150

9TH STOREY x

700
9B1 (1000x850) TRANSFER BEAM
9655 9655

LINKBRIDGE

BLOCK 441A 8TH STOREY

EXISTING COLUMN
TO BE DEMOLISHED

TEMPORARY STEEL BRACING


SEE PILE CAP DETAIL SEE PILE CAP DETAIL

7TH STOREY

PROPOSED COL. PROPOSED COL.


9C1 9C1

EXISTING COLUMN LINKBRIDGE LOCATION PLAN


TO BE DEMOLISHED

METHOD STATEMENT & SEQUENCE


6TH STOREY 6B1 (DIA. 500) TIE BEAM
1. CONSTRUCT MICRO PILES, UNDERGROUND TIE BEAMS, PILEACAPS AND STUMPS.
2. CONSTRUCT 2 NEW COLUMNS TILL 3RD STOREY (SYSTEM FORMWORK TO BE ADOPTED)
3. INSTALL TEMPORARY STEEL TIE BEAM AT 2.5 STOREY AS BRACING (DESIGNED BY CONTRACTOR'S P.E.)
1ST STOREY PLAN - PROPOSED ADDITIONAL COLUMNS 4. CONTINUE CONSTRUCTION OF 2 NEW COLUMNS TILL 6TH STOREY.
5. INSTALL TEMPORARY STEEL BEAM AT 5.5 STOREY AS BRACING (DESIGNED BY CONTRACTOR'S P.E.)
TO SUPPORT LINK BRIDGE BETWEEN (BLOCK 441A & 440) 6.
7.
CONTINUE CONSTRUCTION OF 2 NEW COLUMNS TILL 9TH STOREY.
INSTALL TEMPORARY STEEL BEAM AT 7.5 STOREY AS BRACING (DESIGNED BY CONTRACTOR'S P.E.)
TEMPORARY STEEL BRACING
8. INSTALL DIAGONAL STEEL PROPS TO SUPPORT THE EXISTING BRIDGE. (TEMPORARY STEEL PROP TO
BE DESIGNED BY CONTRACTOR'S P.E.)
5TH STOREY 9. HACK THE EXISTING COLUMN HEAD BY ABOUT 1m TO ENABLE NEW BEAM REBAR PLACEMENT.
10. CONSTRUCT THE 9TH STOREY BEAM BETWEEN THE TWO NEW COLUMNS. ALLOW BEAM TO GAIN
STRENGTH.
11. REMOVE THE EXISTING COLUMNS FROM 9TH STOREY TO 6TH STOREY AND TIE BEAM (DIAMOND
EXISTING COLUMN
CUTTER TO BE ADOPTED).
TO BE DEMOLISHED 12. CONSTRUCT PERMANENT R.C. TIE BEAM AT 6TH STOREY.
13. REMOVE TEMPORARY STEEL TIE BEAM AT 5.5 STOREY AND 7.5 STOREY
14. REMOVE THE EXISTING COLUMNS FROM 6TH STOREY TO 3RD STOREY AND TIE BEAM (DIAMOND
CUTTER TO BE ADOPTED).
15. CONSTRUCT PERMANENT R.C. TIE BEAM AT 3RD STOREY.
4TH STOREY 16. REMOVE TEMPORARY STEEL TIE BEAM AT 2.5 STOREY.
17. REMOVE THE BALANCE EXISTING COLUMNS AND TIE BEAM TO GROUND LEVEL. (EXISTING PILECAPS TO
REMAIN). CONTRACTOR TO VERIFY ALL DIMENSIONS ON
PROPOSED COL. PROPOSED COL. 18. COMPLETE THE ARCHITECTURAL WORKS AND REINSTATEMENT WORKS. SITE PRIOR TO FABRICATION
9655 9655 9C1 9C1

DATE OF ISSUE
BLOCK 441A 23 NOV 2017
P & T CONSULTANTS PTE LTD (C &
3RD STOREY 3B1 (DIA. 500) TIE BEAM S ENGINEERING)

TEMPORARY STEEL BRACING OWNER'S NAME & ADDRESS

9B1(1000x850) 2ND STOREY


6B1(DIA. 500)
EXISTING COLUMN
3B1(DIA. 500)
TO BE DEMOLISHED
HDB Hub 480 Lorong 6 Toa Payoh
Singapore 310480
EXISTING COLUMN
TO BE DEMOLISHED

PROPOSED COL. PROPOSED COL.


9C1 9C1 ________________________
OWNER SIGNATURE

SEE DETAIL '1'


1ST STOREY

BLOCK 440 PROPOSED PILECAP


EXISTING PILECAP
PROPOSED PILECAP
SEE PILE CAP DET. SEE PILE CAP DET.

9TH STOREY PLAN - PROPOSED ADDITIONAL COLUMNS


TO SUPPORT LINK BRIDGE BETWEEN (BLOCK 441A & 440) PROPOSED TIE BEAM
TB2 (1000x800)

PROPOSED TIE BEAM


TB1 (1000x800)

SECTION 1 - 1
4929W PT 10

PROPOSED ADDITIONAL COLUMNS TO


SUPPORT LINK BRIDGE BETWEEN
(BLOCK 441A & 440)
SHEET-1