Building Information Modeling - BIM
• What is BIM?
• How we have implemented it.
• What are the benefits?

3
What is BIM?
• Building Information Modeling (BIM) is the process of
generating and managing building data during its life
cycle. BIM uses three-dimensional, real-time, dynamic
building modeling software to increase productivity in
building design and construction.
• To create a BIM, a modeler uses intelligent objects
(Families) to build the model.

4
Some Key Terms:
2-D/3-D CAD: Equivalent to conventional drafting, only performed on
a computer. Unintelligent.

3-D BIM: A model that includes 3-D shape information only.

4-D BIM: A 3-D BIM that has objects and assemblies that have
schedule and time constraint data added to them. (4-D = 3-D +
schedule (time))

5-D BIM: A 4-D BIM that has objects and assemblies that have a cost
dimension added to them. (5-D = 4-D + cost.)

5
Fiedler Group’s Implementation of BIM

• Completely different than AutoCAD


• New software-Revit
• Retrained our design team
• Re-Created office standards
• Stepped implementation A-S-MEP

6
Challenges of BIM
• Limited availability of trained designers.
• Consultants that use BIM.
• Availability of ready-to-use BIM libraries from vendors
and suppliers.
• Full implementation of Revit Electrical.

7
Benefits of BIM
• Improved quality of the construction drawings (CDs).
• Reduced time to prepare the initial drawings and final
CDs.
• Quantities and shared properties of materials are easily
extracted for cost estimating.

8
Prototype Revit Model

• Architectural
• Structural
• Mechanical
• Electrical
• Plumbing
• Automotive
Drawing Updating

9
Prototype Revit Model

10
Section

11
MEP Coordination

12
Mechanical Coordination

13
Mechanical Schedules/Takeoffs

14
Plumbing Coordination

15
Domestic Water

16
Domestic Water

17
Plumbing Schedules/Takeoffs

18
Automatic Updating

19
Automatic Updating

20
Case Study: Vaulted Tank
System

21
Case Study: Vaulted Tank
System

22
Case Study: Canopy

23
Case Study: Canopy

24
Case Study: Canopy

25
Rendering

26
Night Time Simulations

27
Model Graphics Styles

28
Renderings

29
Accurate Exteriors
Revit

Reality

30
Accurate Interiors
Revit

Reality

31
Contact Information
Patrick O. Fiedler P.E., LEED AP BD+C
President, Fiedler Group
2322 W. Third Street
Los Angeles, CA 90057
213-381-3118
E-Mail: Patrick.Fiedler@FiedlerGroup.com
www.fiedlergroup.com

32