World leading facilities in the heart of energy

development in Scotland
February 2017
BURNTISLAND FABRICATIONS LTD
INTRODUCTIONS TO BIFAB

PART OF THE JCE GROUP AB .


OPERATING AS BURNTISLAND FABRICATIONS LTD

MBO – NEW COMPANY FORMED MARCH , 2001

REGISTERED WITH FPAL, ACHILLES, SELLIHCA

MANAGEMENT SYSTEMS FOR:


QUALITY: BS-EN-ISO 9001:2008 - APPROVED
HEALTH AND SAFETY: BS-OHSAS 18001:2007 – APPROVED
ENVIRONMENTAL: BS-EN-ISO 14001:2004 - APPROVED

Welding of Structural Members for Wind Energy Systems.


BS-EN-1090-2 :Execution Class 4 & BS-EN-ISO 3834-2 :2005.

MANAGEMENT TEAM HAVE OPERATED THE BURNTISLAND


FACILITY SINCE 1990.
BURNTISLAND FABRICATIONS LTD
What BiFab Can Offer

 Provision of Engineering and Fabrication Services to the Offshore


and Onshore Energy Industry – Oil & Gas Sector and Renewable
Energy Sector Covering: Wind, Wave & Tidal

 Three Facilities in the UK that can deliver:


Methil ; Burntisland ; Arnish

 Project Execution including Project Management / Procurement /


Fabrication / Testing & Commissioning

 Design and Engineering solutions for complete EPC contracts

 Good Quayside with Deepwater Access at all Facilities

Global project solutions exceeding clients’ expectations, combined with a fresh


approach and trusted reputation.
BURNTISLAND FABRICATIONS LTD
Corporate Structure

MANAGING DIRECTOR
JCE Group AB
John Robertson

OPERATIONS DIRECTOR SAFETY EXECUTIVE COMMERCIAL DIRECTOR


CORPORATE DEPARTMENTS
Martin Adam Stan Honeyman Matt Smith

QHSE
Facilities
Production Robert Bell
Contract Administration
Labour
Equipment

FINANCE DIRECTOR
Scott Forrest

BiFab shareholding:
PROJECT MANAGEMENT
JCE Group AB (51%)
SSE (15%)
Management (34%)
BUSINESS
DEVELOPMENT
•JCE Group is not active in the Iain Scrimger
management of BiFab.
BURNTISLAND FABRICATIONS LTD
Vision

BIFAB ARE INVESTING IN THE FUTURE

TRAINING SCHEMES IN PLACE 100 APPRENTICES

CREATING FACILITIES IN THE UK THAT CAN DELIVER

HIGHLY SKILLED WORKFORCE 2500

OPPORTUNITIES FOR OUR SUPPLY CHAIN


2018: A CAPACITY TO DELIVER 100 to 120 JACKETS / YEAR
TO THE OFFSHORE WIND SECTOR
OFFSHORE WIND 6 OFF OFFSHORE WIND 30 OFF
OFFSHORE WIND 2 OFF Exporting structures to Germany UK Project – Vattenfall Ormonde
Talisman & SSE – Beatrice Modified design - reduce costs Improved Processes
Transferring Technology – Oil and Gas Investment in access systems Reduced Handling
Mass Manufacturing Studies Pre Piling Design Improved supply chain
Review of processes Strathclyde University New Technology being studied Testing Mass Manufacturing systems
R & D Project 10 % Savings 10 % Savings
2007
2009 2010

OFFSHORE WIND 150 OFF PER ANNUM CREATING A SUSTAINABLE INDUSTRY 2015 -2020

Investment in Methil facilities £ 14.25 Million BIFAB & ATKINS – one team EPC solutions
Investment in Arnish facilities £ 6.00 Million (complete) Joint Patent Ownership
New Factories due to be complete 2018 Continual review of Design and Build
New Manufacturing Process Continual review of processes and technology
Technology Transfer from other Industries Investment in people and equipment training
Considerable Savings in Increased Quantity International Supply Chain
SSE/BiFab minimum 50 off structures / year (for 12 years) SCALE
2010 – 2018 PROJECT - 20 to 30 % FURTHER SAVINGS
BURNTISLAND FABRICATIONS LTD
Our Operations

Load out 4,000 T

Load out 22,000 T

Load out 5,000 T


BURNTISLAND FABRICATIONS LTD
Burntisland Facility
Fully integrated
and recoverable
SB & P facility FACILITIES INFORMATION
SUB ASSEMBLY
HALLS Loadout Capacity:
5,000Te

Certification:
ISO9001; OHSAS 18001; ISO14001
MAIN ASSEMBLY
HALLS OFFICES Welding capabilities:
SAW, SMAW, GTAW, SFCAW,
PGMAW

DOCK GATE 98FT Total area:


WIDE 133,550mtr²
PARKING 400
CARS Facilities:
QUAYSIDE 5’000 • Fabrication Halls
TONNE CAPACITY • Pipe fabrication shop (Exotics)
• Plate cutting and subassembly
fabrication shop
• Shotblasting & Painting
• Storage
• Quayside
NON TIDAL DOCK
WATER DEPTH 5.9M Equipment
• Welding / cutting machines
• Cranes.
2 NO 300 X 90 • Handling Equipment
STANDARD • Multi-wheel trailer (SPMTs)
• Rail Mounted Bogie system
BURNTISLAND FABRICATIONS LTD
Methil Facility
BURNTISLAND FABRICATIONS LTD
Methil Facility

FACILITIES INFORMATION

Loadout Capacity:
22,000Te

Certification:
ISO9001; OHSAS 18001; ISO14001

Welding capabilities:
SAW, SMAW, GTAW, SFCAW,
PGMAW

Total area:
Phase 1: 542,258mtr²

Facilities:
• Fabrication Halls
• Plate cutting and subassembly
fabrication shop
• Shotblasting & Painting
• Storage
• Quayside

Equipment
• Welding / cutting machines
• Cranes.
• Handling Equipment
• Multi-wheel trailer (SPMTs)
BURNTISLAND FABRICATIONS LTD
BURNTISLAND FABRICATIONS LTD
Arnish Facility

FACILITIES INFORMATION

Loadout Capacity:
4,000Te

Certification:
ISO9001; OHSAS 18001; ISO14001

Welding capabilities:
SAW, SMAW, GTAW, SFCAW,
PGMAW

Total area:
38,000mtr²

Facilities:
• Fabrication Halls
• Pipe Rolling
• Plate cutting and subassembly
fabrication shop
• Shotblasting & Painting
• Storage
• Quayside

Equipment
• Welding / cutting machines
• Cranes.
• Handling Equipment
• Multi-wheel trailer (SPMTs)
BURNTISLAND FABRICATIONS LTD
Arnish Facility

BiFab Arnish

• Large scale tubular fabrication, capacity


to process up to 50,000 tonnes of steel
per annum.
• Monopiles, Piles & Transition Pieces
• Subsea devices fabrication
• Climate-controlled blasting, metallization
and coating to high specification
• Facilities to handle 800 tonnes single
sections
• 100mtr long quay, with deep water quay
facilities
• CNC Profile Cutting
• Coded Welding with approved
procedures to a range of processes
BURNTISLAND FABRICATIONS LTD
Arnish Facility

BiFab Arnish

• Our Arnish facility is designed to process up


to 50,000 tonnes of steel per annum.
• BiFab can roll steel plate (Grade S355) up
to 150mm in thickness and plate widths of
4.0m.
• Large diameter of tubes can be rolled and
single tube lengths of 100m can be
accommodated in our main hall.
• Our processes follow state-of-the-art
procedures and are fully controlled via our
Quality Management System which has
been independently certified to ISO
9001:2008
• Strategy to have Arnish produce its own
product for delivery to the Marine
Renewables sector.
BURNTISLAND FABRICATIONS LTD
Arnish Facility

BiFab Arnish

• DAVI MCB3090 Horizontal Rolling Machine


• Hugh Smith Vertical Bending Machine
• Hugh Smith Horizontal Rolling Machine
• CNC Machining
• Paint Shop
• Automatic Welding Machine
BURNTISLAND FABRICATIONS LIMITED
BIFAB ARNISH FACILITY
BURNTISLAND FABRICATIONS LTD
Offshore Wind is Coming...

We have the skills, facilities, track record, designs

ENERGY PARK DEVELOPMENT


(Fife & Arnish)

Scottish Enterprise / Highlands & Island - VISION


Working together with industry to create
Strategic asset not just for Scotland but the whole
of the UK.
Jointly we can provide the best facilities in Europe

We are investing NOW.


BURNTISLAND FABRICATIONS LTD
Workforce

 THE LABOUR IS MADE UP FROM OUR CORE LABOUR FORCE


PLUS ADDITIONAL RECRUITMENT

 PEAK EMPLOYMENT IN THE PAST YEAR - APPROXIMATELY


2500.

 THE BULK OF THE LABOUR FORCE IS RECRUITED FROM


CENTRAL SCOTLAND.

 BIFAB HAS AN APPRENTICESHIP TRAINING SCHEME WITH A


ROLLING PROGRAM OF APPROXIMATELY 50 APPRENTICES
AT ANY ONE TIME.
BURNTISLAND FABRICATIONS LTD
Procurement

 Procurement is carried out in accordance with the requirements of the


BiFab Quality Management system.

 BiFab procure on a global basis, with recent procurement of steel being in


excess of 50,000 tonnes.

 BiFab current order book +£150 million.

Global Supply Chain


GLOBAL OPPORTUNTIES
BURNTISLAND FABRICATIONS LTD
Management Systems

Burntisland Fabrications Limited

HSEQ
Management Systems
BS EN ISO 9001:2008
BS EN ISO 14001:2004
BS OHSAS 18001:2007
BURNTISLAND FABRICATIONS LTD
Management Systems

BS EN ISO 9001:2008
BS EN ISO 14001:2004
BS OHSAS 18001:2007
BURNTISLAND FABRICATIONS LTD
Management Systems

BS-EN-ISO 3834-2 :2005


Certification Valid until:
31st May 2017

BS-EN-1090-2:2008+A1:2011
Certified to Execution Class 4

Certification Valid until:


31st May 2017
BURNTISLAND FABRICATIONS LTD
Management Systems
Third Party Audits & Accreditations

FPAL

BiFab has a current FPAL Assessment


Certificate valid until September 2018

FPAL Verify Audits

2008 2010 2012 2014 2016


Quality N/A N/A N/A 9.0 9.0
H&S 7.8 8.1 8.6 8.6 8.7
Environment 7.3 8.4 8.6 8.7 8.1
Competency N/A 8.0 8.4 8.4 8.4
BURNTISLAND FABRICATIONS LTD
Management Systems
Third Party Audits & Accreditations

Achilles JQS

BiFab participated in Achilles’ Joint


Qualification System and were awarded a
Certificate of Qualification which is valid
until 28 Oct. 2017
BURNTISLAND FABRICATIONS LTD
Management Systems
Third Party Audits & Accreditations

Sellihca

BiFab Certificate for the Nordic Utility


Pre-Qualification System ,which is valid
until January 2018 (awaiting certificate)
BURNTISLAND FABRICATIONS LTD
Experience

TRACK RECORD

BIFAB HAS A WIDE RANGE OF EXPERIENCE COVERING:


JACKETS; TOPSIDES; SUBSEA; ACCOMMODATION MODULES; CONTROL ROOM
AND PILES WITHIN THE OIL & GAS SECTOR AND OFFSHORE RENEWABLES
SECTOR.

Global project solutions exceeding clients’ expectations, combined with a fresh


approach and trusted reputation.
BURNTISLAND FABRICATIONS LTD
Experience

JACKET STRUCTURES
and FLARE TOWER
(Oil & Gas)
CLIENT: PREMIER OIL
PROJECT: Solan Field Development.
SCOPE: Fabrication and Supply of Jacket
VALUE: £120,000,000
YEAR: 2014

PREMIER OIL – SOLAN PROJECT


1 Jacket 8400 T
CLIENT: PREMIER OIL
PROJECT: Solan Field Development.
SCOPE: Fabrication and Supply of Jacket
VALUE: £120,000,000
YEAR: 2014

PREMIER OIL – SOLAN PROJECT


Premier Jacket Loadout Video
1 Jacket 8400 T
GDF SUEZ - CYGNUS PROJECT
CLIENT: GDF SUEZ
PROJECT: Cygnus Field Development.
SCOPE: Engineering, Procurement and
Construction of 4 Jackets
VALUE: £70,000,000
YEAR: 2014

GDF SUEZ - CYGNUS PROJECT


BURNTISLAND FABRICATIONS LTD
GDF SUEZ - CYGNUS PROJECT
CLIENT: GDF SUEZ
PROJECT: Cygnus Field Development.
SCOPE: Engineering, Procurement and
Construction of 4 Jackets
VALUE: £70,000,000
YEAR: 2014

GDF SUEZ - CYGNUS PROJECT


BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: BP
PROJECT: Clair Ridge.
SCOPE: Construction of Flare Tower
VALUE: £3,000,000
YEAR: 2015

BP – Clair Ridge
Flare Boom
BURNTISLAND FABRICATIONS LTD
Experience

TOPSIDES STRUCTURES
BURNTISLAND FABRICATIONS LTD
Experience

PREMIER OIL – SOLAN PROJECT


Engineering Procurement & Construction
1 Topside 4500 T

CLIENT: PREMIER OIL


PROJECT: Solan Field Development.
SCOPE: Engineering, Procurement and
Construction of Wellhead Topside
VALUE: £166,000,000 Premier Topside Loadout Video
YEAR: 2014
PREMIER OIL – SOLAN PROJECT
1 Topside 4500 T

CLIENT: PREMIER OIL


PROJECT: Solan Field Development.
SCOPE: Engineering, Procurement and
Construction of Wellhead Topside
VALUE: £166,000,000
YEAR: 2014
GDF SUEZ – CYGNUS FIELD
1 Topside 4000 T

CLIENT: GDF SUEZ


PROJECT: Cygnus Field Development.
SCOPE: Construction of AUQ Topside
VALUE: £90,000,000
YEAR: 2014
Cygnus Module Loadout Video
BURNTISLAND FABRICATIONS LTD
Experience

ACCOMMODATION / CONTROL BUILDINGS


BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: ConocoPhillips
PROJECT: Britannia Phase II
SCOPE: Engineering, Procurement &
Construction of LER Module
VALUE: £2,500,000
YEAR: 2006

CONOCOPHILLIPS
Britannia Phase II LER Module
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: CB&I
PROJECT: South Hook
SCOPE: Engineering, Procurement &
Construction of Jetty Control
Building
VALUE: £3,500,000
YEAR: 2007

CB&I
South Hook Jetty Control Building
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: ConocoPhillips
PROJECT: Judy
SCOPE: Engineering, Procurement &
Construction of Accommodation
Unit
VALUE: £6,000,000
YEAR: 2009

CONOCOPHILLIPS
Judy Platform Accommodation Unit
BURNTISLAND FABRICATIONS LTD
Experience

SUBSEA STRUCTURES
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Camerons
PROJECT: Jette
SCOPE: Engineering, Procurement &
Construction of Manifold &
Protection Structures
VALUE: £3,500,000
YEAR: 2012

CAMERONS
Protection Structures and PLEM
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Vetco Gray


PROJECT: BP Skarv
SCOPE: Provision of 5 No Manifolds
VALUE: £30,000,000
YEAR: 2010

VETCO GRAY
BP Skarv Subsea Manifolds
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Vetco Gray


PROJECT: Kipper / Tuna
SCOPE: Provision of Manifold & Coolers
VALUE: £4,000,000
YEAR: 2010

VETCO GRAY
Kipper Tuna Manifolds & Coolers
BURNTISLAND FABRICATIONS LTD
Experience

MISCELLANEOUS
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: AMECFW
PROJECT: BP Kinneil Chilldown Project,
Grangemouth
SCOPE: Provision of PAUs / PARs
VALUE: £34,400,000
YEAR: 2016

• six pre-assembled units (PAUs) - each weighing over 100


tonnes form the core of the new plant.

• pre-assembled racks (PARs), for hydrocarbon pipework


connections to the existing plant.

The RLPG plant currently operates with R22, a colourless,


refrigerant gas. EU legislation requires the replacement of
R22 with R410a as a suitable more environmentally friendly
and efficient replacement refrigerant. Refrigeration is
required to chill the Liquefied Petroleum Gas (LPG) to
enable storage and eventual transportation by ship to
market. Without refrigeration, the Forties Pipeline System
would be unable to operate.
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Costain
PROJECT: Total Edradour, Glenlivet Project
SCOPE: Provision of PAUs / PARs
VALUE:
YEAR: 2016
SGP

Representation of Module
Arrangement
• SGP Built for Laggan Tormore Field – Potential 17% UK Oil
and Gas reserves

• Extended for Edradour – Glenlivet Field

• Adjacent to BP Sullom Voe

COSTAIN
Total Edradour PAUs / PAR Modules
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: CB&I
PROJECT: South Hook
SCOPE: Provision of Pre Assembled Racks
VALUE: £9,000,000
YEAR: 2008

CB&I
South Hook Pre Assembled Racks
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Technip
PROJECT: BP QUAD 204
SCOPE: Provision of Hold Down / Hold Back
Piles
VALUE: £3,000,000
YEAR: 2013

TECHNIP, BP QUAD 204


Hold Down / Hold Back Anchor Piles
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: GDF Suez


PROJECT: Cygnus Field Development
SCOPE: Provision of Jacket Piles
VALUE: Included as part of Jacket contract
YEAR: 2014

GDF SUEZ
Cygnus Field Dev. Jacket Piles
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: ConocoPhillips
PROJECT: Britannia
SCOPE: Provision of Monocolumn
VALUE: £6,000,000
YEAR: 2012

CONOCOPHILLIPS
Monocolumn
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: EEW SPC


PROJECT: Global Tech 1
SCOPE: WTG Tripod Columns
VALUE: £5,000,000
YEAR: 2011

GLOBAL TECH 1, OFFHSORE WINDFARM


WTG Tripod Foundation Columns
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Saipem
PROJECT: West Franklin Development
SCOPE: Provision of Jacket Piles
VALUE:
YEAR: 2011

SAIPEM
West Franklin Jacket Piles
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: RES
PROJECT: West of Duddon Sands Offshore
Windfarm
SCOPE: Provision of MetMast
VALUE: £2,000,000
YEAR: 2013

WEST OF DUDDON SANDS


Offshore Windfarm MetMast
DELIVERING OFFSHORE WIND
Deep Water; Large Turbines no limit!

QUESTIONS
BURNTISLAND FABRICATIONS LTD
BURNTISLAND FABRICATIONS LTD
UK ROUND 3 OFFSHORE WIND
Average distance to shore (km)

0 10 20 30 40 50 60 70
Moray Firth 1.3GW
EDP 1GW SeaEnergy 0.3GW Round 1 8

Round 2 25

Round 3 65
Firth of Forth 3.5GW
SSE 1.7GW Fluor 1.7GW
Dogger Bank stretches
Dogger Bank 9GW
SSE 2.25GW
285km offshore
Statoil 2.25GW
RWE 2.25GW
Statkraft 2.25GW

Hornsea 4GW
Mainstream 2GW,
Siemens 2GW
Irish Sea
4.2GW Centrica

Norfolk 7.2GW
SPR 3.6GW,
Vattenfall 3.6GW

Bristol Channel
1.5GW RWE

Hastings
West Isle of Wight 0.7GW EON
0.9GW Eneco

Source: UK Ports for the Offshore Wind Industry: Time to Act, DECC / BVG Associates, 5 February 2009, p.17;Carbon Trust analysis
BURNTISLAND FABRICATIONS LTD
DELIVERING OFFSHORE WIND.

Major opportunities for the UK – EUROPE.

Beatrice R&D: 2 off


Alpha Ventus: 6 off
Ormonde: 31 off
Greater Gabbard: 2 off
RWE Gwynt Y Mor: 2 off
Beatrice: 28 off (new project)

Major expansion plans for our facilities: £20.25 M.

Creating a facility to manufacture 150 structures per year.

Working as a team with the aim of securing substantial reductions in the


cost of delivered power from offshore wind farms ( / )

BiFab working with BEIS & Scottish Enterprise.


BURNTISLAND FABRICATIONS LTD
Experience

JACKET STRUCTURES
(Offshore Renewables)
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Talisman & SSE


PROJECT: Beatrice Offshore Windfarm
Demonstrator Project
SCOPE: Provision of WTG Jackets
VALUE: £7,700,000
YEAR: 2007

TALISMAN & SSE


Beatrice Offshore Windfarm Demonstrator
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Talisman & SSE


PROJECT: Beatrice Offshore Windfarm
Demonstrator R&D Project
SCOPE: Provision of WTG Jackets
VALUE: £7,700,000
YEAR: 2007

TALISMAN & SSE


Beatrice Offshore Windfarm Demonstrator
BURNTISLAND FABRICATIONS LTD

6 Jacket Substructures – DOTI Alpha Ventus Project


BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: DOTI
PROJECT: Alpha Ventus Offshore Windfarm
Project
SCOPE: Provision of 6 No WTG Jackets
VALUE: £14,000,000
YEAR: 2009

Deutsche Offshore-Testfeld und Infrastructur GmbH & Co. KG


Alpha Ventus Offshore Windfarm
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: DOTI
PROJECT: Alpha Ventus Offshore Windfarm
Project
SCOPE: Provision of 6 No WTG Jackets
VALUE: £14,000,000
YEAR: 2009

Deutsche Offshore-Testfeld und Infrastructur GmbH & Co. KG


Alpha Ventus Offshore Windfarm
Alpha Ventus Jacket Loadout Video
150 MW
OFFSHORE WINDFARM
DEVELOPMENT
BURNTISLAND FABRICATIONS LTD
Experience
VATTENFALL

ORMONDE POWER GENERATION PROJECT

30 Mass – Produced
Jacket Substructures to
be Delivered by
September 2010
CLIENT: Vattenfall
PROJECT: Ormonde Power Offshore
Windfarm Project
SCOPE: EPC of 30 No WTG Jackets & Piles
VALUE: £70,000,000
YEAR: 2010

Vattenfall – Ormonde Offshore Windfarm


30 WTG Jacket Structures & Piles
Vattenfall – Ormonde Offshore Windfarm
30 WTG Jacket Structures & Piles
Vattenfall – Ormonde Offshore Windfarm
30 WTG Jacket Structures & Piles
CLIENT: Vattenfall
PROJECT: Ormonde Power Offshore
Windfarm Project
SCOPE: EPC of 1 No OSP Topside, Jacket
& Piles
VALUE:
YEAR: 2010

Vattenfall – Ormonde Offshore Windfarm


1 OSP Topside, Jacket Structure & Piles
BURNTISLAND FABRICATIONS LTD
Experience

Greater Gabbard Offshore Wind Farm


BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Fluor
PROJECT: Greater Gabbard Offshore
Windfarm Project
SCOPE: EPC of 2 No OSP Jackets & Piles
VALUE: £4,000,000
YEAR: 2010

Fluor – Greater Gabbard Offshore Windfarm


2 No OSP Jacket Structures & Piles
BURNTISLAND FABRICATIONS LTD
Experience
GWYNT Y MOR OFFSHORE WIND FARM

• 2 Number 800 tonne OTP Support Structures Design and Build


CLIENT: RWE
PROJECT: Gwynt Y Mor Offshore Windfarm
Project
SCOPE: EPC of 2 No OSP Jackets & Piles
VALUE: £13,000,000
YEAR: 2010

RWE – Gwynt Y Mor Offshore Windfarm


2 No OSP Jacket Structures & Piles
RWE – Gwynt Y Mor Offshore Windfarm
2 No OSP Jacket Structures & Piles
DELIVERING OCEAN ENERGY

BiFab is a proactive company willing to embrace future


technology and help make it a reality.
BURNTISLAND FABRICATIONS LTD
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Marine Current Turbines


PROJECT: SeaGen Project
SCOPE: Wave Power Foundation
VALUE: £1,000,000
YEAR: 2008

Marine Current Turbines


SeaGen Foundation and Piling Template
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: AquaMarine Power


PROJECT: Oyster 800
SCOPE: Wave Energy Convertor
VALUE: £800,000
YEAR: 2011

AquaMarine Power
Oyster 800 Wave Energy Convertor
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: AquaMarine Power


PROJECT: Oyster 800
SCOPE: Wave Energy Convertor
VALUE: £800,000
YEAR: 2011

AquaMarine Power
Oyster 800 Wave Energy Convertor
AquaMarine Power
Oyster 800 Wave Energy Convertor
BURNTISLAND FABRICATIONS LTD
Experience

CLIENT: Hammerfest Strom (UK) Ltd


PROJECT: HS1000 Tidal Turbine
SCOPE: Engineering, Procurement &
Construction of Tidal Turbine
Foundation
VALUE: £1,200,000
YEAR: 2011

Hammerfest Strom
HS1000 Tidal Energy GBS Foundation
CLIENT: Hammerfest Strom (UK) Ltd
PROJECT: HS1000 Tidal Turbine
SCOPE: Engineering, Procurement &
Construction of Tidal Turbine
Foundation
VALUE: £1,200,000
YEAR: 2011

Hammerfest Strom
HS1000 Tidal Energy GBS Foundation
CLIENT: Hammerfest Strom (UK) Ltd
PROJECT: HS1000 Tidal Turbine
SCOPE: Engineering, Procurement &
Construction of Tidal Turbine
Foundation
VALUE: £1,200,000
YEAR: 2011

Hammerfest Strom
HS1000 Tidal Energy GBS Foundation
BURNTISLAND FABRICATIONS LTD
Recent Contract Awards

Seaway Heavy Lifting: Siemens:


26 WTG JACKET 2 OTM JACKET
SUBSTRUCTURES SUBSTRUCTURES & PILES
BURNTISLAND FABRICATIONS LTD
Investment / Innovation

BURNTISLAND FABRICATIONS LTD


INVESTMENT & INNOVATION

SERIAL PRODUCTION
BURNTISLAND FABRICATIONS LTD
Investment / Innovation

SERIAL PRODUCTION

Existing Facility New Facility

100 - 120 Structures


per year
BURNTISLAND FABRICATIONS LTD

MASS MANUFACTURING

100 – 120 Structures per year


BURNTISLAND FABRICATIONS LTD

ONE JACKET PER WEEK


CHALLENGE IS THREE JACKETS PER WEEK
BURNTISLAND FABRICATIONS LTD
Investment / Innovation

BURNTISLAND FABRICATIONS LTD


INVESTMENT & INNOVATION

AUTOMATED FACILITIES
BURNTISLAND FABRICATIONS LTD
Investment / Innovation

We understand what is required


BURNTISLAND FABRICATIONS LTD
Investment / Innovation

The technology is not far away.


BURNTISLAND FABRICATIONS LTD
Investment / Innovation

BURNTISLAND FABRICATIONS LTD


INVESTMENT & INNOVATION

INNOVATIVE SOLUTIONS
BURNTISLAND FABRICATIONS LTD
Investment / Innovation

PRODUCTION ACCESS SYSTEMS


BURNTISLAND FABRICATIONS LTD
Investment / Innovation
Top & Tail
BURNTISLAND FABRICATIONS LTD
Investment / Innovation

New Design – BiFab / Atkins .

• Long term agreements.


• Lightweight transition.
• Standardise.
• Procurement savings.
• Smaller foot print at base.
• Potentially more jackets per barge.
• Manufacturing savings.
• Installation savings.

Projection to achieve 20% reductions by 2018


Thank You