You are on page 1of 1

Notes: 1. Posts shall be set into the ground to a depth as shown.

shown. Place concrete around the base of the post.

2. Painting of frame and posts shall be done in accordance with the project paint specification with 6"
wide black diagonal stripes on yellow.

HYDRANT OR POST INDICATOR PROTECTION FRAME

DESIGN STANDARD
4D-12.05 0
ISSUED FOR
PROJECT NO. PROPAC SHEET 1 OF 1 Rev.

PROJ. DATE OF
APPR. P.Healy ISSUE

DEPT. GENERIC
APPR. K.Serenius APPR. DATE 21Jul2000
Y:\PROYECTO\1800\documentos\Estandares\00 - STD.PROPAC\piping\4d\4D-12.05.DOC

You might also like