You are on page 1of 4

DAVANGERE SCHOOL RENOVATION

PRE-SCHOOL 200 STUDENTS


I educational spaces:

Room No. of Rooms No. of Students Area Required Specifics


(sft)

Nursery 4 20 220-240*4

LKG 3 20 220-240*3

UKG 3 20 220-240*3

Activity Room 1 40 500-600

Gym Room 1 20 200 Foam Flooring &


Play Area

Music & Dance 1 20 300 Speakers in all


rooms

AV Room 1 20 200 Teacher training

Library 1 20 200

Total 15 NA 3800 NA

II non - educational spaces:

i. Staff & Administration :


Reception -
Waiting Area
Administrator/Principal Room 140sft
Staff Room 6 teachers 300-350sft
Staff Washroom Ladies & Gents
ii. Pupils Storage & Washrooms :
Stationary Store 70sft
Pantry 80sft
Toy Store 100sft
Washrooms 6 nos. each (1 per 15 children) 5.25ft x
iii. Outdoor Play Areas :
Pets Area
Aquarium
Sandpit
Splash Pool
Jumking Kit
iv. Ancillary Services :
Security Room - 50sft
CCTV Room 60sft
DG
AC Split AC Units
v. Parking
1 Tata Ace 20 seater
Staff 5 two wheelers

III. design strategies:

Designing environments with diverse life experiences to smoothen the


transition to elementary school
Compact layout For security of the children
Natural light & ventilation
Anthropometric adaptations
Flexibility of spaces to explore Swinging, Climbing and Sliding etc.

IV. anthropometry & standards:

Area Required per child : Indoor - 2.5-2.7m2 , Outdoor - 7m2


Corridor Width 1.2m to 1.8m (depending on circulation)

You might also like