NOTES:

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED


2. ALL LEVELS REFER TO NEW ABU DHABI DATUM (NADD)
3. TOP LEVEL OF RC COVERS ABOVE UTILITIES TO REMAIN FLAT
THROUGHOUT.
4. RAILS TO BE PROVIDED ON WALLS AS SHOWN FOR PROVISION
OF CRANE.
5. CYCLEWAY TO BE GREEN COLOUR RAL 6037
6. FOR STORM WATER DRAINAGE LAYOUT SEE DRAWINGS
109881-SWD-100 TO 109881-SWD-210.
7. FOR THE PAVEMENT, CONTRACTOR IS TO DESIGN PAVEMENT
CROSS SECTION.
8. PIPE SIZE AND SPACING SUBJECT TO RESULTS OF MODELLING.

PIPE CULVERT
HEADWALL

1.50
SCALE BAR

EMPLOYER

GEOTEXTILE GRID CONSULTANT


A LAYER OF GRANULAR MATERIAL TO
PROVIDE BASE FOR IMPORTED FILL LAYER

REV DATE REVISION DETAILS APPROVED


2 MUSANADA COMMENTS ADDRESSED AE
1 12/11/2015 MUSANADA COMMENTS ADDRESSED AE
0 5/10/2015 REFERENCE DESIGN AE

P231-T/BPS/641/161/15
ADDENDUM NO 3

PROJECT

UMM LAFINA LINK ROAD


CONTRACT 2
TITLE

TYPICAL CROSS SECTION


ROCK CAUSEWAY

DRAWN DESIGNED
T. SANTOS
REFERENCE DESIGN
CHECKED TENDER No.
S. BROWN
DOT/T/MR/20/14
APPROVED SCALE SIZE
DATE
NOT TO SCALE A1
A. EL-ESSNAWI
DRAWING No. REV
12/20/2015
2