You are on page 1of 1

1 2 3 4 5 6 7 8

NOTE-
1. All dimensions are in mm.
2. Nail:
F

F
The reinforcement steel shall be
Thermo mechanically treated (TMT)
bars conform to IS 1786 - 1985 of
grade Fe500. Reinforcement shall be
clean and free from loose mill scale,
loose rust, and mud, oil, grease or any
other coating.
3. Grouting composition:- Typical ratio
a). Cement-50kg
b). Admixture(non shrink grout,
E

E
Product:'sika interplast N200'):200gms
c). Water-cement ratio:- 0.4-0.5
4. Don't scale the drawings only written
dimensions to be followed.
5. Entire SoilNail work including nails to
be driven & nail head inserted followed
by the shotcreting should be as per
REIPL's construction methodology.
6. Welded wire mesh should be placed at
approximate the middle of shotcrete
facing by means of steel studs at
D

D
suitable interval .
7. Length of reinforcement mesh must be
such that it allows at least one full mesh
cell to overlap with subsequent
reinforcement mesh.
8. Shotcrete should be a minimum
compressive strength of 15MPa in
28days.
9. Final length of shotcrete should be cured
for at least 7days .
Nail dia. of 25 mm
is OK. 10. Nail length may varry as per site
C

C
condition. Variations, if any, it is to be
immediately reported to RECo INDIA.
B

B
REVISIONS P RO P RI E T AR Y AN D C O N FI D EN T IA L

SOIL NAILING WORKS AT CDQ10 & 11 PROJECTS SITE,


INSIDE TATA STEEL, JAMSHEDPUR

16572 1:150 A3
A

A
E-11, BLOCK-B1 EXTENSION,
( OPPOSITE NTPC BADARPUR),MOHAN KS KS AA 05-04-2016
TATA CONSULTING ENGINEERS LIMITED CDQ 11
CO-OPERATIVE INDUSTRIAL ESTATE,
MATHURA ROAD, NEW DELHI-110044
Tel: +91-11-46457600-7601, Fax: +91-11-46457630 DETAIL OF NAIL HEAD, FACING ( SHORTCRETE ) &
REV DATE DRN CHK AMENDMENTS www.recoindia.com, www.terre-armee.com
PRELIMINARY DRAWING DRAINAGE OUTLET
1 2 3 4 5 6 7 8