12/12/2017 Ground Pressure Simulator | Hitachi Sumitomo Heavy Industries Construction Crane Co., Ltd.

1 2 3
Result
Model and specication Working condition
Model SCX1500A-3 Boom mast With
Catalog
Boom type Standard
Specication of base machine Standard
Boom length 69.00m
Counter weight Standard(56.4t)
Jib type Without
Lower weight Standard(9.0t)
Jib length Without
Shoes Standard
Jib oset angle Without
External weight Without
Lifting point Boom lift
Condition Working
Working radius Working radius: 18.0m
Front attachment Crane Boom or tower jib angle Angle: 76.5

Back to model selection Lifting load (including hook) Boom(t): 14t

Change working condition


Ground pressure
The simulation is based on Japan Construction Machinery and Construction Association

Boom direction Front Diagonally Side Diagonally Rear Max.


to the front to the rear pressure

Swing angle 0 45 90 135 180 150

A Crawler reaction force (RA) t 79.9 93.8 99.5 93.8 79.9 89.7

B Crawler reaction force (RB) t 79.9 66.0 60.2 66.0 79.9 70.1

A Crawler ground pressure 18.8 19.7 14.7 8.0 4.8 6.4


front (QAF) t/m2

A Crawler ground pressure 5.4 8.7 15.4 20.4 19.4 20.8


rear (QAR) t/m2

B Crawler ground pressure 18.8 13.9 8.9 5.6 4.8 5.0


front (QBF) t/m2

B Crawler ground pressure 5.4 6.1 9.4 14.4 19.4 16.2


rear (QBR) t/m2

Length of round pressure (L) m 6.84 6.84 6.84 6.84 6.84 6.84

Distribution of pressure Trapezoidal Trapezoidal Trapezoidal Trapezoidal Trapezoidal Trapezoidal

(Note) 1(KPa)=0.102(t/m2), 1(t/m2)=9.8(KPa)


(Note) Theoretical ground area = Distance between tumblers LT
(Note)This simulation doesn't judge overload. Please conrm load charts rst and input data according to charts.

Description

http://www.hsc-crane.com/simulation/index.php/Selector/index#!/pZ110| 1/2
12/12/2017 Ground Pressure Simulator | Hitachi Sumitomo Heavy Industries Construction Crane Co., Ltd.

Note
1. Calculation conditions
To use the Service, Users shall input values of the capacity of the crane and the values listed in the rated lifting load chart that the Company
provides separately.
2. Warranty and liability
(1) The Company shall provide the Service that it is capable of providing at the times that Users use the Service.
(2) Users should understand that the results obtained by using the Service (hereinafter referred to as the "Calculated Values") are values that
are calculated and not values that are actually measured.
(3) Users shall use the Calculated Values at their own liability and the Company shall not be liable for any damage caused to any of the Users or
third parties that is incurred through the use of the Calculated Values by the Users.

Contact us Manual Copyright Hitachi Sumitomo Heavy Industries Construction Crane Co., Ltd. All Rights Reserved.

http://www.hsc-crane.com/simulation/index.php/Selector/index#!/pZ110| 2/2

You might also like