.258 -15.557 15.720 0.000 0.000 0.000 13.690 2.054 13.844 13.690 2.054 13.844
CCM-TD-102 BB 0.48 2.271 -15.791 15.953 0.000 0.000 0.000 14.244 2.205 14.414 14.244 2.205 14.414
CCM-TDB-1A 0.48 5.341 -19.904 20.608 0.000 0.000 0.000 17.212 4.628 17.824 17.212 4.628 17.824
CCM-TDB-1B 0.48 5.378 -19.960 20.672 0.000 0.000 0.000 17.252 4.653 17.869 17.252 4.653 17.869
CCM-URV 0.48 4.015 -9.503 10.316 4.126 -9.652 10.497 8.239 3.496 8.950 -10.334 1.402 10.429
CF-07 0.48 4.587 -21.354 21.841 5.920 -24.241 24.953 19.059 4.100 19.495 -22.492 9.019 24.233
DER SE-MFA 2.40 3.562 -11.267 11.817 0.000 0.000 0.000 9.919 3.162 10.411 9.919 3.162 10.411
DERIVADOR 1 SE-7 13.80 3.333 -9.863 10.411 0.343 -0.863 0.929 8.359 2.846 8.830 -8.453 -2.616 8.849
DERIVADOR SE-9 13.80 0.721 -4.802 4.855 0.717 -0.132 0.729 4.168 0.637 4.217 -4.353 -0.616 4.397
DERIVADOR SE-17 13.80 0.552 -5.011 5.041 0.756 -0.119 0.766 4.354 0.490 4.381 -4.548 -0.473 4.572
DERIVADOR SE-MZ METRO 2.40 3.565 -8.463 9.183 0.000 0.000 0.000 7.457 3.146 8.094 7.457 3.146 8.094
ENLACE SE-8 13.80 3.470 -7.906 8.634 0.330 -0.915 0.973 6.682 2.915 7.290 6.596 3.166 7.316
ENTRADA 19MV-4160 BA 4.16 1.903 -11.566 11.721 0.397 -0.013 0.397 10.023 1.658 10.160 -10.123 -1.657 10.258
ENTRADA 19MV-4160 BB 4.16 1.080 -7.792 7.867 0.396 -0.017 0.397 6.757 0.945 6.822 -6.856 -0.943 6.921
EXT. MP-TD-1 13.80 1.339 -14.423 14.485 0.327 -0.990 1.043 11.932 1.264 11.999 -12.027 -0.996 12.068
EXT. MP-TD-2 13.80 1.545 -16.087 16.161 0.331 -0.995 1.048 13.430 1.473 13.511 -13.523 -1.206 13.577
EXT. MP-TD-3 13.80 1.425 -15.507 15.572 0.332 -0.996 1.050 13.888 1.595 13.980 -13.962 -1.341 14.026
FUERZA SECC73 13.80 0.530 -4.892 4.921 0.726 -0.127 0.737 4.248 0.471 4.274 -4.435 -0.451 4.457
28-HV-28G22
FUERZA SECC78 13.80 2.327 -13.073 13.279 0.341 -0.933 0.993 10.945 2.006 11.127 -11.042 -1.757 11.181
28-HV-28G21
HR 13.80 0.365 -1.119 1.177 0.210 -0.632 0.666 0.996 0.324 1.047 -1.063 -0.111 1.069
HR-CCM 0.48 3.542 -15.444 15.845 4.143 -18.267 18.731 14.318 3.353 14.705 11.912 12.744 17.444
HR-HV-CFE 13.80 0.363 -1.122 1.179 0.209 -0.633 0.667 0.998 0.322 1.049 -1.066 -0.109 1.071
HR-HV-CFE/RFM 13.80 0.363 -1.122 1.179 0.209 -0.633 0.667 0.998 0.322 1.049 -1.066 -0.109 1.071
HR-HV-REF 13.80 2.241 -2.100 3.071 0.340 -0.614 0.702 1.814 1.918 2.640 1.725 2.096 2.714
HR-I-LINE C 0.48 3.542 -15.444 15.845 4.143 -18.267 18.731 14.318 3.353 14.705 11.912 12.744 17.444
HR-TBT BA 0.22 5.865 -25.543 26.208 6.377 -29.631 30.309 22.355 5.109 22.931 18.836 22.295 29.187
HV-20 BA 13.80 2.528 -14.291 14.513 0.325 -0.991 1.043 11.879 2.184 12.078 -11.973 -1.917 12.125
HV-20 BB 13.80 2.319 -13.523 13.721 0.325 -0.980 1.033 11.348 2.054 11.532 -11.439 -1.791 11.578
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 29
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
I-21.1 13.80 3.232 -14.706 15.056 0.330 -0.993 1.047 12.217 2.739 12.520 -12.313 -2.472 12.558
I-21.2 13.80 2.540 -12.596 12.849 0.328 -0.977 1.030 10.454 2.189 10.681 -10.549 -1.925 10.723
INT ENLACE 15-LV-BA02-480 0.48 2.588 -12.026 12.301 0.000 0.000 0.000 10.403 2.241 10.641 10.403 2.241 10.641
LP-01 0.22 1.469 -2.928 3.276 1.520 -2.991 3.355 2.538 1.275 2.841 -3.321 0.251 3.330
LV-22A61 BA 0.22 6.209 -20.417 21.340 7.340 -20.364 21.647 17.712 5.408 18.519 -21.905 4.669 22.397
LV-22A61 BB 0.22 6.209 -20.417 21.340 7.340 -20.364 21.647 17.712 5.408 18.519 -21.905 4.669 22.397
LV-22B51 BA 0.48 3.183 -19.179 19.441 0.000 0.000 0.000 16.837 2.883 17.082 16.837 2.883 17.082
LV-22B51 BB 0.48 3.185 -19.157 19.419 0.000 0.000 0.000 16.813 2.882 17.058 16.813 2.882 17.058
LV-22B53 BA 0.48 3.129 -18.786 19.045 0.000 0.000 0.000 16.319 2.746 16.548 16.319 2.746 16.548
LV-22B53 BB 0.48 3.137 -18.819 19.079 0.000 0.000 0.000 16.341 2.743 16.570 16.341 2.743 16.570
LV-22B54 BA 0.48 3.298 -12.303 12.737 0.000 0.000 0.000 10.800 2.940 11.193 10.800 2.940 11.193
LV-22B54 BB 0.48 3.309 -12.353 12.788 0.000 0.000 0.000 10.831 2.932 11.221 10.831 2.932 11.221
LV-22B61 BA 0.22 3.463 -10.402 10.963 0.000 0.000 0.000 9.014 3.007 9.502 9.014 3.007 9.502
LV-22B61 BB 0.22 3.505 -10.490 11.060 0.000 0.000 0.000 9.090 3.042 9.585 9.090 3.042 9.585
LV-41L51 0.48 2.678 -5.150 5.804 0.000 0.000 0.000 4.457 2.318 5.024 4.457 2.318 5.024
LV-MCC-01A 0.48 5.529 -20.866 21.586 0.000 0.000 0.000 18.409 4.933 19.058 18.409 4.933 19.058
LV-MCC-01B 0.48 6.663 -22.778 23.732 0.000 0.000 0.000 19.806 5.825 20.645 19.806 5.825 20.645
LV-MCC-02 0.22 1.732 -5.967 6.213 1.805 -6.218 6.475 5.170 1.501 5.384 4.230 4.743 6.355
LVM-0001B BB 0.48 3.877 -15.023 15.516 1.303 -2.374 2.708 13.026 3.379 13.457 -13.395 -2.739 13.672
LVMCC-0001A BA 0.48 3.903 -15.325 15.814 1.256 -2.275 2.599 13.514 3.511 13.963 -13.853 -2.906 14.154
LVMCC-002 BA 0.22 1.007 -1.191 1.560 0.000 0.000 0.000 1.032 0.873 1.352 1.032 0.873 1.352
LVMCC-002 BB 0.22 1.002 -1.189 1.555 0.000 0.000 0.000 1.029 0.868 1.347 1.029 0.868 1.347
MC LV-CCM-1-480 0.48 4.954 -7.866 9.296 0.000 0.000 0.000 6.808 4.288 8.046 6.808 4.288 8.046
MC LV-CCM-2-220 0.22 1.906 -3.184 3.711 2.025 -3.394 3.952 2.757 1.651 3.214 1.678 3.467 3.852
MC-CCM-03 0.48 3.033 -2.947 4.229 0.000 0.000 0.000 2.655 2.697 3.784 2.655 2.697 3.784
MC-LV-CCM-02 0.48 2.938 -8.430 8.927 0.000 0.000 0.000 7.420 2.636 7.874 7.420 2.636 7.874
MC-MV-CCM-2400 2.40 4.207 -11.552 12.294 0.000 0.000 0.000 10.249 3.882 10.960 10.249 3.882 10.960
MC2 TD 220V BA 0.22 2.059 -4.221 4.697 2.141 -3.804 4.365 3.662 1.790 4.076 -4.739 -0.074 4.740
MC2 TD 220V BB 0.22 2.059 -4.221 4.697 2.141 -3.804 4.365 3.662 1.790 4.076 -4.739 -0.074 4.740
MC2-LV-CCM1A 0.48 3.420 -15.789 16.156 0.000 0.000 0.000 13.876 3.046 14.206 13.876 3.046 14.206
MC2-LV-CCM1B 0.48 3.420 -15.789 16.156 0.000 0.000 0.000 13.876 3.046 14.206 13.876 3.046 14.206
MC2-LV-CCM2A 0.48 3.570 -16.642 17.020 0.000 0.000 0.000 14.951 3.326 15.316 14.951 3.326 15.316
MC2-LV-CCM2B 0.48 3.407 -15.707 16.072 0.000 0.000 0.000 13.788 3.048 14.121 13.788 3.048 14.121
MC2-MV-BA01 4.16 1.752 -10.347 10.494 0.786 -0.057 0.788 9.232 1.640 9.377 -9.425 -1.627 9.565
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 30
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
MC2-MV-BB01 4.16 1.601 -9.545 9.679 0.785 -0.061 0.787 8.337 1.437 8.460 -8.534 -1.427 8.653
MFA-LV-CCM1 0.48 2.461 -12.222 12.468 0.000 0.000 0.000 10.844 2.253 11.076 10.844 2.253 11.076
MFA-LV-CCM2 0.48 2.461 -12.222 12.468 0.000 0.000 0.000 10.844 2.253 11.076 10.844 2.253 11.076
MFA-LV-CCM3 0.48 2.461 -12.222 12.468 0.000 0.000 0.000 10.844 2.253 11.076 10.844 2.253 11.076
MFA-LV-CCM4 0.48 2.461 -12.222 12.468 0.000 0.000 0.000 10.844 2.253 11.076 10.844 2.253 11.076
MFA-MV-1 2.40 3.562 -11.267 11.817 0.000 0.000 0.000 9.919 3.162 10.411 9.919 3.162 10.411
MFA-MV-1A 2.40 3.572 -11.201 11.757 0.000 0.000 0.000 9.861 3.170 10.358 9.861 3.170 10.358
MFA-MV-2 2.40 3.582 -11.136 11.698 0.000 0.000 0.000 9.804 3.178 10.306 9.804 3.178 10.306
MFA-MV-2A 2.40 3.591 -11.071 11.639 0.000 0.000 0.000 9.747 3.186 10.255 9.747 3.186 10.255
MFA-MV-3 2.40 3.600 -11.007 11.581 0.000 0.000 0.000 9.691 3.193 10.204 9.691 3.193 10.204
MJA-CCM-480-1 0.48 2.963 -10.382 10.797 0.000 0.000 0.000 9.025 2.600 9.392 9.025 2.600 9.392
MJA-CCM-480-2 0.48 3.832 -6.856 7.854 0.000 0.000 0.000 5.945 3.342 6.820 5.945 3.342 6.820
MJA-LV-1 0.48 1.567 -5.845 6.051 0.000 0.000 0.000 5.063 1.361 5.243 5.063 1.361 5.243
MJA-MV-1 2.40 3.394 -10.159 10.711 0.000 0.000 0.000 8.818 2.981 9.309 8.818 2.981 9.309
MJA-MV-2 2.40 3.473 -9.980 10.567 0.000 0.000 0.000 8.662 3.048 9.182 8.662 3.048 9.182
MJN-131-IT-4 2.40 1.143 -10.174 10.238 0.000 0.000 0.000 8.819 0.999 8.875 8.819 0.999 8.875
MJN-133-IT-1 0.48 2.431 -9.924 10.217 0.000 0.000 0.000 8.595 2.108 8.850 8.595 2.108 8.850
MJN-CCM-PN 0.48 2.431 -9.924 10.217 0.000 0.000 0.000 8.595 2.108 8.850 8.595 2.108 8.850
MLA 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
MP LV-CCM-1-480 0.48 5.369 -16.486 17.338 0.000 0.000 0.000 14.259 4.649 14.998 14.259 4.649 14.998
MP LV-CCM-2-480 0.48 5.399 -16.522 17.382 0.000 0.000 0.000 14.285 4.670 15.029 14.285 4.670 15.029
MP-TD-1 13.80 1.256 -14.737 14.790 0.326 -0.996 1.048 12.175 1.206 12.235 -12.270 -0.936 12.306
MP-TD-2 13.80 1.442 -16.486 16.549 0.330 -1.001 1.054 13.749 1.400 13.820 -13.842 -1.131 13.888
MP-TD-3 13.80 1.328 -15.872 15.927 0.331 -1.002 1.056 14.225 1.521 14.306 -14.298 -1.266 14.354
MP-TD-4 13.80 1.549 -17.666 17.733 0.329 -1.013 1.065 14.558 1.460 14.631 -14.654 -1.187 14.702
MSW-MCC-01A 0.48 3.512 -10.277 10.860 0.000 0.000 0.000 9.098 3.144 9.626 9.098 3.144 9.626
MSW-MCC-01B 0.48 3.464 -10.327 10.892 0.000 0.000 0.000 9.129 3.094 9.639 9.129 3.094 9.639
MSW-MCC-02 0.22 0.635 -0.706 0.949 0.658 -0.736 0.987 0.614 0.551 0.825 0.273 0.931 0.971
MV-1A-1 2.40 3.626 -11.959 12.496 0.000 0.000 0.000 10.450 3.232 10.939 10.450 3.232 10.939
MV-1A-2 2.40 3.413 -13.091 13.529 0.000 0.000 0.000 11.455 3.054 11.856 11.455 3.054 11.856
MV-MZ- BB 2.4 kV 13.80 3.498 -15.969 16.347 1.461 -0.268 1.485 14.083 3.425 14.494 -14.451 -3.359 14.837
MV-MZ-BA 2.4 kV 13.80 4.526 -18.560 19.104 1.491 -0.187 1.502 16.782 4.513 17.378 -17.145 -4.461 17.716
MV-SWGR-01A 13.80 0.514 -5.113 5.139 0.758 -0.116 0.767 4.442 0.458 4.466 -4.636 -0.442 4.657
MV-SWGR-01B 13.80 2.487 -14.493 14.705 0.325 -0.993 1.045 12.033 2.154 12.225 -12.127 -1.887 12.273
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 31
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
MV-SWGR/MCC-01A 4.16 0.819 -9.553 9.588 0.399 -0.013 0.399 8.314 0.733 8.346 -8.413 -0.731 8.445
MV-SWGR/MCC-01B 4.16 1.475 -14.971 15.044 0.399 -0.010 0.399 12.813 1.309 12.879 -12.914 -1.308 12.980
MZ-LV-CCM1 0.48 1.336 -5.623 5.780 0.000 0.000 0.000 4.881 1.159 5.016 4.881 1.159 5.016
MZ-LV-CCM2 0.48 1.348 -5.571 5.732 0.000 0.000 0.000 4.835 1.169 4.975 4.835 1.169 4.975
BK4-CCM-05A 0.22 1.767 -6.120 6.370 1.947 -6.730 7.006 5.301 1.532 5.518 -6.381 2.204 6.751
BK4-CCM-05B 0.22 1.802 -6.121 6.380 1.975 -6.732 7.016 5.303 1.563 5.529 4.213 5.298 6.769
BK4-TM4.16-02 4.16 3.346 -8.718 9.337 0.469 -0.026 0.469 7.648 3.020 8.222 -7.765 -3.013 8.329
BK4-TM4.16-03 4.16 3.212 -8.540 9.124 0.469 -0.027 0.469 7.447 2.865 7.979 -7.564 -2.860 8.087
BOOSTER-CCM-01 0.48 1.938 -6.244 6.538 0.000 0.000 0.000 5.415 1.685 5.671 5.415 1.685 5.671
BT-5298 BA 0.48 1.553 -9.008 9.141 2.931 -13.026 13.351 9.170 1.852 9.355 -10.073 5.547 11.499
BT-5298 BB 0.48 1.533 -8.592 8.728 2.835 -12.400 12.720 8.637 1.792 8.821 -9.601 5.470 11.050
BT-6028-02 0.22 7.832 -24.190 25.426 9.020 -27.869 29.292 21.160 6.849 22.241 -26.264 9.232 27.839
BUS PRIM TRA4 13.80 3.152 -8.019 8.616 0.338 -0.872 0.935 6.823 2.666 7.325 6.734 2.902 7.333
BUS 2.2KV C.A.F. 2.40 4.013 -11.485 12.166 0.000 0.000 0.000 9.895 3.465 10.484 9.895 3.465 10.484
BUS A TR2 13.80 0.731 -4.145 4.209 0.705 -0.147 0.720 3.596 0.643 3.653 -3.780 -0.619 3.830
BUS ALUMBRADO2 0.22 1.134 -2.132 2.415 1.221 -2.221 2.535 1.846 0.982 2.091 -2.506 0.176 2.512
BUS CERO-CORTES-TRA1 13.80 3.034 -8.206 8.749 0.335 -0.875 0.937 6.978 2.567 7.435 -7.071 -2.333 7.446
BUS ENLACE SE-7 Y 13 2.40 3.507 -9.637 10.255 0.000 0.000 0.000 8.362 3.076 8.910 8.362 3.076 8.910
BUS G1 0.48 8.524 -18.983 20.809 9.757 -21.157 23.299 16.578 7.531 18.209 -21.967 4.254 22.375
BUS G2 0.48 7.850 -20.851 22.280 9.207 -22.975 24.751 18.523 6.874 19.758 -23.678 5.230 24.249
BUS JARDIN TR-1A 0.22 3.154 -6.378 7.116 3.267 -6.496 7.271 5.524 2.732 6.163 -7.217 0.577 7.240
BUS JARDIN TR-17 0.22 6.904 -24.653 25.601 7.355 -26.971 27.956 21.353 5.985 22.176 17.434 20.861 27.187
BUS MB-A 4.16 0.475 -2.088 2.141 0.000 0.000 0.000 1.925 0.425 1.972 1.925 0.425 1.972
BUS MB-B 4.16 1.484 -8.195 8.328 0.392 -0.021 0.393 7.227 1.317 7.346 -7.324 -1.312 7.441
BUS MB2 4.16 0.332 -1.444 1.481 0.000 0.000 0.000 1.339 0.297 1.371 1.339 0.297 1.371
BUS MB3 4.16 3.656 -9.385 10.072 0.390 -0.015 0.390 8.165 3.149 8.751 -8.263 -3.147 8.842
BUS P-501B 2.40 5.214 -11.630 12.745 0.000 0.000 0.000 10.326 4.657 11.327 10.326 4.657 11.327
BUS P-608A 2.40 4.969 -11.210 12.262 0.000 0.000 0.000 9.847 4.356 10.767 9.847 4.356 10.767
BUS PPAL BUS A 4.16 1.011 -9.015 9.072 0.398 -0.017 0.398 7.941 0.910 7.993 -8.039 -0.906 8.090
BUS PRI 080-TRF-16531A 0.48 3.110 -14.122 14.461 0.000 0.000 0.000 12.248 2.706 12.543 12.248 2.706 12.543
BUS PRI 080-TRF-16531B 0.48 2.802 -10.150 10.529 0.000 0.000 0.000 8.793 2.433 9.124 8.793 2.433 9.124
Bus SE17 2.40 0.743 -2.780 2.878 1.047 -3.445 3.600 2.535 0.674 2.624 -3.190 1.321 3.452
BUS SE-19 BUNKER 0.22 0.814 -1.543 1.745 0.000 0.000 0.000 1.337 0.705 1.511 1.337 0.705 1.511
BUS SE-19A CERO CORTES 4.16 1.011 -9.015 9.072 0.398 -0.017 0.398 7.941 0.910 7.993 -8.039 -0.906 8.090
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 32
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus272 0.48 2.982 -20.133 20.353 0.000 0.000 0.000 17.744 2.728 17.953 17.744 2.728 17.953
Bus273 2.40 3.473 -11.748 12.251 0.000 0.000 0.000 10.396 3.167 10.868 10.396 3.167 10.868
Bus275 2.40 3.473 -11.748 12.251 0.000 0.000 0.000 10.396 3.167 10.868 10.396 3.167 10.868
Bus277 2.40 3.436 -11.820 12.309 0.000 0.000 0.000 10.463 3.130 10.921 10.463 3.130 10.921
Bus278 2.40 3.845 -9.980 10.695 0.000 0.000 0.000 8.836 3.522 9.512 8.836 3.522 9.512
Bus279 0.48 3.706 -17.155 17.551 0.000 0.000 0.000 15.088 3.328 15.451 15.088 3.328 15.451
Bus280 0.48 3.808 -17.778 18.181 0.000 0.000 0.000 15.934 3.567 16.328 15.934 3.567 16.328
Bus281 2.40 3.849 -10.019 10.733 0.000 0.000 0.000 8.859 3.483 9.519 8.859 3.483 9.519
Bus282 4.16 1.060 -18.911 18.941 0.479 -0.011 0.480 16.977 1.085 17.011 -17.093 -1.080 17.127
Bus283 2.40 3.874 -9.835 10.571 0.000 0.000 0.000 8.644 3.501 9.326 8.644 3.501 9.326
Bus284 0.48 3.713 -16.896 17.299 0.000 0.000 0.000 14.720 3.269 15.079 14.720 3.269 15.079
Bus285 0.48 2.860 -21.187 21.379 0.000 0.000 0.000 18.433 2.535 18.606 18.433 2.535 18.606
Bus286 4.16 1.475 -17.925 17.986 0.479 -0.012 0.479 16.068 1.455 16.134 -16.184 -1.450 16.249
Bus287 0.48 2.836 -21.394 21.581 0.000 0.000 0.000 18.777 2.560 18.951 18.777 2.560 18.951
Bus288 0.48 3.758 -17.295 17.699 0.000 0.000 0.000 15.265 3.406 15.640 15.265 3.406 15.640
Bus289 4.16 1.474 -17.927 17.987 0.479 -0.012 0.479 16.071 1.454 16.137 -16.187 -1.449 16.252
Bus290 2.40 3.840 -9.905 10.624 0.000 0.000 0.000 8.774 3.517 9.453 8.774 3.517 9.453
Bus291 0.48 2.831 -21.230 21.417 0.000 0.000 0.000 18.472 2.483 18.638 18.472 2.483 18.638
Bus292 4.16 1.569 -18.764 18.829 0.479 -0.012 0.479 16.865 1.519 16.933 -16.981 -1.514 17.048
Bus293 4.16 1.087 -19.721 19.751 0.479 -0.011 0.480 17.758 1.081 17.791 -17.873 -1.077 17.906
Bus294 4.16 2.315 -17.685 17.836 0.478 -0.012 0.478 15.885 2.180 16.034 -16.001 -2.175 16.148
Bus295 13.80 1.821 -15.414 15.522 0.328 -0.994 1.047 12.879 1.683 12.989 -12.972 -1.416 13.049
Bus296 4.16 1.567 -18.771 18.836 0.479 -0.012 0.479 16.875 1.516 16.943 -16.991 -1.512 17.058
Bus297 0.48 2.936 -21.954 22.150 0.000 0.000 0.000 19.450 2.751 19.643 19.450 2.751 19.643
Bus298 13.80 1.756 -14.551 14.656 0.330 -0.989 1.043 12.990 1.862 13.123 -13.064 -1.608 13.163
Bus300 4.16 2.799 -17.464 17.687 0.478 -0.013 0.478 15.670 2.623 15.888 -15.786 -2.618 16.001
Bus303 4.16 4.578 -16.351 16.980 0.476 -0.013 0.476 14.605 4.250 15.211 -14.721 -4.245 15.321
Bus304 2.40 4.216 -8.424 9.420 0.000 0.000 0.000 7.302 3.687 8.180 7.302 3.687 8.180
Bus306 4.16 4.271 -15.725 16.295 0.476 -0.013 0.476 14.001 3.983 14.556 -14.117 -3.977 14.667
Bus308 4.16 4.255 -15.742 16.307 0.476 -0.013 0.476 14.027 3.960 14.575 -14.143 -3.955 14.686
Bus309 2.40 4.160 -10.652 11.435 0.000 0.000 0.000 9.180 3.590 9.857 9.180 3.590 9.857
Bus310 2.40 2.193 -9.019 9.282 0.000 0.000 0.000 8.336 2.057 8.586 8.336 2.057 8.586
Bus311 4.16 2.605 -9.113 9.478 0.771 -0.062 0.774 8.095 2.396 8.442 -8.286 -2.383 8.622
Bus312 0.22 1.537 -2.762 3.161 1.609 -2.834 3.259 2.392 1.332 2.738 -3.234 0.123 3.237
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 33
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus313 0.22 0.900 -1.594 1.831 0.932 -1.626 1.874 1.380 0.780 1.585 -1.863 0.050 1.864
Bus314 0.22 2.015 -4.026 4.502 2.180 -4.303 4.824 3.487 1.747 3.900 -4.671 0.564 4.705
Bus315 2.40 4.847 -10.085 11.189 0.000 0.000 0.000 8.951 4.325 9.941 8.951 4.325 9.941
Bus316 0.48 6.003 -16.533 17.589 0.000 0.000 0.000 14.294 5.192 15.208 14.294 5.192 15.208
Bus317 4.16 1.095 -14.342 14.384 0.479 -0.015 0.479 12.655 1.036 12.697 -12.773 -1.032 12.815
Bus318 0.22 2.740 -14.134 14.397 3.173 -15.906 16.219 12.276 2.394 12.508 -14.103 6.647 15.591
Bus319 0.22 0.905 -1.603 1.840 0.938 -1.634 1.884 1.390 0.787 1.598 -1.872 0.044 1.873
Bus320 13.80 0.520 -5.102 5.129 0.758 -0.117 0.767 4.433 0.463 4.457 -4.627 -0.447 4.648
Bus321 0.22 0.986 -1.730 1.992 0.000 0.000 0.000 1.500 0.856 1.727 1.500 0.856 1.727
Bus322 2.40 3.920 -7.623 8.572 0.000 0.000 0.000 6.577 3.380 7.395 6.577 3.380 7.395
Bus323 0.22 2.009 -7.497 7.762 2.195 -7.999 8.294 6.495 1.743 6.725 -7.699 2.540 8.107
Bus324 13.80 2.913 -19.962 20.173 1.510 -0.169 1.520 18.222 3.014 18.470 -18.585 -2.966 18.820
Bus325 0.48 5.746 -9.197 10.845 0.000 0.000 0.000 7.966 4.988 9.399 7.966 4.988 9.399
Bus326 2.40 1.571 -8.194 8.344 0.000 0.000 0.000 7.459 1.445 7.598 7.459 1.445 7.598
Bus327 0.22 1.937 -3.588 4.078 2.050 -3.690 4.222 3.107 1.677 3.531 -4.195 0.222 4.201
Bus328 0.48 2.745 -20.494 20.677 0.000 0.000 0.000 17.814 2.410 17.976 17.814 2.410 17.976
Bus329 0.22 0.899 -1.592 1.829 0.932 -1.625 1.873 1.379 0.779 1.584 -1.862 0.050 1.863
Bus332 10.35 1.000 -11.174 11.219 1.112 -13.113 13.160 9.963 0.943 10.008 9.345 8.309 12.505
Bus333 0.48 4.965 -9.615 10.821 0.000 0.000 0.000 8.341 4.352 9.408 8.341 4.352 9.408
Bus334 13.80 2.038 -16.922 17.044 1.527 -0.248 1.547 15.029 2.133 15.180 -15.410 -2.073 15.548
Bus335 0.22 0.927 -1.634 1.879 0.953 -1.655 1.910 1.417 0.806 1.630 -1.903 0.031 1.903
Bus336 0.22 0.899 -1.590 1.826 0.931 -1.623 1.871 1.377 0.778 1.581 -1.859 0.051 1.860
Bus337 2.40 1.321 -7.017 7.141 0.000 0.000 0.000 6.081 1.149 6.188 6.081 1.149 6.188
Bus338 0.22 1.636 -3.764 4.104 1.934 -4.111 4.543 3.345 1.508 3.669 -4.332 0.668 4.383
Bus339 2.40 4.071 -14.085 14.662 0.000 0.000 0.000 12.159 3.542 12.664 12.159 3.542 12.664
Bus340 0.22 2.646 -12.264 12.546 3.225 -14.971 15.314 10.627 2.295 10.872 8.569 11.885 14.652
Bus598 13.80 1.947 -15.542 15.664 0.327 -1.011 1.063 12.978 1.787 13.100 -13.070 -1.516 13.157
Bus599 0.48 2.345 -7.668 8.018 2.298 -8.247 8.561 6.636 2.030 6.940 5.533 6.490 8.528
Bus600 0.48 6.663 -22.778 23.732 0.000 0.000 0.000 19.806 5.825 20.645 19.806 5.825 20.645
Bus602 2.40 1.321 -7.017 7.141 0.000 0.000 0.000 6.081 1.149 6.188 6.081 1.149 6.188
Bus603 0.48 2.328 -13.279 13.481 0.000 0.000 0.000 11.489 2.019 11.665 11.489 2.019 11.665
Bus604 0.48 3.085 -20.143 20.378 0.000 0.000 0.000 17.489 2.701 17.696 17.489 2.701 17.696
Bus605 115.00 0.007 -0.041 0.041 0.007 -0.036 0.037 0.040 0.008 0.041 0.037 0.020 0.042
Bus606 13.80 1.668 -13.982 14.081 0.324 -1.006 1.057 11.569 1.517 11.668 -11.664 -1.244 11.730
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 34
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus607 0.22 2.691 -8.518 8.933 2.711 -8.807 9.215 7.374 2.330 7.733 6.011 6.891 9.144
Bus608 0.48 1.960 -9.511 9.711 0.000 0.000 0.000 8.238 1.700 8.412 8.238 1.700 8.412
Bus609 4.16 0.162 -0.999 1.012 0.363 -0.086 0.373 0.968 0.175 0.983 -1.054 -0.160 1.066
Bus610 13.80 0.810 -17.902 17.921 1.567 -0.162 1.576 15.558 0.724 15.575 -15.952 -0.699 15.968
Bus611 0.22 0.700 -1.197 1.387 0.726 -1.238 1.435 1.037 0.606 1.201 -1.414 0.035 1.415
Bus612 13.80 2.673 -12.812 13.088 0.338 -0.944 1.002 11.347 2.633 11.648 -11.425 -2.389 11.672
Bus613 0.22 2.197 -7.396 7.715 2.343 -7.938 8.277 6.403 1.903 6.680 5.150 6.188 8.051
Bus614 0.22 1.459 -2.607 2.987 1.538 -2.700 3.107 2.258 1.264 2.588 -3.069 0.135 3.072
Bus615 2.40 2.678 -12.574 12.856 0.000 0.000 0.000 10.814 2.313 11.059 10.814 2.313 11.059
Bus617 34.50 1.006 -12.904 12.943 0.134 -0.791 0.802 11.036 0.945 11.076 -11.072 -0.737 11.096
Bus618 0.22 2.543 -5.386 5.956 2.517 -4.426 5.091 4.663 2.202 5.157 -5.866 -0.341 5.875
Bus619 4.16 4.221 -15.417 15.984 0.476 -0.013 0.476 13.733 3.939 14.286 -13.849 -3.933 14.397
Bus620 0.22 1.503 -2.626 3.026 1.555 -2.689 3.106 2.274 1.301 2.620 -3.080 0.076 3.081
Bus621 0.48 3.464 -10.327 10.892 0.000 0.000 0.000 9.129 3.094 9.639 9.129 3.094 9.639
Bus622 0.22 2.019 -3.612 4.138 2.109 -3.706 4.264 3.128 1.748 3.583 -4.232 0.155 4.235
Bus623 4.16 4.192 -15.449 16.008 0.476 -0.013 0.476 13.752 3.919 14.299 -13.868 -3.914 14.410
Bus624 34.50 1.006 -12.904 12.943 0.134 -0.791 0.802 11.036 0.945 11.076 -11.072 -0.737 11.096
Bus627 0.48 1.420 -2.912 3.240 1.479 -2.967 3.315 2.523 1.232 2.808 -3.291 0.278 3.303
Bus629 4.16 2.260 -16.514 16.668 0.478 -0.013 0.478 14.775 2.163 14.932 -14.891 -2.158 15.046
Bus630 13.80 2.785 -13.419 13.705 0.332 -0.983 1.038 11.898 2.761 12.214 -11.973 -2.507 12.232
Bus632 13.80 2.698 -13.612 13.877 0.332 -0.985 1.039 12.078 2.690 12.374 -12.153 -2.435 12.395
Bus635 4.16 0.927 -5.443 5.522 0.000 0.000 0.000 4.690 0.802 4.758 4.690 0.802 4.758
Bus637 13.80 1.343 -15.812 15.869 0.331 -0.999 1.053 14.169 1.537 14.253 -14.243 -1.282 14.301
Bus638 0.48 2.839 -8.109 8.592 0.000 0.000 0.000 7.017 2.457 7.435 7.017 2.457 7.435
Bus639 4.16 1.296 -18.083 18.130 0.479 -0.012 0.479 16.237 1.302 16.289 -16.353 -1.297 16.404
Bus640 13.80 1.550 -17.659 17.726 0.330 -1.009 1.062 14.523 1.468 14.598 -14.620 -1.195 14.669
Bus641 2.40 4.270 -11.461 12.231 0.000 0.000 0.000 10.026 3.873 10.748 10.026 3.873 10.748
Bus642 0.48 2.839 -8.109 8.592 0.000 0.000 0.000 7.017 2.457 7.435 7.017 2.457 7.435
Bus644 4.16 1.244 -17.266 17.310 0.479 -0.012 0.479 15.275 1.234 15.325 -15.393 -1.230 15.442
Bus647 0.48 2.839 -8.109 8.592 0.000 0.000 0.000 7.017 2.457 7.435 7.017 2.457 7.435
Bus648 0.22 1.198 -2.073 2.395 1.285 -2.209 2.555 1.796 1.037 2.074 -2.489 0.144 2.493
Bus650 0.22 1.433 -2.926 3.258 1.543 -3.093 3.457 2.534 1.241 2.821 -3.369 0.400 3.393
Bus651 13.80 0.334 -5.569 5.579 0.776 -0.104 0.783 4.837 0.303 4.847 -5.034 -0.289 5.043
Bus653 13.80 1.238 -14.745 14.797 0.330 -0.981 1.035 12.216 1.172 12.272 -12.312 -0.908 12.345
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 35
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus655 2.40 0.703 -2.770 2.857 1.000 -3.360 3.506 2.538 0.627 2.614 -3.171 1.231 3.401
Bus657 13.80 1.392 -16.586 16.644 0.335 -0.987 1.043 13.870 1.339 13.935 -13.964 -1.076 14.006
Bus658 2.40 4.207 -11.552 12.294 0.000 0.000 0.000 10.249 3.882 10.960 10.249 3.882 10.960
Bus660 2.40 1.831 -7.942 8.151 0.000 0.000 0.000 6.971 1.612 7.155 6.971 1.612 7.155
Bus661 13.80 0.923 -17.646 17.670 1.566 -0.163 1.575 15.338 0.821 15.360 -15.732 -0.796 15.752
Bus662 13.80 1.685 -17.376 17.457 0.333 -0.992 1.046 14.375 1.523 14.455 -14.471 -1.256 14.525
Bus665 13.80 1.273 -16.001 16.051 0.336 -0.988 1.044 14.291 1.472 14.366 -14.367 -1.219 14.418
Bus667 0.22 2.387 -4.118 4.760 2.425 -4.152 4.808 3.568 2.071 4.125 -4.795 0.022 4.795
Bus668 4.16 3.837 -14.952 15.436 0.476 -0.014 0.476 13.173 3.502 13.631 -13.291 -3.498 13.743
Bus671 0.48 4.328 -22.533 22.945 4.955 -27.247 27.693 20.068 3.880 20.439 17.166 19.884 26.269
Bus673 2.40 1.968 -7.713 7.960 0.000 0.000 0.000 6.773 1.730 6.991 6.773 1.730 6.991
Bus676 2.40 0.605 -2.958 3.019 0.780 -3.900 3.978 2.694 0.549 2.750 2.136 3.016 3.696
Bus677 0.22 2.387 -4.118 4.760 2.425 -4.152 4.808 3.568 2.071 4.125 -4.795 0.022 4.795
Bus679 0.22 2.387 -4.118 4.760 2.424 -4.151 4.807 3.567 2.070 4.124 -4.795 0.023 4.795
Bus680 4.16 3.962 -14.820 15.340 0.476 -0.014 0.476 13.036 3.632 13.532 -13.154 -3.628 13.645
Bus685 4.16 4.252 -8.781 9.756 0.390 -0.015 0.390 7.759 3.871 8.671 -7.855 -3.866 8.755
Bus688 0.22 1.061 -1.252 1.641 1.085 -1.262 1.664 1.084 0.919 1.422 -1.639 -0.283 1.663
Bus690 4.16 1.306 -17.117 17.167 0.479 -0.012 0.479 15.140 1.288 15.195 -15.258 -1.284 15.312
Bus693 4.16 1.336 -17.043 17.095 0.479 -0.012 0.479 15.073 1.314 15.130 -15.191 -1.310 15.247
Bus695 0.48 3.365 -15.635 15.993 0.000 0.000 0.000 13.566 2.937 13.881 13.566 2.937 13.881
Bus696 0.22 1.761 -3.248 3.694 1.924 -3.449 3.949 2.819 1.535 3.210 -3.861 0.298 3.873
Bus697 0.48 4.809 -19.894 20.467 6.542 -20.835 21.837 17.814 4.284 18.322 -21.619 5.872 22.402
Bus698 4.16 1.367 -16.969 17.024 0.479 -0.012 0.479 15.005 1.340 15.064 -15.122 -1.336 15.181
Bus699 2.40 1.738 -9.050 9.216 0.000 0.000 0.000 7.960 1.556 8.111 7.960 1.556 8.111
Bus700 2.40 0.594 -2.976 3.035 0.751 -3.957 4.028 2.710 0.540 2.763 2.188 3.083 3.781
Bus701 0.22 1.350 -2.730 3.046 1.435 -2.853 3.194 2.370 1.174 2.645 -3.127 0.314 3.143
Bus705 0.22 1.092 -1.270 1.675 1.106 -1.274 1.687 1.099 0.946 1.451 -1.659 -0.307 1.687
Bus706 0.22 1.424 -2.515 2.890 1.462 -2.545 2.935 2.178 1.234 2.503 -2.928 0.054 2.929
Bus708 0.48 2.821 -21.620 21.803 0.000 0.000 0.000 19.122 2.600 19.297 19.122 2.600 19.297
Bus709 0.48 3.845 -15.705 16.169 0.000 0.000 0.000 13.644 3.362 14.052 13.644 3.362 14.052
Bus710 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus711 0.22 1.164 -2.104 2.404 1.220 -2.155 2.477 1.824 1.012 2.086 -2.459 0.091 2.461
Bus712 0.48 2.822 -21.610 21.794 0.000 0.000 0.000 19.097 2.608 19.274 19.097 2.608 19.274
Bus713 13.80 0.329 -5.579 5.589 0.777 -0.104 0.783 4.847 0.299 4.856 -5.044 -0.285 5.052
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 36
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus715 2.40 2.254 -13.832 14.014 0.000 0.000 0.000 12.154 2.070 12.329 12.154 2.070 12.329
Bus717 2.40 1.992 -12.431 12.590 0.000 0.000 0.000 10.971 1.845 11.125 10.971 1.845 11.125
Bus718 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus719 13.80 0.110 -0.346 0.363 0.000 0.000 0.000 0.299 0.095 0.314 0.299 0.095 0.314
Bus723 0.48 2.866 -21.730 21.918 0.000 0.000 0.000 19.199 2.663 19.382 19.199 2.663 19.382
Bus725 0.22 2.087 -4.010 4.520 2.369 -4.550 5.130 3.472 1.807 3.914 -4.842 0.824 4.912
Bus726 0.48 2.838 -21.463 21.650 0.000 0.000 0.000 18.869 2.618 19.050 18.869 2.618 19.050
Bus727 0.22 2.077 -3.721 4.261 2.152 -3.782 4.352 3.222 1.799 3.691 -4.337 0.123 4.339
Bus728 2.40 5.282 -6.324 8.240 0.000 0.000 0.000 5.581 4.656 7.268 5.581 4.656 7.268
Bus730 2.40 5.287 -6.311 8.233 0.000 0.000 0.000 5.558 4.661 7.254 5.558 4.661 7.254
Bus731 0.22 2.632 -4.639 5.334 2.702 -4.697 5.419 4.017 2.280 4.619 -5.404 0.099 5.405
Bus733 0.22 2.522 -4.437 5.103 2.586 -4.490 5.181 3.842 2.184 4.420 -5.168 0.088 5.169
Bus734 2.40 5.652 -8.974 10.606 0.000 0.000 0.000 7.889 4.988 9.334 7.889 4.988 9.334
Bus735 0.22 2.643 -4.660 5.358 2.714 -4.719 5.444 4.036 2.290 4.640 -5.429 0.100 5.430
Bus738 0.48 2.857 -21.561 21.750 0.000 0.000 0.000 18.974 2.638 19.156 18.974 2.638 19.156
Bus739 2.40 5.661 -8.956 10.595 0.000 0.000 0.000 7.858 4.999 9.313 7.858 4.999 9.313
Bus740 0.48 2.821 -21.352 21.538 0.000 0.000 0.000 18.741 2.572 18.917 18.741 2.572 18.917
Bus741 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus742 34.50 0.046 -0.269 0.273 0.000 0.000 0.000 0.233 0.040 0.236 0.233 0.040 0.236
Bus743 0.48 3.006 -9.368 9.838 0.000 0.000 0.000 8.111 2.603 8.519 8.111 2.603 8.519
Bus744 0.48 3.191 -9.957 10.456 0.000 0.000 0.000 8.627 2.771 9.061 8.627 2.771 9.061
Bus745 13.80 1.236 -14.747 14.798 0.331 -0.979 1.034 12.220 1.169 12.276 -12.316 -0.904 12.349
Bus748 2.40 1.686 -9.053 9.209 0.000 0.000 0.000 7.802 1.459 7.937 7.802 1.459 7.937
Bus749 2.40 1.708 -9.016 9.177 0.000 0.000 0.000 7.922 1.513 8.065 7.922 1.513 8.065
Bus750 0.22 1.023 -1.206 1.581 1.044 -1.214 1.601 1.045 0.886 1.370 -1.577 -0.276 1.601
Bus751 13.80 3.353 -6.357 7.187 0.330 -0.884 0.944 5.401 2.826 6.095 5.314 3.069 6.137
Bus752 4.16 0.478 -2.338 2.386 0.473 -2.406 2.452 2.020 0.413 2.062 1.788 1.657 2.438
Bus754 0.22 1.761 -3.248 3.694 1.924 -3.449 3.949 2.819 1.535 3.210 -3.861 0.298 3.873
Bus755 4.16 1.441 -14.709 14.779 0.478 -0.015 0.479 13.050 1.337 13.119 -13.167 -1.333 13.235
Bus756 0.22 1.062 -1.253 1.643 1.087 -1.263 1.666 1.085 0.921 1.424 -1.640 -0.285 1.664
Bus757 4.16 1.411 -14.106 14.176 0.478 -0.015 0.478 12.557 1.380 12.632 -12.674 -1.375 12.748
Bus758 4.16 2.006 -3.853 4.344 1.969 -4.222 4.659 3.326 1.728 3.749 2.377 4.070 4.713
Bus759 0.22 3.365 -4.432 5.565 4.084 -4.871 6.357 3.838 2.916 4.820 -6.385 -0.243 6.389
Bus760 2.40 3.172 -8.714 9.274 0.000 0.000 0.000 7.550 2.756 8.037 7.550 2.756 8.037
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 37
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus761 2.40 4.160 -10.652 11.435 0.000 0.000 0.000 9.180 3.590 9.857 9.180 3.590 9.857
Bus762 0.48 0.962 -4.387 4.491 0.989 -4.551 4.657 3.805 0.835 3.896 3.297 3.191 4.588
Bus764 13.80 3.865 -12.783 13.354 0.331 -0.979 1.033 10.653 3.244 11.136 -10.748 -2.981 11.153
Bus767 0.22 2.876 -10.760 11.137 3.197 -12.505 12.907 9.338 2.508 9.669 7.571 9.922 12.480
Bus769 0.22 1.062 -1.253 1.643 1.087 -1.263 1.666 1.085 0.921 1.424 -1.640 -0.285 1.664
Bus770 0.48 1.158 -2.223 2.506 1.184 -2.273 2.563 1.925 1.002 2.170 -2.531 0.161 2.536
Bus774 0.48 1.894 -7.401 7.640 0.000 0.000 0.000 6.412 1.644 6.620 6.412 1.644 6.620
Bus775 0.48 2.789 -21.095 21.279 0.000 0.000 0.000 18.352 2.460 18.516 18.352 2.460 18.516
Bus776 0.22 0.941 -1.664 1.912 0.985 -1.716 1.979 1.441 0.815 1.656 -1.957 0.071 1.958
Bus777 0.48 2.798 -21.142 21.326 0.000 0.000 0.000 18.441 2.498 18.609 18.441 2.498 18.609
Bus778 13.80 0.109 -0.344 0.361 0.000 0.000 0.000 0.297 0.095 0.312 0.297 0.095 0.312
Bus779 0.22 0.948 -1.672 1.922 0.989 -1.722 1.986 1.448 0.821 1.664 -1.965 0.067 1.966
Bus780 4.16 1.981 -4.082 4.538 1.955 -4.988 5.357 3.523 1.706 3.915 2.681 4.863 5.553
Bus781 13.80 0.110 -0.345 0.362 0.000 0.000 0.000 0.298 0.095 0.313 0.298 0.095 0.313
Bus782 0.22 0.673 -0.817 1.058 0.699 -0.830 1.085 0.708 0.583 0.917 -1.071 -0.161 1.083
Bus784 13.80 0.110 -0.344 0.362 0.000 0.000 0.000 0.298 0.095 0.313 0.298 0.095 0.313
Bus785 2.40 2.443 -8.855 9.186 0.000 0.000 0.000 7.755 2.163 8.051 7.755 2.163 8.051
Bus787 13.80 0.362 -1.124 1.181 0.209 -0.634 0.667 1.000 0.322 1.050 -1.067 -0.108 1.073
Bus788 13.80 1.823 -22.015 22.090 1.565 -0.146 1.572 20.277 2.015 20.377 -20.648 -1.972 20.742
Bus790 13.80 1.687 -17.359 17.441 0.333 -0.990 1.045 14.365 1.522 14.445 -14.461 -1.256 14.516
Bus793 13.80 1.386 -16.596 16.654 0.335 -0.986 1.042 13.883 1.333 13.947 -13.977 -1.069 14.018
Bus794 0.22 1.793 -3.117 3.596 1.825 -3.143 3.634 2.699 1.553 3.114 -3.628 0.032 3.628
Bus795 13.80 1.266 -16.014 16.064 0.336 -0.987 1.043 14.298 1.466 14.373 -14.374 -1.213 14.425
Bus797 2.40 2.283 -0.640 2.371 0.000 0.000 0.000 0.581 1.997 2.080 0.581 1.997 2.080
Bus798 4.16 2.166 -13.928 14.095 0.477 -0.016 0.477 12.364 1.968 12.520 -12.481 -1.964 12.635
Bus799 4.16 1.440 -14.711 14.781 0.478 -0.015 0.479 13.053 1.336 13.122 -13.171 -1.332 13.238
Bus800 2.40 4.723 -6.239 7.825 0.000 0.000 0.000 5.388 4.074 6.755 5.388 4.074 6.755
Bus801 0.48 1.522 -7.259 7.417 0.000 0.000 0.000 6.282 1.318 6.419 6.282 1.318 6.419
Bus802 4.16 1.437 -14.729 14.799 0.478 -0.015 0.479 13.069 1.333 13.137 -13.186 -1.329 13.253
Bus804 4.16 3.174 -12.726 13.116 0.475 -0.016 0.475 11.281 2.946 11.660 -11.398 -2.941 11.772
Bus806 4.16 1.643 -13.528 13.628 0.478 -0.016 0.478 12.028 1.580 12.131 -12.145 -1.575 12.247
Bus807 4.16 3.012 -12.308 12.672 0.475 -0.017 0.475 10.844 2.763 11.190 -10.962 -2.758 11.303
Bus809 13.80 1.734 -17.339 17.426 0.328 -1.015 1.067 14.298 1.600 14.387 -14.393 -1.326 14.454
Bus810 13.80 1.734 -17.339 17.426 0.330 -1.008 1.060 14.298 1.600 14.387 -14.394 -1.328 14.455
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 38
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus811 4.16 3.175 -12.725 13.115 0.475 -0.016 0.475 11.280 2.948 11.659 -11.397 -2.943 11.770
Bus812 4.16 3.191 -12.710 13.104 0.475 -0.016 0.475 11.256 2.970 11.641 -11.373 -2.965 11.753
Bus814 4.16 1.409 -14.114 14.184 0.478 -0.015 0.478 12.568 1.378 12.643 -12.684 -1.373 12.759
Bus815 4.16 1.408 -14.123 14.193 0.478 -0.015 0.478 12.572 1.377 12.647 -12.689 -1.372 12.763
Bus816 0.48 2.945 -21.690 21.889 0.000 0.000 0.000 19.441 2.918 19.659 19.441 2.918 19.659
Bus817 0.48 2.793 -20.778 20.964 0.000 0.000 0.000 18.177 2.515 18.350 18.177 2.515 18.350
Bus818 0.48 3.594 -23.149 23.427 0.000 0.000 0.000 20.176 3.182 20.425 20.176 3.182 20.425
Bus819 0.48 3.579 -23.028 23.304 0.000 0.000 0.000 20.093 3.191 20.345 20.093 3.191 20.345
Bus820 13.80 2.052 -21.432 21.530 1.563 -0.149 1.570 19.687 2.226 19.812 -20.059 -2.182 20.177
Bus821 13.80 1.723 -17.849 17.932 1.534 -0.240 1.553 15.883 1.882 15.994 -16.264 -1.823 16.366
Bus822 4.16 1.367 -13.751 13.819 0.478 -0.016 0.478 12.125 1.274 12.191 -12.243 -1.271 12.308
Bus823 4.16 1.350 -13.595 13.662 0.478 -0.016 0.478 12.021 1.294 12.090 -12.138 -1.290 12.207
Bus824 4.16 2.936 -12.383 12.726 0.475 -0.017 0.475 10.918 2.686 11.244 -11.036 -2.682 11.357
Bus826 4.16 1.368 -13.749 13.817 0.478 -0.016 0.478 12.121 1.275 12.188 -12.239 -1.271 12.305
Bus827 4.16 1.365 -13.757 13.824 0.478 -0.016 0.478 12.132 1.272 12.198 -12.250 -1.268 12.315
Bus828 4.16 1.470 -13.703 13.782 0.478 -0.016 0.478 12.079 1.367 12.156 -12.197 -1.363 12.273
Bus829 4.16 1.469 -13.705 13.784 0.478 -0.016 0.478 12.082 1.365 12.159 -12.200 -1.361 12.276
Bus830 2.40 1.527 -15.773 15.847 0.000 0.000 0.000 14.137 1.519 14.218 14.137 1.519 14.218
Bus831 4.16 1.450 -13.550 13.627 0.478 -0.016 0.478 11.978 1.384 12.057 -12.095 -1.379 12.174
Bus832 4.16 1.451 -13.548 13.625 0.478 -0.016 0.478 11.975 1.385 12.054 -12.092 -1.380 12.171
Bus833 4.16 1.349 -13.598 13.665 0.478 -0.016 0.478 12.025 1.293 12.094 -12.143 -1.289 12.211
Bus834 4.16 1.351 -13.592 13.659 0.478 -0.016 0.478 12.016 1.295 12.086 -12.134 -1.291 12.203
Bus835 0.48 2.846 -21.375 21.564 0.000 0.000 0.000 19.083 2.704 19.273 19.083 2.704 19.273
Bus836 0.48 2.825 -21.018 21.207 0.000 0.000 0.000 18.644 2.694 18.838 18.644 2.694 18.838
Bus837 0.48 2.711 -20.263 20.443 0.000 0.000 0.000 17.600 2.374 17.759 17.600 2.374 17.759
Bus838 0.48 2.704 -20.224 20.404 0.000 0.000 0.000 17.574 2.379 17.734 17.574 2.379 17.734
Bus839 0.48 3.191 -13.677 14.044 0.000 0.000 0.000 11.982 2.831 12.312 11.982 2.831 12.312
Bus840 0.48 3.179 -13.624 13.990 0.000 0.000 0.000 11.948 2.839 12.281 11.948 2.839 12.281
Bus841 0.48 2.761 -20.460 20.645 0.000 0.000 0.000 17.780 2.428 17.945 17.780 2.428 17.945
Bus842 0.48 2.754 -20.388 20.573 0.000 0.000 0.000 17.709 2.411 17.872 17.709 2.411 17.872
Bus844 4.16 1.882 -17.323 17.425 0.479 -0.012 0.479 15.521 1.843 15.630 -15.637 -1.838 15.745
Bus845 4.16 1.881 -17.328 17.429 0.479 -0.012 0.479 15.528 1.842 15.637 -15.644 -1.837 15.752
Bus846 4.16 1.880 -17.329 17.431 0.479 -0.012 0.479 15.530 1.842 15.639 -15.646 -1.837 15.754
Bus847 4.16 4.419 -15.136 15.768 0.475 -0.013 0.476 13.456 4.131 14.076 -13.573 -4.125 14.186
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 39
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus849 4.16 4.417 -15.138 15.769 0.475 -0.013 0.476 13.459 4.128 14.078 -13.576 -4.123 14.188
Bus850 4.16 4.418 -15.136 15.768 0.475 -0.013 0.476 13.457 4.130 14.076 -13.573 -4.125 14.186
Bus853 4.16 1.878 -17.334 17.435 0.479 -0.012 0.479 15.537 1.839 15.646 -15.653 -1.834 15.761
Bus854 4.16 1.817 -16.811 16.909 0.479 -0.012 0.479 14.900 1.753 15.002 -15.017 -1.749 15.119
Bus855 4.16 1.819 -16.806 16.904 0.479 -0.012 0.479 14.891 1.755 14.995 -15.009 -1.751 15.111
Bus856 4.16 1.818 -16.809 16.907 0.479 -0.012 0.479 14.896 1.754 14.999 -15.014 -1.750 15.115
Bus857 4.16 1.818 -16.807 16.905 0.479 -0.012 0.479 14.894 1.755 14.997 -15.011 -1.750 15.113
Bus859 4.16 4.225 -14.755 15.348 0.475 -0.013 0.476 13.002 3.885 13.570 -13.119 -3.880 13.681
Bus861 4.16 3.561 -13.855 14.305 0.475 -0.015 0.476 12.211 3.271 12.641 -12.328 -3.266 12.754
Bus863 0.48 3.027 -22.246 22.451 0.000 0.000 0.000 20.015 2.973 20.235 20.015 2.973 20.235
Bus864 0.48 2.939 -21.512 21.711 0.000 0.000 0.000 19.002 2.755 19.201 19.002 2.755 19.201
Bus865 0.48 2.976 -21.678 21.881 0.000 0.000 0.000 19.198 2.828 19.406 19.198 2.828 19.406
Bus866 0.48 2.871 -21.073 21.268 0.000 0.000 0.000 18.397 2.570 18.575 18.397 2.570 18.575
Bus867 0.48 2.924 -21.512 21.710 0.000 0.000 0.000 18.999 2.701 19.190 18.999 2.701 19.190
Bus868 0.48 2.883 -21.252 21.447 0.000 0.000 0.000 18.662 2.609 18.844 18.662 2.609 18.844
Bus869 0.48 2.864 -20.999 21.193 0.000 0.000 0.000 18.269 2.523 18.442 18.269 2.523 18.442
Bus870 0.48 2.847 -20.907 21.100 0.000 0.000 0.000 18.164 2.501 18.335 18.164 2.501 18.335
Bus872 4.16 4.404 -14.557 15.208 0.475 -0.014 0.475 12.955 4.086 13.584 -13.071 -4.081 13.694
Bus873 4.16 2.149 -16.633 16.771 0.478 -0.013 0.478 14.890 2.075 15.034 -15.006 -2.069 15.148
Bus874 13.80 1.287 -23.295 23.330 1.571 -0.137 1.577 21.490 1.566 21.547 -21.861 -1.524 21.914
Bus875 4.16 2.070 -16.158 16.290 0.478 -0.013 0.478 14.312 1.969 14.447 -14.430 -1.965 14.563
Bus877 4.16 4.216 -14.207 14.820 0.475 -0.014 0.475 12.538 3.849 13.115 -12.655 -3.845 13.226
Bus878 0.48 2.994 -21.657 21.863 0.000 0.000 0.000 19.173 2.749 19.369 19.173 2.749 19.369
Bus879 0.48 2.983 -21.617 21.822 0.000 0.000 0.000 19.091 2.723 19.284 19.091 2.723 19.284
Bus880 13.80 0.940 -17.611 17.636 1.566 -0.164 1.575 15.307 0.836 15.330 -15.701 -0.811 15.722
Bus881 13.80 0.712 -18.104 18.118 1.569 -0.160 1.577 15.944 0.729 15.961 -16.334 -0.700 16.349
Bus882 13.80 1.304 -23.186 23.222 1.571 -0.137 1.577 21.384 1.575 21.442 -21.756 -1.533 21.810
Bus883 13.80 1.142 -19.221 19.254 1.546 -0.229 1.563 17.152 1.405 17.209 -17.534 -1.348 17.586
Bus884 13.80 2.804 -11.957 12.281 0.328 -0.971 1.025 9.958 2.389 10.240 -10.052 -2.127 10.275
Bus885 2.40 1.962 -16.781 16.895 0.000 0.000 0.000 14.634 1.793 14.744 14.634 1.793 14.744
Bus886 2.40 4.153 -12.543 13.213 0.000 0.000 0.000 10.982 3.683 11.584 10.982 3.683 11.584
Bus887 0.48 3.520 -18.172 18.510 0.000 0.000 0.000 15.966 3.174 16.279 15.966 3.174 16.279
Bus888 0.48 3.458 -17.931 18.261 0.000 0.000 0.000 15.526 3.004 15.814 15.526 3.004 15.814
Bus889 2.40 3.972 -12.105 12.740 0.000 0.000 0.000 10.475 3.454 11.030 10.475 3.454 11.030
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 40
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus900 2.40 5.049 -8.683 10.044 0.000 0.000 0.000 7.562 4.366 8.732 7.562 4.366 8.732
Bus991 2.40 5.084 -8.608 9.997 0.000 0.000 0.000 7.446 4.408 8.653 7.446 4.408 8.653
Bus992 2.40 6.303 -7.957 10.151 0.000 0.000 0.000 7.015 5.505 8.917 7.015 5.505 8.917
Bus993 2.40 5.266 -8.869 10.314 0.000 0.000 0.000 7.769 4.626 9.042 7.769 4.626 9.042
Bus995 13.80 3.599 -13.725 14.189 0.331 -0.986 1.040 11.415 3.034 11.811 -11.510 -2.769 11.839
Bus996 2.40 4.071 -14.085 14.662 0.000 0.000 0.000 12.159 3.542 12.664 12.159 3.542 12.664
Bus997 13.80 2.400 -13.429 13.642 0.329 -0.983 1.037 11.968 2.400 12.207 -12.043 -2.147 12.233
Bus998 13.80 2.400 -13.429 13.642 0.329 -0.983 1.037 11.968 2.400 12.207 -12.043 -2.147 12.233
Bus999 13.80 2.818 -14.615 14.884 0.327 -0.993 1.046 12.185 2.409 12.420 -12.279 -2.143 12.464
Bus1000 13.80 2.818 -14.615 14.884 0.327 -0.993 1.046 12.185 2.409 12.420 -12.279 -2.143 12.464
Bus1001 13.80 2.558 -11.851 12.124 0.324 -0.961 1.015 9.990 2.225 10.235 -10.080 -1.967 10.271
Bus1002 4.16 1.107 -10.515 10.573 0.791 -0.055 0.793 9.186 1.011 9.242 -9.384 -1.003 9.438
Bus1003 4.16 1.789 -10.876 11.023 0.788 -0.053 0.789 9.691 1.688 9.837 -9.885 -1.676 10.026
Bus1004 0.48 2.880 -19.818 20.026 0.000 0.000 0.000 17.585 2.696 17.791 17.585 2.696 17.791
Bus1005 0.48 2.764 -19.007 19.207 0.000 0.000 0.000 16.490 2.417 16.666 16.490 2.417 16.666
Bus1006 4.16 1.620 -10.024 10.154 0.787 -0.057 0.789 8.751 1.458 8.871 -8.948 -1.449 9.065
Bus1009 4.16 2.102 -9.459 9.690 0.781 -0.060 0.783 8.264 1.865 8.472 -8.460 -1.855 8.661
Bus1010 4.16 1.958 -9.099 9.308 0.779 -0.063 0.781 7.943 1.746 8.133 -8.139 -1.737 8.322
Bus1011 0.48 3.124 -17.335 17.614 0.000 0.000 0.000 15.217 2.791 15.471 15.217 2.791 15.471
Bus1012 0.22 0.307 -0.352 0.467 0.309 -0.352 0.469 0.305 0.266 0.404 -0.460 -0.090 0.469
Bus1013 0.22 1.166 -2.071 2.377 1.208 -2.109 2.430 1.794 1.012 2.060 -2.418 0.061 2.418
Bus1014 0.22 1.166 -2.071 2.377 1.208 -2.109 2.430 1.794 1.012 2.060 -2.418 0.061 2.418
Bus1015 0.48 3.175 -17.403 17.691 0.000 0.000 0.000 15.158 2.791 15.412 15.158 2.791 15.412
Bus1016 4.16 2.170 -9.817 10.054 0.780 -0.059 0.782 8.738 2.016 8.968 -8.931 -2.003 9.153
Bus1017 4.16 1.958 -9.100 9.308 0.779 -0.063 0.781 7.944 1.747 8.133 -8.140 -1.737 8.323
Bus1018 0.48 3.115 -17.227 17.506 0.000 0.000 0.000 15.107 2.796 15.364 15.107 2.796 15.364
Bus1019 0.48 3.269 -18.228 18.518 0.000 0.000 0.000 16.330 3.067 16.616 16.330 3.067 16.616
Bus1020 4.16 2.161 -9.828 10.063 0.780 -0.059 0.782 8.754 2.006 8.981 -8.946 -1.993 9.166
Bus1021 4.16 3.171 -7.804 8.424 0.764 -0.065 0.767 6.785 2.802 7.341 -6.980 -2.791 7.517
Bus1022 0.48 3.707 -16.535 16.946 1.304 -2.363 2.699 14.340 3.234 14.700 -14.706 -2.603 14.934
Bus1023 0.48 3.736 -16.808 17.219 1.256 -2.263 2.588 14.810 3.370 15.188 -15.146 -2.772 15.398
Bus1024 4.16 3.522 -8.285 9.003 0.765 -0.061 0.768 7.302 3.213 7.978 -7.494 -3.200 8.149
Bus1025 4.16 2.361 -10.192 10.461 0.782 -0.056 0.784 9.063 2.188 9.323 -9.256 -2.176 9.508
Bus1026 4.16 2.404 -10.146 10.427 0.782 -0.056 0.784 9.018 2.231 9.290 -9.211 -2.219 9.475
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 41
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1027 4.16 2.384 -10.169 10.444 0.782 -0.056 0.784 9.033 2.217 9.301 -9.226 -2.204 9.486
Bus1028 4.16 1.200 -11.440 11.503 0.792 -0.050 0.794 10.211 1.159 10.276 -10.405 -1.147 10.468
Bus1029 13.80 2.751 -12.797 13.089 0.322 -0.979 1.030 10.731 2.346 10.984 -10.822 -2.084 11.021
Bus1030 4.16 1.016 -9.313 9.369 0.398 -0.014 0.398 8.105 0.904 8.156 -8.205 -0.902 8.254
Bus1031 0.48 3.608 -27.812 28.045 0.000 0.000 0.000 24.419 3.273 24.638 24.419 3.273 24.638
Bus1032 0.48 4.446 -31.921 32.229 0.000 0.000 0.000 27.681 3.922 27.958 27.681 3.922 27.958
Bus1033 4.16 1.936 -14.365 14.495 0.399 -0.010 0.399 12.298 1.696 12.415 -12.399 -1.695 12.515
Bus1036 13.80 2.836 -14.907 15.175 0.335 -0.971 1.028 12.380 2.429 12.616 -12.477 -2.168 12.664
Bus1037 4.16 1.245 -12.860 12.920 0.399 -0.011 0.399 11.254 1.139 11.312 -11.353 -1.136 11.410
Bus1038 0.22 1.937 -3.588 4.078 2.050 -3.690 4.222 3.107 1.677 3.531 -4.195 0.222 4.201
Bus1039 0.48 2.532 -18.042 18.218 0.000 0.000 0.000 15.592 2.196 15.746 15.592 2.196 15.746
Bus1040 0.22 1.959 -3.584 4.085 2.074 -3.692 4.234 3.110 1.705 3.546 -4.197 0.194 4.201
Bus1041 0.48 2.655 -18.998 19.183 0.000 0.000 0.000 16.831 2.461 17.010 16.831 2.461 17.010
Bus1042 4.16 1.663 -11.973 12.088 0.398 -0.013 0.398 10.476 1.499 10.583 -10.575 -1.497 10.680
Bus1044 4.16 4.875 -5.674 7.481 0.384 -0.018 0.384 4.976 4.259 6.550 -5.072 -4.256 6.621
Bus1045 4.16 1.448 -12.489 12.572 0.399 -0.012 0.399 10.934 1.310 11.013 -11.033 -1.308 11.111
Bus1049 4.16 1.147 -11.575 11.632 0.399 -0.012 0.399 9.912 1.014 9.964 -10.013 -1.013 10.065
Bus1050 13.80 2.216 -12.570 12.764 0.333 -0.951 1.008 10.443 1.931 10.620 -10.539 -1.674 10.672
Bus1051 13.80 2.614 -12.430 12.701 0.328 -0.975 1.029 10.320 2.246 10.562 -10.415 -1.982 10.602
Bus1052 2.40 1.914 -17.083 17.190 0.000 0.000 0.000 14.650 1.680 14.746 14.650 1.680 14.746
Bus1053 0.22 1.328 -2.375 2.721 1.395 -2.450 2.819 2.059 1.153 2.360 -2.789 0.110 2.792
Bus1054 2.40 5.500 -15.469 16.418 0.000 0.000 0.000 13.554 4.913 14.417 13.554 4.913 14.417
Bus1055 0.48 3.490 -12.973 13.435 0.000 0.000 0.000 11.259 3.038 11.662 11.259 3.038 11.662
Bus1056 0.48 3.519 -13.211 13.671 0.000 0.000 0.000 11.596 3.124 12.010 11.596 3.124 12.010
Bus1057 2.40 5.485 -15.486 16.429 0.000 0.000 0.000 13.582 4.895 14.438 13.582 4.895 14.438
Bus1059 2.40 2.679 -17.410 17.614 0.000 0.000 0.000 15.347 2.394 15.533 15.347 2.394 15.533
Bus1060 2.40 3.101 -17.112 17.390 0.000 0.000 0.000 15.067 2.775 15.321 15.067 2.775 15.321
Bus1061 2.40 2.015 -18.720 18.828 0.000 0.000 0.000 16.487 1.826 16.588 16.487 1.826 16.588
Bus1062 2.40 1.886 -16.140 16.250 0.000 0.000 0.000 13.939 1.669 14.038 13.939 1.669 14.038
Bus1063 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
Bus1064 4.16 3.497 -11.975 12.476 0.474 -0.017 0.474 10.630 3.225 11.109 -10.747 -3.220 11.219
Bus1065 4.16 1.507 -13.781 13.863 0.478 -0.015 0.478 12.297 1.450 12.382 -12.414 -1.445 12.498
Bus1066 0.48 2.746 -20.269 20.454 0.000 0.000 0.000 17.640 2.419 17.805 17.640 2.419 17.805
Bus1067 0.48 3.070 -12.069 12.453 0.000 0.000 0.000 10.499 2.700 10.841 10.499 2.700 10.841
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 42
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1068 2.40 4.039 -10.051 10.832 0.000 0.000 0.000 8.839 3.693 9.580 8.839 3.693 9.580
Bus1069 0.48 2.892 -19.804 20.014 0.000 0.000 0.000 17.188 2.534 17.373 17.188 2.534 17.373
Bus1070 0.48 2.972 -20.419 20.634 0.000 0.000 0.000 18.049 2.741 18.256 18.049 2.741 18.256
Bus1071 4.16 2.602 -16.749 16.950 0.478 -0.013 0.478 14.990 2.457 15.190 -15.107 -2.452 15.304
Bus1073 4.16 2.157 -16.949 17.086 0.478 -0.013 0.478 15.186 2.052 15.324 -15.302 -2.047 15.438
Bus1074 2.40 4.257 -8.466 9.476 0.000 0.000 0.000 7.303 3.673 8.175 7.303 3.673 8.175
Bus1075 4.16 0.891 -9.779 9.820 0.477 -0.022 0.478 8.487 0.813 8.526 -8.607 -0.809 8.645
Bus1076 13.80 2.474 -16.725 16.907 1.522 -0.248 1.542 14.813 2.526 15.027 -15.194 -2.465 15.393
Bus1077 4.16 1.208 -13.563 13.616 0.478 -0.016 0.479 11.824 1.115 11.876 -11.943 -1.112 11.995
Bus1078 0.48 2.739 -20.208 20.393 0.000 0.000 0.000 17.539 2.391 17.702 17.539 2.391 17.702
Bus1079 4.16 1.489 -13.544 13.626 0.478 -0.016 0.478 11.884 1.356 11.961 -12.002 -1.352 12.078
Bus1080 4.16 0.898 -9.587 9.629 0.005 0.000 0.005 8.404 0.833 8.446 -8.406 -0.833 8.447
Bus1081 0.48 3.165 -13.384 13.753 0.000 0.000 0.000 11.606 2.754 11.928 11.606 2.754 11.928
Bus1082 4.16 1.587 -13.498 13.591 0.478 -0.016 0.478 11.842 1.443 11.929 -11.960 -1.440 12.047
Bus1083 13.80 2.979 -19.741 19.964 1.503 -0.172 1.513 17.978 3.080 18.240 -18.341 -3.032 18.590
Bus1084 4.16 1.235 -14.129 14.183 0.479 -0.015 0.479 12.406 1.134 12.458 -12.525 -1.131 12.575
Bus1088 4.16 3.117 -12.232 12.623 0.475 -0.017 0.475 10.715 2.785 11.071 -10.833 -2.782 11.185
Bus1089 4.16 1.441 -13.022 13.101 0.478 -0.017 0.478 11.347 1.315 11.423 -11.467 -1.312 11.541
Bus1091 4.16 2.968 -11.796 12.164 0.475 -0.018 0.475 10.258 2.642 10.593 -10.377 -2.639 10.707
Bus1094 4.16 0.986 -9.383 9.435 0.005 0.000 0.005 8.224 0.909 8.274 -8.225 -0.909 8.276
Bus1096 0.48 2.522 -19.098 19.264 0.000 0.000 0.000 16.770 2.283 16.924 16.770 2.283 16.924
Bus1098 4.16 1.442 -13.021 13.100 0.478 -0.017 0.478 11.346 1.315 11.422 -11.465 -1.312 11.540
Bus1099 0.48 2.493 -18.863 19.027 0.000 0.000 0.000 16.342 2.180 16.487 16.342 2.180 16.487
Bus1100 0.48 2.719 -20.069 20.253 0.000 0.000 0.000 17.399 2.374 17.560 17.399 2.374 17.560
Bus1101 4.16 0.983 -9.568 9.618 0.477 -0.022 0.477 8.305 0.891 8.352 -8.424 -0.888 8.471
Bus1102 4.16 1.489 -13.544 13.626 0.478 -0.016 0.478 11.884 1.356 11.961 -12.002 -1.352 12.078
Bus1103 0.48 2.739 -20.209 20.393 0.000 0.000 0.000 17.540 2.392 17.702 17.540 2.392 17.702
Bus1104 4.16 1.489 -13.544 13.626 0.478 -0.016 0.478 11.884 1.356 11.961 -12.002 -1.352 12.078
Bus1105 0.48 2.739 -20.208 20.393 0.000 0.000 0.000 17.539 2.391 17.702 17.539 2.391 17.702
Bus1107 4.16 1.442 -13.021 13.100 0.478 -0.017 0.478 11.346 1.315 11.422 -11.465 -1.312 11.540
Bus1108 4.16 1.532 -12.978 13.068 0.478 -0.017 0.478 11.308 1.395 11.393 -11.427 -1.391 11.511
Bus1109 0.48 2.538 -19.034 19.203 0.000 0.000 0.000 16.614 2.275 16.769 16.614 2.275 16.769
Bus1110 4.16 1.027 -9.464 9.520 0.477 -0.023 0.477 8.215 0.928 8.267 -8.334 -0.925 8.386
Bus1111 0.48 2.507 -18.721 18.888 0.000 0.000 0.000 16.256 2.200 16.404 16.256 2.200 16.404
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 43
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1112 4.16 1.030 -9.264 9.321 0.005 0.000 0.005 8.118 0.947 8.173 -8.119 -0.947 8.174
Bus1114 4.16 1.833 -8.685 8.877 0.005 0.000 0.005 7.602 1.649 7.779 -7.604 -1.649 7.780
Bus1115 0.48 2.739 -20.183 20.368 0.000 0.000 0.000 17.553 2.430 17.720 17.553 2.430 17.720
Bus1117 4.16 1.865 -8.846 9.041 0.473 -0.024 0.474 7.676 1.648 7.851 -7.796 -1.645 7.967
Bus1118 4.16 1.865 -8.846 9.041 0.473 -0.024 0.474 7.676 1.648 7.851 -7.796 -1.645 7.967
Bus1119 0.48 2.719 -20.069 20.253 0.000 0.000 0.000 17.399 2.374 17.560 17.399 2.374 17.560
Bus1121 0.48 3.144 -13.323 13.689 0.000 0.000 0.000 11.544 2.735 11.864 11.544 2.735 11.864
Bus1122 0.48 4.130 -11.816 12.517 0.000 0.000 0.000 10.280 3.632 10.902 10.280 3.632 10.902
Bus1123 0.48 4.065 -11.684 12.370 0.000 0.000 0.000 10.130 3.539 10.731 10.130 3.539 10.731
Bus1124 4.16 0.766 -7.883 7.921 0.476 -0.027 0.477 6.892 0.700 6.928 -7.011 -0.695 7.046
Bus1125 13.80 2.548 -16.529 16.724 1.520 -0.249 1.540 14.635 2.584 14.861 -15.015 -2.524 15.226
Bus1127 13.80 3.259 -18.993 19.270 1.495 -0.178 1.505 17.279 3.300 17.591 -17.640 -3.251 17.937
Bus1128 13.80 3.043 -19.444 19.680 1.498 -0.175 1.508 17.715 3.113 17.987 -18.076 -3.065 18.334
Bus1129 4.16 0.764 -7.944 7.981 0.476 -0.027 0.477 6.973 0.699 7.008 -7.092 -0.694 7.126
Bus1130 2.40 5.319 -9.983 11.312 0.000 0.000 0.000 8.698 4.734 9.902 8.698 4.734 9.902
Bus1131 2.40 1.378 -15.467 15.528 0.000 0.000 0.000 13.612 1.311 13.674 13.612 1.311 13.674
Bus1132 13.80 1.913 -15.689 15.805 0.331 -0.990 1.044 13.102 1.761 13.220 -13.195 -1.495 13.280
Bus1133 13.80 1.638 -14.100 14.195 0.328 -0.985 1.038 11.670 1.493 11.765 -11.765 -1.226 11.829
Bus1134 2.40 1.269 -13.718 13.776 0.000 0.000 0.000 12.112 1.221 12.174 12.112 1.221 12.174
Bus1135 2.40 4.624 -9.316 10.401 0.000 0.000 0.000 8.137 4.145 9.132 8.137 4.145 9.132
Bus1136 4.16 0.853 -7.734 7.781 0.475 -0.028 0.476 6.787 0.777 6.831 -6.905 -0.772 6.948
Bus1139 4.16 0.853 -7.734 7.781 0.475 -0.028 0.476 6.787 0.777 6.831 -6.905 -0.772 6.948
Bus1141 4.16 1.415 -7.273 7.409 0.472 -0.029 0.473 6.355 1.263 6.479 -6.473 -1.259 6.595
Bus1142 13.80 1.909 -15.696 15.811 0.331 -0.990 1.044 13.106 1.758 13.224 -13.199 -1.492 13.283
Bus1143 4.16 0.853 -7.675 7.722 0.475 -0.028 0.476 6.708 0.775 6.753 -6.827 -0.771 6.871
Bus1144 4.16 0.853 -7.676 7.723 0.475 -0.028 0.476 6.710 0.775 6.754 -6.828 -0.770 6.872
Bus1145 4.16 1.290 -7.058 7.175 0.472 -0.031 0.473 6.190 1.158 6.298 -6.308 -1.152 6.413
Bus1146 13.80 1.635 -14.107 14.201 0.328 -0.985 1.039 11.673 1.492 11.768 -11.768 -1.225 11.832
Bus1147 0.48 2.396 -18.046 18.205 0.000 0.000 0.000 15.764 2.145 15.909 15.764 2.145 15.909
Bus1148 0.48 2.400 -18.046 18.205 0.000 0.000 0.000 15.738 2.136 15.882 15.738 2.136 15.882
Bus1149 0.48 0.801 -18.012 18.030 0.000 0.000 0.000 15.640 0.713 15.656 15.640 0.713 15.656
Bus1150 0.48 0.819 -18.178 18.196 0.000 0.000 0.000 15.864 0.771 15.883 15.864 0.771 15.883
Bus1153 2.40 5.695 -8.890 10.557 0.000 0.000 0.000 7.754 5.046 9.252 7.754 5.046 9.252
Bus1157 13.80 1.770 -18.128 18.214 1.535 -0.237 1.554 16.134 1.935 16.250 -16.516 -1.876 16.622
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 44
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1158 4.16 0.884 -10.516 10.553 0.478 -0.020 0.478 9.477 0.874 9.518 -9.593 -0.868 9.632
Bus1159 0.48 2.519 -19.576 19.738 0.000 0.000 0.000 17.464 2.371 17.624 17.464 2.371 17.624
Bus1160 4.16 0.931 -10.223 10.265 0.477 -0.021 0.478 9.207 0.913 9.252 -9.322 -0.907 9.366
Bus1170 4.16 1.890 -8.778 8.980 0.473 -0.025 0.474 7.869 1.771 8.065 -7.984 -1.764 8.176
Bus1171 4.16 1.890 -8.778 8.980 0.473 -0.025 0.474 7.869 1.771 8.065 -7.984 -1.764 8.176
Bus1172 13.80 2.134 -21.643 21.748 1.546 -0.152 1.553 19.861 2.330 19.997 -20.229 -2.286 20.358
Bus1173 4.16 0.906 -10.742 10.780 0.478 -0.020 0.478 9.666 0.884 9.707 -9.782 -0.878 9.821
Bus1174 4.16 1.948 -8.931 9.141 0.473 -0.024 0.474 7.996 1.814 8.199 -8.111 -1.807 8.310
Bus1177 4.16 0.946 -10.522 10.564 0.478 -0.021 0.478 9.465 0.919 9.510 -9.581 -0.913 9.624
Bus1178 0.48 2.568 -20.022 20.186 0.000 0.000 0.000 18.021 2.473 18.190 18.021 2.473 18.190
Bus1179 0.48 2.976 -13.008 13.344 0.000 0.000 0.000 11.517 2.682 11.825 11.517 2.682 11.825
Bus1180 4.16 1.250 -9.490 9.572 0.476 -0.023 0.476 8.537 1.194 8.620 -8.652 -1.188 8.733
MZ-MV-01 2.40 3.565 -8.463 9.183 0.000 0.000 0.000 7.457 3.146 8.094 7.457 3.146 8.094
OLEODUCTO-CCM-2400V 2.40 0.651 -2.873 2.946 0.889 -3.647 3.754 2.624 0.585 2.688 -3.161 1.594 3.540
PARTE SUP SUPTCIA FUERZA 2.40 4.160 -10.652 11.435 0.000 0.000 0.000 9.180 3.590 9.857 9.180 3.590 9.857
PATOS-HV-CCM13.8A 13.80 3.830 -6.146 7.241 0.346 -0.763 0.838 5.334 3.439 6.346 5.248 3.639 6.386
PATOS-HV-CCM13.8B 13.80 3.622 -6.025 7.030 0.342 -0.760 0.833 5.136 3.048 5.972 5.046 3.256 6.005
PATOS-MV-CCM2.4A 2.40 1.808 -8.858 9.041 0.000 0.000 0.000 7.793 1.615 7.958 7.793 1.615 7.958
PATOS-MV-CCM2.4B1 2.40 1.776 -8.829 9.006 0.000 0.000 0.000 7.762 1.571 7.919 7.762 1.571 7.919
PRIM 19-MV-TR3 4.16 2.120 -6.806 7.129 0.389 -0.019 0.389 5.898 1.846 6.180 -5.996 -1.844 6.273
PRIM 19-MV-TR4 4.16 0.328 -1.033 1.084 0.000 0.000 0.000 0.899 0.286 0.943 0.899 0.286 0.943
PRIM CERO-CORTES-TRA2 0.48 8.524 -18.983 20.809 9.757 -21.157 23.299 16.578 7.531 18.209 -21.967 4.254 22.375
PRIM CERO-CORTES-TRA3 0.48 7.850 -20.851 22.280 9.207 -22.975 24.751 18.523 6.874 19.758 -23.678 5.230 24.249
PRIMARIO 19-TR1 13.80 2.629 -8.740 9.126 0.328 -0.886 0.944 7.420 2.231 7.748 -7.512 -1.994 7.772
PRIMARIO SE-19 TR-2 13.80 0.731 -4.145 4.209 0.705 -0.147 0.720 3.596 0.643 3.653 -3.780 -0.619 3.830
S. AUX. TD-480 V 0.48 3.006 -9.368 9.838 0.000 0.000 0.000 8.111 2.603 8.519 8.111 2.603 8.519
S.E-16-MV-TDA-2 13.80 3.468 -7.744 8.485 0.330 -0.912 0.970 6.548 2.914 7.168 6.463 3.164 7.195
S.E 25 TAB 13.8 BA 13.80 2.735 -12.930 13.216 0.323 -0.980 1.031 10.837 2.334 11.085 -10.929 -2.072 11.123
S.E 25 TAB 13.8 BB 13.80 2.544 -11.969 12.236 0.324 -0.963 1.016 10.087 2.214 10.327 -10.177 -1.957 10.363
S.E 25 TDA-1 BB 4.16 1.137 -10.464 10.525 0.791 -0.055 0.793 9.143 1.036 9.201 -9.341 -1.028 9.397
S.E 25 TDA-1 BB2 4.16 1.230 -11.388 11.454 0.792 -0.051 0.794 10.167 1.184 10.236 -10.361 -1.173 10.427
S.E-CH-LV-CCM-480 0.48 1.163 -2.116 2.415 1.201 -2.093 2.413 1.832 1.007 2.091 -2.451 0.027 2.452
S.E-U100 CCM-A-1 4160 BA 4.16 3.338 -8.749 9.364 0.769 -0.060 0.772 7.725 3.057 8.308 -7.917 -3.044 8.482
S.E-U100 CCM-A-2 4160 BB 4.16 2.996 -8.207 8.737 0.768 -0.064 0.771 7.140 2.652 7.617 -7.335 -2.641 7.797
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 45
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
S.E.CH-MV-CCMBA 4.16 1.998 -3.898 4.380 1.957 -4.287 4.713 3.365 1.721 3.779 2.426 4.108 4.771
SE GIS 115 kV BA 115.00 2.105 -16.186 16.322 1.940 -12.737 12.883 14.021 1.824 14.139 -14.894 3.421 15.282
SE GIS 115 kV BB 115.00 2.159 -16.744 16.882 1.976 -14.314 14.450 14.489 1.876 14.610 -15.393 4.383 16.005
SE-1 TD-1 2.40 1.403 -13.562 13.634 0.000 0.000 0.000 11.980 1.335 12.054 11.980 1.335 12.054
SE-1 TD-2 2.40 1.497 -15.274 15.347 0.000 0.000 0.000 13.447 1.412 13.521 13.447 1.412 13.521
SE-2-MV- BA 2.40 1.480 -16.624 16.690 0.000 0.000 0.000 14.301 1.311 14.361 14.301 1.311 14.361
SE-2-MV- BB 2.40 1.477 -16.441 16.508 0.000 0.000 0.000 14.328 1.346 14.391 14.328 1.346 14.391
SE-10 INT DE 2400V 2.40 1.235 -7.227 7.332 0.000 0.000 0.000 6.263 1.075 6.354 6.263 1.075 6.354
SE 13 2400 2.40 1.342 -14.880 14.941 0.000 0.000 0.000 12.964 1.215 13.021 12.964 1.215 13.021
SE-14-CCM-MV-TD-2 4.16 0.474 -2.345 2.392 0.468 -2.416 2.461 2.026 0.410 2.067 1.797 1.661 2.447
SE-19 BUS TR-ALUMBRADO 0.22 0.293 -0.345 0.453 0.299 -0.348 0.459 0.299 0.254 0.392 -0.452 -0.078 0.459
SE-19A 28-MV-28G31 BA 4.16 1.104 -8.797 8.866 0.397 -0.017 0.397 7.751 0.990 7.814 -7.849 -0.986 7.911
SE-19A 28-MV-28G31 BB 4.16 0.468 -2.112 2.163 0.000 0.000 0.000 1.945 0.421 1.990 1.945 0.421 1.990
SE-19A BUS TAB 480 0.48 7.226 -24.084 25.144 9.014 -30.485 31.790 21.660 6.401 22.586 -26.888 12.451 29.631
SE-21 CCM 480V BA 0.48 3.487 -11.466 11.985 0.000 0.000 0.000 10.081 3.095 10.545 10.081 3.095 10.545
SE-21 CCM 480V BB 0.48 3.458 -11.227 11.748 0.000 0.000 0.000 9.740 3.008 10.194 9.740 3.008 10.194
SE-171-HV-4221A 13.80 1.559 -16.030 16.105 0.331 -0.994 1.048 13.383 1.483 13.465 -13.476 -1.216 13.531
SE-171-HV-4221B 13.80 1.899 -17.031 17.137 0.330 -1.003 1.056 14.053 1.724 14.158 -14.149 -1.454 14.223
SE-ANIDES TABLERO 2.40 1.578 -9.588 9.717 0.000 0.000 0.000 8.311 1.376 8.424 8.311 1.376 8.424
SE-CAF BUS ALUM. 220 0.22 3.807 -16.172 16.614 3.872 -16.933 17.370 13.996 3.297 14.379 12.034 12.193 17.131
SE-CAF CCM-LV-480-2 0.48 5.759 -23.704 24.394 0.000 0.000 0.000 20.485 4.989 21.084 20.485 4.989 21.084
SE-CAF CCM-LV-BUS 440 0.48 5.759 -23.704 24.394 0.000 0.000 0.000 20.485 4.989 21.084 20.485 4.989 21.084
SE-CAF CCM-LV-VENT DB-25 0.48 5.759 -23.704 24.394 0.000 0.000 0.000 20.485 4.989 21.084 20.485 4.989 21.084
SE-CAF COMP. Y VENT. 0.48 5.759 -23.704 24.394 0.000 0.000 0.000 20.485 4.989 21.084 20.485 4.989 21.084
SE-CAF LV-DB-50 0.22 3.807 -16.172 16.614 3.872 -16.933 17.370 13.996 3.297 14.379 12.034 12.193 17.131
SE-CAF UBICADO DIB.-220-1 0.22 1.001 -1.163 1.534 1.015 -1.168 1.547 1.007 0.867 1.329 -1.521 -0.280 1.547
SE-CAF UBICADO DIB.-220-2 0.22 1.001 -1.163 1.534 1.015 -1.168 1.547 1.007 0.867 1.329 -1.521 -0.280 1.547
SE-CAF UBICADO DIBUJO 0.48 5.759 -23.704 24.394 0.000 0.000 0.000 20.485 4.989 21.084 20.485 4.989 21.084
SE-ED PER LV-CCM-480-1 0.48 2.900 -5.531 6.245 3.148 -4.770 5.715 4.788 2.510 5.406 -6.407 -0.456 6.424
SE-ED PER LV-CCM-480-2 0.48 2.900 -5.531 6.245 3.148 -4.770 5.715 4.788 2.510 5.406 -6.407 -0.456 6.424
SE-ED PER UBICADO DIB 0.22 2.211 -3.786 4.384 2.677 -4.571 5.297 3.278 1.915 3.796 -4.974 0.970 5.068
SE-LAB. CCM-BA_220V 0.22 2.633 -6.853 7.342 2.858 -5.989 6.636 5.934 2.280 6.356 -7.404 0.352 7.413
SE-LAB. CCM-BA-480 0.48 2.057 -6.086 6.424 0.000 0.000 0.000 5.272 1.785 5.566 5.272 1.785 5.566
SE-LAB. CCM-BB-220V 0.22 2.633 -6.853 7.342 2.858 -5.989 6.636 5.934 2.280 6.356 -7.404 0.352 7.413
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 46
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
SE-LAB. CCM-BB-480 0.48 2.057 -6.086 6.424 0.000 0.000 0.000 5.272 1.785 5.566 5.272 1.785 5.566
SE-U100 LP-1 220 0.22 0.919 -0.861 1.259 0.000 0.000 0.000 0.746 0.796 1.091 0.746 0.796 1.091
SE-U100 LPE-2 0.22 0.915 -0.861 1.256 0.000 0.000 0.000 0.745 0.793 1.088 0.745 0.793 1.088
SEC CERO-CORTES-TRA1 0.48 4.698 -29.081 29.458 6.821 -33.710 34.393 25.578 4.189 25.918 -30.275 15.122 33.842
SEC-2 CERO-CORTES-TRA1 0.48 8.524 -18.983 20.809 9.757 -21.157 23.299 16.578 7.531 18.209 -21.967 4.254 22.375
SEC-3 CERO-CORTES-TRA1 0.48 7.850 -20.851 22.280 9.207 -22.975 24.751 18.523 6.874 19.758 -23.678 5.230 24.249
SECCIONAD-124 13.80 1.506 -14.294 14.373 0.328 -0.987 1.040 11.823 1.393 11.905 -11.919 -1.126 11.972
SECCIONAD-0244 13.80 1.751 -15.929 16.025 0.331 -0.992 1.046 13.298 1.635 13.398 -13.391 -1.369 13.461
SECCIONAD-0246 13.80 1.757 -15.920 16.017 0.331 -0.992 1.046 13.290 1.640 13.391 -13.383 -1.374 13.454
SECCIONAD-0248 13.80 1.511 -14.285 14.365 0.328 -0.987 1.040 11.817 1.397 11.899 -11.912 -1.129 11.965
SECUNDARIO 19-TR1 4.16 1.852 -11.952 12.094 0.398 -0.011 0.399 10.351 1.617 10.477 -10.451 -1.615 10.575
SECUNDARIO 19-TR2 4.16 1.045 -7.977 8.045 0.398 -0.016 0.398 6.917 0.915 6.977 -7.017 -0.913 7.076
SGM-5176 BA 4.16 0.184 -1.105 1.120 0.369 -0.077 0.377 1.106 0.216 1.127 -1.189 -0.199 1.206
SGM-5176 BB 4.16 0.184 -1.105 1.120 0.369 -0.077 0.377 1.106 0.216 1.127 -1.189 -0.199 1.206
T.C LV-CCM-220 0.22 2.222 -1.246 2.547 2.771 -1.862 3.338 1.079 1.924 2.206 -0.674 3.533 3.596
T.C LV-CCM-480 0.48 1.521 -0.405 1.574 0.000 0.000 0.000 0.351 1.317 1.363 0.351 1.317 1.363
TA-A TD-102 0.22 1.350 -2.451 2.798 1.412 -2.503 2.873 2.124 1.172 2.426 -2.859 0.105 2.861
TAB SE-7 1/2 0.22 3.075 -2.923 4.243 2.325 -1.780 2.929 2.531 2.662 3.674 -3.452 -2.036 4.008
TAB-E-EDIFICIO 0.22 4.544 -9.856 10.853 4.348 -8.929 9.932 8.532 3.932 9.394 -10.612 0.148 10.613
TAB. EMERG. SITE 0.22 4.544 -9.856 10.853 4.348 -8.929 9.932 8.532 3.932 9.394 -10.612 0.148 10.613
TAB.LAB B1 2.40 4.271 -9.042 10.001 0.000 0.000 0.000 7.798 3.685 8.625 7.798 3.685 8.625
TAB.LAB B2 2.40 4.228 -8.993 9.937 0.000 0.000 0.000 7.797 3.701 8.631 7.797 3.701 8.631
TABLERO 04-CB-01 13.80 1.858 -14.209 14.330 0.330 -0.987 1.040 12.691 1.939 12.838 -12.766 -1.686 12.876
TABLERO 04-CB-02 13.80 1.725 -13.271 13.382 0.326 -0.981 1.033 11.019 1.547 11.127 -11.113 -1.282 11.187
TAR-CCM-1 0.48 4.015 -9.503 10.316 4.126 -9.652 10.497 8.239 3.496 8.950 -10.334 1.402 10.429
TAR-CCM-2 0.48 4.015 -9.503 10.317 4.127 -9.652 10.497 8.240 3.496 8.951 -10.335 1.402 10.429
TAR-CCM-220V 0.22 2.979 -8.753 9.246 3.321 -10.100 10.633 7.584 2.586 8.013 5.723 8.542 10.282
TBS-1 34.50 0.956 -12.980 13.015 0.134 -0.791 0.802 11.101 0.904 11.138 -11.137 -0.696 11.158
TBT-01 0.48 4.486 -32.903 33.208 6.613 -39.692 40.240 29.254 4.078 29.537 -33.640 19.407 38.837
TBT-01 CC 0.48 4.587 -21.354 21.841 5.920 -24.241 24.953 19.059 4.100 19.495 -22.492 9.019 24.233
TCC-TAB-DIS-INT 0.48 2.839 -8.109 8.592 0.000 0.000 0.000 7.017 2.457 7.435 7.017 2.457 7.435
TD-1 0.22 1.891 -3.602 4.068 2.075 -3.806 4.335 3.124 1.644 3.530 -4.258 0.369 4.274
TD-1 BA SE-1 0.48 3.731 -26.669 26.929 0.000 0.000 0.000 23.119 3.289 23.352 23.119 3.289 23.352
TD-1 BB SE-1 0.48 4.077 -29.239 29.522 0.000 0.000 0.000 25.353 3.624 25.611 25.353 3.624 25.611
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 47
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
TD-2 0.22 1.875 -3.568 4.030 2.056 -3.767 4.291 3.094 1.631 3.498 -4.216 0.359 4.231
TD-5 13.80 0.381 -5.455 5.468 0.766 -0.108 0.774 4.739 0.344 4.752 -4.934 -0.329 4.945
TD-6 13.80 0.385 -5.442 5.456 0.766 -0.108 0.773 4.728 0.347 4.741 -4.923 -0.332 4.934
TD-34.5 kV-SP 34.50 0.955 -12.967 13.002 0.134 -0.790 0.802 11.092 0.897 11.128 -11.128 -0.690 11.149
TD-BT-220 BA SE-7A 0.22 2.612 -6.173 6.703 3.047 -6.799 7.450 5.348 2.265 5.807 -7.155 1.511 7.313
TD-BT-220 BB SE-7A 0.22 2.612 -6.173 6.703 3.047 -6.799 7.450 5.348 2.265 5.807 -7.155 1.511 7.313
TD-BT-CB-1A 0.22 1.458 -2.607 2.987 1.538 -2.700 3.107 2.258 1.265 2.588 -3.069 0.135 3.072
TD-BT-CB-1B 0.22 1.459 -2.607 2.987 1.538 -2.700 3.107 2.258 1.264 2.588 -3.069 0.135 3.072
TD-MT-CB-1A 2.40 3.819 -11.084 11.723 0.000 0.000 0.000 9.780 3.519 10.394 9.780 3.519 10.394
TD-MT-CB-1B 2.40 3.843 -11.082 11.729 0.000 0.000 0.000 9.697 3.484 10.304 9.697 3.484 10.304
TD-MT-CB-CCM 2.40 3.185 -11.603 12.032 0.000 0.000 0.000 10.267 2.956 10.684 10.267 2.956 10.684
TD-SP BA 0.48 2.854 -7.991 8.485 0.000 0.000 0.000 6.919 2.472 7.347 6.919 2.472 7.347
TD-SP BB 0.48 3.019 -8.415 8.940 0.000 0.000 0.000 7.290 2.620 7.747 7.290 2.620 7.747
TDA-1 BUS A 2.40 1.623 -9.440 9.578 0.000 0.000 0.000 8.134 1.405 8.254 8.134 1.405 8.254
TDA-1 BUS B 2.40 1.649 -9.665 9.804 0.000 0.000 0.000 8.478 1.461 8.603 8.478 1.461 8.603
TDA-1 SE 17 2.40 0.908 -9.090 9.135 0.000 0.000 0.000 7.964 0.815 8.005 7.964 0.815 8.005
TDA-21 BA 2.40 2.015 -18.720 18.828 0.000 0.000 0.000 16.487 1.826 16.588 16.487 1.826 16.588
TDA-21 BB 2.40 2.015 -18.720 18.828 0.000 0.000 0.000 16.487 1.826 16.588 16.487 1.826 16.588
TDA-190-01A 4.16 3.330 -10.371 10.893 0.395 -0.015 0.395 9.039 2.899 9.493 -9.138 -2.897 9.586
TDA-190-01B 4.16 3.555 -10.664 11.241 0.395 -0.014 0.395 9.478 3.286 10.031 -9.575 -3.281 10.121
TDB-190-1A 0.22 1.612 -5.759 5.981 1.829 -6.454 6.709 5.009 1.409 5.203 -6.036 2.231 6.435
TDB-190-1B 0.22 1.612 -5.774 5.994 1.838 -6.482 6.737 5.037 1.418 5.233 -6.054 2.223 6.449
TDB-SP-SE-7 0.48 1.496 -2.974 3.329 0.000 0.000 0.000 2.576 1.297 2.884 2.576 1.297 2.884
TE-MT-CB-1 2.40 4.178 -10.123 10.951 0.000 0.000 0.000 8.961 3.825 9.743 8.961 3.825 9.743
TEM-CCM-1-480 0.48 4.819 -11.809 12.754 0.000 0.000 0.000 10.217 4.172 11.036 10.217 4.172 11.036
TEM-CCM-2-480 0.48 4.838 -11.826 12.777 0.000 0.000 0.000 10.229 4.185 11.052 10.229 4.185 11.052
TEM-CCM-3-220 0.22 1.833 -7.007 7.242 1.908 -7.687 7.920 6.066 1.587 6.270 5.078 5.844 7.742
TG-01 BA 0.22 1.767 -8.766 8.943 1.893 -9.229 9.421 7.593 1.533 7.746 -8.607 3.338 9.232
TG-01 BB 0.22 1.939 -9.624 9.817 2.079 -10.132 10.343 8.335 1.684 8.504 -9.448 3.665 10.134
TGD-1 SE BUNKER 0.48 2.551 -9.750 10.078 0.000 0.000 0.000 8.540 2.275 8.838 8.540 2.275 8.838
TGD-2 SE BUNKER 0.48 2.546 -9.698 10.027 0.000 0.000 0.000 8.490 2.266 8.787 8.490 2.266 8.787
TM-4.16-01 4.16 1.544 -6.786 6.959 0.470 -0.033 0.471 5.973 1.385 6.131 -6.090 -1.379 6.244
U30-HV-1121A 13.80 1.840 -21.998 22.075 1.566 -0.145 1.572 20.223 2.051 20.327 -20.595 -2.008 20.693
U30-HV-1121B 13.80 1.515 -18.381 18.443 1.538 -0.236 1.556 16.381 1.708 16.470 -16.762 -1.649 16.843
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 48
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
URA LV-CCM-220 0.22 2.777 -6.050 6.657 2.892 -5.404 6.130 5.238 2.404 5.763 -6.704 0.021 6.704
URA-COMB INT 2.40 3.252 -4.757 5.762 0.000 0.000 0.000 4.110 2.805 4.976 4.110 2.805 4.976
VINE SE-14 13.80 3.469 -7.824 8.559 0.330 -0.913 0.971 6.615 2.915 7.229 6.529 3.165 7.256
XXI-MV-CCM1A 2.40 5.408 -16.593 17.452 0.000 0.000 0.000 14.279 4.683 15.027 14.279 4.683 15.027
XXI-MV-CCM1B 2.40 5.523 -16.704 17.593 0.000 0.000 0.000 14.346 4.754 15.113 14.346 4.754 15.113

All fault currents are symmetrical momentary (1.5-4 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 49
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
BUS SE-19A CERO CORTES1 4.160 0.03771 0.26957 0.27219 0.03770 0.26017 0.26288 18.06356 0.26737 18.06554
BUS TABLERO 28G31 4.160 0.23596 1.07954 1.10503 0.19899 0.95586 0.97635
Bus TAR 2.400 0.05838 0.12411 0.13715 0.05887 0.12147 0.13498
BUS TBT 0.480 0.00317 0.01056 0.01102 0.00286 0.00982 0.01023 0.00139 0.00470 0.00490
BUS TR-28G21 PRIM 13.800 0.11121 0.60085 0.61105 0.12434 0.63904 0.65103 8.03714 21.40750 22.86650
BUS TR-28G21 SEC 4.160 0.02571 0.25804 0.25932 0.02633 0.24945 0.25084 18.01927 0.23387 18.02079
BUS TR-28G41 0.220 0.01860 0.03945 0.04361 0.01860 0.03942 0.04359 0.01605 0.02712 0.03151
Bus2 4.160 0.03003 0.21752 0.21959 0.03180 0.22191 0.22418 18.02590 0.18022 18.02680
Bus3 13.800 0.11986 0.52271 0.53627 0.13362 0.56442 0.58002 6.97468 20.61051 21.75866
Bus4 13.800 0.10152 0.57788 0.58673 0.11829 0.61071 0.62206 7.08332 20.79789 21.97102
Bus5 2.400 0.00835 0.08149 0.08192 0.00928 0.08018 0.08071
Bus6 0.220 0.00550 0.02059 0.02131 0.00555 0.02031 0.02105 0.00477 0.01646 0.01713
Bus7 2.400 0.01164 0.08631 0.08709 0.01227 0.08605 0.08692
Bus8 0.480 0.00251 0.01791 0.01808 0.00261 0.01769 0.01788
Bus9 0.480 0.00243 0.01732 0.01748 0.00268 0.01631 0.01653
Bus10 2.400 0.01169 0.08700 0.08778 0.01260 0.08555 0.08648
Bus12 2.400 0.05574 0.09681 0.11171 0.05559 0.09517 0.11022
Bus15 2.400 0.05574 0.09681 0.11171 0.05559 0.09517 0.11022
Bus19 2.400 0.05516 0.09604 0.11075 0.05386 0.09536 0.10952
Bus21 2.400 0.00826 0.08072 0.08115 0.00888 0.08050 0.08099
Bus22 13.800 0.09899 0.54618 0.55508 0.11431 0.58868 0.59967 6.93766 20.66610 21.79952
Bus23 2.400 0.01712 0.15157 0.15253 0.01749 0.14795 0.14898
Bus24 2.400 0.01508 0.15093 0.15168 0.01545 0.14731 0.14812
Bus25 13.800 0.17625 1.57639 1.58621 0.18240 1.56427 1.57487 30.49394 1.73149 30.54306
Bus26 2.400 0.00839 0.04953 0.05023 0.00886 0.05067 0.05144
Bus27 2.400 0.00825 0.05021 0.05089 0.00876 0.05091 0.05166
Bus32 13.800 0.05492 0.46767 0.47089 0.07058 0.51098 0.51583 6.96577 20.53949 21.68853
Bus33 4.160 0.02796 0.30454 0.30582 0.02938 0.30847 0.30987 15.02298 0.26204 15.02526
Bus34 4.160 0.02976 0.28556 0.28711 0.02993 0.27350 0.27513 15.03367 0.28610 15.03639
Bus35 0.480 0.00476 0.02108 0.02161 0.00476 0.02092 0.02145
Bus36 0.480 0.00482 0.02143 0.02197 0.00484 0.02148 0.02202
Bus37 4.160 0.03443 0.31219 0.31408 0.03585 0.31612 0.31815 15.03327 0.28150 15.03590
Bus39 4.160 0.04419 0.29150 0.29483 0.04187 0.27814 0.28127 15.06608 0.30794 15.06923
Bus40 4.160 0.02369 0.27843 0.27944 0.02401 0.26661 0.26769 15.02338 0.26664 15.02575
Bus41 13.800 0.05115 0.49782 0.50044 0.06820 0.53162 0.53598 7.09574 20.64418 21.82960
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 50
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus42 13.800 0.58427 0.93668 1.10397 0.59872 0.89657 1.07810 10.59519 24.17146 26.39162
Bus43 13.800 0.58626 0.97415 1.13695 0.59762 1.01856 1.18094 10.59519 24.17146 26.39162
bus45 13.800 0.56279 1.91795 1.99881 0.56967 1.90755 1.99079 32.25448 3.44293 32.43772
Bus48 2.400 0.05973 0.16457 0.17508 0.05647 0.15893 0.16866
Bus49 13.800 2.23798 1.98516 2.99155 2.24939 2.02961 3.02970 13.22148 26.73946 29.82962
Bus53 2.400 0.02873 0.18290 0.18514 0.02894 0.18259 0.18487
Bus58 13.800 0.25281 1.62910 1.64860 0.25969 1.61870 1.63940 31.76170 2.70918 31.87704
Bus66 2.400 0.07031 0.14789 0.16375 0.07052 0.14757 0.16356
Bus67 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus68 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus69 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus70 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus71 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus72 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus73 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus74 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus75 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus76 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus77 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus78 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus79 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus80 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus81 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus82 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus83 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus84 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus85 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus86 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus87 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus88 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus89 13.800 0.45426 0.92219 1.02800 0.46936 0.96722 1.07509 7.72261 21.57426 22.91479
Bus90 13.800 0.45556 0.92340 1.02966 0.47067 0.96843 1.07674 7.72468 21.57733 22.91837
Bus91 4.160 0.19706 0.98280 1.00236 0.19843 0.98689 1.00664 0.15522 0.89870 0.91201
Bus92 13.800 0.46047 0.92547 1.03370 0.47557 0.97051 1.08076 7.73247 21.58260 22.92596
Bus95 2.400 0.03560 0.15035 0.15451 0.03450 0.14578 0.14981
Bus96 2.400 0.02152 0.13683 0.13851 0.02153 0.13332 0.13505
Bus97 13.800 0.38375 0.85697 0.93896 0.39873 0.90193 0.98614 7.61064 21.40866 22.72120
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 51
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus98 2.400 0.02212 0.13998 0.14172 0.02258 0.14134 0.14313
Bus99 13.800 0.37740 0.85101 0.93094 0.39262 0.89611 0.97835 7.60029 21.39336 22.70331
Bus101 4.160 0.06250 0.42305 0.42765 0.06396 0.42720 0.43196
Bus102 13.800 0.31390 0.79190 0.85184 0.33008 0.83760 0.90030 7.49825 21.24245 22.52700
Bus104 2.400 0.01595 0.10007 0.10133 0.01644 0.10145 0.10277
Bus105 13.800 0.32041 0.79792 0.85985 0.33659 0.84363 0.90830 7.50860 21.25776 22.54487
Bus106 13.800 0.32033 0.79789 0.85979 0.33641 0.84353 0.90814 7.50860 21.25776 22.54487
Bus115 0.480 0.01113 0.05229 0.05346 0.01115 0.05235 0.05352
BUS 115KV 115.000 271.89230 1577.76000 1601.01600 267.13940 1180.37000 1210.22200 518.72680 2593.63400 2644.99800
Bus116 0.480 0.00878 0.02318 0.02479 0.00880 0.02324 0.02485
Bus117 13.800 0.03330 0.36500 0.36652 0.04158 0.32101 0.32369 15.07399 0.74301 15.09229
Bus118 13.800 0.04391 0.37641 0.37896 0.05206 0.33239 0.33645 15.09136 0.77260 15.11113
Bus119 13.800 0.03873 0.43589 0.43760 0.05454 0.40806 0.41169 15.09967 1.51154 15.17514
Bus120 13.800 0.04929 0.44724 0.44995 0.06493 0.41938 0.42437 15.11705 1.54113 15.19540
Bus122 4.160 0.00895 0.12642 0.12673 0.01013 0.11833 0.11876 15.00625 0.09671 15.00656
Bus123 4.160 0.00825 0.11815 0.11844 0.00902 0.10889 0.10926 15.00625 0.09671 15.00656
Bus124 4.160 0.01233 0.12404 0.12465 0.01303 0.11466 0.11540 15.01300 0.11233 15.01342
Bus125 4.160 0.01233 0.12404 0.12465 0.01303 0.11466 0.11540 15.01300 0.11233 15.01342
Bus127 4.160 0.01232 0.12403 0.12464 0.01301 0.11463 0.11536 15.01300 0.11233 15.01342
Bus129 4.160 0.01305 0.13233 0.13298 0.01415 0.12411 0.12491 15.01300 0.11233 15.01342
Bus130 4.160 0.01304 0.13232 0.13296 0.01414 0.12409 0.12489 15.01300 0.11233 15.01342
Bus131 4.160 0.01306 0.13235 0.13299 0.01416 0.12415 0.12495 15.01300 0.11233 15.01342
Bus134 13.800 0.25141 0.73099 0.77302 0.26492 0.76034 0.80517 9.01418 22.43895 24.18185
Bus135 4.160 0.03804 0.14352 0.14847 0.03781 0.13504 0.14023 15.05760 0.14365 15.05829
Bus136 4.160 0.04018 0.13631 0.14211 0.04065 0.12677 0.13312 15.05760 0.14365 15.05829
Bus137 2.400 0.01915 0.09541 0.09732 0.01963 0.09280 0.09485
Bus138 4.160 0.04017 0.13630 0.14210 0.04063 0.12676 0.13311 15.05760 0.14365 15.05829
Bus139 4.160 0.04011 0.13628 0.14206 0.04050 0.12670 0.13301 15.05760 0.14365 15.05829
BUS 140-ALUMBRADO TR-1 0.220 0.01548 0.03142 0.03503 0.01548 0.03126 0.03488 0.01491 0.02862 0.03227
BUS 140-ALUMBRADO TR-2 0.220 0.01549 0.03153 0.03513 0.01549 0.03127 0.03489 0.01491 0.02862 0.03227
BUS 140-TR1 SEC 2.400 0.00610 0.06369 0.06398 0.00681 0.06065 0.06103
BUS 140-TR3 SEC 2.400 0.00646 0.06736 0.06767 0.00716 0.06670 0.06709
BUS 140-TR-3731B 0.480 0.00633 0.01923 0.02024 0.00631 0.01795 0.01903
Bus141 4.160 0.03900 0.13587 0.14135 0.03916 0.12627 0.13220 15.05760 0.14365 15.05829
Bus142 4.160 0.03814 0.13554 0.14081 0.03797 0.12582 0.13142 15.05760 0.14365 15.05829
Bus143 4.160 0.02680 0.13409 0.13674 0.02687 0.12427 0.12714 15.03865 0.14060 15.03930
Bus146 4.160 0.03964 0.14413 0.14948 0.04015 0.13568 0.14150 15.05760 0.14365 15.05829
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 52
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus147 4.160 0.04073 0.14454 0.15017 0.04136 0.13606 0.14221 15.05760 0.14365 15.05829
Bus148 4.160 0.04078 0.14456 0.15020 0.04147 0.13611 0.14228 15.05760 0.14365 15.05829
Bus150 4.160 0.04090 0.14461 0.15028 0.04175 0.13623 0.14248 15.05760 0.14365 15.05829
Bus151 0.480 0.00173 0.01284 0.01296 0.00179 0.01254 0.01267
Bus152 0.480 0.00171 0.01265 0.01276 0.00176 0.01234 0.01246
Bus153 0.480 0.00172 0.01274 0.01286 0.00178 0.01239 0.01252
Bus154 0.480 0.00174 0.01287 0.01299 0.00175 0.01274 0.01286
Bus155 13.800 0.10466 0.40821 0.42142 0.11330 0.36470 0.38190 15.59819 1.21750 15.64563
Bus156 13.800 0.11015 0.47913 0.49163 0.12660 0.45210 0.46949 15.62387 1.98602 15.74959
Bus157 0.480 0.00173 0.01272 0.01284 0.00180 0.01223 0.01237
Bus158 4.160 0.01530 0.14235 0.14317 0.01696 0.13639 0.13745 15.01300 0.11233 15.01342
Bus159 4.160 0.01031 0.12925 0.12966 0.01133 0.11994 0.12047 15.00636 0.09844 15.00669
Bus160 13.800 0.04752 0.39063 0.39351 0.05578 0.34628 0.35074 15.51611 0.98700 15.54747
Bus161 4.160 0.01111 0.13631 0.13676 0.01283 0.13047 0.13110 15.00625 0.09671 15.00656
Bus162 13.800 0.05576 0.46390 0.46724 0.07182 0.43607 0.44194 15.12552 1.57965 15.20778
Bus163 2.400 0.03676 0.11335 0.11916 0.03606 0.10935 0.11514
Bus164 4.160 0.01445 0.13522 0.13599 0.01540 0.12577 0.12671 15.01311 0.11406 15.01354
Bus165 0.480 0.00173 0.01273 0.01285 0.00176 0.01232 0.01245
Bus166 4.160 0.01446 0.13523 0.13600 0.01541 0.12580 0.12674 15.01311 0.11406 15.01354
Bus167 0.480 0.00175 0.01283 0.01295 0.00179 0.01258 0.01270
Bus169 4.160 0.04785 0.14738 0.15496 0.04783 0.13769 0.14576 15.07013 0.14652 15.07084
Bus170 4.160 0.01532 0.14238 0.14321 0.01700 0.13648 0.13753 15.01300 0.11233 15.01342
Bus171 0.480 0.00177 0.01303 0.01315 0.00179 0.01295 0.01307 0.00157 0.01113 0.01124
Bus172 4.160 0.04987 0.14791 0.15609 0.05025 0.13823 0.14708 15.07013 0.14652 15.07084
Bus176 2.400 0.39091 0.30778 0.49753 0.39137 0.30914 0.49874
Bus177 13.800 0.12757 0.59895 0.61238 0.14674 0.56112 0.57999 7.78611 21.29676 22.67544
Bus179 4.160 0.03176 0.16454 0.16758 0.03280 0.15762 0.16099 15.04003 0.17052 15.04099
Bus180 0.480 0.00195 0.01311 0.01326 0.00198 0.01273 0.01288
Bus181 4.160 0.04085 0.17457 0.17929 0.04129 0.16708 0.17211 15.05521 0.19694 15.05650
Bus184 0.480 0.03899 0.07768 0.08692 0.03901 0.07763 0.08689
Bus185 2.400 0.01691 0.10290 0.10428 0.01750 0.10176 0.10325
Bus186 4.160 0.03087 0.15736 0.16036 0.03123 0.14692 0.15020 15.04014 0.17225 15.04112
Bus187 0.480 0.00193 0.01292 0.01306 0.00197 0.01237 0.01253
Bus188 4.160 0.06414 0.16965 0.18137 0.06290 0.15877 0.17077 15.09496 0.20399 15.09634
Bus189 0.480 0.00989 0.04333 0.04445 0.00994 0.04328 0.04441
Bus190 2.400 0.04309 0.12385 0.13113 0.04368 0.12270 0.13024
Bus193 0.480 0.00201 0.01305 0.01321 0.00202 0.01292 0.01308
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 53
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus194 4.160 0.03518 0.15782 0.16169 0.03604 0.14825 0.15257 15.04621 0.17165 15.04719
Bus195 4.160 0.03614 0.16506 0.16897 0.03781 0.15915 0.16358 15.04610 0.16992 15.04706
Bus196 0.480 0.00202 0.01315 0.01330 0.00205 0.01307 0.01323
Bus197 4.160 0.03614 0.16506 0.16897 0.03781 0.15915 0.16358 15.04610 0.16992 15.04706
Bus198 4.160 0.03516 0.15779 0.16166 0.03601 0.14819 0.15250 15.04621 0.17165 15.04719
Bus199 2.400 0.00863 0.08690 0.08733 0.00998 0.08287 0.08347
Bus200 13.800 0.09916 0.60393 0.61201 0.11759 0.65052 0.66106 7.52562 21.04208 22.34735
Bus201 0.480 0.00197 0.01285 0.01300 0.00200 0.01245 0.01260
Bus202 0.480 0.00202 0.01315 0.01330 0.00205 0.01307 0.01323
Bus203 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus204 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus205 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus207 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus208 0.220 0.01337 0.02345 0.02700 0.01337 0.02345 0.02700 0.01318 0.02227 0.02588
Bus209 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus210 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus211 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus213 13.800 0.32684 0.80392 0.86782 0.34292 0.84955 0.91615 7.51895 21.27306 22.56275
Bus214 13.800 0.08976 0.55447 0.56169 0.10822 0.51559 0.52682 7.43705 20.96985 22.24959
Bus215 0.480 0.00562 0.02064 0.02140 0.00567 0.02039 0.02117
Bus216 0.480 0.00563 0.02064 0.02139 0.00569 0.02048 0.02125
Bus217 13.800 0.06552 0.46311 0.46772 0.08173 0.43570 0.44330 15.14104 1.57720 15.22296
Bus218 4.160 0.01509 0.17245 0.17311 0.01683 0.16732 0.16817 15.00939 0.13350 15.00999
Bus219 0.220 0.02076 0.03711 0.04252 0.02077 0.03706 0.04248 0.01917 0.03240 0.03764
Bus220 13.800 0.05577 0.39074 0.39470 0.06366 0.34623 0.35203 15.50652 1.01141 15.53947
Bus221 4.160 0.01437 0.16580 0.16642 0.01613 0.15514 0.15598 15.00939 0.13350 15.00999
Bus223 0.480 0.00513 0.02056 0.02119 0.00511 0.01967 0.02032
Bus224 0.480 0.00496 0.02053 0.02112 0.00496 0.01973 0.02034
Bus225 0.480 0.00183 0.01352 0.01364 0.00185 0.01345 0.01357
Bus226 4.160 0.01957 0.17892 0.17999 0.02129 0.17373 0.17503 15.01659 0.15016 15.01734
Bus227 4.160 0.05486 0.19154 0.19924 0.05583 0.18597 0.19417 15.07361 0.18262 15.07472
Bus228 4.160 0.05452 0.19143 0.19904 0.05584 0.18607 0.19427 15.07361 0.18262 15.07472
Bus230 0.480 0.00183 0.01352 0.01364 0.00185 0.01345 0.01357
Bus231 0.480 0.00778 0.02769 0.02876 0.00786 0.02664 0.02777
Bus232 4.160 0.01957 0.17892 0.17999 0.02129 0.17373 0.17503 15.01659 0.15016 15.01734
Bus234 2.400 0.04899 0.11351 0.12364 0.04935 0.10640 0.11729
Bus235 0.480 0.00178 0.01321 0.01333 0.00183 0.01277 0.01290
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 54
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus236 4.160 0.01881 0.17220 0.17322 0.02049 0.16136 0.16265 15.01659 0.15016 15.01734
Bus237 4.160 0.03246 0.19296 0.19567 0.03418 0.18777 0.19086 15.03709 0.18583 15.03824
Bus238 4.160 0.05426 0.18489 0.19269 0.05542 0.17381 0.18243 15.07361 0.18262 15.07472
Bus239 2.400 0.02172 0.09280 0.09531 0.02306 0.08877 0.09172
Bus240 4.160 0.03152 0.18604 0.18869 0.03305 0.17489 0.17799 15.03709 0.18583 15.03824
Bus241 4.160 0.03246 0.19296 0.19567 0.03418 0.18777 0.19086 15.03709 0.18583 15.03824
Bus242 0.480 0.00196 0.01343 0.01357 0.00200 0.01303 0.01318
Bus243 4.160 0.03153 0.18606 0.18871 0.03307 0.17494 0.17804 15.03709 0.18583 15.03824
Bus244 0.480 0.00241 0.01471 0.01491 0.00247 0.01429 0.01450
Bus245 0.480 0.00237 0.01447 0.01466 0.00244 0.01379 0.01401
Bus246 0.220 0.00206 0.01001 0.01022 0.00207 0.00985 0.01006 0.00141 0.00663 0.00678
Bus247 0.220 0.00207 0.01007 0.01028 0.00208 0.00998 0.01019 0.00141 0.00663 0.00678
Bus248 2.400 0.02275 0.10105 0.10358 0.02324 0.09386 0.09669
Bus249 2.400 0.02312 0.10106 0.10368 0.02355 0.09555 0.09841
Bus251 2.400 0.03062 0.10783 0.11209 0.03064 0.10037 0.10494
Bus252 2.400 0.03100 0.10804 0.11240 0.03117 0.10066 0.10537
Bus253 2.400 0.03156 0.10836 0.11287 0.03169 0.10088 0.10574
Bus256 0.480 0.00194 0.01354 0.01368 0.00203 0.01326 0.01342
Bus258 4.160 0.02953 0.19329 0.19553 0.03123 0.18797 0.19055 15.03252 0.18702 15.03368
Bus262 0.480 0.00196 0.01371 0.01385 0.00199 0.01364 0.01378
Bus263 4.160 0.02955 0.19331 0.19555 0.03125 0.18803 0.19061 15.03252 0.18702 15.03368
Bus264 0.480 0.00192 0.01343 0.01357 0.00197 0.01303 0.01318
Bus265 4.160 0.02863 0.18638 0.18857 0.03016 0.17510 0.17768 15.03252 0.18702 15.03368
Bus267 4.160 0.06418 0.19911 0.20920 0.06521 0.18757 0.19858 15.08954 0.21948 15.09114
Bus268 2.400 0.03216 0.10852 0.11318 0.03251 0.10293 0.10794
Bus269 2.400 0.03215 0.10851 0.11317 0.03248 0.10291 0.10791
Bus270 4.160 0.03536 0.19610 0.19926 0.03685 0.18470 0.18833 15.04331 0.21201 15.04481
Bus272 0.480 0.00199 0.01347 0.01362 0.00207 0.01296 0.01312
Bus273 2.400 0.03207 0.10846 0.11311 0.03229 0.10279 0.10774
Bus275 2.400 0.03207 0.10846 0.11311 0.03229 0.10279 0.10774
Bus277 2.400 0.03142 0.10809 0.11257 0.03157 0.10245 0.10720
Bus278 2.400 0.04658 0.12090 0.12956 0.04686 0.11349 0.12278
Bus279 0.480 0.00333 0.01543 0.01579 0.00336 0.01490 0.01528
Bus280 0.480 0.00319 0.01490 0.01524 0.00323 0.01378 0.01416
Bus281 2.400 0.04630 0.12052 0.12911 0.04595 0.11413 0.12303
Bus282 4.160 0.00710 0.12661 0.12680 0.00850 0.11744 0.11775 15.00551 0.10230 15.00586
Bus283 2.400 0.04804 0.12196 0.13108 0.04856 0.11656 0.12627
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 55
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus284 0.480 0.00344 0.01565 0.01602 0.00346 0.01543 0.01581
Bus285 0.480 0.00173 0.01285 0.01296 0.00178 0.01271 0.01283
Bus286 4.160 0.01095 0.13309 0.13354 0.01230 0.12371 0.12432 15.01184 0.11990 15.01232
Bus287 0.480 0.00169 0.01273 0.01284 0.00173 0.01237 0.01249
Bus288 0.480 0.00332 0.01530 0.01566 0.00336 0.01465 0.01503
Bus289 4.160 0.01094 0.13308 0.13353 0.01228 0.12367 0.12428 15.01184 0.11990 15.01232
Bus290 2.400 0.04715 0.12161 0.13043 0.04732 0.11405 0.12348
Bus291 0.480 0.00171 0.01283 0.01294 0.00172 0.01270 0.01281
Bus292 4.160 0.01063 0.12711 0.12755 0.01141 0.11757 0.11812 15.01199 0.11730 15.01245
Bus293 4.160 0.00669 0.12142 0.12161 0.00752 0.11198 0.11223 15.00551 0.10230 15.00586
Bus294 4.160 0.01748 0.13352 0.13466 0.01780 0.12352 0.12480 15.02481 0.13650 15.02543
Bus295 13.800 0.06023 0.50977 0.51331 0.07739 0.54374 0.54922 7.01708 20.62335 21.78444
Bus296 4.160 0.01061 0.12707 0.12751 0.01137 0.11748 0.11802 15.01199 0.11730 15.01245
Bus297 0.480 0.00166 0.01240 0.01251 0.00176 0.01179 0.01193
Bus298 13.800 0.06513 0.53971 0.54362 0.08408 0.50128 0.50828 7.10566 20.69558 21.88144
Bus300 4.160 0.02149 0.13408 0.13579 0.02174 0.12416 0.12605 15.03143 0.13742 15.03206
Bus303 4.160 0.03813 0.13621 0.14145 0.03828 0.12638 0.13205 15.05653 0.14076 15.05719
Bus304 2.400 0.06584 0.13154 0.14709 0.06641 0.13037 0.14632
Bus306 4.160 0.03863 0.14224 0.14739 0.03957 0.13265 0.13842 15.05638 0.14337 15.05706
Bus308 4.160 0.03843 0.14218 0.14729 0.03912 0.13250 0.13815 15.05638 0.14337 15.05706
3-HV-0305 13.800 0.08661 0.55154 0.55830 0.10512 0.51272 0.52338 7.43187 20.96220 22.24065
3-HV-0306 13.800 0.09599 0.60099 0.60860 0.11450 0.64767 0.65772 7.52044 21.03443 22.33840
3-MV-BA01 2.400 0.00843 0.08703 0.08744 0.00961 0.08080 0.08137
3-MV-BB01 2.400 0.00863 0.08690 0.08733 0.00998 0.08287 0.08347
04-CCM-01 BA 4.160 0.01406 0.15113 0.15178 0.01602 0.15163 0.15247 18.00767 0.10133 18.00795
04-CCM-01 BB 4.160 0.01321 0.14315 0.14376 0.01521 0.13109 0.13197 18.00767 0.10133 18.00795
04-CCM-02 BA 0.480 0.00403 0.01749 0.01795 0.00405 0.01749 0.01796
04-CCM-02 BB 0.480 0.00404 0.01752 0.01798 0.00407 0.01736 0.01783
04-CCM-03 BA 0.480 0.00391 0.01695 0.01739 0.00391 0.01665 0.01710
04-CCM-03 BB 0.480 0.00373 0.01644 0.01685 0.00367 0.01549 0.01592
04-CCM-04 BA 0.480 0.00401 0.01740 0.01785 0.00405 0.01740 0.01786
04-CCM-04 BB 0.480 0.00381 0.01663 0.01706 0.00380 0.01606 0.01650
04-TDB-01 BA 0.220 0.00548 0.01625 0.01715 0.00549 0.01625 0.01716 0.00708 0.01416 0.01583
04-TDB-01 BB 0.220 0.00548 0.01626 0.01716 0.00549 0.01623 0.01713 0.00708 0.01416 0.01583
6-LV-SERV. PROPIOS 0.480 0.05540 0.08654 0.10275 0.05542 0.08649 0.10272
6-MV-2.4 kV 2.400 0.01040 0.09755 0.09811 0.01099 0.09641 0.09703
07-CCM-01 BA 4.160 0.01485 0.15199 0.15271 0.01681 0.15248 0.15340 18.00893 0.10353 18.00923
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 56
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
07-CCM-01 BB 4.160 0.01398 0.14399 0.14467 0.01596 0.13189 0.13286 18.00893 0.10353 18.00923
07-CCM-02 BA 0.480 0.00391 0.01699 0.01743 0.00393 0.01664 0.01710
07-CCM-02 BB 0.480 0.00388 0.01679 0.01724 0.00390 0.01630 0.01676
07-CCM-03 BA 0.480 0.00394 0.01710 0.01754 0.00393 0.01682 0.01727
07-CCM-03 BB 0.480 0.00393 0.01715 0.01759 0.00394 0.01668 0.01714
07-CCM-04 BA 0.480 0.00404 0.01754 0.01800 0.00408 0.01755 0.01802
07-CCM-04 BB 0.480 0.00390 0.01708 0.01752 0.00388 0.01641 0.01686
07-MV-BA01 2.400 0.01282 0.08841 0.08933 0.01329 0.08579 0.08682
07-MV-BB01 2.400 0.01282 0.08841 0.08933 0.01329 0.08579 0.08682
07-TDB-01 BA 0.220 0.00748 0.02063 0.02194 0.00749 0.02055 0.02187 0.00911 0.01864 0.02075
07-TDB-01 BB 0.220 0.00748 0.02058 0.02190 0.00748 0.02048 0.02180 0.00911 0.01864 0.02075
8-MJW-LV-CCM1 0.480 0.01595 0.05802 0.06017 0.01597 0.05807 0.06023
8-MJW-MV-BABB 2.400 0.02246 0.10542 0.10778 0.02295 0.10680 0.10924
8-MJW-MV-IEM 4.160 0.08347 0.43455 0.44250 0.08493 0.43870 0.44685
8-MJW-MV-SQ-D 4.160 0.08347 0.43455 0.44250 0.08493 0.43870 0.44685
10-BUS-2.4 2.400 0.03111 0.18550 0.18809 0.03133 0.18519 0.18782
10-CCM-2.4 KV 2.400 0.03183 0.18628 0.18898 0.03204 0.18597 0.18871
10-CCM-10 0.480 0.00576 0.02795 0.02854 0.00577 0.02794 0.02853
010-HV-2121A 13.800 0.03321 0.36592 0.36743 0.04174 0.32204 0.32473 15.29737 0.83908 15.32036
010-HV-2121B 13.800 0.03999 0.43787 0.43970 0.05625 0.41044 0.41427 15.10043 1.51356 15.17610
10-HV-CCM-13.8 13.800 0.55628 1.91192 1.99120 0.56316 1.90152 1.98316 32.24414 3.42763 32.42581
010-LV-2151A 0.480 0.00191 0.01322 0.01336 0.00197 0.01261 0.01276
010-LV-2151B 0.480 0.00194 0.01328 0.01342 0.00200 0.01268 0.01283
010-LV-2152A 0.480 0.00193 0.01296 0.01310 0.00202 0.01238 0.01254
010-LV-2152B 0.480 0.00202 0.01346 0.01361 0.00212 0.01299 0.01316
010-LV-2153A 0.480 0.00184 0.01301 0.01314 0.00194 0.01254 0.01269
010-LV-2153B 0.480 0.00188 0.01321 0.01334 0.00196 0.01281 0.01296
010-LV-2154A 0.480 0.00194 0.01345 0.01359 0.00197 0.01332 0.01346
010-LV-2154B 0.480 0.00191 0.01335 0.01348 0.00196 0.01313 0.01328
010-LV-2161A 0.220 0.00211 0.00962 0.00985 0.00212 0.00960 0.00983 0.00211 0.00702 0.00733
010-LV-2161B 0.220 0.00212 0.00963 0.00986 0.00214 0.00958 0.00982 0.00222 0.00716 0.00749
010-MV-2131A 4.160 0.00873 0.13092 0.13121 0.01020 0.12122 0.12165 15.00608 0.10499 15.00645
010-MV-2131B 4.160 0.00923 0.13717 0.13748 0.01115 0.13097 0.13145 15.00601 0.10361 15.00637
11-CCM-BUS1 2.400 0.01311 0.13244 0.13308 0.01284 0.11544 0.11615
11-CCM-BUS2 2.400 0.01319 0.13409 0.13473 0.01300 0.11563 0.11636
11-LV-BA01 0.480 0.00228 0.01313 0.01332 0.00248 0.01237 0.01261
11-LV-BB01 0.480 0.00225 0.01291 0.01310 0.00240 0.01222 0.01245
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 57
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
11-LV-CCM1 0.480 0.01285 0.01720 0.02147 0.01191 0.01606 0.01999
11-LV-CCM2 0.480 0.02394 0.01798 0.02994 0.02275 0.01733 0.02859
11-LV-CCM3 0.480 0.02348 0.01834 0.02979 0.02136 0.01740 0.02755
11-LV-CCM4 0.480 0.02408 0.01815 0.03016 0.02268 0.01735 0.02856
12-BARRAS2.4A 2.400 0.00952 0.08146 0.08201 0.01028 0.08011 0.08077
12-BARRAS2.4B 2.400 0.00990 0.08469 0.08527 0.01042 0.08506 0.08569
12-CCM-440 0.480 0.08984 0.12499 0.15393 0.08986 0.12500 0.15395 0.13393 0.13127 0.18754
13-HV-BA 13.800 0.06866 0.54323 0.54755 0.08640 0.50280 0.51017 7.03501 20.67058 21.83493
13-HV-BB 13.800 0.06722 0.49390 0.49845 0.08126 0.53380 0.53995 6.88935 20.53879 21.66345
15-LV-BA01-480 0.480 0.00151 0.01049 0.01059 0.00156 0.01014 0.01026 0.00123 0.00875 0.00883
15-LV-BA02-480 0.480 0.00473 0.02203 0.02253 0.00475 0.02206 0.02257
15-LV-BB01-480 0.480 0.00184 0.01274 0.01287 0.00188 0.01250 0.01264 0.00154 0.01095 0.01106
15-LV-BB02-220 0.220 0.00875 0.01951 0.02138 0.00875 0.01952 0.02139 0.00775 0.01488 0.01678
15-MV-BA01 2.400 0.00352 0.04506 0.04520 0.00408 0.04584 0.04602
15-MV-BB01 2.400 0.00364 0.04435 0.04450 0.00414 0.04553 0.04572
18 -MV-BA01 2.400 0.01361 0.14192 0.14257 0.01319 0.12800 0.12867
18-LV-220 0.220 0.00456 0.01734 0.01793 0.00458 0.01717 0.01777 0.00411 0.01419 0.01478
18-LV-480 BA 0.480 0.00204 0.01423 0.01437 0.00210 0.01349 0.01366
18-LV-480 BB 0.480 0.00266 0.01569 0.01591 0.00268 0.01408 0.01433
18-LV-TR5-EXT 0.220 0.00456 0.01734 0.01793 0.00458 0.01717 0.01777 0.00411 0.01419 0.01478
18-MV-BB01 2.400 0.01735 0.16684 0.16774 0.01720 0.15529 0.15624
19-HV-4160 BA1 4.160 0.61443 2.09773 2.18587 0.61387 2.07536 2.16424
19-HV-4160 BA2 4.160 0.34202 1.56888 1.60573 0.28383 1.37209 1.40114
19-HV-4160 BA3 4.160 0.03609 0.20813 0.21124 0.03629 0.20748 0.21063 18.11592 0.21780 18.11723
19-HV-4160 BB 4.160 0.04503 0.30750 0.31078 0.04565 0.30656 0.30994 18.11592 0.20862 18.11712
19-LV-480 BA 0.480 0.01566 0.05982 0.06183 0.01565 0.05952 0.06154 0.14601 0.24676 0.28672
19-LV-480 BB 0.480 0.00808 0.03598 0.03688 0.00809 0.03597 0.03687
020-HV-22A21A 13.800 0.02325 0.34845 0.34923 0.03130 0.30421 0.30582 15.05904 0.70363 15.07547
020-HV-22A21B 13.800 0.03018 0.42163 0.42271 0.04647 0.39425 0.39698 15.08472 1.47215 15.15638
020-HV-22B21 13.800 0.03189 0.36281 0.36421 0.03962 0.31822 0.32068 15.07394 0.74289 15.09223
020-HV-22B21 BB 13.800 0.03936 0.43677 0.43854 0.05556 0.40918 0.41293 15.09962 1.51141 15.17507
020-LV-22A51A 0.480 0.00237 0.01418 0.01437 0.00239 0.01407 0.01427
020-LV-22A51B 0.480 0.00235 0.01407 0.01427 0.00244 0.01374 0.01395
020-LV-22A52 BA 0.480 0.00233 0.01397 0.01416 0.00239 0.01364 0.01385
020-LV-22A52 BB 0.480 0.00222 0.01332 0.01350 0.00240 0.01223 0.01247
020-LV-22A53 BA 0.480 0.00229 0.01234 0.01255 0.00232 0.01216 0.01238
020-LV-22A53 BB 0.480 0.00230 0.01239 0.01261 0.00234 0.01218 0.01240
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 58
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
020-LV-22B52 BA 0.480 0.00228 0.01377 0.01396 0.00242 0.01299 0.01321
020-LV-22B52 BB 0.480 0.00222 0.01353 0.01371 0.00228 0.01260 0.01280
020-LV-22B55A 0.480 0.00239 0.01419 0.01439 0.00241 0.01409 0.01430
020-LV-22B55B 0.480 0.00239 0.01424 0.01444 0.00241 0.01415 0.01436
020-MV-22A31A 4.160 0.01245 0.15684 0.15733 0.01307 0.14882 0.14939 15.01119 0.13767 15.01182
020-MV-22A31B 4.160 0.01349 0.16370 0.16426 0.01574 0.15391 0.15471 15.01119 0.13767 15.01182
020-MV-22B31A 4.160 0.01381 0.16808 0.16864 0.01511 0.16157 0.16228 15.01119 0.13767 15.01182
020-MV-22B31B 4.160 0.01399 0.17007 0.17065 0.01610 0.16234 0.16314 15.01119 0.13767 15.01182
22-TDA-1 13.800 0.51077 0.97449 1.10023 0.52587 1.01952 1.14715 7.81243 21.70711 23.07017
22-TDA-2 13.800 0.16617 0.56506 0.58899 0.18185 0.60840 0.63500 7.04401 20.71305 21.87804
22-TDA-4A 4.160 0.05516 0.21552 0.22246 0.05653 0.21961 0.22677 36.00817 0.12641 36.00839
22-TDA-4B 4.160 0.02385 0.17831 0.17990 0.02527 0.18225 0.18399 36.00817 0.12641 36.00839
23-HV-CCM-13.8A 13.800 0.10512 0.61170 0.62067 0.12459 0.66002 0.67168 7.59735 21.10645 22.43216
23-HV-CCM-13.8B 13.800 0.09184 0.50993 0.51813 0.10632 0.55184 0.56199 7.36312 20.90243 22.16139
023-LV-2451A 0.480 0.00578 0.02223 0.02297 0.00581 0.02217 0.02291
023-LV-2451B 0.480 0.00580 0.02233 0.02307 0.00583 0.02229 0.02304
23-LV-CCM-220A 0.220 0.01550 0.02879 0.03270 0.01550 0.02862 0.03255 0.01610 0.02778 0.03211
23-LV-CCM-480A 0.480 0.00264 0.01591 0.01613 0.00267 0.01597 0.01619
23-LV-CCM-480B 0.480 0.00321 0.01531 0.01564 0.00319 0.01449 0.01484
23-MV-CCM-4.16A 4.160 0.02156 0.20677 0.20789 0.02332 0.21116 0.21245 18.01242 0.15292 18.01307
23-MV-CCM-4.16B 4.160 0.01895 0.18618 0.18714 0.02006 0.18189 0.18299 18.01242 0.15292 18.01307
25-CCM-1 BUS A 0.480 0.00286 0.01474 0.01501 0.00292 0.01390 0.01420
25-CCM-1 BUS B 0.480 0.00304 0.01542 0.01572 0.00307 0.01536 0.01567
25-TDBT-1 BA 0.220 0.01009 0.01862 0.02118 0.01010 0.01844 0.02103 0.01765 0.02257 0.02865
25-TDBT-1 BB 0.220 0.01119 0.02242 0.02505 0.01119 0.02240 0.02504 0.01871 0.02622 0.03221
28-LV-28G41 BA 0.480 0.01217 0.05867 0.05991 0.01217 0.05854 0.05979
28-LV-28G41 BB 0.480 0.01513 0.07052 0.07213 0.01462 0.06886 0.07039
30-LV-30F42 0.480 0.01393 0.05240 0.05422 0.01339 0.05055 0.05229
030-LV-1151A 0.480 0.00199 0.01329 0.01344 0.00204 0.01296 0.01312
030-LV-1151B 0.480 0.00201 0.01349 0.01364 0.00207 0.01316 0.01332
030-LV-1152A 0.480 0.00208 0.01357 0.01373 0.00209 0.01345 0.01361
030-LV-1152B 0.480 0.00209 0.01368 0.01384 0.00211 0.01357 0.01373
030-LV-1153A 0.480 0.00197 0.01340 0.01354 0.00198 0.01326 0.01341
030-LV-1153B 0.480 0.00194 0.01325 0.01339 0.00200 0.01287 0.01303
030-LV-1161A 0.220 0.00214 0.01026 0.01048 0.00215 0.01023 0.01045 0.00235 0.00840 0.00872
030-LV-1161B 0.220 0.00214 0.01022 0.01045 0.00215 0.01015 0.01037 0.00235 0.00840 0.00872
030-MV-1131A 4.160 0.00893 0.11914 0.11948 0.00963 0.10976 0.11018 15.00760 0.09983 15.00793
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 59
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
030-MV-1131B 4.160 0.00966 0.12745 0.12782 0.01077 0.11925 0.11973 15.00760 0.09983 15.00793
040-HV-2521A 13.800 0.04588 0.38791 0.39061 0.05416 0.34361 0.34785 15.51341 0.97989 15.54433
040-HV-2521B 13.800 0.05408 0.46113 0.46429 0.07017 0.43335 0.43899 15.12282 1.57254 15.20436
040-LV-2551 BA 0.480 0.00200 0.01336 0.01351 0.00203 0.01293 0.01309
040-LV-2551 BB 0.480 0.00200 0.01335 0.01349 0.00207 0.01281 0.01298
040-LV-2552 BA 0.480 0.00214 0.01374 0.01390 0.00219 0.01346 0.01363
040-LV-2552 BB 0.480 0.00217 0.01395 0.01412 0.00220 0.01387 0.01404 0.00283 0.01339 0.01369
040-LV-2561 BA 0.220 0.00220 0.00984 0.01008 0.00220 0.00978 0.01003 0.00286 0.00868 0.00914
040-LV-2561 BB 0.220 0.00220 0.00989 0.01013 0.00221 0.00987 0.01011 0.00286 0.00868 0.00914
040-MV-2531A 4.160 0.01107 0.13034 0.13081 0.01203 0.12093 0.12152 15.00771 0.10156 15.00806
040-MV-2531B 4.160 0.01193 0.13748 0.13800 0.01361 0.13158 0.13228 15.00760 0.09983 15.00793
050-LV-1351A 0.480 0.00248 0.01454 0.01475 0.00254 0.01385 0.01408
050-LV-1351B 0.480 0.00257 0.01501 0.01523 0.00260 0.01494 0.01517
050-LV-1352A 0.480 0.00251 0.01470 0.01491 0.00255 0.01425 0.01447
050-LV-1352B 0.480 0.00257 0.01501 0.01523 0.00260 0.01494 0.01517
050-LV-1361A 0.220 0.00369 0.01381 0.01430 0.00370 0.01372 0.01421 0.00687 0.01647 0.01785
050-LV-1361B 0.220 0.00367 0.01372 0.01420 0.00368 0.01370 0.01419 0.00684 0.01631 0.01769
050-MV-1331A 4.160 0.02815 0.18118 0.18336 0.02971 0.17010 0.17267 15.03169 0.17333 15.03269
050-MV-1331B 4.160 0.02907 0.18806 0.19029 0.03079 0.18287 0.18545 15.03169 0.17333 15.03269
060-LV-1451A 0.480 0.00247 0.01471 0.01491 0.00251 0.01425 0.01447
060-LV-1451B 0.480 0.00250 0.01482 0.01503 0.00259 0.01449 0.01472
060-LV-1452A 0.480 0.00254 0.01472 0.01494 0.00260 0.01413 0.01437
060-LV-1452B 0.480 0.00254 0.01502 0.01523 0.00256 0.01495 0.01517
060-LV-1461A 0.220 0.00370 0.01382 0.01430 0.00371 0.01369 0.01419 0.00687 0.01647 0.01785
060-LV-1461B 0.220 0.00367 0.01372 0.01420 0.00367 0.01370 0.01419 0.00684 0.01631 0.01769
060-MV-1431A 4.160 0.02526 0.18151 0.18326 0.02680 0.17026 0.17236 15.02712 0.17453 15.02813
060-MV-1431B 4.160 0.02615 0.18841 0.19022 0.02786 0.18313 0.18523 15.02712 0.17453 15.02813
070-HV-1521A 13.800 0.05242 0.38522 0.38877 0.06035 0.34079 0.34609 15.50112 0.99718 15.53316
070-HV-1521B 13.800 0.06216 0.45756 0.46176 0.07839 0.43019 0.43727 15.13564 1.56298 15.21613
070-LV-1551A 0.480 0.00233 0.01447 0.01466 0.00237 0.01396 0.01416
070-LV-1551B 0.480 0.00240 0.01483 0.01502 0.00243 0.01476 0.01496
070-LV-1552A 0.480 0.00239 0.01474 0.01493 0.00242 0.01459 0.01479
070-LV-1552B 0.480 0.00240 0.01483 0.01502 0.00243 0.01476 0.01496
070-LV-1561A 0.220 0.00247 0.01108 0.01135 0.00248 0.01105 0.01133 0.00310 0.00974 0.01022
070-LV-1561B 0.220 0.00247 0.01110 0.01137 0.00248 0.01109 0.01136 0.00310 0.00974 0.01022
070-MV-1531A 4.160 0.01543 0.16733 0.16804 0.01713 0.15652 0.15746 15.01119 0.13767 15.01182
070-MV-1531B 4.160 0.01618 0.17402 0.17477 0.01790 0.16883 0.16978 15.01119 0.13767 15.01182
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 60
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
080-HV-1621A 13.800 0.05888 0.39350 0.39788 0.06754 0.34997 0.35643 15.56552 1.04276 15.60041
080-HV-1621B 13.800 0.06793 0.46450 0.46944 0.08437 0.43742 0.44549 15.14432 1.57968 15.22648
080-LV-1651A 0.480 0.00240 0.01478 0.01497 0.00241 0.01471 0.01491
080-LV-1651B 0.480 0.00241 0.01487 0.01507 0.00243 0.01484 0.01503
080-LV-1652A 0.480 0.00240 0.01478 0.01497 0.00241 0.01471 0.01491
080-LV-1652B 0.480 0.00240 0.01478 0.01497 0.00245 0.01462 0.01483
080-LV-1653A 0.480 0.00240 0.01478 0.01497 0.00241 0.01471 0.01491
080-LV-1653B 0.480 0.00528 0.02143 0.02207 0.00530 0.02140 0.02205
080-LV 1661A 0.220 0.00282 0.01147 0.01181 0.00283 0.01146 0.01180 0.00314 0.00842 0.00898
080-LV 1661B 0.220 0.00343 0.01287 0.01332 0.00343 0.01286 0.01331 0.00314 0.00842 0.00898
080-MV-1631A 4.160 0.01586 0.17031 0.17105 0.01677 0.16544 0.16629 15.01233 0.15378 15.01311
080-MV-1631B 4.160 0.01678 0.17732 0.17812 0.01837 0.17466 0.17562 15.01233 0.15378 15.01311
090-HV-1721A 13.800 0.05921 0.39439 0.39881 0.06683 0.35012 0.35644 15.60157 1.06827 15.63810
090-HV-1721B 13.800 0.07088 0.46805 0.47339 0.08722 0.44082 0.44937 15.14918 1.58902 15.23229
090-LV-1751A 0.480 0.00257 0.01638 0.01658 0.00263 0.01606 0.01627
090-LV-1751B 0.480 0.00257 0.01637 0.01657 0.00261 0.01611 0.01632
090-LV-1752A 0.480 0.00125 0.01650 0.01655 0.00135 0.01623 0.01629
090-LV-1752B 0.480 0.00126 0.01667 0.01671 0.00129 0.01658 0.01663
090-LV-1761A 0.220 0.00463 0.01271 0.01352 0.00465 0.01264 0.01347 0.00330 0.00898 0.00957
090-LV-1761B 0.220 0.00758 0.01720 0.01880 0.00759 0.01718 0.01878 0.01261 0.01994 0.02359
090-MV-1731A 4.160 0.03046 0.30195 0.30348 0.03204 0.29337 0.29511 15.02608 0.27289 15.02856
090-MV-1731B 4.160 0.03097 0.30421 0.30579 0.03296 0.29792 0.29974 15.02568 0.26829 15.02807
100-HV-1821A 13.800 0.04486 0.38603 0.38862 0.05324 0.34163 0.34576 15.49188 0.96586 15.52196
100-HV-1821B 13.800 0.05256 0.45860 0.46160 0.06859 0.43061 0.43604 15.12059 1.56666 15.20153
100-LV-1851A 0.480 0.00218 0.01302 0.01320 0.00229 0.01187 0.01209
100-LV-1851B 0.480 0.00228 0.01348 0.01368 0.00240 0.01285 0.01307
100-LV-1852A 0.480 0.00227 0.01338 0.01357 0.00242 0.01267 0.01290
100-LV-1852B 0.480 0.00234 0.01379 0.01398 0.00239 0.01353 0.01374
100-LV-1853A 0.480 0.00228 0.01350 0.01369 0.00234 0.01289 0.01310
100-LV-1853B 0.480 0.00231 0.01367 0.01386 0.00234 0.01324 0.01344
100-LV-1854A 0.480 0.00236 0.01385 0.01405 0.00238 0.01372 0.01392
100-LV-1854B 0.480 0.00236 0.01390 0.01410 0.00239 0.01381 0.01402
100-LV-1861A 0.220 0.00298 0.01054 0.01096 0.00299 0.01052 0.01093 0.00350 0.00860 0.00928
100-LV-1861B 0.220 0.00589 0.01511 0.01622 0.00589 0.01509 0.01620 0.01245 0.01922 0.02290
100-MV-1831A 4.160 0.01150 0.13213 0.13263 0.01310 0.12237 0.12307 15.00771 0.10156 15.00806
100-MV-1831B 4.160 0.01189 0.13636 0.13688 0.01379 0.12937 0.13010 15.00760 0.09983 15.00793
110-HV-3221A 13.800 0.05684 0.50417 0.50736 0.07400 0.53814 0.54320 7.01168 20.60913 21.76924
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 61
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
110-HV-3221B 13.800 0.06174 0.53411 0.53766 0.08069 0.49568 0.50220 7.10026 20.68135 21.86623
110-HV-3321A 13.800 0.06275 0.51391 0.51773 0.07987 0.54780 0.55359 7.02113 20.63402 21.79585
110-HV-3321B 13.800 0.07357 0.55363 0.55849 0.09248 0.51510 0.52334 7.11915 20.73114 21.91945
110-LV-3351A 0.480 0.00250 0.01533 0.01553 0.00253 0.01531 0.01552
110-LV-3351B 0.480 0.00245 0.01512 0.01532 0.00249 0.01465 0.01486
110-LV-3352A 0.480 0.00248 0.01517 0.01538 0.00254 0.01489 0.01510
110-LV-3352B 0.480 0.00254 0.01543 0.01564 0.00257 0.01535 0.01556
110-LV-3361A 0.220 0.00472 0.01369 0.01448 0.00473 0.01363 0.01443 0.00699 0.01321 0.01494
110-LV-3361B 0.220 0.00473 0.01375 0.01454 0.00473 0.01373 0.01452 0.00699 0.01321 0.01494
110-MV-3331A 4.160 0.02384 0.24595 0.24710 0.02592 0.24438 0.24575 15.01919 0.20631 15.02061
110-MV-3331B 4.160 0.02492 0.25074 0.25198 0.02697 0.24415 0.24563 1441.08500 0.20631 1441.08500
120-LV-35A51A 0.480 0.00299 0.01559 0.01587 0.00304 0.01515 0.01545
120-LV-35A51B 0.480 0.00293 0.01531 0.01559 0.00297 0.01457 0.01487
120-LV-35A61A 0.220 0.00557 0.01216 0.01337 0.00558 0.01206 0.01329 0.01243 0.01175 0.01711
120-LV-35A61B 0.220 0.00383 0.01269 0.01325 0.00384 0.01252 0.01310 0.00699 0.01321 0.01494
120-LV-35B51A 0.480 0.00356 0.01578 0.01618 0.00358 0.01524 0.01565
120-LV-35B51B 0.480 0.00340 0.01523 0.01560 0.00342 0.01406 0.01447
120-LV-35B52A 0.480 0.00388 0.01615 0.01661 0.00390 0.01545 0.01594
120-LV-35B52B 0.480 0.00403 0.01654 0.01702 0.00405 0.01632 0.01682
120-MV-35A41A 2.400 0.01627 0.09572 0.09710 0.01678 0.08857 0.09014
120-MV-35A41B 2.400 0.01670 0.09578 0.09723 0.01722 0.09038 0.09200
120-MV-35B41A 2.400 0.04579 0.12004 0.12847 0.04608 0.11263 0.12169
120-MV-35B41B 2.400 0.04553 0.11967 0.12804 0.04521 0.11332 0.12201
120-MV-35B42A 2.400 0.04558 0.11990 0.12827 0.04578 0.11237 0.12133
120-MV-35B42B 2.400 0.04645 0.12023 0.12889 0.04697 0.11482 0.12406
130-LV-3651A 0.480 0.00259 0.01436 0.01460 0.00260 0.01424 0.01447
130-LV-3651B 0.480 0.00260 0.01446 0.01469 0.00262 0.01438 0.01462
130-LV-3652A 0.480 0.00252 0.01412 0.01434 0.00253 0.01365 0.01388
130-LV-3652B 0.480 0.00260 0.01446 0.01469 0.00262 0.01438 0.01462
130-LV-3661A 0.220 0.00194 0.00959 0.00979 0.00194 0.00950 0.00969 0.00141 0.00663 0.00678
130-LV-3661B 0.220 0.00196 0.00967 0.00986 0.00196 0.00965 0.00985 0.00141 0.00663 0.00678
130-MV-3631A 4.160 0.03178 0.15292 0.15618 0.03265 0.14335 0.14702 15.04081 0.15916 15.04166
130-MV-3631B 4.160 0.03274 0.16016 0.16347 0.03442 0.15425 0.15804 15.04070 0.15743 15.04153
140-LV-3461A 0.220 0.00277 0.01071 0.01106 0.00276 0.01055 0.01091 0.00144 0.00679 0.00694
140-LV-3461B 0.220 0.00277 0.01083 0.01117 0.00277 0.01056 0.01091 0.00144 0.00679 0.00694
140-LV-3751A2 0.480 0.00276 0.01333 0.01361 0.00273 0.01258 0.01287
140-MV-3741A 2.400 0.03035 0.08693 0.09207 0.02911 0.08193 0.08695
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 62
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
140-MV-3741B 2.400 0.03127 0.09091 0.09613 0.03035 0.08839 0.09345
140-MV-3751B 0.480 0.00278 0.01388 0.01416 0.00276 0.01260 0.01290
140-TR-3731A 0.480 0.00630 0.01867 0.01971 0.00628 0.01793 0.01900
150-LV-3851A 0.480 0.00704 0.02290 0.02396 0.00682 0.02191 0.02295
150-LV-3851B 0.480 0.00718 0.02341 0.02448 0.00703 0.02256 0.02363
150-LV-3861A 0.220 0.01091 0.02418 0.02653 0.01086 0.02397 0.02632 0.01484 0.02586 0.02982
150-LV-3861B 0.220 0.01094 0.02428 0.02663 0.01091 0.02411 0.02646 0.01484 0.02586 0.02982
150-MV-3841A 2.400 0.03854 0.09897 0.10621 0.03692 0.09348 0.10051
150-MV-3841B 2.400 0.03974 0.10317 0.11056 0.03874 0.10051 0.10772
160-HV-41A21 13.800 0.01689 0.43825 0.43857 0.02184 0.42310 0.42366 15.03841 0.67838 15.05371
160-HV-41A22 (TD-7) 13.800 0.01877 0.34094 0.34145 0.02749 0.29752 0.29878 15.04902 0.67722 15.06425
160-HV-41A23 13.800 0.02418 0.41179 0.41250 0.04062 0.38476 0.38690 15.07470 1.44575 15.14387
160-HV-41C21A 13.800 0.03260 0.35906 0.36054 0.04117 0.31538 0.31806 15.22926 0.80478 15.25051
160-HV-41C21B 13.800 0.03918 0.42987 0.43165 0.05534 0.40244 0.40623 15.09900 1.49249 15.17258
160-LV-41A51A 0.480 0.00254 0.01386 0.01409 0.00261 0.01311 0.01337
160-LV-41A51B 0.480 0.00268 0.01440 0.01465 0.00274 0.01426 0.01452
160-LV-41A52A 0.480 0.00266 0.01440 0.01464 0.00267 0.01427 0.01452
160-LV-41A52B 0.480 0.00261 0.01426 0.01450 0.00263 0.01383 0.01407
160-LV-41A61A 0.220 0.00188 0.00924 0.00943 0.00188 0.00921 0.00940
160-LV-41A61B 0.220 0.00187 0.00921 0.00940 0.00187 0.00911 0.00930
160-LV-41C51A 0.480 0.00226 0.01479 0.01496 0.00231 0.01352 0.01371
160-LV-41C51B 0.480 0.00232 0.01514 0.01532 0.00237 0.01415 0.01435
160-LV-41C61A 0.220 0.08421 0.06865 0.10865 0.08423 0.06837 0.10848 0.19305 0.07975 0.20887
160-LV-41C61B 0.220 0.08423 0.06873 0.10871 0.08424 0.06851 0.10858 0.19305 0.07975 0.20887
160-LV-41D51A 0.480 0.00491 0.01746 0.01814 0.00470 0.01638 0.01704
160-LV-41D51B 0.480 0.00489 0.01746 0.01813 0.00469 0.01647 0.01713
160-LV-41E51A 0.480 0.00247 0.01417 0.01438 0.00250 0.01353 0.01375
160-LV-41E51B 0.480 0.00250 0.01438 0.01460 0.00252 0.01393 0.01416
160-LV-41E61A 0.220 0.02245 0.04016 0.04601 0.02246 0.04001 0.04589 0.02191 0.03703 0.04302
160-LV-41E61B 0.220 0.02246 0.04020 0.04605 0.02247 0.04010 0.04597 0.02191 0.03703 0.04302
160-LV-41F51A 0.480 0.00485 0.02064 0.02120 0.00468 0.01899 0.01956
160-LV-41F51B 0.480 0.00506 0.02124 0.02184 0.00498 0.02021 0.02082
160-LV-41F61A 0.220 0.05936 0.06502 0.08804 0.05932 0.06466 0.08775 0.11296 0.06765 0.13166
160-LV-41F61B 0.220 0.05941 0.06515 0.08817 0.05939 0.06493 0.08799 0.11296 0.06765 0.13166
160-MV-41C31A 4.160 0.01933 0.22290 0.22373 0.02087 0.20553 0.20659 15.01757 0.20257 15.01894
160-MV-41C31B 4.160 0.01966 0.22767 0.22852 0.02160 0.20917 0.21028 15.01757 0.20257 15.01894
160-MV-41D31A 4.160 0.01499 0.13718 0.13800 0.01650 0.12724 0.12830 15.01344 0.11481 15.01387
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 63
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
160-MV-41D31B 4.160 0.01538 0.14140 0.14223 0.01717 0.13422 0.13532 15.01332 0.11308 15.01375
160-MV-41E31 BA 4.160 0.02614 0.15220 0.15442 0.02652 0.14181 0.14427 15.03255 0.15904 15.03339
160-MV-41E31 BB 4.160 0.02702 0.15937 0.16164 0.02808 0.15248 0.15505 15.03243 0.15731 15.03326
160-MV-41F31A 4.160 0.03022 0.23869 0.24059 0.03113 0.22016 0.22235 15.03593 0.24505 15.03792
160-MV-41F31B 4.160 0.03063 0.24358 0.24550 0.03198 0.22405 0.22632 15.03593 0.24505 15.03792
160-MV-4131A 4.160 0.00724 0.12221 0.12242 0.00801 0.11267 0.11296 15.00659 0.10480 15.00696
160-MV-4131B 4.160 0.00756 0.12820 0.12842 0.00891 0.11882 0.11915 15.00644 0.10741 15.00683
171-LV-4251A 0.480 0.00594 0.02286 0.02362 0.00594 0.02270 0.02346
171-LV-4251B 0.480 0.00600 0.02321 0.02398 0.00602 0.02327 0.02403
171-LV-4261A 0.220 0.03765 0.06569 0.07572 0.03765 0.06565 0.07569 0.04402 0.06869 0.08159
171-LV-4261B 0.220 0.03767 0.06576 0.07579 0.03767 0.06577 0.07580 0.04402 0.06869 0.08159
171-MV-4231A 4.160 0.02499 0.28036 0.28147 0.02515 0.26830 0.26948 15.02608 0.27289 15.02856
171-MV-4231B 4.160 0.02965 0.30699 0.30842 0.03108 0.31092 0.31247 15.02568 0.26829 15.02807
172-LV-4351A 0.480 0.00347 0.01969 0.02000 0.00369 0.01835 0.01872
172-LV-4351B 0.480 0.00364 0.02049 0.02081 0.00375 0.02019 0.02054
180-HV-44C21A 13.800 0.10026 0.44773 0.45882 0.10897 0.40431 0.41874 16.09667 1.41866 16.15907
180-HV-44C21B 13.800 0.11272 0.51846 0.53057 0.12895 0.49106 0.50771 15.21599 1.71755 15.31262
180-HV-44G21A 13.800 0.11787 0.47081 0.48534 0.12659 0.42739 0.44574 16.32310 1.57891 16.39928
180-HV-44G21B 13.800 0.13216 0.54186 0.55774 0.14860 0.51482 0.53584 15.24643 1.77611 15.34954
180-HV-44I21 (TD-9) 13.800 0.02340 0.45000 0.45061 0.02433 0.44661 0.44727 15.04708 0.67709 15.06231
180-LV-44A51A 0.480 0.00262 0.01466 0.01489 0.00263 0.01453 0.01477
180-LV-44A51B 0.480 0.00263 0.01476 0.01499 0.00266 0.01468 0.01491
180-LV-44A61A 0.220 0.00768 0.02366 0.02487 0.00768 0.02363 0.02485 0.01453 0.03208 0.03522
180-LV-44A61B 0.220 0.00768 0.02368 0.02489 0.00769 0.02366 0.02488 0.01453 0.03208 0.03522
180-LV-44C51A 0.480 0.00245 0.01493 0.01513 0.00246 0.01487 0.01508
180-LV-44C51B 0.480 0.00233 0.01437 0.01456 0.00239 0.01366 0.01386
180-LV-44C61A 0.220 0.00528 0.01959 0.02029 0.00529 0.01958 0.02028 0.00477 0.01646 0.01713
180-LV-44C61B 0.220 0.00526 0.01947 0.02017 0.00527 0.01932 0.02003 0.00477 0.01646 0.01713
180-LV-44E51A 0.480 0.00621 0.02268 0.02352 0.00622 0.02263 0.02347
180-LV-44E51B 0.480 0.00622 0.02275 0.02359 0.00625 0.02270 0.02355
180-LV-44E61A 0.220 0.05064 0.06941 0.08592 0.05064 0.06940 0.08591 0.08454 0.07733 0.11457
180-LV-44E61B 0.220 0.05056 0.06917 0.08568 0.05059 0.06913 0.08566 0.08454 0.07733 0.11457
180-LV-44F51A 0.480 0.00590 0.02091 0.02173 0.00580 0.01983 0.02066
180-LV-44F51B 0.480 0.00590 0.02091 0.02173 0.00580 0.01983 0.02066
180-LV-44F61A 0.220 0.03417 0.06016 0.06919 0.03415 0.05992 0.06897 0.03286 0.05554 0.06453
180-LV-44F61B 0.220 0.03417 0.06016 0.06919 0.03415 0.05992 0.06897 0.03286 0.05554 0.06453
180-LV-44G51A 0.480 0.00586 0.02234 0.02310 0.00587 0.02229 0.02305
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 64
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
180-LV-44G51B 0.480 0.00588 0.02243 0.02319 0.00590 0.02240 0.02316
180-LV-44G61A 0.220 0.08501 0.07032 0.11033 0.08501 0.07031 0.11032 0.19305 0.07975 0.20887
180-LV-44G61B 0.220 0.08502 0.07034 0.11034 0.08502 0.07033 0.11034 0.19305 0.07975 0.20887
180-LV-44H51A 0.480 0.00791 0.02399 0.02526 0.00792 0.02394 0.02522
180-LV-44H51B 0.480 0.00793 0.02408 0.02535 0.00795 0.02405 0.02533
180-LV-44H51B2 0.220 0.07799 0.05794 0.09716 0.07799 0.05794 0.09716 0.18566 0.06726 0.19746
180-LV-44H61A 0.220 0.07807 0.05819 0.09737 0.07807 0.05818 0.09736 0.18566 0.06726 0.19746
180-LV-44I51A 0.480 0.00601 0.01764 0.01863 0.00601 0.01763 0.01863
180-LV-44I51B 0.480 0.00601 0.01764 0.01863 0.00601 0.01763 0.01863
180-LV-44I61 0.220 0.03413 0.05924 0.06837 0.03413 0.05924 0.06837 0.03286 0.05554 0.06453
180-LV-44M51 BA 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
180-LV-44M51 BB 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
180-MV-44A31A 4.160 0.03259 0.16141 0.16467 0.03355 0.15199 0.15565 15.04194 0.18078 15.04303
180-MV-44A31B 4.160 0.03346 0.16855 0.17184 0.03513 0.16264 0.16640 15.04183 0.17905 15.04289
180-MV-44C31A 4.160 0.01993 0.17633 0.17745 0.02073 0.17238 0.17362 15.01119 0.13767 15.01182
180-MV-44C31B 4.160 0.02096 0.18157 0.18278 0.02262 0.17789 0.17932 15.01119 0.13767 15.01182
180-MV-44E31-A 4.160 0.03327 0.20872 0.21136 0.03406 0.20478 0.20759 15.03239 0.21996 15.03400
180-MV-44E31-B 4.160 0.03429 0.21397 0.21670 0.03595 0.21028 0.21333 15.03239 0.21996 15.03400
180-MV-44F31A 4.160 0.04296 0.16508 0.17058 0.04392 0.15566 0.16174 15.05843 0.18980 15.05962
180-MV-44F31B 4.160 0.04360 0.17200 0.17744 0.04510 0.16576 0.17179 15.05832 0.18808 15.05949
180-MV-44G31A 4.160 0.02153 0.17843 0.17972 0.02232 0.17448 0.17590 15.01119 0.13767 15.01182
180-MV-44G31B 4.160 0.02283 0.18488 0.18629 0.02433 0.18243 0.18404 15.01119 0.13767 15.01182
180-MV-44H31A 4.160 0.10167 0.29407 0.31114 0.10246 0.29012 0.30768 15.13859 0.43255 15.14477
180-MV-44H31B 4.160 0.10296 0.30052 0.31767 0.10446 0.29807 0.31584 15.13859 0.43255 15.14477
180B-CCM-CTOSAT 0.480 0.00233 0.01437 0.01456 0.00239 0.01366 0.01386
181-LV-3951A 0.480 0.00386 0.01657 0.01701 0.00389 0.01597 0.01644
181-LV-3951B 0.480 0.00393 0.01685 0.01730 0.00395 0.01684 0.01730
181-LV-3961A 0.220 0.00449 0.01619 0.01680 0.00450 0.01606 0.01668 0.00368 0.01271 0.01323
181-LV-3961B 0.220 0.00451 0.01625 0.01686 0.00451 0.01624 0.01686 0.00368 0.01271 0.01323
181-MV-3941A 2.400 0.01926 0.09563 0.09755 0.01939 0.09306 0.09506
181-MV-3941B 2.400 0.02005 0.09939 0.10139 0.02038 0.09936 0.10143
330-CCM-1 BA 0.480 0.00432 0.01694 0.01748 0.00434 0.01659 0.01715
330-CCM-1 BB 0.480 0.00439 0.01732 0.01787 0.00441 0.01726 0.01781
330-CCM-2 BA 0.220 0.04053 0.04182 0.05824 0.04053 0.04175 0.05819 0.08476 0.04818 0.09750
330-CCM-2 BB 0.220 0.04054 0.04190 0.05831 0.04055 0.04189 0.05830 0.08476 0.04818 0.09750
330-TDA-1 BA 4.160 0.06468 0.23167 0.24053 0.06601 0.21792 0.22770 9.08180 0.23693 9.08489
330-TDA-1 BB 4.160 0.06690 0.25010 0.25889 0.06788 0.24518 0.25440 9.08203 0.24015 9.08520
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 65
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
330-TDBT-1 BA 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
330-TDBT-1 BB 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
ALIM-API-1 2.400 0.12010 0.18567 0.22113 0.12059 0.18705 0.22255
API-LV-CCM-01 0.480 0.02348 0.02794 0.03649 0.02350 0.02799 0.03655
API-LV-CCM-MJW 0.480 0.01928 0.02658 0.03284 0.01930 0.02663 0.03289
Barra11 4.160 0.61262 0.46685 0.77023 0.61399 0.47095 0.77380 36.89454 0.76478 36.90246
Barra12 0.220 0.00313 0.00795 0.00855 0.00313 0.00797 0.00856 0.00141 0.00665 0.00680
Barra14 0.220 0.00490 0.01063 0.01170 0.00490 0.01064 0.01172 0.00700 0.01323 0.01496
BK4-CCM-04A 0.480 0.00709 0.02481 0.02581 0.00712 0.02473 0.02574
BK4-CCM-04B 0.480 0.00752 0.02452 0.02565 0.00754 0.02439 0.02553
BK4-CCM-05A 0.220 0.00553 0.01916 0.01994 0.00554 0.01914 0.01993 0.00404 0.01395 0.01452
BK4-CCM-05B 0.220 0.00562 0.01910 0.01991 0.00563 0.01907 0.01988 0.00404 0.01395 0.01452
BK4-TM4.16-02 4.160 0.09216 0.24014 0.25722 0.09364 0.23045 0.24875 15.13874 0.38243 15.14357
BK4-TM4.16-03 4.160 0.09266 0.24639 0.26324 0.09458 0.24020 0.25815 15.13867 0.38105 15.14346
BOOSTER-CCM-01 0.480 0.01256 0.04048 0.04239 0.01258 0.04034 0.04225
BT-5298 BA 0.480 0.00515 0.02988 0.03032 0.00500 0.02042 0.02102 0.00352 0.01046 0.01103
BT-5298 BB 0.480 0.00558 0.03126 0.03175 0.00547 0.02202 0.02269 0.00351 0.01044 0.01101
BT-6028-02 0.220 0.00154 0.00475 0.00500 0.00151 0.00466 0.00490 0.00096 0.00297 0.00312
BUS PRIM TRA4 13.800 0.33830 0.86057 0.92468 0.34738 0.89404 0.95916 8.55213 22.08850 23.68630
BUS 2.2KV C.A.F. 2.400 0.03757 0.10752 0.11389 0.03809 0.10854 0.11503
BUS A TR2 13.800 0.32872 1.86441 1.89317 0.33559 1.85401 1.88414 31.82710 3.04122 31.97207
BUS ALUMBRADO2 0.220 0.02470 0.04644 0.05260 0.02470 0.04643 0.05260 0.02300 0.03888 0.04517
BUS CERO-CORTES-TRA1 13.800 0.31583 0.85419 0.91071 0.32509 0.88769 0.94535 8.47969 22.07275 23.64554
BUS ENLACE SE-7 Y 13 2.400 0.04620 0.12698 0.13512 0.04679 0.12583 0.13425
BUS G1 0.480 0.00546 0.01215 0.01332 0.00545 0.01185 0.01304 0.00404 0.00840 0.00932
BUS G2 0.480 0.00438 0.01164 0.01244 0.00407 0.01114 0.01186 0.00404 0.00840 0.00932
BUS JARDIN TR-1A 0.220 0.00791 0.01600 0.01785 0.00791 0.01600 0.01785 0.00772 0.01482 0.01671
BUS JARDIN TR-17 0.220 0.00134 0.00478 0.00496 0.00134 0.00477 0.00496 0.00091 0.00360 0.00371
BUS MB-A 4.160 0.24868 1.09400 1.12191 0.20621 0.96637 0.98812
BUS MB-B 4.160 0.05140 0.28378 0.28840 0.05008 0.27332 0.27788 18.20911 0.44126 18.21446
BUS MB2 4.160 0.36323 1.58036 1.62157 0.29484 1.38112 1.41224
BUS MB3 4.160 0.08657 0.22220 0.23847 0.08445 0.22132 0.23688 18.28978 0.25284 18.29153
BUS P-501B 2.400 0.04448 0.09921 0.10872 0.04264 0.09394 0.10316
BUS P-608A 2.400 0.04579 0.10331 0.11300 0.04438 0.10054 0.10990
BUS PPAL BUS A 4.160 0.02950 0.26311 0.26476 0.02973 0.25395 0.25569 18.03477 0.24977 18.03650
BUS PRI 080-TRF-16531A 0.480 0.00412 0.01872 0.01916 0.00413 0.01865 0.01910
BUS PRI 080-TRF-16531B 0.480 0.00700 0.02537 0.02632 0.00703 0.02534 0.02629
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 66
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus SE17 2.400 0.12430 0.46513 0.48145 0.11087 0.41892 0.43334 0.10041 0.22065 0.24242
BUS SE-19 BUNKER 0.220 0.03396 0.06440 0.07281 0.03396 0.06434 0.07275
BUS SE-19A CERO CORTES 4.160 0.02950 0.26311 0.26476 0.02973 0.25395 0.25569 18.03477 0.24977 18.03650
Bus309 2.400 0.04408 0.11287 0.12117 0.04460 0.11389 0.12232
Bus310 2.400 0.03527 0.14506 0.14929 0.03169 0.12632 0.13023
Bus311 4.160 0.06966 0.24365 0.25341 0.07021 0.22883 0.23936 9.14132 0.26842 9.14526
Bus312 0.220 0.01955 0.03511 0.04018 0.01955 0.03510 0.04017 0.01862 0.03147 0.03657
Bus313 0.220 0.03412 0.06042 0.06939 0.03413 0.06043 0.06940 0.03286 0.05554 0.06453
Bus314 0.220 0.01263 0.02523 0.02822 0.01264 0.02521 0.02820 0.01043 0.02003 0.02259
Bus315 2.400 0.05364 0.11162 0.12384 0.05139 0.10577 0.11759
Bus316 0.480 0.00538 0.01481 0.01576 0.00540 0.01486 0.01581
Bus317 4.160 0.01271 0.16649 0.16698 0.01403 0.16004 0.16066 15.00939 0.13350 15.00999
Bus318 0.220 0.00168 0.00866 0.00882 0.00169 0.00860 0.00877 0.00123 0.00578 0.00590
Bus319 0.220 0.03393 0.06010 0.06902 0.03390 0.05974 0.06868 0.03286 0.05554 0.06453
Bus320 13.800 0.15758 1.54548 1.55349 0.16419 1.53403 1.54279 30.48400 1.65520 30.52891
Bus321 0.220 0.03158 0.05540 0.06377 0.03158 0.05526 0.06365
Bus322 2.400 0.07392 0.14375 0.16164 0.07442 0.14493 0.16292
Bus323 0.220 0.00424 0.01581 0.01636 0.00424 0.01579 0.01635 0.00368 0.01271 0.01323
Bus324 13.800 0.05703 0.39081 0.39495 0.06490 0.34635 0.35238 15.50872 1.01179 15.54169
Bus325 0.480 0.01354 0.02167 0.02555 0.01356 0.02161 0.02552
Bus326 2.400 0.03128 0.16310 0.16607 0.02882 0.14702 0.14982
Bus327 0.220 0.01480 0.02741 0.03115 0.01480 0.02742 0.03116 0.01424 0.02407 0.02796
Bus328 0.480 0.00178 0.01328 0.01340 0.00180 0.01318 0.01330
Bus329 0.220 0.03416 0.06048 0.06946 0.03416 0.06046 0.06945 0.03286 0.05554 0.06453
Bus332 10.350 0.04748 0.53051 0.53263 0.04996 0.49909 0.50158 0.01762 0.32772 0.32819
Bus333 0.480 0.01175 0.02275 0.02561 0.01185 0.02248 0.02541
Bus334 13.800 0.05589 0.46410 0.46745 0.07187 0.43599 0.44188 15.12599 1.58089 15.20837
Bus335 0.220 0.03336 0.05881 0.06761 0.03337 0.05853 0.06737 0.03286 0.05554 0.06453
Bus336 0.220 0.03424 0.06055 0.06956 0.03424 0.06054 0.06955 0.03286 0.05554 0.06453
Bus337 2.400 0.03589 0.19070 0.19405 0.03610 0.19039 0.19378
Bus338 0.220 0.01234 0.02838 0.03095 0.01231 0.02627 0.02901 0.01106 0.02123 0.02394
Bus339 2.400 0.02624 0.09079 0.09451 0.02677 0.09116 0.09500
Bus340 0.220 0.00213 0.00990 0.01012 0.00214 0.00988 0.01011 0.00097 0.00454 0.00465
Bus1229 0.480 0.00319 0.01589 0.01621 0.00320 0.01583 0.01615
Bus1230 2.400 0.04150 0.08340 0.09315 0.04206 0.08417 0.09410
Bus1231 0.480 0.00289 0.01210 0.01244 0.00292 0.01213 0.01247
Bus1232 2.400 0.04162 0.08269 0.09257 0.04212 0.08387 0.09385
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 67
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1233 0.480 0.00290 0.01205 0.01240 0.00292 0.01210 0.01245
Bus1234 0.480 0.00313 0.01553 0.01584 0.00317 0.01522 0.01554
Bus1235 4.160 0.07513 0.23740 0.24901 0.07642 0.22363 0.23633 9.09847 0.25154 9.10194
Bus1236 4.160 0.08952 0.24538 0.26119 0.09044 0.23143 0.24847 9.12180 0.27198 9.12586
Bus1237 4.160 0.09171 0.26379 0.27928 0.09225 0.25863 0.27459 9.12203 0.27521 9.12618
Bus1238 0.480 0.00503 0.02078 0.02138 0.00506 0.02073 0.02134
Bus1239 0.480 0.00502 0.02071 0.02131 0.00503 0.02066 0.02127
Bus1240 4.160 0.03804 0.21362 0.21698 0.03883 0.20968 0.21324 15.03998 0.23240 15.04178
Bus1241 4.160 0.03907 0.21887 0.22232 0.04073 0.21518 0.21900 15.03998 0.23240 15.04178
Bus1242 13.800 0.07374 0.55402 0.55890 0.09177 0.51385 0.52198 7.12088 20.73569 21.92432
Bus1243 4.160 0.01250 0.14238 0.14292 0.01458 0.13043 0.13125 18.00640 0.09913 18.00668
Bus1244 4.160 0.03096 0.15903 0.16202 0.03292 0.15953 0.16290 18.06089 0.12078 18.06130
Bus1245 0.480 0.00282 0.01606 0.01630 0.00285 0.01606 0.01631
Bus1246 0.480 0.00283 0.01609 0.01633 0.00286 0.01593 0.01618
Bus1247 4.160 0.03011 0.15106 0.15403 0.03210 0.13899 0.14265 18.06089 0.12078 18.06130
Bus1249 4.160 0.05273 0.16184 0.17021 0.05343 0.14928 0.15856 18.13540 0.14801 18.13601
Bus1250 4.160 0.05295 0.16189 0.17033 0.05394 0.14942 0.15885 18.13540 0.14801 18.13601
Bus1254 4.160 0.01330 0.15030 0.15088 0.01529 0.15085 0.15162 18.00640 0.09913 18.00668
Bus1255 13.800 0.07840 0.59316 0.59832 0.09739 0.64048 0.64784 7.12088 20.73569 21.92432
Bus1256 4.160 0.02454 0.15688 0.15879 0.02650 0.15738 0.15959 18.02434 0.11593 18.02471
Bus1257 4.160 0.02369 0.14890 0.15077 0.02569 0.13684 0.13923 18.02434 0.11593 18.02471
Bus1258 0.220 0.00387 0.01434 0.01486 0.00388 0.01435 0.01486 0.00201 0.00947 0.00968
Bus1259 0.220 0.00388 0.01435 0.01486 0.00388 0.01432 0.01483 0.00201 0.00947 0.00968
Bus1260 4.160 0.03229 0.15652 0.15982 0.03418 0.15698 0.16066 18.06540 0.11462 18.06577
Bus1261 0.480 0.00274 0.01556 0.01580 0.00278 0.01531 0.01556
Bus1262 4.160 0.02995 0.15099 0.15393 0.03181 0.13883 0.14242 18.06089 0.12078 18.06130
Bus1263 0.480 0.00262 0.01511 0.01534 0.00265 0.01430 0.01455
Bus1264 4.160 0.03001 0.15102 0.15397 0.03194 0.13890 0.14253 18.06089 0.12078 18.06130
Bus1265 0.480 0.00267 0.01526 0.01549 0.00270 0.01476 0.01501
Bus1266 4.160 0.03096 0.15903 0.16202 0.03292 0.15953 0.16289 18.06089 0.12078 18.06130
Bus1267 0.480 0.00280 0.01596 0.01621 0.00284 0.01597 0.01622
Bus1268 4.160 0.03175 0.15989 0.16301 0.03370 0.16038 0.16389 18.06216 0.12298 18.06258
Bus1269 0.480 0.00284 0.01611 0.01636 0.00287 0.01612 0.01637
Bus1270 0.200 0.00587 0.01868 0.01958 0.00588 0.01857 0.01948 0.00404 0.01395 0.01452
Bus1271 0.200 0.00588 0.01872 0.01962 0.00588 0.01864 0.01955 0.00404 0.01395 0.01452
Bus1272 4.160 0.03080 0.15187 0.15496 0.03268 0.13970 0.14348 18.06216 0.12298 18.06258
Bus1273 0.480 0.00275 0.01570 0.01594 0.00278 0.01512 0.01537
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 68
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1274 4.160 0.03307 0.15738 0.16081 0.03496 0.15784 0.16166 18.06667 0.11682 18.06705
Bus1275 0.480 0.00278 0.01572 0.01596 0.00281 0.01549 0.01574
Bus1276 4.160 0.03081 0.15187 0.15496 0.03274 0.13973 0.14352 18.06216 0.12298 18.06258
Bus1277 0.480 0.00277 0.01576 0.01600 0.00281 0.01535 0.01561
Bus1278 4.160 0.03082 0.15187 0.15497 0.03274 0.13973 0.14351 18.06216 0.12298 18.06258
Bus1279 0.480 0.00271 0.01540 0.01564 0.00276 0.01497 0.01522
Bus1280 4.160 0.03169 0.15987 0.16298 0.03358 0.16030 0.16378 18.06216 0.12298 18.06258
Bus1281 0.480 0.00274 0.01559 0.01583 0.00279 0.01531 0.01556
Bus1287 4.160 0.05337 0.16200 0.17057 0.05490 0.14970 0.15945 18.13540 0.14801 18.13601
Bus1296 4.160 0.03195 0.14934 0.15272 0.03351 0.13711 0.14115 18.06667 0.11682 18.06705
Bus1302 4.160 0.08433 0.21058 0.22684 0.08491 0.19692 0.21445 18.14942 0.27481 18.15150
Bus1303 0.480 0.00645 0.02834 0.02906 0.00648 0.02693 0.02770
Bus1304 4.160 0.08423 0.21782 0.23354 0.08317 0.21520 0.23071 18.14942 0.27481 18.15150
Bus1305 0.480 0.00650 0.02845 0.02918 0.00653 0.02765 0.02841
Bus1307 4.160 0.10610 0.22871 0.25212 0.10249 0.22550 0.24770 18.22393 0.30204 18.22643
Bus1308 4.160 0.13239 0.24429 0.27786 0.13386 0.23460 0.27010 15.20270 0.39297 15.20778
Bus1309 4.160 0.09715 0.24919 0.26746 0.09907 0.24300 0.26242 15.14581 0.38816 15.15079
Bus1310 4.160 0.00846 0.13047 0.13074 0.00995 0.12083 0.12123 15.00559 0.10368 15.00595
Bus1311 4.160 0.00894 0.13670 0.13699 0.01087 0.13053 0.13099 15.00551 0.10230 15.00586
BusESCUELA BJ 0.220 0.01200 0.01842 0.02198 0.01200 0.01842 0.02198 0.01962 0.01927 0.02750
BusTAR 0.220 0.00672 0.02082 0.02188 0.00673 0.02079 0.02186 0.00453 0.01562 0.01626
CASAVISITAS-CCM-480 0.220 0.01192 0.02099 0.02414 0.01192 0.02099 0.02414 0.01172 0.01981 0.02302
CASETAPALMAS-CCM-480 0.220 0.01175 0.02071 0.02381 0.01175 0.02071 0.02381 0.01156 0.01953 0.02269
CASETAPALMAS-CCM-480A 0.220 0.01405 0.02459 0.02832 0.01405 0.02459 0.02832 0.01385 0.02341 0.02720
CCM-1/3 SE-1 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
CCM-01 480 V 0.480 0.01941 0.06639 0.06917 0.01940 0.06620 0.06898 0.03104 0.06914 0.07579
CCM-1 B-1 0.480 0.00696 0.02660 0.02750 0.00702 0.02588 0.02682
CCM-1 SE-1 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
CCM-01 SE-1 2.400 0.01197 0.10273 0.10343 0.01300 0.09829 0.09915
CCM-1 SE-20 2.400 0.00826 0.08072 0.08115 0.00888 0.08050 0.08099
CCM-2 A/A SE-1 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
CCM-2 B-1 0.480 0.00702 0.02673 0.02764 0.00707 0.02604 0.02699
CCM-2 SE-1 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
CCM-02 SE-1 2.400 0.01031 0.09149 0.09207 0.01113 0.08817 0.08887
CCM-2 SE-20 2.400 0.00835 0.08149 0.08192 0.00928 0.08018 0.08071
CCM-3 SE-1 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
CCM-4 SE-1 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 69
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
CCM-5 SE-1 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
CCM-6 SE-1 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
CCM-190-1A 0.480 0.00802 0.03097 0.03199 0.00799 0.03001 0.03105
CCM-190-1B 0.480 0.00789 0.03076 0.03176 0.00784 0.02911 0.03014
CCM-480 SE-MFA 0.480 0.00439 0.02179 0.02223 0.00443 0.02064 0.02111
CCM-4160 4.160 0.39078 2.14727 2.18254 0.39352 1.53992 1.58940 18.08764 0.36512 18.09133
CCM-5207A-2 0.480 0.00558 0.03126 0.03175 0.00547 0.02202 0.02269 0.00351 0.01044 0.01101
CCM-5207B-1 0.460 0.00704 0.03354 0.03427 0.00630 0.02294 0.02379 0.01550 0.02595 0.03023
CCM-5207C-1 0.460 0.00991 0.03775 0.03903 0.00976 0.02829 0.02993 0.01850 0.02983 0.03510
CCM-5207C-2 0.460 0.00985 0.03849 0.03973 0.00954 0.02886 0.03039 0.01850 0.02981 0.03508
CCM-5207D-1 0.460 0.00877 0.03676 0.03779 0.00842 0.02715 0.02842 0.01550 0.02593 0.03021
CCM-5207E-1 0.460 0.01086 0.03932 0.04080 0.01071 0.02987 0.03173 0.02150 0.03370 0.03997
CCM-5420-2 0.480 0.00515 0.02988 0.03032 0.00500 0.02042 0.02102 0.00352 0.01046 0.01103
CCM-5420-3 0.460 0.02558 0.05206 0.05800 0.02510 0.04218 0.04908 0.06924 0.06338 0.09387
CCM-BT-480 BA 0.480 0.00618 0.02723 0.02792 0.00620 0.02713 0.02782
CCM-BT-480 BB 0.480 0.00592 0.02695 0.02759 0.00594 0.02685 0.02750
CCM-BT-CB-1A 0.480 0.00756 0.02243 0.02367 0.00761 0.02218 0.02345
CCM-BT-CB-1B 0.480 0.00757 0.02242 0.02366 0.00762 0.02226 0.02353
CCM-CB-2 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
CCM-CB3-1 0.480 0.08274 0.05122 0.09731 0.08280 0.05047 0.09697
CCM-CB3-2 0.220 0.02513 0.02564 0.03590 0.02515 0.02548 0.03580 0.00775 0.01488 0.01678
CCM-DAF 0.480 0.00134 0.00915 0.00925 0.00137 0.00897 0.00907
CCM-E BUS B 0.460 0.02243 0.05061 0.05536 0.02195 0.04074 0.04628 0.05932 0.05983 0.08425
CCM-LV-BT-5414 0.220 0.00377 0.01017 0.01084 0.00377 0.01017 0.01084 0.00723 0.00973 0.01212
CCM-MZ-BA-1 0.480 0.00134 0.00915 0.00925 0.00137 0.00897 0.00907
CCM-MZ-BB-1 0.480 0.00137 0.00932 0.00942 0.00139 0.00929 0.00939
CCM-MZ-BC-1 0.480 0.00134 0.00915 0.00925 0.00137 0.00897 0.00907
CCM-S.AUX-TG-4 BA 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
CCM-S.AUX-TG-4 BB 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
CCM-SA-01/SA-02 BA 0.480 0.00134 0.00915 0.00925 0.00137 0.00897 0.00907
CCM-SA3 0.480 0.00137 0.00932 0.00942 0.00139 0.00929 0.00939
CCM-SA-04 BB 0.480 0.00137 0.00932 0.00942 0.00139 0.00929 0.00939
CCM-TD-102 BA 0.480 0.00253 0.01745 0.01763 0.00261 0.01684 0.01704
CCM-TD-102 BB 0.480 0.00247 0.01719 0.01737 0.00262 0.01571 0.01593
CCM-TDB-1A 0.480 0.00348 0.01299 0.01345 0.00351 0.01302 0.01348
CCM-TDB-1B 0.480 0.00349 0.01294 0.01341 0.00351 0.01299 0.01346
CCM-URV 0.480 0.01045 0.02475 0.02686 0.01049 0.02463 0.02677 0.01019 0.02346 0.02557
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 70
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
CF-07 0.480 0.00266 0.01241 0.01269 0.00251 0.01167 0.01193 0.00273 0.00830 0.00873
DER SE-MFA 2.400 0.03535 0.11181 0.11726 0.03467 0.10784 0.11327
DERIVADOR 1 SE-7 13.800 0.24502 0.72503 0.76532 0.25867 0.75450 0.79761 9.00383 22.42365 24.16379
DERIVADOR SE-9 13.800 0.24382 1.62273 1.64094 0.25070 1.61233 1.63170 31.74741 2.69299 31.86142
DERIVADOR SE-17 13.800 0.17298 1.57101 1.58050 0.17917 1.55897 1.56923 30.48855 1.71726 30.53687
DERIVADOR SE-MZ METRO 2.400 0.05858 0.13906 0.15090 0.05669 0.13414 0.14562
ENLACE SE-8 13.800 0.37089 0.84498 0.92280 0.38611 0.89008 0.97022 7.58994 21.37805 22.68542
ENTRADA 19MV-4160 BA 4.160 0.03326 0.20219 0.20491 0.03358 0.20178 0.20456 18.06241 0.17220 18.06323
ENTRADA 19MV-4160 BB 4.160 0.04190 0.30242 0.30530 0.04252 0.30147 0.30445 18.06241 0.17220 18.06323
EXT. MP-TD-1 13.800 0.05086 0.54770 0.55006 0.07033 0.59602 0.60016 7.07645 20.61862 21.79917
EXT. MP-TD-2 13.800 0.04712 0.49073 0.49299 0.06425 0.52457 0.52849 7.07645 20.61862 21.79917
EXT. MP-TD-3 13.800 0.04682 0.50951 0.51166 0.06582 0.47120 0.47577 7.07645 20.61862 21.79917
FUERZA SECC73 13.800 0.17429 1.60972 1.61913 0.18117 1.59933 1.60956 31.58158 2.39427 31.67220
28-HV-28G22
FUERZA SECC78 13.800 0.10515 0.59073 0.60002 0.11840 0.62913 0.64017 8.02699 21.38075 22.83789
28-HV-28G21
HR 13.800 2.09834 6.43549 6.76894 1.98446 6.09581 6.41069 7.22284 21.55579 22.73371
HR-CCM 0.480 0.00391 0.01705 0.01749 0.00353 0.01473 0.01515 0.00237 0.01150 0.01175
HR-HV-CFE 13.800 2.07794 6.42831 6.75582 1.96407 6.08864 6.39758 7.19042 21.53757 22.70614
HR-HV-CFE/RFM 13.800 2.07794 6.42831 6.75582 1.96407 6.08864 6.39758 7.19042 21.53757 22.70614
HR-HV-REF 13.800 1.89291 1.77364 2.59401 1.90433 1.81810 2.63286 12.67280 26.20220 29.10593
HR-I-LINE C 0.480 0.00391 0.01705 0.01749 0.00353 0.01473 0.01515 0.00237 0.01150 0.01175
HR-TBT BA 0.220 0.00108 0.00472 0.00485 0.00105 0.00463 0.00475 0.00051 0.00294 0.00298
HV-20 BA 13.800 0.09561 0.54060 0.54899 0.11095 0.58315 0.59362 6.93226 20.65188 21.78431
HV-20 BB 13.800 0.09815 0.57232 0.58068 0.11496 0.60523 0.61605 7.07792 20.78367 21.95581
I-21.1 13.800 0.11359 0.51684 0.52917 0.12751 0.55868 0.57304 6.96433 20.59520 21.74084
I-21.2 13.800 0.12257 0.60783 0.62007 0.14223 0.65681 0.67203 7.10999 20.72699 21.91256
INT ENLACE 15-LV-BA02-480 0.480 0.00474 0.02202 0.02253 0.00476 0.02207 0.02258
LP-01 0.220 0.01738 0.03466 0.03877 0.01737 0.03456 0.03868 0.01669 0.03205 0.03614
LV-22A61 BA 0.220 0.00173 0.00569 0.00595 0.00174 0.00567 0.00593 0.00250 0.00520 0.00577
LV-22A61 BB 0.220 0.00173 0.00569 0.00595 0.00174 0.00567 0.00593 0.00250 0.00520 0.00577
LV-22B51 BA 0.480 0.00233 0.01406 0.01425 0.00241 0.01363 0.01385
LV-22B51 BB 0.480 0.00234 0.01408 0.01427 0.00241 0.01366 0.01387
LV-22B53 BA 0.480 0.00239 0.01435 0.01455 0.00242 0.01425 0.01445
LV-22B53 BB 0.480 0.00239 0.01433 0.01453 0.00241 0.01424 0.01444
LV-22B54 BA 0.480 0.00563 0.02102 0.02176 0.00563 0.02036 0.02113
LV-22B54 BB 0.480 0.00561 0.02093 0.02167 0.00557 0.02036 0.02111
LV-22B61 BA 0.220 0.00366 0.01099 0.01159 0.00367 0.01097 0.01157
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 71
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
LV-22B61 BB 0.220 0.00364 0.01089 0.01148 0.00364 0.01087 0.01147
LV-41L51 0.480 0.02203 0.04236 0.04774 0.02205 0.04241 0.04780
LV-MCC-01A 0.480 0.00329 0.01241 0.01284 0.00323 0.01192 0.01235
LV-MCC-01B 0.480 0.00328 0.01121 0.01168 0.00328 0.01110 0.01157
LV-MCC-02 0.220 0.00570 0.01963 0.02044 0.00570 0.01961 0.02042 0.00501 0.01728 0.01799
LVM-0001B BB 0.480 0.00446 0.01729 0.01786 0.00449 0.01723 0.01781 0.13880 0.23457 0.27256
LVMCC-0001A BA 0.480 0.00432 0.01698 0.01752 0.00432 0.01629 0.01685 0.14601 0.24676 0.28672
LVMCC-002 BA 0.220 0.05258 0.06219 0.08144 0.05258 0.06205 0.08133
LVMCC-002 BB 0.220 0.05266 0.06245 0.08168 0.05266 0.06243 0.08168
MC LV-CCM-1-480 0.480 0.01589 0.02523 0.02981 0.01591 0.02526 0.02985
MC LV-CCM-2-220 0.220 0.01758 0.02937 0.03422 0.01758 0.02937 0.03423 0.01424 0.02407 0.02796
MC-CCM-03 0.480 0.04700 0.04567 0.06553 0.04339 0.04332 0.06132
MC-LV-CCM-02 0.480 0.01022 0.02931 0.03104 0.01019 0.02813 0.02992
MC-MV-CCM-2400 2.400 0.03857 0.10590 0.11271 0.03900 0.09888 0.10629
MC2 TD 220V BA 0.220 0.01186 0.02430 0.02704 0.01185 0.02419 0.02694 0.01910 0.02758 0.03355
MC2 TD 220V BB 0.220 0.01186 0.02430 0.02704 0.01185 0.02419 0.02694 0.01910 0.02758 0.03355
MC2-LV-CCM1A 0.480 0.00363 0.01676 0.01715 0.00361 0.01624 0.01663
MC2-LV-CCM1B 0.480 0.00363 0.01676 0.01715 0.00361 0.01624 0.01663
MC2-LV-CCM2A 0.480 0.00342 0.01592 0.01628 0.00339 0.01467 0.01506
MC2-LV-CCM2B 0.480 0.00365 0.01685 0.01724 0.00368 0.01634 0.01675
MC2-MV-BA01 4.160 0.03821 0.22565 0.22886 0.03937 0.21117 0.21481 9.04037 0.22358 9.04314
MC2-MV-BB01 4.160 0.04105 0.24474 0.24816 0.04245 0.23986 0.24358 9.04060 0.22680 9.04344
MFA-LV-CCM1 0.480 0.00439 0.02179 0.02223 0.00443 0.02064 0.02111
MFA-LV-CCM2 0.480 0.00439 0.02179 0.02223 0.00443 0.02064 0.02111
MFA-LV-CCM3 0.480 0.00439 0.02179 0.02223 0.00443 0.02064 0.02111
MFA-LV-CCM4 0.480 0.00439 0.02179 0.02223 0.00443 0.02064 0.02111
MFA-MV-1 2.400 0.03535 0.11181 0.11726 0.03467 0.10784 0.11327
MFA-MV-1A 2.400 0.03581 0.11229 0.11786 0.03511 0.10830 0.11384
MFA-MV-2 2.400 0.03627 0.11276 0.11845 0.03555 0.10876 0.11442
Bus341 0.220 0.01631 0.02933 0.03356 0.01632 0.02930 0.03353 0.01369 0.02314 0.02689
bus342 13.800 0.12867 0.59932 0.61297 0.14536 0.55814 0.57675 7.13539 20.81904 22.00786
Bus343 0.220 0.05195 0.06127 0.08033 0.05196 0.06117 0.08026 0.05132 0.05799 0.07744
Bus344 2.400 0.03527 0.14506 0.14929 0.03169 0.12632 0.13023
Bus346 4.160 0.06986 0.24372 0.25353 0.07064 0.22900 0.23964 9.14132 0.26842 9.14526
Bus347 4.160 0.01043 0.13372 0.13412 0.01190 0.12402 0.12459 15.00878 0.11210 15.00920
Bus348 2.400 0.04189 0.10383 0.11196 0.04023 0.09829 0.10620
Bus350 4.160 0.01296 0.16858 0.16908 0.01512 0.16096 0.16167 15.00939 0.13350 15.00999
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 72
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus351 0.220 0.00169 0.00871 0.00887 0.00169 0.00869 0.00885 0.00123 0.00578 0.00590
Bus352 0.220 0.03398 0.06023 0.06916 0.03396 0.06001 0.06895 0.03286 0.05554 0.06453
Bus353 2.400 0.13910 0.18954 0.23510 0.13946 0.18592 0.23241
Bus354 0.220 0.03166 0.05566 0.06403 0.03167 0.05564 0.06402
Bus355 0.220 0.01132 0.02304 0.02567 0.01132 0.02305 0.02568 0.01058 0.02032 0.02291
Bus356 13.800 0.09402 0.53688 0.54505 0.10966 0.58006 0.59033 6.92942 20.64168 21.77374
Bus357 0.220 0.01953 0.03503 0.04011 0.01954 0.03496 0.04005 0.01862 0.03147 0.03657
Bus358 0.480 0.00756 0.02738 0.02841 0.00758 0.02743 0.02846
Bus359 0.480 0.01336 0.02099 0.02488 0.01342 0.02015 0.02421
Bus360 0.220 0.03416 0.06050 0.06947 0.03417 0.06049 0.06947 0.03286 0.05554 0.06453
Bus361 2.400 0.03501 0.09205 0.09848 0.03368 0.08693 0.09323
Bus362 13.800 0.03502 0.36803 0.36969 0.04264 0.32335 0.32615 15.07934 0.75711 15.09833
Bus363 0.220 0.03411 0.06034 0.06932 0.03411 0.06031 0.06929 0.03286 0.05554 0.06453
Bus364 0.480 0.00873 0.02271 0.02433 0.00875 0.02237 0.02402
Bus365 0.480 0.00429 0.01370 0.01435 0.00429 0.01369 0.01435
Bus366 0.220 0.00185 0.00923 0.00942 0.00186 0.00920 0.00939 0.00129 0.00606 0.00620
Bus367 13.800 0.01725 0.43929 0.43963 0.02222 0.42413 0.42471 15.05046 0.68711 15.06614
Bus369 0.480 0.00178 0.01321 0.01332 0.00187 0.01290 0.01304
Bus372 13.800 0.05625 0.54120 0.54411 0.05837 0.50948 0.51281 0.03280 0.35693 0.35843
Bus373 0.480 0.01176 0.02292 0.02576 0.01179 0.02283 0.02570
Bus374 4.160 0.01109 0.13521 0.13566 0.01303 0.12831 0.12897 15.00625 0.09671 15.00656
Bus375 0.220 0.03338 0.05889 0.06769 0.03339 0.05867 0.06750 0.03286 0.05554 0.06453
Bus376 0.220 0.03416 0.06031 0.06932 0.03419 0.06029 0.06931 0.03286 0.05554 0.06453
Bus377 13.800 2.08446 6.43366 6.76291 1.97058 6.09399 6.40467 7.20077 21.55116 22.72231
Bus378 13.800 1.89291 1.77364 2.59401 1.90433 1.81810 2.63286 12.67280 26.20220 29.10593
Bus379 0.220 0.01354 0.03023 0.03312 0.01351 0.02807 0.03115 0.01106 0.02123 0.02394
Bus381 0.220 0.00274 0.01129 0.01162 0.00275 0.01129 0.01162 0.00097 0.00454 0.00465
Bus383 0.220 0.05195 0.06127 0.08033 0.05196 0.06117 0.08026 0.05132 0.05799 0.07744
Bus386 0.220 0.05253 0.06776 0.08574 0.05254 0.06778 0.08575 0.04918 0.05558 0.07421
Bus387 4.160 0.06983 0.24371 0.25351 0.07057 0.22896 0.23959 9.14132 0.26842 9.14526
Bus388 2.400 0.03582 0.09595 0.10242 0.03469 0.09318 0.09943
Bus389 0.480 0.00177 0.01322 0.01334 0.00185 0.01285 0.01298
Bus390 0.220 0.00423 0.01579 0.01634 0.00424 0.01576 0.01632 0.00368 0.01271 0.01323
Bus391 2.400 0.04310 0.10804 0.11632 0.04206 0.10532 0.11341
Bus392 0.480 0.00200 0.01370 0.01385 0.00203 0.01363 0.01378
Bus393 0.220 0.00527 0.01289 0.01393 0.00528 0.01272 0.01377 0.00246 0.00849 0.00883
Bus394 2.400 0.03147 0.16328 0.16629 0.02907 0.14727 0.15012
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 73
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus395 0.220 0.02722 0.04834 0.05548 0.02722 0.04833 0.05547 0.02547 0.04304 0.05001
Bus396 2.400 0.14389 0.20156 0.24765 0.14438 0.20294 0.24906
Bus397 0.220 0.01491 0.02728 0.03109 0.01491 0.02711 0.03094 0.01424 0.02407 0.02796
Bus398 13.800 0.05234 0.49976 0.50249 0.06944 0.53362 0.53812 7.09747 20.64873 21.83447
Bus399 0.480 0.00870 0.02252 0.02414 0.00872 0.02202 0.02369
Bus400 0.220 0.00183 0.00919 0.00937 0.00184 0.00914 0.00932 0.00129 0.00606 0.00620
Bus401 13.800 0.01716 0.43907 0.43941 0.02209 0.42386 0.42444 15.03843 0.67836 15.05372
Bus403 13.800 0.02655 0.35389 0.35488 0.03458 0.30961 0.31154 15.06444 0.71785 15.08153
Bus404 10.350 0.04020 0.52078 0.52233 0.04279 0.48903 0.49090
Bus406 0.220 0.00404 0.01181 0.01249 0.00406 0.01175 0.01244 0.00144 0.00679 0.00694
Bus407 13.800 0.04818 0.39151 0.39446 0.05651 0.34699 0.35156 15.49728 0.98008 15.52824
Bus409 2.400 0.03589 0.19070 0.19405 0.03610 0.19039 0.19378
Bus410 2.400 0.03589 0.19070 0.19405 0.03610 0.19039 0.19378
Bus411 13.800 2.07794 6.42831 6.75582 1.96407 6.08864 6.39758 7.19042 21.53757 22.70614
Bus414 0.480 0.00537 0.02076 0.02144 0.00540 0.02077 0.02146
Bus415 0.220 0.01409 0.02485 0.02857 0.01410 0.02482 0.02854 0.01395 0.02358 0.02739
Bus417 34.500 0.11964 1.53587 1.54052 0.14468 1.57026 1.57691 12.23437 70.39762 71.45282
Bus418 2.400 0.03550 0.14677 0.15100 0.03220 0.12670 0.13073
bus419 13.800 0.12925 0.55152 0.56647 0.14188 0.59006 0.60688 6.98973 20.68725 21.83617
Bus421 2.400 0.02151 0.09293 0.09539 0.02270 0.08670 0.08962
Bus422 4.160 0.01001 0.13303 0.13341 0.01148 0.12332 0.12386 15.00813 0.11040 15.00854
Bus423 0.480 0.00379 0.01683 0.01726 0.00345 0.01459 0.01499 0.00188 0.01086 0.01102
Bus425 0.480 0.00177 0.01321 0.01332 0.00185 0.01283 0.01296
Bus426 0.220 0.05000 0.05897 0.07731 0.05000 0.05882 0.07720 0.04918 0.05558 0.07421
Bus428 0.220 0.02713 0.04810 0.05523 0.02714 0.04809 0.05522 0.02547 0.04304 0.05001
Bus429 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus430 0.480 0.00829 0.03718 0.03809 0.00831 0.03723 0.03815
Bus431 2.400 0.03757 0.16892 0.17304 0.03715 0.15500 0.15938
Bus432 0.480 0.00268 0.01548 0.01571 0.00270 0.01553 0.01576 0.00225 0.01305 0.01325
Bus433 0.220 0.05253 0.06776 0.08574 0.05254 0.06778 0.08575 0.04918 0.05558 0.07421
Bus434 0.220 0.01491 0.02728 0.03109 0.01491 0.02711 0.03094 0.01424 0.02407 0.02796
Bus436 13.800 0.05600 0.46946 0.47279 0.07165 0.51274 0.51772 6.96750 20.54404 21.69340
Bus438 0.480 0.06884 0.11820 0.13678 0.06886 0.11821 0.13681 0.06779 0.11457 0.13312
Bus439 2.400 0.14389 0.20156 0.24765 0.14438 0.20294 0.24906
Bus440 0.480 0.00885 0.02321 0.02484 0.00888 0.02322 0.02486
Bus441 0.480 0.00254 0.01436 0.01458 0.00257 0.01423 0.01446
Bus443 13.800 0.03347 0.42704 0.42835 0.04971 0.39955 0.40263 15.09012 1.48637 15.16315
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 74
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus445 4.160 0.04773 0.17028 0.17684 0.04869 0.16086 0.16807 15.06602 0.20301 15.06739
Bus446 0.220 0.00404 0.01185 0.01252 0.00405 0.01183 0.01250 0.00144 0.00679 0.00694
Bus447 4.160 0.01071 0.13100 0.13144 0.01237 0.12137 0.12199 15.00636 0.09844 15.00669
Bus448 2.400 0.04165 0.19330 0.19773 0.04186 0.19298 0.19747
Bus449 2.400 0.04950 0.19684 0.20297 0.04971 0.19652 0.20271
Bus450 13.800 2.09643 6.43527 6.76813 1.98047 6.09486 6.40856 7.22284 21.55579 22.73371
Bus452 0.220 0.02537 0.04787 0.05417 0.02530 0.04566 0.05220 0.02311 0.03906 0.04539
Bus454 34.500 0.11244 1.52802 1.53215 0.13735 1.56237 1.56839 12.22865 70.39587 71.45011
Bus455 2.400 0.03532 0.14669 0.15088 0.03183 0.12652 0.13046
Bus456 13.800 0.06612 0.51948 0.52367 0.08322 0.55332 0.55954 7.02653 20.64824 21.81106
Bus458 0.220 0.01720 0.02780 0.03269 0.01720 0.02781 0.03270 0.01315 0.02222 0.02581
Bus460 0.480 0.00635 0.01829 0.01936 0.00638 0.01819 0.01927
Bus462 0.220 0.05000 0.05897 0.07731 0.05000 0.05882 0.07720 0.04918 0.05558 0.07421
Bus463 4.160 0.59953 0.46096 0.75625 0.60090 0.46505 0.75984 36.87373 0.74979 36.88135
Bus465 0.480 0.00797 0.02087 0.02234 0.00799 0.02092 0.02240
Bus466 0.480 0.00592 0.02120 0.02201 0.00577 0.02032 0.02113
Bus467 0.220 0.00398 0.01507 0.01559 0.00399 0.01502 0.01554 0.00359 0.01240 0.01291
Bus468 0.480 0.00886 0.02324 0.02487 0.00889 0.02308 0.02473
Bus469 0.480 0.00244 0.01415 0.01436 0.00249 0.01393 0.01415
Bus470 13.800 0.02190 0.34635 0.34704 0.03062 0.30293 0.30447 15.10112 0.71118 15.11786
Bus472 0.220 0.00159 0.00558 0.00580 0.00159 0.00555 0.00578 0.00134 0.00440 0.00460
Bus473 10.350 0.04327 0.56082 0.56248 0.04981 0.53744 0.53974
Bus474 0.480 0.00500 0.01954 0.02017 0.00501 0.01942 0.02005
Bus475 0.220 0.00195 0.00988 0.01007 0.00195 0.00985 0.01004 0.00144 0.00679 0.00694
Bus476 0.480 0.00477 0.01671 0.01738 0.00480 0.01658 0.01726
Bus478 0.220 0.00200 0.00936 0.00957 0.00200 0.00935 0.00956 0.00165 0.00773 0.00791
Bus479 0.220 0.00826 0.01671 0.01864 0.00826 0.01670 0.01863 0.00784 0.01505 0.01697
bus481 0.220 0.01638 0.03566 0.03925 0.01623 0.03344 0.03717 0.01491 0.02862 0.03227
Bus481 0.120 0.02025 0.02435 0.03167 0.02025 0.02435 0.03167 0.01463 0.01654 0.02208
Bus482 0.480 0.01049 0.04452 0.04574 0.00995 0.04267 0.04382
Bus483 0.440 0.00674 0.02219 0.02320 0.00678 0.02208 0.02310 0.00429 0.01698 0.01751
Bus484 13.800 0.07695 0.55920 0.56447 0.09585 0.52065 0.52940 7.12455 20.74537 21.93466
Bus486 2.400 0.06072 0.16405 0.17492 0.05886 0.15828 0.16887
Bus488 4.160 0.00981 0.13269 0.13306 0.01128 0.12299 0.12350 15.00781 0.10954 15.00821
Bus489 0.480 0.00634 0.01826 0.01933 0.00636 0.01818 0.01926
Bus490 0.220 0.02860 0.07210 0.07757 0.02860 0.07199 0.07746 0.02785 0.06879 0.07421
Bus491 2.400 0.03809 0.19091 0.19468 0.03428 0.17514 0.17847
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 75
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus492 13.800 0.12431 0.59594 0.60877 0.14349 0.55810 0.57625 7.78094 21.28911 22.66648
Bus493 13.800 0.58392 0.97129 1.13330 0.59534 1.01574 1.17735 10.59139 24.16416 26.38341
Bus495 2.400 0.03426 0.14506 0.14906 0.03410 0.14136 0.14542
Bus496 0.220 0.00636 0.01669 0.01786 0.00637 0.01668 0.01785 0.00352 0.01214 0.01264
Bus497 0.480 0.00607 0.02169 0.02253 0.00597 0.02096 0.02180
Bus498 0.220 0.00486 0.01428 0.01509 0.00486 0.01429 0.01510 0.00365 0.01259 0.01311
Bus499 2.400 0.07067 0.14108 0.15778 0.07116 0.14226 0.15906
Bus500 0.220 0.00158 0.00556 0.00578 0.00158 0.00553 0.00576 0.00132 0.00435 0.00455
Bus501 13.800 0.02731 0.41721 0.41810 0.04375 0.39017 0.39262 15.12680 1.47970 15.19900
Bus502 0.480 0.00174 0.01289 0.01301 0.00177 0.01278 0.01290
Bus503 0.220 0.00195 0.00990 0.01009 0.00195 0.00989 0.01008 0.00144 0.00679 0.00694
Bus504 0.480 0.00477 0.01677 0.01743 0.00480 0.01667 0.01735
Bus505 0.220 0.02819 0.05055 0.05788 0.02808 0.04829 0.05586 0.02306 0.03897 0.04528
Bus506 13.800 2.09834 6.43549 6.76894 1.98446 6.09581 6.41069 7.22284 21.55579 22.73371
Bus507 0.220 0.00310 0.01309 0.01345 0.00311 0.01310 0.01346 0.00255 0.01199 0.01226
Bus508 0.220 0.00775 0.01611 0.01788 0.00775 0.01612 0.01789 0.00718 0.01379 0.01555
Bus509 2.400 0.56271 0.15775 0.58441 0.54515 0.16452 0.56943
Bus510 0.220 0.00703 0.01858 0.01987 0.00703 0.01846 0.01976 0.00391 0.01349 0.01405
Bus511 4.160 0.03991 0.14500 0.15039 0.04113 0.13515 0.14127 15.05602 0.14096 15.05668
Bus512 0.220 0.00269 0.01010 0.01045 0.00270 0.01008 0.01043
Bus513 0.220 0.04993 0.05889 0.07721 0.04993 0.05878 0.07712 0.04918 0.05558 0.07421
Bus514 2.400 0.03111 0.18550 0.18809 0.03133 0.18519 0.18782
Bus516 0.480 0.01753 0.02915 0.03402 0.01732 0.02816 0.03306
Bus518 13.800 0.02407 0.41157 0.41227 0.04065 0.38471 0.38685 15.07605 1.44930 15.14555
Bus519 4.160 0.01148 0.15545 0.15588 0.01215 0.14752 0.14802 15.00939 0.13350 15.00999
Bus520 0.480 0.00173 0.01278 0.01290 0.00175 0.01266 0.01278
Bus521 4.160 0.04833 0.17717 0.18364 0.04979 0.17087 0.17798 15.06591 0.20129 15.06725
Bus522 0.220 0.00197 0.00987 0.01007 0.00198 0.00978 0.00998 0.00144 0.00679 0.00694
Bus523 0.220 0.00227 0.00948 0.00974 0.00228 0.00945 0.00972 0.00127 0.00596 0.00610
Bus524 0.277 0.42839 0.49628 0.65560 0.42821 0.49567 0.65502 0.42375 0.47883 0.63941
Bus526 2.400 0.04408 0.11287 0.12117 0.04460 0.11389 0.12232
Bus528 0.220 0.00267 0.01000 0.01035 0.00267 0.00998 0.01033
Bus529 0.220 0.04990 0.05878 0.07710 0.04990 0.05853 0.07691 0.04918 0.05558 0.07421
Bus533 0.480 0.01768 0.02966 0.03453 0.01753 0.02881 0.03373
Bus535 4.160 0.01250 0.16232 0.16280 0.01483 0.15268 0.15340 15.00939 0.13350 15.00999
Bus536 0.220 0.00186 0.00960 0.00978 0.00186 0.00957 0.00975 0.00144 0.00679 0.00694
Bus537 0.480 0.00478 0.01904 0.01964 0.00476 0.01815 0.01876
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 76
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus538 0.220 0.00195 0.00978 0.00997 0.00196 0.00977 0.00996 0.00141 0.00663 0.00678
Bus539 0.220 0.00234 0.00976 0.01004 0.00235 0.00974 0.01002 0.00129 0.00606 0.00620
Bus540 4.160 0.37682 2.13754 2.17050 0.37181 1.52118 1.56596 18.10834 0.39230 18.11259
Bus541 0.220 0.00137 0.00421 0.00443 0.00134 0.00412 0.00433 0.00078 0.00242 0.00255
Bus542 34.500 0.11951 1.53424 1.53889 0.14597 1.56897 1.57574 12.17714 70.38012 71.42580
Bus543 0.220 0.00296 0.01107 0.01146 0.00296 0.01105 0.01144 0.00141 0.00663 0.00678
Bus544 0.220 0.00638 0.01348 0.01491 0.00638 0.01349 0.01492 0.00581 0.01116 0.01258
Bus545 4.160 0.03995 0.14501 0.15041 0.04116 0.13515 0.14128 15.05602 0.14096 15.05668
Bus546 2.400 0.02447 0.09704 0.10008 0.02552 0.09068 0.09420
Bus547 0.127 0.09395 0.08575 0.12720 0.09395 0.08576 0.12720 0.09283 0.08169 0.12366
Bus548 0.480 0.01413 0.02301 0.02701 0.01411 0.02249 0.02655
Bus549 0.220 0.00737 0.01883 0.02022 0.00732 0.01862 0.02001 0.00368 0.01271 0.01323
Bus550 2.400 0.01015 0.04970 0.05072 0.01065 0.05088 0.05198
Bus551 0.220 0.00185 0.00957 0.00975 0.00186 0.00949 0.00967 0.00144 0.00679 0.00694
Bus552 13.800 0.02175 0.34610 0.34678 0.03042 0.30260 0.30412 15.10112 0.71118 15.11786
Bus553 0.220 0.00198 0.00988 0.01007 0.00199 0.00975 0.00995 0.00144 0.00679 0.00694
Bus554 4.160 0.01499 0.13718 0.13800 0.01650 0.12724 0.12830 15.01344 0.11481 15.01387
Bus556 4.160 0.38440 2.14336 2.17756 0.38047 1.52801 1.57466 18.10834 0.39230 18.11259
Bus557 34.500 0.11397 1.52797 1.53221 0.14061 1.56287 1.56918 12.17142 70.37837 71.42310
Bus558 0.220 0.04799 0.05683 0.07438 0.04801 0.05677 0.07435 0.04918 0.05558 0.07421
Bus560 2.400 0.04258 0.15464 0.16040 0.04201 0.15001 0.15578
Bus561 0.220 0.00302 0.00931 0.00979 0.00299 0.00921 0.00969 0.00243 0.00752 0.00791
Bus563 0.480 0.01413 0.02301 0.02701 0.01411 0.02249 0.02655
Bus564 0.220 0.00740 0.01894 0.02033 0.00737 0.01876 0.02015 0.00368 0.01271 0.01323
Bus565 0.480 0.00356 0.02024 0.02055 0.00358 0.02029 0.02060
Bus566 0.480 0.00408 0.01435 0.01492 0.00411 0.01418 0.01476
Bus567 13.800 0.02712 0.41690 0.41778 0.04348 0.38973 0.39215 15.12680 1.47970 15.19900
Bus568 0.220 0.00194 0.00978 0.00997 0.00195 0.00977 0.00996 0.00141 0.00663 0.00678
Bus569 4.160 0.01538 0.14140 0.14223 0.01717 0.13422 0.13532 15.01332 0.11308 15.01375
Bus570 0.460 0.00489 0.02936 0.02976 0.00488 0.02026 0.02084 0.00102 0.00723 0.00730
Bus571 13.800 0.06298 0.52360 0.52737 0.08215 0.48576 0.49266 6.78151 20.35969 21.45940
Bus572 0.220 0.04970 0.05876 0.07697 0.04972 0.05870 0.07693 0.04918 0.05558 0.07421
Bus573 0.220 0.01461 0.02502 0.02897 0.01462 0.02502 0.02898 0.00712 0.01203 0.01398
Bus575 2.400 0.02025 0.09646 0.09856 0.02150 0.09231 0.09478
Bus576 2.400 0.03048 0.11105 0.11516 0.03167 0.10482 0.10950
Bus577 0.220 0.01545 0.02994 0.03369 0.01545 0.02994 0.03369 0.01424 0.02407 0.02796
Bus578 13.800 0.09412 0.51884 0.52731 0.10783 0.55834 0.56866 6.93281 20.60307 21.73822
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 77
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus579 0.220 0.01016 0.02145 0.02373 0.01016 0.02143 0.02372 0.00870 0.01671 0.01884
Bus580 0.220 0.03140 0.05456 0.06295 0.03141 0.05457 0.06296 0.03067 0.05184 0.06023
Bus581 0.480 0.00409 0.01440 0.01497 0.00413 0.01420 0.01479
Bus582 4.160 0.03599 0.16631 0.17016 0.03695 0.15689 0.16118 15.04734 0.19327 15.04858
Bus583 0.460 0.00517 0.03052 0.03096 0.00519 0.02162 0.02223 0.00102 0.00721 0.00728
Bus584 34.500 0.11478 1.52890 1.53320 0.14125 1.56357 1.56993 12.17475 70.37837 71.42367
Bus585 2.400 0.07548 0.12703 0.14776 0.07601 0.12805 0.14891
Bus586 0.220 0.05323 0.06253 0.08212 0.05324 0.06248 0.08208 0.04961 0.05606 0.07486
Bus588 0.220 0.00703 0.01858 0.01987 0.00703 0.01846 0.01976 0.00391 0.01349 0.01405
Bus589 4.160 0.03685 0.17345 0.17732 0.03853 0.16754 0.17192 15.04722 0.19155 15.04844
Bus590 0.220 0.02045 0.03604 0.04144 0.02045 0.03605 0.04145 0.01972 0.03332 0.03872
Bus591 13.800 0.09539 0.56803 0.57599 0.11279 0.52724 0.53917 7.07847 20.73486 21.90979
Bus592 2.400 0.02151 0.09293 0.09539 0.02270 0.08670 0.08962
Bus593 4.160 0.03987 0.14498 0.15037 0.04102 0.13511 0.14120 15.05602 0.14096 15.05668
Bus594 2.400 0.01003 0.05041 0.05140 0.01059 0.05119 0.05227
Bus595 0.480 0.00205 0.01335 0.01350 0.00206 0.01322 0.01338
Bus596 115.000 271.89780 1577.77300 1601.03000 267.14480 1180.38300 1210.23600 518.76560 2593.65500 2645.02600
Bus598 13.800 0.06323 0.50471 0.50865 0.08047 0.53888 0.54485 6.78151 20.35969 21.45940
Bus599 0.480 0.01011 0.03305 0.03456 0.01013 0.03309 0.03461 0.00583 0.02740 0.02802
Bus600 0.480 0.00328 0.01121 0.01168 0.00328 0.01110 0.01157
Bus602 2.400 0.03589 0.19070 0.19405 0.03610 0.19039 0.19378
Bus603 0.480 0.00355 0.02025 0.02056 0.00357 0.02028 0.02059
Bus604 0.480 0.00206 0.01344 0.01360 0.00208 0.01336 0.01353
Bus605 115.000 271.89300 1577.76300 1601.01900 267.13920 1180.36900 1210.22100 518.76560 2593.65500 2645.02600
Bus606 13.800 0.06704 0.56184 0.56582 0.08670 0.61081 0.61693 6.78151 20.35968 21.45939
Bus607 0.220 0.00428 0.01356 0.01422 0.00429 0.01357 0.01423 0.00359 0.01240 0.01291
Bus608 0.480 0.00576 0.02795 0.02854 0.00577 0.02794 0.02853
Bus609 4.160 0.37864 2.34193 2.37234 0.37242 1.82193 1.85960 18.02285 0.27733 18.02499
Bus610 13.800 0.02010 0.44414 0.44460 0.02107 0.44094 0.44145 15.04805 0.67661 15.06325
Bus611 0.220 0.04623 0.07907 0.09159 0.04623 0.07908 0.09160 0.04190 0.07081 0.08228
Bus612 13.800 0.12431 0.59594 0.60877 0.14349 0.55810 0.57625 7.78094 21.28911 22.66648
Bus613 0.220 0.00469 0.01578 0.01646 0.00469 0.01579 0.01647 0.00365 0.01259 0.01311
Bus614 0.220 0.02076 0.03711 0.04252 0.02077 0.03707 0.04250 0.01917 0.03240 0.03764
Bus615 2.400 0.02246 0.10542 0.10778 0.02295 0.10680 0.10924
Bus617 34.500 0.11956 1.53430 1.53895 0.14604 1.56906 1.57584 12.17714 70.38012 71.42580
Bus618 0.220 0.00911 0.01928 0.02133 0.00911 0.01929 0.02134 0.01879 0.02648 0.03247
Bus619 4.160 0.03968 0.14493 0.15026 0.04060 0.13497 0.14095 15.05602 0.14096 15.05668
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 78
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus620 0.220 0.02085 0.03643 0.04198 0.02085 0.03644 0.04199 0.01972 0.03332 0.03872
Bus621 0.480 0.00809 0.02412 0.02544 0.00789 0.02304 0.02435
Bus622 0.220 0.01497 0.02680 0.03069 0.01498 0.02680 0.03070 0.01424 0.02407 0.02796
Bus623 4.160 0.03929 0.14480 0.15004 0.04044 0.13499 0.14092 15.05602 0.14096 15.05668
Bus624 34.500 0.11956 1.53430 1.53895 0.14604 1.56906 1.57584 12.15425 70.37312 71.41500
Bus627 0.480 0.03750 0.07688 0.08553 0.03751 0.07673 0.08541 0.03690 0.07084 0.07987
Bus629 4.160 0.01954 0.14276 0.14409 0.02082 0.13289 0.13451 15.02430 0.13670 15.02493
Bus630 13.800 0.11812 0.56923 0.58136 0.13730 0.53140 0.54885 7.10937 20.72607 21.91149
Bus632 13.800 0.11162 0.56321 0.57416 0.13079 0.52537 0.54141 7.09902 20.71077 21.89365
Bus635 4.160 0.07299 0.42880 0.43497 0.07445 0.43295 0.43930
Bus637 13.800 0.04250 0.50026 0.50206 0.06190 0.46234 0.46647 7.04019 20.58831 21.75874
Bus638 0.480 0.01066 0.03044 0.03226 0.01068 0.03049 0.03231
Bus639 4.160 0.00947 0.13214 0.13248 0.01094 0.12243 0.12292 15.00727 0.10812 15.00766
Bus640 13.800 0.03929 0.44775 0.44947 0.05580 0.49283 0.49598 6.89453 20.45652 21.58712
Bus641 2.400 0.03956 0.10616 0.11329 0.04090 0.10214 0.11002
Bus642 0.480 0.01066 0.03044 0.03226 0.01068 0.03049 0.03231
Bus644 4.160 0.00997 0.13839 0.13875 0.01188 0.13218 0.13271 15.00720 0.10674 15.00758
Bus647 0.480 0.01066 0.03044 0.03226 0.01068 0.03049 0.03231
Bus648 0.220 0.02654 0.04592 0.05304 0.02654 0.04594 0.05305 0.02191 0.03703 0.04302
Bus650 0.220 0.01714 0.03501 0.03899 0.01715 0.03502 0.03900 0.01491 0.02862 0.03227
Bus651 13.800 0.08544 1.42565 1.42821 0.09252 1.41600 1.41902 30.09097 1.22453 30.11588
Bus653 13.800 0.04506 0.53657 0.53845 0.06235 0.58276 0.58609 7.26880 20.77145 22.00656
Bus655 2.400 0.11935 0.47001 0.48492 0.10078 0.42141 0.43329 0.11792 0.24505 0.27195
Bus657 13.800 0.04003 0.47702 0.47870 0.05516 0.50871 0.51169 7.26840 20.72578 21.96333
Bus658 2.400 0.03857 0.10590 0.11271 0.03900 0.09888 0.10629
Bus660 2.400 0.03820 0.16565 0.17000 0.03736 0.16114 0.16542
Bus661 13.800 0.02356 0.45029 0.45090 0.02448 0.44689 0.44756 15.04704 0.67712 15.06226
Bus662 13.800 0.04405 0.45427 0.45640 0.05651 0.49511 0.49832 7.16650 20.71309 21.91782
Bus665 13.800 0.03935 0.49481 0.49637 0.05906 0.46071 0.46448 7.26840 20.72578 21.96333
Bus667 0.220 0.01338 0.02309 0.02669 0.01339 0.02304 0.02665 0.01320 0.02231 0.02592
Bus668 4.160 0.03867 0.15071 0.15560 0.03974 0.14424 0.14961 15.05594 0.13957 15.05659
Bus671 0.480 0.00228 0.01186 0.01208 0.00218 0.01120 0.01141 0.00091 0.00648 0.00654
Bus673 2.400 0.04303 0.16866 0.17407 0.04191 0.16398 0.16925
Bus676 2.400 0.09198 0.44967 0.45898 0.08219 0.40561 0.41385 0.03082 0.16952 0.17230
Bus677 0.220 0.01338 0.02309 0.02669 0.01339 0.02304 0.02665 0.01320 0.02231 0.02592
Bus679 0.220 0.01338 0.02309 0.02669 0.01339 0.02305 0.02666 0.01320 0.02231 0.02592
Bus680 4.160 0.04044 0.15126 0.15657 0.04207 0.14488 0.15087 15.05594 0.13957 15.05659
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 79
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus685 4.160 0.10729 0.22158 0.24619 0.10689 0.20771 0.23361 18.22393 0.30204 18.22643
Bus688 0.220 0.05003 0.05905 0.07739 0.05003 0.05900 0.07736 0.04918 0.05558 0.07421
Bus690 4.160 0.01064 0.13950 0.13991 0.01256 0.13329 0.13388 15.00828 0.10958 15.00868
Bus693 4.160 0.01098 0.14006 0.14049 0.01290 0.13385 0.13447 15.00882 0.11101 15.00923
Bus695 0.480 0.00365 0.01694 0.01733 0.00367 0.01686 0.01725
Bus696 0.220 0.01639 0.03022 0.03438 0.01638 0.02998 0.03416 0.01424 0.02407 0.02796
Bus697 0.480 0.00318 0.01316 0.01354 0.00294 0.01231 0.01266 0.00528 0.01085 0.01207
Bus698 4.160 0.01133 0.14063 0.14109 0.01324 0.13442 0.13508 15.00936 0.11243 15.00978
Bus699 2.400 0.02836 0.14766 0.15036 0.02839 0.14275 0.14554
Bus700 2.400 0.08934 0.44774 0.45656 0.08031 0.40415 0.41205 0.02282 0.16198 0.16358
Bus701 0.220 0.01848 0.03738 0.04170 0.01844 0.03714 0.04147 0.01669 0.03205 0.03614
Bus705 0.220 0.04946 0.05750 0.07585 0.04947 0.05746 0.07582 0.04918 0.05558 0.07421
Bus706 0.220 0.02166 0.03824 0.04395 0.02167 0.03823 0.04395 0.02136 0.03610 0.04195
Bus708 0.480 0.00164 0.01260 0.01271 0.00171 0.01204 0.01216
Bus709 0.480 0.00408 0.01665 0.01714 0.00410 0.01652 0.01702
Bus710 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus711 0.220 0.02557 0.04623 0.05283 0.02558 0.04599 0.05262 0.02465 0.04165 0.04840
Bus712 0.480 0.00165 0.01261 0.01272 0.00172 0.01207 0.01219
Bus713 13.800 0.08393 1.42306 1.42554 0.09104 1.41348 1.41640 30.06492 1.20755 30.08916
Bus715 2.400 0.01591 0.09759 0.09888 0.01677 0.09431 0.09579
Bus717 2.400 0.01742 0.10867 0.11006 0.01837 0.10407 0.10567
Bus718 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus719 13.800 6.67146 20.92921 21.96680 6.68714 20.97255 22.01285
Bus723 0.480 0.00165 0.01254 0.01264 0.00175 0.01199 0.01212
Bus725 0.220 0.01297 0.02492 0.02810 0.01298 0.02494 0.02811 0.00835 0.01603 0.01807
Bus726 0.480 0.00168 0.01269 0.01280 0.00179 0.01227 0.01240
Bus727 0.220 0.01453 0.02603 0.02981 0.01453 0.02602 0.02980 0.01424 0.02407 0.02796
Bus728 2.400 0.10781 0.12906 0.16817 0.10372 0.12448 0.16203
Bus730 2.400 0.10808 0.12902 0.16831 0.10452 0.12450 0.16256
Bus731 0.220 0.01175 0.02071 0.02381 0.01175 0.02071 0.02381 0.01156 0.01953 0.02269
Bus733 0.220 0.01230 0.02164 0.02489 0.01230 0.02164 0.02489 0.01210 0.02046 0.02377
Bus734 2.400 0.06962 0.11055 0.13065 0.06779 0.10678 0.12648
Bus735 0.220 0.01170 0.02062 0.02371 0.01170 0.02062 0.02371 0.01150 0.01944 0.02259
Bus738 0.480 0.00167 0.01263 0.01274 0.00178 0.01219 0.01232
Bus739 2.400 0.06987 0.11055 0.13078 0.06846 0.10687 0.12692
Bus740 0.480 0.00169 0.01276 0.01287 0.00176 0.01238 0.01251
Bus741 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 80
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus742 34.500 12.27381 71.90742 72.94740 12.30029 71.94218 72.98613
Bus743 0.480 0.00861 0.02682 0.02817 0.00861 0.02683 0.02818
Bus744 0.480 0.00809 0.02524 0.02650 0.00811 0.02519 0.02647
Bus745 13.800 0.04495 0.53652 0.53840 0.06205 0.58251 0.58581 7.29491 20.78815 22.03095
Bus748 2.400 0.02755 0.14793 0.15047 0.02801 0.14929 0.15190
Bus749 2.400 0.02811 0.14836 0.15100 0.02771 0.14394 0.14658
Bus750 0.220 0.05195 0.06127 0.08033 0.05196 0.06117 0.08026 0.05132 0.05799 0.07744
Bus751 13.800 0.51727 0.98051 1.10859 0.53238 1.02555 1.15549 7.82278 21.72242 23.08808
Bus752 4.160 0.20146 0.98621 1.00658 0.20283 0.99031 1.01087 0.16221 0.90737 0.92176
Bus754 0.220 0.01639 0.03022 0.03438 0.01638 0.02998 0.03416 0.01424 0.02407 0.02796
Bus755 4.160 0.01584 0.16174 0.16251 0.01647 0.15372 0.15460 15.01659 0.15016 15.01734
Bus756 0.220 0.05000 0.05897 0.07731 0.05000 0.05882 0.07720 0.04918 0.05558 0.07421
Bus757 4.160 0.01687 0.16858 0.16942 0.01912 0.15876 0.15991 15.01659 0.15016 15.01734
Bus758 4.160 0.25533 0.49035 0.55284 0.25637 0.49439 0.55691 0.14189 0.41693 0.44042
Bus759 0.220 0.01380 0.01818 0.02282 0.01381 0.01817 0.02282 0.01090 0.00959 0.01452
Bus760 2.400 0.05110 0.14041 0.14942 0.05131 0.14009 0.14919
Bus761 2.400 0.04408 0.11287 0.12117 0.04460 0.11389 0.12232
Bus762 0.480 0.01321 0.06027 0.06170 0.01319 0.06008 0.06151 0.01151 0.05409 0.05530
Bus764 13.800 0.17268 0.57109 0.59662 0.18836 0.61443 0.64265 7.05436 20.72836 21.89586
Bus767 0.220 0.00294 0.01102 0.01140 0.00296 0.01096 0.01135 0.00141 0.00663 0.00678
Bus769 0.220 0.05000 0.05897 0.07731 0.05000 0.05882 0.07720 0.04918 0.05558 0.07421
Bus770 0.480 0.05108 0.09807 0.11058 0.05109 0.09813 0.11063 0.04768 0.09155 0.10322
Bus774 0.480 0.00899 0.03514 0.03627 0.00902 0.03510 0.03624
Bus775 0.480 0.00171 0.01291 0.01302 0.00174 0.01278 0.01290
Bus776 0.220 0.03271 0.05783 0.06644 0.03271 0.05784 0.06644 0.03040 0.05137 0.05969
Bus777 0.480 0.00170 0.01288 0.01299 0.00176 0.01268 0.01280
Bus778 13.800 6.69301 21.03609 22.07517 6.71267 21.08506 22.12780
Bus779 0.220 0.03260 0.05750 0.06610 0.03260 0.05749 0.06609 0.03040 0.05137 0.05969
Bus780 4.160 0.23109 0.47618 0.52929 0.23213 0.48022 0.53338 0.02772 0.29578 0.29708
Bus781 13.800 6.68920 20.97896 22.01958 6.70644 21.01313 22.05738
Bus782 0.220 0.07626 0.09266 0.12001 0.07628 0.09265 0.12000 0.07377 0.08336 0.11132
Bus784 13.800 6.68895 20.99784 22.03750 6.70812 20.96001 22.00730
Bus785 2.400 0.04012 0.14541 0.15085 0.03996 0.14171 0.14724
Bus787 13.800 2.06850 6.42224 6.74714 1.95568 6.08322 6.38985 7.17375 21.52125 22.68539
Bus788 13.800 0.02976 0.35945 0.36067 0.03723 0.31448 0.31668 15.07199 0.73777 15.09004
Bus790 13.800 0.04418 0.45468 0.45682 0.05648 0.49533 0.49854 7.19262 20.72980 21.94216
Bus793 13.800 0.03980 0.47675 0.47840 0.05474 0.50820 0.51114 7.29452 20.74248 21.98774
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 81
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus794 0.220 0.01761 0.03062 0.03532 0.01761 0.03062 0.03532 0.01742 0.02944 0.03420
Bus795 13.800 0.03909 0.49444 0.49598 0.05884 0.46068 0.46442 7.29452 20.74248 21.98774
Bus797 2.400 0.56271 0.15775 0.58441 0.54515 0.16452 0.56943
Bus798 4.160 0.02619 0.16837 0.17039 0.02604 0.15977 0.16188 15.03603 0.17028 15.03699
Bus799 4.160 0.01583 0.16171 0.16249 0.01645 0.15367 0.15455 15.01659 0.15016 15.01734
Bus800 2.400 0.10689 0.14119 0.17709 0.10741 0.14221 0.17822
Bus801 0.480 0.00767 0.03657 0.03736 0.00769 0.03662 0.03742
Bus802 4.160 0.01575 0.16153 0.16229 0.01638 0.15351 0.15438 15.01659 0.15016 15.01734
Bus804 4.160 0.04432 0.17767 0.18312 0.04583 0.16753 0.17369 15.06113 0.17363 15.06213
Bus806 4.160 0.02125 0.17496 0.17624 0.02340 0.16503 0.16668 15.02415 0.16765 15.02508
Bus807 4.160 0.04505 0.18411 0.18954 0.04672 0.17613 0.18222 15.06113 0.17363 15.06213
Bus809 13.800 0.04549 0.45496 0.45723 0.06117 0.49830 0.50204 6.78152 20.35968 21.45940
Bus810 13.800 0.04549 0.45496 0.45723 0.06117 0.49830 0.50204 6.90230 20.47087 21.60320
Bus811 4.160 0.04434 0.17768 0.18313 0.04588 0.16754 0.17371 15.06113 0.17363 15.06213
Bus812 4.160 0.04463 0.17777 0.18329 0.04655 0.16777 0.17410 15.06113 0.17363 15.06213
Bus814 4.160 0.01682 0.16850 0.16933 0.01904 0.15859 0.15972 15.01659 0.15016 15.01734
Bus815 4.160 0.01679 0.16838 0.16922 0.01904 0.15859 0.15972 15.01659 0.15016 15.01734
Bus816 0.480 0.00170 0.01255 0.01266 0.00192 0.01160 0.01176
Bus817 0.480 0.00176 0.01310 0.01322 0.00182 0.01281 0.01294
Bus818 0.480 0.00181 0.01169 0.01183 0.00185 0.01152 0.01167
Bus819 0.480 0.00183 0.01175 0.01189 0.00187 0.01155 0.01170
Bus820 13.800 0.03526 0.36837 0.37006 0.04299 0.32376 0.32660 15.07934 0.75711 15.09833
Bus821 13.800 0.04268 0.44225 0.44431 0.05884 0.41458 0.41874 15.10502 1.52564 15.18187
Bus822 4.160 0.01719 0.17295 0.17380 0.01848 0.16640 0.16743 15.01659 0.15016 15.01734
Bus823 4.160 0.01737 0.17494 0.17580 0.01947 0.16717 0.16830 15.01659 0.15016 15.01734
Bus824 4.160 0.04354 0.18363 0.18873 0.04485 0.17562 0.18126 15.06113 0.17363 15.06213
Bus826 4.160 0.01721 0.17298 0.17383 0.01851 0.16647 0.16750 15.01659 0.15016 15.01734
Bus827 4.160 0.01715 0.17289 0.17374 0.01842 0.16628 0.16730 15.01659 0.15016 15.01734
Bus828 4.160 0.01859 0.17328 0.17427 0.01989 0.16677 0.16796 15.01879 0.15088 15.01954
Bus829 4.160 0.01857 0.17325 0.17425 0.01985 0.16672 0.16790 15.01879 0.15088 15.01954
Bus830 2.400 0.00843 0.08703 0.08744 0.00961 0.08080 0.08137
Bus831 4.160 0.01875 0.17525 0.17625 0.02085 0.16749 0.16878 15.01879 0.15088 15.01954
Bus832 4.160 0.01877 0.17527 0.17627 0.02088 0.16754 0.16884 15.01879 0.15088 15.01954
Bus833 4.160 0.01735 0.17491 0.17576 0.01944 0.16709 0.16822 15.01659 0.15016 15.01734
Bus834 4.160 0.01739 0.17497 0.17583 0.01950 0.16724 0.16837 15.01659 0.15016 15.01734
Bus835 0.480 0.00170 0.01274 0.01285 0.00180 0.01192 0.01205
Bus836 0.480 0.00174 0.01295 0.01307 0.00190 0.01227 0.01241
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 82
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus837 0.480 0.00180 0.01344 0.01356 0.00182 0.01335 0.01347
Bus838 0.480 0.00180 0.01346 0.01358 0.00183 0.01336 0.01348
Bus839 0.480 0.00448 0.01922 0.01973 0.00448 0.01873 0.01926
Bus840 0.480 0.00450 0.01929 0.01981 0.00453 0.01874 0.01928
Bus841 0.480 0.00180 0.01330 0.01342 0.00182 0.01320 0.01333
Bus842 0.480 0.00180 0.01335 0.01347 0.00182 0.01326 0.01339
Bus844 4.160 0.01489 0.13703 0.13784 0.01650 0.12727 0.12833 15.01311 0.11406 15.01354
Bus845 4.160 0.01487 0.13700 0.13780 0.01646 0.12719 0.12825 15.01311 0.11406 15.01354
Bus846 4.160 0.01486 0.13698 0.13779 0.01646 0.12717 0.12823 15.01311 0.11406 15.01354
Bus847 4.160 0.04269 0.14622 0.15232 0.04404 0.13632 0.14325 15.05765 0.13752 15.05828
Bus849 4.160 0.04266 0.14621 0.15231 0.04399 0.13629 0.14321 15.05765 0.13752 15.05828
Bus850 4.160 0.04268 0.14622 0.15232 0.04403 0.13631 0.14325 15.05765 0.13752 15.05828
Bus853 4.160 0.01484 0.13695 0.13775 0.01642 0.12709 0.12815 15.01311 0.11406 15.01354
Bus854 4.160 0.01526 0.14122 0.14204 0.01715 0.13417 0.13526 15.01300 0.11233 15.01342
Bus855 4.160 0.01529 0.14126 0.14208 0.01718 0.13427 0.13536 15.01300 0.11233 15.01342
Bus856 4.160 0.01527 0.14124 0.14206 0.01716 0.13421 0.13530 15.01300 0.11233 15.01342
Bus857 4.160 0.01528 0.14125 0.14207 0.01717 0.13424 0.13533 15.01300 0.11233 15.01342
Bus859 4.160 0.04307 0.15044 0.15649 0.04469 0.14329 0.15010 15.05754 0.13580 15.05815
Bus861 4.160 0.04179 0.16261 0.16789 0.04335 0.15527 0.16121 15.05560 0.16705 15.05653
Bus863 0.480 0.00166 0.01223 0.01234 0.00182 0.01123 0.01138
Bus864 0.480 0.00173 0.01265 0.01276 0.00186 0.01209 0.01224
Bus865 0.480 0.00172 0.01255 0.01267 0.00188 0.01192 0.01207
Bus866 0.480 0.00176 0.01291 0.01303 0.00182 0.01268 0.01281
Bus867 0.480 0.00172 0.01265 0.01277 0.00180 0.01212 0.01225
Bus868 0.480 0.00174 0.01280 0.01292 0.00179 0.01242 0.01255
Bus869 0.480 0.00177 0.01296 0.01308 0.00179 0.01283 0.01295
Bus870 0.480 0.00177 0.01301 0.01313 0.00180 0.01292 0.01305
Bus872 4.160 0.04573 0.15116 0.15792 0.04639 0.14090 0.14834 15.06337 0.15077 15.06413
Bus873 4.160 0.01835 0.14203 0.14321 0.01984 0.13204 0.13352 15.01883 0.12730 15.01937
Bus874 13.800 0.01883 0.34099 0.34151 0.02772 0.29779 0.29908 15.04911 0.67718 15.06434
Bus875 4.160 0.01874 0.14624 0.14744 0.02051 0.13902 0.14052 15.01872 0.12557 15.01925
Bus877 4.160 0.04610 0.15537 0.16207 0.04699 0.14784 0.15513 15.06326 0.14904 15.06400
Bus878 0.480 0.00174 0.01256 0.01268 0.00178 0.01198 0.01211
Bus879 0.480 0.00174 0.01258 0.01270 0.00178 0.01206 0.01219
Bus880 13.800 0.02408 0.45112 0.45176 0.02501 0.44773 0.44843 15.04816 0.67994 15.06352
Bus881 13.800 0.01728 0.43940 0.43974 0.02223 0.42432 0.42491 15.03840 0.67839 15.05369
Bus882 13.800 0.01927 0.34255 0.34309 0.02801 0.29931 0.30062 15.04881 0.67756 15.06406
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 83
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus883 13.800 0.02454 0.41307 0.41380 0.04094 0.38614 0.38831 15.06265 1.43701 15.13105
Bus884 13.800 0.14810 0.63161 0.64874 0.16623 0.67883 0.69889 7.15242 20.78974 21.98569
Bus885 2.400 0.00952 0.08146 0.08201 0.01028 0.08011 0.08077
Bus886 2.400 0.03296 0.09956 0.10487 0.03292 0.09688 0.10232
Bus887 0.480 0.00285 0.01470 0.01497 0.00290 0.01422 0.01452
Bus888 0.480 0.00287 0.01490 0.01518 0.00289 0.01490 0.01518
Bus889 2.400 0.03391 0.10334 0.10876 0.03423 0.10331 0.10883
Bus900 2.400 0.06935 0.11927 0.13796 0.06808 0.11878 0.13690
Bus991 2.400 0.07049 0.11935 0.13861 0.07081 0.11932 0.13875
Bus992 2.400 0.08476 0.10700 0.13650 0.08139 0.10473 0.13263
Bus993 2.400 0.06859 0.11552 0.13434 0.06723 0.11254 0.13109
Bus995 13.800 0.14243 0.54314 0.56151 0.15769 0.58602 0.60686 7.00676 20.65795 21.81389
Bus996 2.400 0.02624 0.09079 0.09451 0.02677 0.09116 0.09500
Bus997 13.800 0.10275 0.57492 0.58403 0.11950 0.53356 0.54677 7.09089 20.75323 21.93119
Bus998 13.800 0.10275 0.57492 0.58403 0.11950 0.53356 0.54677 7.09089 20.75323 21.93119
Bus999 13.800 0.10133 0.52563 0.53531 0.11417 0.56434 0.57578 6.94523 20.62144 21.75959
Bus1000 13.800 0.10133 0.52563 0.53531 0.11417 0.56434 0.57578 6.94523 20.62144 21.75959
Bus1001 13.800 0.13867 0.64239 0.65719 0.15440 0.67372 0.69119 7.22555 21.01151 22.21919
Bus1002 4.160 0.02378 0.22591 0.22716 0.02545 0.22152 0.22297 9.01251 0.17792 9.01426
Bus1003 4.160 0.03537 0.21501 0.21790 0.03719 0.20160 0.20500 9.03461 0.19423 9.03669
Bus1004 0.480 0.00199 0.01369 0.01384 0.00210 0.01297 0.01314
Bus1005 0.480 0.00208 0.01428 0.01443 0.00210 0.01422 0.01437
Bus1006 4.160 0.03773 0.23351 0.23653 0.03935 0.22904 0.23239 9.03483 0.19746 9.03699
Bus1009 4.160 0.05376 0.24197 0.24787 0.05432 0.23705 0.24319 9.06396 0.22110 9.06666
Bus1010 4.160 0.05428 0.25227 0.25805 0.05556 0.24729 0.25346 9.08266 0.24549 9.08598
Bus1011 0.480 0.00279 0.01548 0.01573 0.00281 0.01503 0.01529
Bus1012 0.220 0.17896 0.20488 0.27204 0.17896 0.20477 0.27195 0.17820 0.20136 0.26889
Bus1013 0.220 0.02623 0.04656 0.05344 0.02623 0.04645 0.05335 0.02547 0.04304 0.05001
Bus1014 0.220 0.02623 0.04656 0.05344 0.02623 0.04645 0.05335 0.02547 0.04304 0.05001
Bus1015 0.480 0.00281 0.01541 0.01567 0.00283 0.01522 0.01548
Bus1016 4.160 0.05156 0.23325 0.23888 0.05272 0.21876 0.22503 9.08243 0.24226 9.08566
Bus1017 4.160 0.05427 0.25226 0.25803 0.05556 0.24728 0.25344 9.08266 0.24549 9.08598
Bus1018 0.480 0.00282 0.01558 0.01583 0.00287 0.01514 0.01541
Bus1019 0.480 0.00264 0.01473 0.01496 0.00269 0.01366 0.01392
Bus1020 4.160 0.05126 0.23310 0.23867 0.05217 0.21840 0.22455 9.08243 0.24226 9.08566
Bus1021 4.160 0.10734 0.26414 0.28512 0.10897 0.25966 0.28160 9.14552 0.27527 9.14967
Bus1022 0.480 0.00358 0.01596 0.01635 0.00361 0.01590 0.01630 0.14159 0.23786 0.27682
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 84
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1023 0.480 0.00349 0.01571 0.01609 0.00352 0.01510 0.01551 0.14880 0.25005 0.29097
Bus1024 4.160 0.10437 0.24551 0.26678 0.10562 0.23178 0.25471 9.14530 0.27205 9.14934
Bus1025 4.160 0.05180 0.22366 0.22958 0.05292 0.21007 0.21663 9.06374 0.21788 9.06635
Bus1026 4.160 0.05311 0.22413 0.23034 0.05443 0.21055 0.21747 9.06374 0.21788 9.06635
Bus1027 4.160 0.05249 0.22389 0.22996 0.05410 0.21049 0.21733 9.06374 0.21788 9.06635
Bus1028 4.160 0.02178 0.20766 0.20880 0.02386 0.19457 0.19603 9.01228 0.17470 9.01397
Bus1029 13.800 0.12792 0.59513 0.60872 0.14037 0.63227 0.64767 6.99132 20.80750 21.95064
Bus1030 4.160 0.02781 0.25485 0.25636 0.02870 0.25208 0.25371 18.01748 0.12394 18.01790
Bus1031 0.480 0.00127 0.00980 0.00988 0.00132 0.00951 0.00960
Bus1032 0.480 0.00119 0.00852 0.00860 0.00122 0.00848 0.00857
Bus1033 4.160 0.02214 0.16421 0.16570 0.02364 0.16773 0.16939 18.01748 0.12394 18.01790
Bus1036 13.800 0.09814 0.51580 0.52505 0.11246 0.55757 0.56880 7.37346 20.91774 22.17926
Bus1037 4.160 0.01791 0.18504 0.18590 0.01911 0.18086 0.18186 18.01052 0.14961 18.01114
Bus1038 0.220 0.01480 0.02741 0.03115 0.01480 0.02742 0.03116 0.01424 0.02407 0.02796
Bus1039 0.480 0.00211 0.01506 0.01521 0.00214 0.01512 0.01527
Bus1040 0.220 0.01491 0.02728 0.03109 0.01491 0.02711 0.03094 0.01424 0.02407 0.02796
Bus1041 0.480 0.00200 0.01431 0.01445 0.00208 0.01361 0.01377
Bus1042 4.160 0.02733 0.19681 0.19869 0.02836 0.19232 0.19440 18.02590 0.18022 18.02680
Bus1044 4.160 0.20924 0.24351 0.32106 0.20376 0.23903 0.31409 18.31395 0.39937 18.31830
Bus1045 4.160 0.02200 0.18977 0.19104 0.02294 0.18530 0.18672 18.01786 0.16298 18.01860
Bus1049 4.160 0.02036 0.20547 0.20648 0.02213 0.20986 0.21103 18.01052 0.14961 18.01114
Bus1050 13.800 0.10838 0.61471 0.62419 0.12785 0.66303 0.67525 7.60252 21.11410 22.44111
Bus1051 13.800 0.12908 0.61386 0.62728 0.14874 0.66283 0.67931 7.12034 20.74230 21.93039
Bus1052 2.400 0.00897 0.08011 0.08061 0.00957 0.08159 0.08215
Bus1053 0.220 0.02277 0.04075 0.04668 0.02275 0.04059 0.04654 0.02136 0.03610 0.04195
Bus1054 2.400 0.02827 0.07952 0.08440 0.02845 0.07698 0.08207
Bus1055 0.480 0.00536 0.01992 0.02063 0.00537 0.01982 0.02053
Bus1056 0.480 0.00522 0.01959 0.02027 0.00518 0.01900 0.01970
Bus1057 2.400 0.02816 0.07950 0.08434 0.02821 0.07689 0.08190
Bus1059 2.400 0.01196 0.07775 0.07867 0.01185 0.07492 0.07585
Bus1060 2.400 0.01421 0.07840 0.07968 0.01417 0.07566 0.07697
Bus1061 2.400 0.00788 0.07317 0.07360 0.00805 0.07063 0.07109
Bus1062 2.400 0.00990 0.08469 0.08527 0.01042 0.08506 0.08569
Bus1063 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
Bus1064 4.160 0.05397 0.18480 0.19252 0.05477 0.17355 0.18198 15.07361 0.18262 15.07472
Bus1065 4.160 0.01883 0.17223 0.17325 0.02053 0.16142 0.16272 15.01659 0.15016 15.01734
Bus1066 0.480 0.00182 0.01343 0.01355 0.00184 0.01328 0.01341
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 85
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1067 0.480 0.00549 0.02157 0.02225 0.00554 0.02131 0.02202
Bus1068 2.400 0.04770 0.11870 0.12792 0.04889 0.11246 0.12262
Bus1069 0.480 0.00200 0.01370 0.01385 0.00203 0.01363 0.01378
Bus1070 0.480 0.00193 0.01329 0.01343 0.00201 0.01270 0.01286
Bus1071 4.160 0.02175 0.14002 0.14170 0.02254 0.13023 0.13217 15.03128 0.14002 15.03193
Bus1073 4.160 0.01775 0.13945 0.14057 0.01860 0.12958 0.13091 15.02466 0.13911 15.02531
Bus1074 2.400 0.06569 0.13063 0.14622 0.06621 0.13166 0.14737
Bus1075 4.160 0.02219 0.24357 0.24458 0.02431 0.24211 0.24332 15.01649 0.20007 15.01783
Bus1076 13.800 0.06895 0.46618 0.47125 0.08539 0.43910 0.44733 15.14594 1.58394 15.22854
Bus1077 4.160 0.01565 0.17569 0.17639 0.01724 0.17304 0.17389 15.01053 0.14961 15.01127
Bus1078 0.480 0.00182 0.01347 0.01359 0.00184 0.01340 0.01353
Bus1079 4.160 0.01926 0.17521 0.17627 0.02017 0.17034 0.17153 15.01772 0.16627 15.01864
Bus1080 4.160 0.02325 0.24834 0.24943 0.02534 0.24182 0.24315 1441.08300 0.20007 1441.08300
Bus1081 0.480 0.00464 0.01961 0.02015 0.00466 0.01954 0.02009
Bus1082 4.160 0.02064 0.17551 0.17672 0.02155 0.17064 0.17200 15.01992 0.16699 15.02085
Bus1083 13.800 0.05956 0.39462 0.39909 0.06821 0.35109 0.35765 15.56660 1.04561 15.60168
Bus1084 4.160 0.01474 0.16869 0.16934 0.01566 0.16385 0.16459 15.01053 0.14961 15.01127
Bus1088 4.160 0.04699 0.18437 0.19027 0.04754 0.17929 0.18548 15.06226 0.18974 15.06346
Bus1089 4.160 0.02017 0.18221 0.18333 0.02175 0.17954 0.18085 15.01772 0.16627 15.01864
Bus1091 4.160 0.04818 0.19148 0.19745 0.04977 0.18882 0.19527 15.06226 0.18974 15.06346
Bus1094 4.160 0.02660 0.25317 0.25456 0.02864 0.24655 0.24821 1441.08800 0.21256 1441.08800
Bus1096 0.480 0.00188 0.01426 0.01439 0.00194 0.01384 0.01398
Bus1098 4.160 0.02017 0.18222 0.18334 0.02176 0.17956 0.18088 15.01772 0.16627 15.01864
Bus1099 0.480 0.00191 0.01444 0.01457 0.00194 0.01442 0.01455
Bus1100 0.480 0.00184 0.01356 0.01368 0.00186 0.01352 0.01365
Bus1101 4.160 0.02553 0.24840 0.24971 0.02761 0.24683 0.24837 15.02189 0.21256 15.02339
Bus1102 4.160 0.01926 0.17521 0.17627 0.02017 0.17034 0.17153 15.01772 0.16627 15.01864
Bus1103 0.480 0.00182 0.01347 0.01359 0.00184 0.01340 0.01353
Bus1104 4.160 0.01926 0.17521 0.17627 0.02017 0.17034 0.17153 15.01772 0.16627 15.01864
Bus1105 0.480 0.00182 0.01347 0.01359 0.00184 0.01340 0.01353
Bus1107 4.160 0.02017 0.18222 0.18334 0.02176 0.17956 0.18088 15.01772 0.16627 15.01864
Bus1108 4.160 0.02155 0.18252 0.18379 0.02314 0.17986 0.18134 15.01992 0.16699 15.02085
Bus1109 0.480 0.00191 0.01431 0.01443 0.00198 0.01405 0.01419
Bus1110 4.160 0.02721 0.25082 0.25229 0.02928 0.24920 0.25092 15.02459 0.21881 15.02618
Bus1111 0.480 0.00195 0.01454 0.01467 0.00198 0.01445 0.01459
Bus1112 4.160 0.02846 0.25609 0.25767 0.03051 0.24950 0.25136 1441.09700 0.21947 1441.09700
Bus1114 4.160 0.05588 0.26474 0.27057 0.05748 0.25787 0.26420 1441.13500 0.24228 1441.13500
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 86
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1115 0.480 0.00183 0.01348 0.01361 0.00188 0.01335 0.01348
Bus1117 4.160 0.05481 0.25995 0.26566 0.05643 0.25809 0.26419 15.06913 0.24228 15.07107
Bus1118 4.160 0.05481 0.25995 0.26566 0.05643 0.25809 0.26419 15.06913 0.24228 15.07107
Bus1119 0.480 0.00184 0.01356 0.01368 0.00186 0.01352 0.01365
Bus1121 0.480 0.00465 0.01970 0.02024 0.00468 0.01967 0.02021
Bus1122 0.480 0.00731 0.02090 0.02214 0.00736 0.02061 0.02189
Bus1123 0.480 0.00736 0.02116 0.02240 0.00739 0.02107 0.02233
Bus1124 4.160 0.02931 0.30181 0.30323 0.03132 0.29559 0.29725 15.02298 0.26204 15.02526
Bus1125 13.800 0.07258 0.47084 0.47641 0.08890 0.44361 0.45243 15.15188 1.59614 15.23572
Bus1127 13.800 0.06992 0.40750 0.41345 0.07722 0.36306 0.37118 15.61979 1.10332 15.65871
Bus1128 13.800 0.06260 0.39997 0.40484 0.07021 0.35568 0.36255 15.60697 1.08250 15.64447
Bus1129 4.160 0.02881 0.29956 0.30094 0.03041 0.29106 0.29265 15.02338 0.26664 15.02575
Bus1130 2.400 0.05760 0.10811 0.12249 0.05826 0.10477 0.11988
Bus1131 2.400 0.00792 0.08888 0.08923 0.00890 0.08582 0.08628
Bus1132 13.800 0.06102 0.50041 0.50411 0.07799 0.53417 0.53984 7.11880 20.67484 21.86610
Bus1133 13.800 0.06477 0.55753 0.56128 0.08411 0.60599 0.61180 7.12079 20.67648 21.86830
Bus1134 2.400 0.00927 0.10015 0.10058 0.01051 0.09600 0.09657
Bus1135 2.400 0.05923 0.11933 0.13322 0.06007 0.11485 0.12961
Bus1136 4.160 0.03384 0.30682 0.30869 0.03541 0.29821 0.30030 15.03148 0.28538 15.03419
Bus1139 4.160 0.03385 0.30683 0.30869 0.03542 0.29821 0.30031 15.03148 0.28538 15.03419
Bus1141 4.160 0.06191 0.31819 0.32416 0.06329 0.31151 0.31787 15.07561 0.30425 15.07868
Bus1142 13.800 0.06083 0.50023 0.50391 0.07790 0.53411 0.53976 7.11839 20.67423 21.86539
Bus1143 4.160 0.03437 0.30911 0.31102 0.03635 0.30282 0.30500 15.03108 0.28078 15.03370
Bus1144 4.160 0.03435 0.30908 0.31099 0.03633 0.30276 0.30493 15.03108 0.28078 15.03370
Bus1145 4.160 0.06019 0.32928 0.33473 0.06123 0.32003 0.32583 15.07408 0.34329 15.07799
Bus1146 13.800 0.06460 0.55731 0.56104 0.08405 0.60590 0.61170 7.11839 20.67423 21.86539
Bus1147 0.480 0.00200 0.01509 0.01522 0.00206 0.01481 0.01495
Bus1148 0.480 0.00201 0.01509 0.01522 0.00206 0.01486 0.01500
Bus1149 0.480 0.00068 0.01536 0.01537 0.00071 0.01527 0.01529
Bus1150 0.480 0.00069 0.01521 0.01523 0.00078 0.01497 0.01499
Bus1153 2.400 0.07080 0.11052 0.13125 0.07070 0.10691 0.12817
Bus1157 13.800 0.04251 0.43537 0.43744 0.05861 0.40782 0.41201 15.10439 1.50671 15.17936
Bus1158 4.160 0.01906 0.22680 0.22760 0.02108 0.20844 0.20950 15.01649 0.20007 15.01783
Bus1159 0.480 0.00179 0.01393 0.01404 0.00187 0.01306 0.01320
Bus1160 4.160 0.02122 0.23302 0.23398 0.02316 0.21441 0.21565 15.02009 0.21635 15.02164
Bus1170 4.160 0.05630 0.26148 0.26747 0.05696 0.24171 0.24833 15.07757 0.29057 15.08037
Bus1171 4.160 0.05630 0.26148 0.26747 0.05696 0.24171 0.24833 15.07757 0.29057 15.08037
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 87
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1172 13.800 0.03595 0.36459 0.36635 0.04447 0.32082 0.32389 15.23466 0.81901 15.25666
Bus1173 4.160 0.01872 0.22201 0.22280 0.02032 0.20477 0.20578 15.01649 0.20007 15.01783
Bus1174 4.160 0.05598 0.25672 0.26275 0.05627 0.23811 0.24466 15.07757 0.29057 15.08037
Bus1177 4.160 0.02036 0.22643 0.22735 0.02190 0.20897 0.21012 15.01925 0.21176 15.02074
Bus1178 0.480 0.00175 0.01362 0.01373 0.00184 0.01253 0.01266
Bus1179 0.480 0.00463 0.02025 0.02077 0.00457 0.01929 0.01983
Bus1180 4.160 0.03276 0.24876 0.25091 0.03410 0.22918 0.23170 15.03935 0.25832 15.04156
Bus1181 4.160 0.06655 0.27697 0.28485 0.06572 0.25558 0.26389 15.09593 0.33305 15.09960
Bus1182 4.160 0.06778 0.25590 0.26473 0.06653 0.23652 0.24570 15.09835 0.29000 15.10113
Bus1183 4.160 0.03234 0.24383 0.24596 0.03322 0.22520 0.22764 15.03935 0.25832 15.04156
Bus1184 0.480 0.00445 0.01969 0.02019 0.00433 0.01819 0.01869
Bus1185 13.800 0.10365 0.45333 0.46503 0.11237 0.40991 0.42503 16.10207 1.43289 16.16570
Bus1186 4.160 0.01880 0.17469 0.17570 0.01959 0.17075 0.17187 15.00939 0.13350 15.00999
Bus1187 13.800 0.11610 0.52404 0.53675 0.13233 0.49662 0.51395 15.22139 1.73177 15.31958
Bus1188 4.160 0.01984 0.17996 0.18105 0.02151 0.17630 0.17761 15.00939 0.13350 15.00999
Bus1194 4.160 0.02286 0.18638 0.18777 0.02365 0.18243 0.18396 15.01585 0.16319 15.01674
Bus1195 0.480 0.00187 0.01361 0.01374 0.00188 0.01356 0.01369
Bus1196 0.480 0.00181 0.01317 0.01329 0.00189 0.01257 0.01271
Bus1197 13.800 0.04599 0.53713 0.53910 0.06631 0.58733 0.59107 7.04019 20.58831 21.75874
Bus1198 13.800 0.04247 0.48067 0.48255 0.06033 0.51603 0.51955 7.04019 20.58831 21.75874
Bus1199 13.800 0.13555 0.54746 0.56399 0.15200 0.52042 0.54217 15.25183 1.79034 15.35655
Bus1200 4.160 0.02170 0.18325 0.18453 0.02319 0.18079 0.18227 15.00939 0.13350 15.00999
Bus1201 4.160 0.02385 0.19148 0.19296 0.02550 0.18764 0.18936 15.01585 0.16319 15.01674
Bus1202 0.480 0.00473 0.01981 0.02036 0.00475 0.01977 0.02034
Bus1203 4.160 0.02761 0.19008 0.19208 0.02910 0.18763 0.18987 15.01879 0.15088 15.01954
Bus1206 13.800 0.12126 0.47641 0.49160 0.12998 0.43299 0.45208 16.32850 1.59313 16.40603
Bus1207 4.160 0.02040 0.17679 0.17797 0.02119 0.17285 0.17414 15.00939 0.13350 15.00999
Bus1211 4.160 0.02631 0.18363 0.18550 0.02710 0.17968 0.18171 15.01879 0.15088 15.01954
Bus1212 0.480 0.00471 0.01972 0.02028 0.00472 0.01967 0.02023
Bus1217 0.480 0.00580 0.02135 0.02212 0.00582 0.02131 0.02209
Bus1218 4.160 0.10774 0.30572 0.32415 0.10923 0.30327 0.32234 15.14619 0.44576 15.15275
Bus1221 4.160 0.10644 0.29927 0.31763 0.10723 0.29532 0.31419 15.14619 0.44576 15.15275
Bus1222 0.480 0.00578 0.02126 0.02203 0.00579 0.02121 0.02198
Bus1225 13.800 0.03459 0.36820 0.36982 0.04310 0.32427 0.32712 15.29963 0.84506 15.32296
Bus1226 13.800 0.04085 0.43929 0.44119 0.05710 0.41184 0.41577 15.10184 1.51725 15.17786
Bus1227 2.400 0.10510 0.15656 0.18857 0.09975 0.15137 0.18128
Bus1228 4.160 0.07738 0.25585 0.26729 0.07837 0.25093 0.26288 9.09870 0.25476 9.10226
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 88
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
MFA-MV-2A 2.400 0.03673 0.11324 0.11905 0.03598 0.10921 0.11499
MFA-MV-3 2.400 0.03719 0.11372 0.11965 0.03642 0.10967 0.11556
MJA-CCM-480-1 0.480 0.00704 0.02468 0.02567 0.00710 0.02443 0.02544
MJA-CCM-480-2 0.480 0.01721 0.03080 0.03528 0.01727 0.03055 0.03509
MJA-LV-1 0.480 0.01186 0.04423 0.04580 0.01191 0.04418 0.04576
MJA-MV-1 2.400 0.04100 0.12270 0.12936 0.04158 0.12155 0.12846
MJA-MV-2 2.400 0.04309 0.12385 0.13113 0.04368 0.12270 0.13024
MJN-131-IT-4 2.400 0.01512 0.13450 0.13535 0.01532 0.13419 0.13506
MJN-133-IT-1 0.480 0.00645 0.02634 0.02712 0.00646 0.02633 0.02711
MJN-CCM-PN 0.480 0.00645 0.02634 0.02712 0.00646 0.02633 0.02711
MLA 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
MP LV-CCM-1-480 0.480 0.00495 0.01520 0.01598 0.00497 0.01523 0.01602
MP LV-CCM-2-480 0.480 0.00495 0.01515 0.01594 0.00497 0.01520 0.01599
MP-TD-1 13.800 0.04576 0.53674 0.53869 0.06542 0.58571 0.58935 6.98788 20.54639 21.70218
MP-TD-2 13.800 0.04195 0.47961 0.48144 0.05919 0.51378 0.51718 6.98788 20.54639 21.70218
MP-TD-3 13.800 0.04170 0.49850 0.50024 0.06087 0.46067 0.46467 6.98788 20.54639 21.70218
MP-TD-4 13.800 0.03923 0.44758 0.44929 0.05491 0.49091 0.49398 6.84222 20.41460 21.53072
MSW-MCC-01A 0.480 0.00825 0.02415 0.02552 0.00804 0.02298 0.02435
MSW-MCC-01B 0.480 0.00809 0.02412 0.02544 0.00789 0.02304 0.02435
MSW-MCC-02 0.220 0.08951 0.09950 0.13383 0.08871 0.09898 0.13291 0.07912 0.08941 0.11939
MV-1A-1 2.400 0.03217 0.10611 0.11088 0.03265 0.10350 0.10852
MV-1A-2 2.400 0.02584 0.09911 0.10242 0.02631 0.09649 0.10001
MV-MZ- BB 2.4 kV 13.800 0.10428 0.47610 0.48739 0.12073 0.44906 0.46501 15.60541 1.97856 15.73034
MV-MZ-BA 2.4 kV 13.800 0.09880 0.40518 0.41705 0.10744 0.36168 0.37730 15.57973 1.21003 15.62665
MV-SWGR-01A 13.800 0.15521 1.54262 1.55041 0.16184 1.53122 1.53975 30.48021 1.64790 30.52472
MV-SWGR-01B 13.800 0.09164 0.53401 0.54182 0.10728 0.57719 0.58708 6.92562 20.63438 21.76561
MV-SWGR/MCC-01A 4.160 0.02139 0.24958 0.25049 0.02238 0.24695 0.24796 18.00713 0.11035 18.00747
MV-SWGR/MCC-01B 4.160 0.01565 0.15888 0.15965 0.01718 0.16244 0.16335 18.00713 0.11035 18.00747
MZ-LV-CCM1 0.480 0.01109 0.04665 0.04795 0.01102 0.04645 0.04774
MZ-LV-CCM2 0.480 0.01137 0.04699 0.04835 0.01131 0.04679 0.04814
MZ-MV-01 2.400 0.05858 0.13906 0.15090 0.05669 0.13414 0.14562
OLEODUCTO-CCM-2400V 2.400 0.10390 0.45878 0.47040 0.09048 0.41257 0.42238 0.06798 0.20452 0.21552
PARTE SUP SUPTCIA FUERZA 2.400 0.04408 0.11287 0.12117 0.04460 0.11389 0.12232
PATOS-HV-CCM13.8A 13.800 0.58191 0.93381 1.10029 0.59639 0.89373 1.07445 10.59140 24.16416 26.38341
PATOS-HV-CCM13.8B 13.800 0.58392 0.97129 1.13330 0.59534 1.01574 1.17735 10.59139 24.16416 26.38341
PATOS-MV-CCM2.4A 2.400 0.03065 0.15017 0.15327 0.03056 0.14512 0.14831
PATOS-MV-CCM2.4B1 2.400 0.03034 0.15083 0.15385 0.02977 0.14620 0.14920
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 89
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
PRIM 19-MV-TR3 4.160 0.10022 0.32167 0.33693 0.10085 0.32073 0.33621 18.28978 0.24366 18.29140
PRIM 19-MV-TR4 4.160 0.66963 2.11191 2.21553 0.66907 2.08953 2.19404
PRIM CERO-CORTES-TRA2 0.480 0.00546 0.01215 0.01332 0.00545 0.01185 0.01304 0.00404 0.00840 0.00932
PRIM CERO-CORTES-TRA3 0.480 0.00438 0.01164 0.01244 0.00407 0.01114 0.01186 0.00404 0.00840 0.00932
PRIMARIO 19-TR1 13.800 0.25151 0.83599 0.87300 0.26130 0.86960 0.90801 8.27251 22.02771 23.52986
PRIMARIO SE-19 TR-2 13.800 0.32872 1.86441 1.89317 0.33559 1.85401 1.88414 31.82710 3.04122 31.97207
S. AUX. TD-480 V 0.480 0.00861 0.02682 0.02817 0.00861 0.02683 0.02818
S.E-16-MV-TDA-2 13.800 0.38383 0.85700 0.93903 0.39893 0.90203 0.98631 7.61064 21.40866 22.72120
S.E 25 TAB 13.8 BA 13.800 0.12476 0.58981 0.60286 0.13734 0.62720 0.64206 6.98592 20.79327 21.93544
S.E 25 TAB 13.8 BB 13.800 0.13537 0.63691 0.65114 0.15116 0.66834 0.68522 7.22015 20.99729 22.20398
S.E 25 TDA-1 BB 4.160 0.02464 0.22686 0.22819 0.02626 0.22239 0.22393 9.01403 0.18057 9.01583
S.E 25 TDA-1 BB2 4.160 0.02252 0.20848 0.20969 0.02449 0.19522 0.19675 9.01380 0.17734 9.01554
S.E-CH-LV-CCM-480 0.480 0.05528 0.10057 0.11477 0.05529 0.10063 0.11482 0.06091 0.09770 0.11513
S.E-U100 CCM-A-1 4160 BA 4.160 0.09144 0.23964 0.25649 0.09283 0.22597 0.24430 9.12449 0.25706 9.12811
S.E-U100 CCM-A-2 4160 BB 4.160 0.09426 0.25824 0.27491 0.09588 0.25376 0.27127 9.12472 0.26029 9.12843
S.E.CH-MV-CCMBA 4.160 0.25010 0.48799 0.54835 0.25114 0.49203 0.55241 0.13357 0.41094 0.43210
SE GIS 115 kV BA 115.000 0.52460 4.03384 4.06781 0.52486 4.03186 4.06588 1.27809 7.21866 7.33093
SE GIS 115 kV BB 115.000 0.50296 3.90053 3.93282 0.50792 3.90539 3.93828 0.87394 5.84906 5.91399
SE-1 TD-1 2.400 0.01046 0.10109 0.10163 0.01159 0.09679 0.09748
SE-1 TD-2 2.400 0.00881 0.08985 0.09028 0.00973 0.08668 0.08722
SE-2-MV- BA 2.400 0.00736 0.08270 0.08302 0.00789 0.08372 0.08409
SE-2-MV- BB 2.400 0.00751 0.08360 0.08394 0.00809 0.08244 0.08284
SE-10 INT DE 2400V 2.400 0.03183 0.18628 0.18898 0.03204 0.18597 0.18871
SE 13 2400 2.400 0.00833 0.09237 0.09274 0.00887 0.09114 0.09157
SE-14-CCM-MV-TD-2 4.160 0.19886 0.98407 1.00397 0.20023 0.98817 1.00825 0.15807 0.90194 0.91569
SE-19 BUS TR-ALUMBRADO 0.220 0.18149 0.21393 0.28054 0.18149 0.21387 0.28049 0.17820 0.20136 0.26889
SE-19A 28-MV-28G31 BA 4.160 0.03373 0.26880 0.27090 0.03369 0.25928 0.26146 18.05028 0.26567 18.05223
SE-19A 28-MV-28G31 BB 4.160 0.24044 1.08401 1.11035 0.20162 0.95914 0.98010
SE-19A BUS TAB 480 0.480 0.00317 0.01056 0.01102 0.00286 0.00982 0.01023 0.00139 0.00470 0.00490
SE-21 CCM 480V BA 0.480 0.00673 0.02212 0.02312 0.00663 0.02139 0.02240
SE-21 CCM 480V BB 0.480 0.00694 0.02254 0.02359 0.00695 0.02244 0.02349
SE-171-HV-4221A 13.800 0.04788 0.49239 0.49471 0.06498 0.52629 0.53028 7.09034 20.62995 21.81440
SE-171-HV-4221B 13.800 0.05153 0.46207 0.46494 0.06718 0.50538 0.50982 6.96038 20.52526 21.67333
SE-ANIDES TABLERO 2.400 0.02316 0.14070 0.14259 0.02337 0.14039 0.14232
SE-CAF BUS ALUM. 220 0.220 0.00175 0.00744 0.00765 0.00176 0.00745 0.00765 0.00138 0.00649 0.00664
SE-CAF CCM-LV-480-2 0.480 0.00268 0.01104 0.01136 0.00270 0.01108 0.01141
SE-CAF CCM-LV-BUS 440 0.480 0.00268 0.01104 0.01136 0.00270 0.01108 0.01141
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 90
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
SE-CAF CCM-LV-VENT DB-25 0.480 0.00268 0.01104 0.01136 0.00270 0.01108 0.01141
SE-CAF COMP. Y VENT. 0.480 0.00268 0.01104 0.01136 0.00270 0.01108 0.01141
SE-CAF LV-DB-50 0.220 0.00175 0.00744 0.00765 0.00176 0.00745 0.00765 0.00138 0.00649 0.00664
SE-CAF UBICADO DIB.-220-1 0.220 0.05402 0.06273 0.08278 0.05403 0.06274 0.08279 0.05346 0.06041 0.08067
SE-CAF UBICADO DIB.-220-2 0.220 0.05402 0.06273 0.08278 0.05403 0.06274 0.08279 0.05346 0.06041 0.08067
SE-CAF UBICADO DIBUJO 0.480 0.00268 0.01104 0.01136 0.00270 0.01108 0.01141
SE-ED PER LV-CCM-480-1 0.480 0.02060 0.03930 0.04437 0.02063 0.03934 0.04442 0.03890 0.04278 0.05782
SE-ED PER LV-CCM-480-2 0.480 0.02060 0.03930 0.04437 0.02063 0.03934 0.04442 0.03890 0.04278 0.05782
SE-ED PER UBICADO DIB 0.220 0.01461 0.02502 0.02897 0.01462 0.02502 0.02898 0.00712 0.01203 0.01398
SE-LAB. CCM-BA_220V 0.220 0.00620 0.01615 0.01730 0.00621 0.01616 0.01731 0.01232 0.01952 0.02308
SE-LAB. CCM-BA-480 0.480 0.01381 0.04087 0.04314 0.01384 0.04082 0.04310
SE-LAB. CCM-BB-220V 0.220 0.00620 0.01615 0.01730 0.00621 0.01616 0.01731 0.01232 0.01952 0.02308
SE-LAB. CCM-BB-480 0.480 0.01381 0.04087 0.04314 0.01384 0.04082 0.04310
SE-U100 LP-1 220 0.220 0.07358 0.06899 0.10086 0.07357 0.06884 0.10076
SE-U100 LPE-2 0.220 0.07365 0.06924 0.10109 0.07366 0.06922 0.10108
SEC CERO-CORTES-TRA1 0.480 0.00150 0.00929 0.00941 0.00149 0.00899 0.00911 0.00180 0.00542 0.00571
SEC-2 CERO-CORTES-TRA1 0.480 0.00546 0.01215 0.01332 0.00545 0.01185 0.01304 0.00404 0.00840 0.00932
SEC-3 CERO-CORTES-TRA1 0.480 0.00438 0.01164 0.01244 0.00407 0.01114 0.01186 0.00404 0.00840 0.00932
SECCIONAD-124 13.800 0.05810 0.55129 0.55434 0.07756 0.59990 0.60489 7.10804 20.65892 21.84755
SECCIONAD-0244 13.800 0.05433 0.49421 0.49718 0.07140 0.52809 0.53290 7.10804 20.65893 21.84755
SECCIONAD-0246 13.800 0.05458 0.49444 0.49745 0.07165 0.52833 0.53316 7.10845 20.65954 21.84826
SECCIONAD-0248 13.800 0.05835 0.55158 0.55466 0.07780 0.60018 0.60521 7.11044 20.66117 21.85046
SECUNDARIO 19-TR1 4.160 0.03041 0.19625 0.19859 0.03086 0.19606 0.19848 18.00891 0.12660 18.00935
SECUNDARIO 19-TR2 4.160 0.03877 0.29602 0.29855 0.03939 0.29507 0.29769 18.00891 0.12660 18.00935
SGM-5176 BA 4.160 0.35172 2.11517 2.14422 0.35446 1.50782 1.54892 18.02555 0.28358 18.02778
SGM-5176 BB 4.160 0.35172 2.11517 2.14422 0.35446 1.50782 1.54892 18.02555 0.28358 18.02778
T.C LV-CCM-220 0.220 0.04349 0.02439 0.04987 0.04350 0.02440 0.04988 0.00775 0.01488 0.01678
T.C LV-CCM-480 0.480 0.17015 0.04527 0.17607 0.17017 0.04533 0.17610
TA-A TD-102 0.220 0.02189 0.03977 0.04539 0.02191 0.03964 0.04529 0.02136 0.03610 0.04195
TAB SE-7 1/2 0.220 0.02170 0.02063 0.02994 0.02170 0.02064 0.02995 0.05991 0.03783 0.07085
TAB-E-EDIFICIO 0.220 0.00490 0.01063 0.01170 0.00490 0.01064 0.01172 0.00700 0.01323 0.01496
TAB. EMERG. SITE 0.220 0.00490 0.01063 0.01170 0.00490 0.01064 0.01172 0.00700 0.01323 0.01496
TAB.LAB B1 2.400 0.05918 0.12528 0.13856 0.05970 0.12631 0.13971
TAB.LAB B2 2.400 0.05933 0.12619 0.13944 0.05990 0.12502 0.13863
TABLERO 04-CB-01 13.800 0.07211 0.55132 0.55601 0.09020 0.51127 0.51916 7.11818 20.72858 21.91672
TABLERO 04-CB-02 13.800 0.07673 0.59040 0.59536 0.09575 0.63778 0.64493 7.11818 20.72858 21.91672
TAR-CCM-1 0.480 0.01045 0.02475 0.02686 0.01049 0.02463 0.02677 0.01019 0.02346 0.02557
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 91
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
TAR-CCM-2 0.480 0.01045 0.02474 0.02686 0.01049 0.02462 0.02677 0.01019 0.02346 0.02557
TAR-CCM-220V 0.220 0.00443 0.01301 0.01374 0.00443 0.01298 0.01372 0.00234 0.00806 0.00839
TBS-1 34.500 0.11241 1.52630 1.53043 0.13889 1.56106 1.56723 12.16570 70.37663 71.42039
TBT-01 0.480 0.00113 0.00827 0.00835 0.00112 0.00783 0.00791 0.00115 0.00428 0.00444
TBT-01 CC 0.480 0.00266 0.01241 0.01269 0.00251 0.01167 0.01193 0.00273 0.00830 0.00873
TCC-TAB-DIS-INT 0.480 0.01066 0.03044 0.03226 0.01068 0.03049 0.03231
TD-1 0.220 0.01451 0.02765 0.03122 0.01452 0.02750 0.03110 0.01304 0.02203 0.02560
TD-1 BA SE-1 0.480 0.00143 0.01019 0.01029 0.00147 0.01016 0.01026
TD-1 BB SE-1 0.480 0.00130 0.00930 0.00939 0.00136 0.00926 0.00935
TD-2 0.220 0.01466 0.02790 0.03152 0.01468 0.02774 0.03139 0.01320 0.02231 0.02592
TD-5 13.800 0.10158 1.45344 1.45699 0.10846 1.44308 1.44715 30.37075 1.40688 30.40332
TD-6 13.800 0.10313 1.45678 1.46043 0.11001 1.44638 1.45056 30.39680 1.42812 30.43033
TD-34.5 kV-SP 34.500 0.11248 1.52787 1.53200 0.13753 1.56226 1.56830 12.22292 70.39412 71.44741
TD-BT-220 BA SE-7A 0.220 0.00739 0.01745 0.01895 0.00739 0.01743 0.01893 0.00614 0.01179 0.01329
TD-BT-220 BB SE-7A 0.220 0.00739 0.01745 0.01895 0.00739 0.01743 0.01893 0.00614 0.01179 0.01329
TD-BT-CB-1A 0.220 0.02076 0.03711 0.04252 0.02077 0.03706 0.04248 0.01917 0.03240 0.03764
TD-BT-CB-1B 0.220 0.02076 0.03711 0.04252 0.02077 0.03707 0.04250 0.01917 0.03240 0.03764
TD-MT-CB-1A 2.400 0.03850 0.11175 0.11819 0.03968 0.10551 0.11273
TD-MT-CB-1B 2.400 0.03871 0.11162 0.11814 0.04005 0.10759 0.11480
TD-MT-CB-CCM 2.400 0.03048 0.11105 0.11516 0.03167 0.10482 0.10950
TD-SP BA 0.480 0.01099 0.03076 0.03266 0.01099 0.03076 0.03267
TD-SP BB 0.480 0.01047 0.02918 0.03100 0.01049 0.02913 0.03096
TDA-1 BUS A 2.400 0.02451 0.14258 0.14467 0.02497 0.14394 0.14609
TDA-1 BUS B 2.400 0.02378 0.13931 0.14133 0.02362 0.13561 0.13766
TDA-1 SE 17 2.400 0.01508 0.15093 0.15168 0.01545 0.14731 0.14812
TDA-21 BA 2.400 0.00788 0.07317 0.07360 0.00805 0.07063 0.07109
TDA-21 BB 2.400 0.00788 0.07317 0.07360 0.00805 0.07063 0.07109
TDA-190-01A 4.160 0.06741 0.20994 0.22049 0.06642 0.20737 0.21775 18.09619 0.25536 18.09799
TDA-190-01B 4.160 0.06757 0.20270 0.21367 0.06827 0.18912 0.20106 18.09619 0.25536 18.09799
TDB-190-1A 0.220 0.00573 0.02045 0.02124 0.00572 0.02025 0.02104 0.00404 0.01395 0.01452
TDB-190-1B 0.220 0.00570 0.02041 0.02119 0.00569 0.02006 0.02085 0.00404 0.01395 0.01452
TDB-SP-SE-7 0.480 0.03741 0.07438 0.08325 0.03743 0.07427 0.08317
TE-MT-CB-1 2.400 0.04828 0.11696 0.12653 0.04844 0.10959 0.11982
TEM-CCM-1-480 0.480 0.00821 0.02012 0.02173 0.00823 0.02015 0.02177
TEM-CCM-2-480 0.480 0.00821 0.02007 0.02169 0.00823 0.02012 0.02174
TEM-CCM-3-220 0.220 0.00444 0.01697 0.01754 0.00444 0.01698 0.01755 0.00271 0.01275 0.01304
TG-01 BA 0.220 0.00281 0.01392 0.01420 0.00282 0.01392 0.01420 0.00251 0.01178 0.01205
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 92
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
TG-01 BB 0.220 0.00256 0.01268 0.01294 0.00257 0.01267 0.01293 0.00228 0.01073 0.01097
TGD-1 SE BUNKER 0.480 0.00696 0.02660 0.02750 0.00702 0.02588 0.02682
TGD-2 SE BUNKER 0.480 0.00702 0.02673 0.02764 0.00707 0.02604 0.02699
TM-4.16-01 4.160 0.07654 0.33652 0.34511 0.07671 0.32446 0.33340 15.10807 0.41555 15.11379
U30-HV-1121A 13.800 0.03008 0.35967 0.36093 0.03843 0.31578 0.31811 15.06859 0.72879 15.08620
U30-HV-1121B 13.800 0.03549 0.43054 0.43200 0.05140 0.40284 0.40611 15.09427 1.49731 15.16835
URA LV-CCM-220 0.220 0.00796 0.01734 0.01908 0.00796 0.01735 0.01909 0.01342 0.02011 0.02418
URA-COMB INT 2.400 0.13572 0.19851 0.24047 0.13621 0.19989 0.24189
VINE SE-14 13.800 0.37732 0.85098 0.93088 0.39242 0.89601 0.97817 7.60029 21.39336 22.70331
XXI-MV-CCM1A 2.400 0.02460 0.07549 0.07940 0.02517 0.07626 0.08031
XXI-MV-CCM1B 2.400 0.02473 0.07478 0.07876 0.02522 0.07596 0.08004

You might also like