Professional Documents
Culture Documents
Feet = meter
1 = 0.3048
4.42935 = 1.35
DESIGN OF CANAL SECTION
Feet = meter
1 = 0.3048
4.00282 = 1.22
1 CANAL L.M.C. Garda
2 REACH to
3 Discharge q= 0.1490 m
4 Bed Width b= 0.30 m
5 F.S.D. d= 0.42 m 1.54
6 Free Board Fb= 0.20 m Fb.= 0.200
7 Water side slope n= 1.0 m/m
8 Bed Slope s= 1500 m/m d= 0.420 side slpoe
9 Rougosity coefficent N= 0.018 1.0 :1
10 Top Width tw= 2*(d+fb)*n+b 1.54 m
11 Wetted Perimeter P= 2((n +1) *d)+b
2 1/2 1.49 m 0.300
12 Cross sectional Area A= d(b+nd) 0.302 m2
13 Hydrolicc mean depth R= A/ P 0.20 Proposed canal section
14 R2/3
= 0.35
15 Valocity V= R /N/s
2/3 0.496 m/sec
1/2
Feet = meter
1 = 0.3048
4.4294 = 1.35
DESIGN OF CANAL SECTION
Feet = meter
1 = 0.3048
4.00282 = 1.22
DESIGN OF CANAL SECTION
1 Top Width tw = Bw
= 1.52 = 1.520 m
5 Valocity V = R2/3/N/s1/2
= 0.603 / 0.018 / 3333 1/2
= 0.580 m/sec
6 Passing Discharge Q= A x V
Q = 1.85 x 0.580 = 1.0761 cumec
8 C.V.R. = V/V0
= 0.58 / 0.62 = 0.929 m/sec
1 Top Width tw = Bw
= 1.52 = 1.52 m
5 Valocity V = 1.48*R2/3/N/s1/2
= 1.48 x 0.603 / 0.018 / 3333 1/2
= 0.859 m/sec
6 Passing Discharge Q= A x V
Q = 1.85 x 0.859 = 1.593 cumec
8 C.V.R. = V/V0
= 0.86 / 0.62 = 1.375 m/sec
Design :-
5 Valocity V = R2/3/N/s1/2
= 0.768 / 0.018 / 3333 1/2
= 0.739 m/sec
6 Passing Discharge = Ax V
Q = 3.34 x 0.739 = 2.47 cumec
8 C.V.R. = V/V0
= 0.74 / 0.62 = 1.18 Ft/sec
= 0.36 m/sec
9 Losses = 0.61 x ch x 100 x P/106
=( 0.610 x 15 x 30 x 4.97 )/10'6 = 0 cumec
Design
5 Valocity V = R2/3/N/s1/2
= 1.48 x 1.695 / 0.018 / 3333 1/2
= 2.414 Ft./sec
= 0.74 m?sec
6 Passing Discharge = AxV
Q = 36.00 x 2.414 = 86.9042 cusec
= 2.45939 cumec
7 Critical valocity V0 = 0.55 x D0.64
= 0.55 x 4.000 0.64
= 1.33561 Ft/sec
= 0.4071 m/sec
8 C.V.R. = V/V0
= 2.41 / 1.34 = 1.80741 Ft/sec
= 0.5509 m/sec
9 Losses = 0.61 x ch x 100 x P/106
=( 0.610 x 15 x 100 x 16.31 )/106 = 0.01493 cusec
= 0.0004 cumec
Discharge passes is more than required Hence O.K.