1) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow center line method.
(i) Earthwork excavation
(ii) Brick work in superstructure
(iii) Brick work in foundation
(iv) 10Cm thick RCC
(v)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 14-107,108,109,110,111,112
2) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow center line method.
(i) Earthwork excavation
(ii) BBCC in footing
(ii) Brick work in super structure
(iii) 10Cm thick RCC
(iv)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 14-113,115,116,117,118,119
3) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow center line method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv) 12mm Plastering
NOTE: make suitable assumptions where necessary
Note: Make suitable assumptions where necessary.
Roll No: 14-120,122.124,125,126,127
4) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow center line method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv)Doors
NOTE: make suitable assumptions where necessary
Roll No: 14-128,129,130,131,132,133
5) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow center line method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 14-135,136,137,138,139,140
6) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow center line method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 14-142,143,144,145,146,147
7) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow Long wall Short Wall method.
(i) Earthwork excavation
(ii) Brick work in superstructure
(iii) Brick work in foundation
(iv) 10Cm thick RCC
(v)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 14-148,149,150,151,152,153
8) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow Long wall Short Wall method.
(i) Earthwork excavation
(ii) BBCC in footing
(ii) Brick work in super structure
(iii) 10Cm thick RCC
(iv)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 14-154, 14-155,14-156, 15-101,102
9) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow Long wall Short Wall method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv) 12mm Plastering
NOTE: make suitable assumptions where necessary
Note: Make suitable assumptions where necessary.
15-103, 104, 105,106,107
10) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow Long wall Short Wall method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv)Doors
NOTE: make suitable assumptions where necessary
Roll No: 15-108,109,110,111,112
11) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow Long wall Short Wall method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv)12mm Plastering
NOTE: make suitable assumptions where necessary
Roll No: 15-113,114,115,116,117
12 ) Calculate quantity of following items of work and enter the same in standard format of
measurement sheet with brief description of item and also calculate the cost of the items.
Follow Long wall Short Wall method.
(i) Earthwork excavation
(ii) Brick work
(iii) 10Cm thick RCC
(iv) 12mm Plastering
NOTE: make suitable assumptions where necessary