DESIGN OF CANAL SECTION

1 CANAL L.M.C. Garda


2 REACH to
3 Discharge q= 2.400
4 Bed Width b= 3.000
5 F.S.D. d= 1.200
6 Free Board Fb= 0.500 Fb= 0.500
7 Water side slope n= 0.000
8 Bed Slope bs= 4000 d= 1.200
9 Rougosity coefficent N= 0.018
10 Top Width tw= 2*(d+fb)*n+b 3.000
11 Wetted Perimeter P= 2((n2+1)1/2*d)+b 5.40 3.000
12 Cross sectional Area A= d(b+nd) 3.60
13 Hydrolicc mean depth R= A/P 0.667 Proposed canal section
14 R^2/3 = 0.763
15 Valocity V= R2/3/N/s1/2 0.670
16 Discharge passes Q= A*V 2.41
17 Critical valocity V0= 0.55*D0.64 0.618
17 C.V.R. V/V0 1.08
18 Losses 0.61*length*P/10 6 0.000
Discharge passes is more than required Hence O.K.
Convertar
cusec = cumec
cusec = cumec
1 = 0.02832
35.315 = 1

Feet = meter
1 = 0.3048
4.42935 = 1.35
DESIGN OF CANAL SECTION

1 CANAL L.M.C. Garda


2 REACH 286 to 300
3 Discharge q= 76.372
4 Bed Width b= 16.000
5 F.S.D. d= 4.00
6 Free Board Fb= 3333 Fb= 3333
7 Water side slope n= 0.000
8 Bed Slope s= 10000
9 Rougosity coefficen N= 0.018 d= 4.00
10 Top Width tw= 2*(d+fb)*n+b 16.000
11 Wetted Perimeter P= 2((n +1) *d)+b 24.00
2 1/2
16.00
12 Cross sectional Are A= d(b+nd) 64.00
13 Hydrolicc mean dep R= A/P 2.667 Proposed canal section
14 R 2/3
= 1.923
15 Valocity V= 1.48*R2/3/N/s1/2 1.581
16 Discharge passes Q= A*V 101.19
17 Critical valocity V0= 0.55*D0.64 1.336
17 C.V.R. V/V0 1.18
18 Losses 0.61*length*P/10 0.00
6

Discharge passes is more than required Hence O.K.


Converter
cusec = comic
1 = 0.02832
35.315 = 1

Feet = meter
1 = 0.3048
4.00282 = 1.22
1 CANAL L.M.C. Garda
2 REACH to
3 Discharge q= 0.1490 m
4 Bed Width b= 0.30 m
5 F.S.D. d= 0.42 m 1.54
6 Free Board Fb= 0.20 m Fb.= 0.200
7 Water side slope n= 1.0 m/m
8 Bed Slope s= 1500 m/m d= 0.420 side slpoe
9 Rougosity coefficent N= 0.018 1.0 :1
10 Top Width tw= 2*(d+fb)*n+b 1.54 m
11 Wetted Perimeter P= 2((n +1) *d)+b
2 1/2 1.49 m 0.300
12 Cross sectional Area A= d(b+nd) 0.302 m2
13 Hydrolicc mean depth R= A/ P 0.20 Proposed canal section
14 R2/3
= 0.35
15 Valocity V= R /N/s
2/3 0.496 m/sec
1/2

16 Discharge passes Q= A*V 0.1499 cumec


17 Critical valocity V0= 0.55*D 0.316 m/sec
0.64

17 C.V.R. V/V0 1.57


18 Losses 0.61*length*P/106 0.000 cumec
Discharge passes is more than required Hence O.K.
Convertar
cusec = cumec
1 = 0.0283
35.315 = 1

Feet = meter
1 = 0.3048
4.4294 = 1.35
DESIGN OF CANAL SECTION

1 CANAL L.M.C. Gudda


2 REACH 286 to 300
3 Discharge q= 76.3720
4 Bed Width b= 3.000
5 F.S.D. d= 4.000
6 Free Board Fb= 1.500 Fb= 1.500
7 Water side slope n= 1.5 side slope
8 Bed Slope s= 3333 d= 4.000 1.5 :1
9 Rougosity coefficent N= 0.018
10 Top Width tw= 2*(d+fb)*n+b 19.500 3.00
11 Wetted Perimeter P= 2((n2+1)^0.5*d)+b 17.42
12 Cross sectional Area A= d(b+nd) 36.00
13 Hydrolicc mean depth R= A/ P 2.066 Proposed canal section
14 R2/3 = 1.622
15 Valocity V= 1.48*R2/3/N/s1/2 2.310
16 Discharge passes Q= A*V 83.18
17 Critical valocity V0= 0.55*D^0.64 1.336
17 C.V.R. V/V0 1.73
18 Losses 0.61*length*P/10 6
0.015
Discharge passes is more than required Hence O.K.
Convertar
cusec = cumec
1 = 0.02832
35.315 = 1

Feet = meter
1 = 0.3048
4.00282 = 1.22
DESIGN OF CANAL SECTION

1 CANAL L.M.C. Gudda


2 REACH ch 285 to 300
3 Discharge q 2.161 cumec
4 Bed Width b 1.52 mt Fb = 0.460
5 F.S.D. d 1.22 mt
6 Free Board Fb 0.46 mt d= 1.220
7 Bed Slope s 3333 mt/mt
8 Rougosity coefficent N 0.018 1.52
Proposed canal section
Design :-

1 Top Width tw = Bw
= 1.52 = 1.520 m

2 Wetted Perimeter p = (2 x d)+b


=( 2 x 1.22 )+ 1.52 = 3.960 Rm

3 Sectional Area A = bw x fsd


= 1.52 x 1.22 = 1.854 Sqm

4 Hydrolic mean depth R = A/p


R = 1.85 / 3.96 = 0.468 R2/3 = 0.603 m

5 Valocity V = R2/3/N/s1/2
= 0.603 / 0.018 / 3333 1/2
= 0.580 m/sec

6 Passing Discharge Q= A x V
Q = 1.85 x 0.580 = 1.0761 cumec

7 Critical valocity V0 = 0.55 x D0.64


= 0.55 x 1.22 0.64
= 0.6246 m/sec

8 C.V.R. = V/V0
= 0.58 / 0.62 = 0.929 m/sec

9 Losses = 0.61x 30 x P/106


=( 0.610 x 15 x 30 x 3.96 )/10'6 = 0.0011 cumec

Design Section Fail (Increase BW or FSD)


DESIGN OF CANAL SCTION

1 CANAL L.M.C. Gudda


2 REACH ch 285 to 300
3 Discharge q 2.161 Cusec
4 Bed Width b 1.52 Ft Fb= 0.460
5 F.S.D. d 1.22 Ft
6 Free Board Fb 0.46 Ft d= 1.220
7 Bed Slope s 3333 Ft/Ft
8 Rougosity coefficent N 0.018 1.52
Proposed canal section
Design :-

1 Top Width tw = Bw
= 1.52 = 1.52 m

2 Wetted Perimeter p = (2 x d)+b


=( 2 x 1.22 )+ 1.52 = 3.96 Rm

3 Sectional Area A = bw x fsd


= 1.52 x 1.22 = 1.85 Sqm

4 Hydrolic mean depth R = A/p


R = 1.85 / 3.96 = 0.468 R2/3 = 0.603 m

5 Valocity V = 1.48*R2/3/N/s1/2
= 1.48 x 0.603 / 0.018 / 3333 1/2
= 0.859 m/sec

6 Passing Discharge Q= A x V
Q = 1.85 x 0.859 = 1.593 cumec

7 Critical valocity V0 = 0.55 x D0.64


= 0.55 x 1.22 0.64
= 0.625 m/sec

8 C.V.R. = V/V0
= 0.86 / 0.62 = 1.375 m/sec

9 Losses = 0.61x ch x100 x P/106


=( 0.610 x 15 x 30 x 3.96 )/10'6 = 0.001 cusec

Design Section Fail (Increase BW or FSD)


DESIGN OF CANAL SECTION

1 CANAL L.M.C. Gudda


2 REACH ch 285 To 300
3 Discharge q 2.160 cumec
4 Bed Width b 1.52 m Fb= 0.460
5 F.S.D. d 1.22 m side slope
6 Free Board Fb 0.46 m d= 1.220 1.0
7 Water side slope n 1.0 :1 m/m
8 Bed Slope s 3333 m/m 1.52
9 Rougosity coefficent N 0.018 Proposed canal section

Design :-

1 Top Width tw = 2 x (d+fb) x n+b


= 2 x( 1.22 + 0.46 )x 1.0 + 1.520 = 4.88 m

2 Wetted Perimete p = 2((n2+1)1/2 x d)+b


= 2 x(( 1.00 2
+ 1.00 )1/2x 1.22 )+ 1.52 = 4.97 Rm

3 Sectional Area A = d(b+nd) SqFt


= 1.22 x( 1.52 + 1.00 x 1.22 ) = 3.34 Sqm

4 Hydrolic mean depth = A/p


R = 3.34 / 4.97 = 0.673 R2/3 = 0.768 m

5 Valocity V = R2/3/N/s1/2
= 0.768 / 0.018 / 3333 1/2
= 0.739 m/sec

6 Passing Discharge = Ax V
Q = 3.34 x 0.739 = 2.47 cumec

7 Critical valocity V0 = 0.55 x D0.64


= 0.55 x 1.220 0.64
= 0.62 m/sec

8 C.V.R. = V/V0
= 0.74 / 0.62 = 1.18 Ft/sec
= 0.36 m/sec
9 Losses = 0.61 x ch x 100 x P/106
=( 0.610 x 15 x 30 x 4.97 )/10'6 = 0 cumec

Discharge passes is more than required Hence O.K.


DESIGN OF CANAL SECTION

1 CANAL L.M.C. Gudda


2 REACH ch 285 To 300
3 Discharge q 76.372 Cusec
4 Bed Width b 5.00 Ft Fb= 1.500
5 F.S.D. d 4.00 Ft side slope
6 Free Board Fb 1.50 Ft d= 4.000 1.0 :1
7 Water side slope n 1.0 :1 Ft/Ft
8 Bed Slope s 3333 Ft/Ft 5.00
9 Rougosity coefficent N 0.018 Proposed canal section

Design

1 Top Width tw = 2 x (d+fb) x n+b


= 2 x( 4.00 + 1.50 )x 1.0 + 5.000 = 16.00 Ft
= 4.88 m
2 Wetted Perimete p = 2((n2+1)1/2 x d)+b
= 2 x(( 1.00 2
+ 1.00 )1/2x 4.00 )+ 5.00 = 16.31 R Ft
= 4.97 Rm
3 Sectional Area A = d(b+nd) SqFt
= 4.00 x( 5.00 + 1.00 x 4.00 ) = 36.00 sqFt
= 3.34 Sqm
4 Hydrolic mean depth R = A/p
= 36.00 / 16.31 = 2.207 R2/3 = 1.695

5 Valocity V = R2/3/N/s1/2
= 1.48 x 1.695 / 0.018 / 3333 1/2
= 2.414 Ft./sec
= 0.74 m?sec
6 Passing Discharge = AxV
Q = 36.00 x 2.414 = 86.9042 cusec
= 2.45939 cumec
7 Critical valocity V0 = 0.55 x D0.64
= 0.55 x 4.000 0.64
= 1.33561 Ft/sec
= 0.4071 m/sec
8 C.V.R. = V/V0
= 2.41 / 1.34 = 1.80741 Ft/sec
= 0.5509 m/sec
9 Losses = 0.61 x ch x 100 x P/106
=( 0.610 x 15 x 100 x 16.31 )/106 = 0.01493 cusec
= 0.0004 cumec
Discharge passes is more than required Hence O.K.