Professional Documents
Culture Documents
2. Painting of frame and posts shall be done in accordance with the project paint specification with 6"
wide black diagonal stripes on yellow.
DESIGN STANDARD
4D-12.05 0
ISSUED FOR
PROJECT NO. PROPAC SHEET 1 OF 1 Rev.
PROJ. DATE OF
APPR. P.Healy ISSUE
DEPT. GENERIC
APPR. K.Serenius APPR. DATE 21Jul2000
Y:\PROYECTO\1800\documentos\Estandares\00 - STD.PROPAC\piping\4d\4D-12.05.DOC