Professional Documents
Culture Documents
ADDITIONAL LEARNING
RULES AND REGULATIONS FOR ESTABLISHMENT OF FACTORIES
S.G.Sai sarath
15BBA0036
DEFINATION:
Factory as any premises including the precincts thereof.
1. Where 10 or more workers are working or were working in any day in the
preceding 12 months with the manufacturing process being carried on with the
aid of power.
2. Where 20 or more workers are working or were working in any day in the
preceding 12 months with the manufacturing process being carried on with the
aid of power.
The term factory does not include mines because mines are covered under
Indian Mines Act. Similarly mobile unit of armed forces, railway running shed
or hotel, restaurant etc... Are not factory.
The manufacturing processing may be carried on at two different sites. The
following establishment has been held to be factories.
1. Railway workshops
2. Salt works even on open structure of land.
3. The premises employed seven permanent workmen in the manufacturing
process using power
4. Establishments which prepare food items, drinking items etc
The following establishments have not been held to be factories:
1. Railway running sheds. 2. Exhibition or Cinema theaters. 3. Contraction
Works.
1. Meaning of Manufacturing Process:
a) Manufacturing process means any process of making altering, repairing,
ornamenting packing, roiling, washing, cleaning breaking up any article or
substance with the view to its use, sale, transport, delivery or disposal.
b) Pumping oil, water and sewerage.
c) Generating, transforming power.
d) Composing types of printing, printing by letters presslethography,
photography or other process of book binding.
e) Construction, reconstructing, repairing or breaking up ships or vessels.
f) Preserving or storing any article in cold storage.
This MSME certificate helps you enjoy various benefits like priority sector
lending (you get loans easily), differential rates of interest (you pay lesser
interest on loans), various exemption under tax laws, get environmental
clearances, etc.
When you are about to start your Micro, Small and Medium Enterprise, you
should apply for a Provisional Registration.
Once you are given the Provisional MSME Certificate and you start production
you can apply for a Permanent Certificate, which opens up more benefits for
you.
It may not be compulsory to register your Micro, Small and Medium Enterprise,
but it is definitely what youd want to do. It will provide you may government
benefits and schemes eligibility.
Final Registration
A provisionally registered industrial unit when it is about to go into production
is to apply for grant of Final Registration. An existing and functioning industrial
unit is eligible to apply for Final Registration without going into provisional
registration processes.
Provisional Registration
Provisional registration is granted to a unit at its pre- investment period to
enable it to take necessary steps to apply for financial credit, land or an
industrial set, water, power or telephone connections, etc.
MPCB Consent
Setting up a manufacturing unit in India attracts many types of licenses
from Indian Government i.e both State and Central, One of such license is
for the Pollution Licenses.
Any industry, which discharge sewage or effluent into the environment or
emit any pollution in air will have to obtain consent of the State Pollution
Control Board.
Similarly any industry / process generating, storing, transporting,
disposing or handling hazardous waste are required to obtain
authorization from MPC Board.
Documents required:
Application Form for the Consent.
DD For the statuary Fees Amounted.
Lease Agreement copy with owner Or 7/12 Copy.
Grampanchayat NOC copy in name of Company.
Final drawing copy of factory and layout copy.
Declaration for the investment and Project profile by Chartered
accountant.
Water Budget means input water, uses, applications, losses, recycled,
Effluent.
Manufacturing process of each product with flow diagram.
SSI Registration copy Or IEM Registration. Copy.
Process flow diagram.
M.O.A. Copy.
List of Raw Material With monthly or annual consumption.
List of manufacturing Products with monthly or annul consumption.
Details of the Generators or boilers.
Details of the Stack and the chimney.
Details of hazardous and non hazardous waste, treatment and disposal.
ETP/STP scheme, process and diagram.
Other rules and regulation to be followed by factory
In the field of Material Procurement Defence Procurement Manual
and Ordnance factory Board Purchase & Procurement Manual is
available.
For accounting of labour and material we follow our Store Accounting
Procedure.
For leasing and licensing of facilities in estates we have a Land Lease
Policy, 1990 approved by the government. It provides for the method
adopted/criteria to be followed for leasing out land for market, school,
banks, etc.
Detailed instructions are issued by DOP&T based on rules in the
matters of recruitment, promotion, reservation etc.
CVC instructions received from time to time are followed for ensuring
transparency and impartiality in purchase matters.
In construction of building and other facilities, the standard rates and
estimates given in MES regulations are followed.
In most of our units ISO 9001 systems are incorporated to ensure
quality output, customer satisfaction and continued improvement in
our methods. Work is carried out on the production shop floor as per
the Standing instructions.