Question:

When scheduling a routing in the SAP ECC system, which of the following time
elements is a interoperation time?
Please choose the correct answer.

Response:

Float before production

Processing time

Safety time

Setup time

Score 0 of 1
Question:

When testing requirements planning in plant 1000, you receive the error
message displayed below. Large numbers of materials are already available in
plant 1000. As a first step in solving the problem, you activate requirements
planning in the Customizing for plant 1000.

Single Item Multi-Level

Requirement planning is not active in plant


MD02 t37tdc00 INS
1000
What further tasks do you perform before you can use requirements planning in
plant 1000 in SAP ECC?

Please choose the correct answer.

Response:

Activate requirements planning in Customizing for MRP areas in plant 1000


specify the plant parameters for plant 1000 in the MRP views in material ma

Set up the planning files in Customizing and specify the plant parameters fo
1000 in Customizing of the MRP group.

Set up the planning file in Customizing and specify the plant parameters for
1000 in the MRP views in material master.

Set up the planning file in Customizing and specify the plant parameters for
1000 in Customizing.

Score 1 of 1
Question:

Which functions lead to a reduction in the capacity requirement for an


individual operation at a work center?
There are 3 correct answers to this question.

Response:

Reducing the order quantity

Confirming the operation

Posting the goods receipt for the production order

Rescheduling the operation

Setting the status technically complete (TECO)

Score 1 of 1
Question:

In which of the following objects can you activate back flushing for production
orders?
There are 3 correct answers to this question.

Response:

Material master (finished product)

Material master (component)

Routing

Production scheduling profile

Work center

Score 1 of 1
Question:
A user has entered planning strategy group 10 (make-to-stock production) in
the material master (SAP ECC) of a product. For the coming months,
requirements with requirement type LSF (derived from the main strategy 10)
have been planned.

The user would like to change the requirement type from LSF to VSF planning
with final assembly (in accordance with planning strategy 40) for requirements
in the production plan that have already been saved.

Which of the following statements are applicable in this case?

There are 2 correct answers to this question.

Response:

The user has to change the requirement type for planning strategy 10 to VS
planning with final assembly in Customizing. The requirement type for all ex
requirements is then changed automatically.

The user can enter the new planning strategy group 40 in the material mast
product, but the requirement type is not changed automatically for existing
requirements.

The present requirement for the product can be changed manually from LSF
in the Requirement Type field in the production plan, so that the new strate
determines the next planning operation.

The planning strategy group can be changed from 10 to 40 in the existing p


plan, and the requirement type for all requirements is changed automaticall

Score 0 of 1
Question:

Which of the following activities is necessary for the capacity availability check
to be carried out automatically when a production order is released?
Please choose the correct answer.

Response:

Activate the availability check and assign the check control to the plant.

Activate the availability check and assign an overall profile in check control
business function order release.

Activate the availability check and assign an availability checking group to t


material master for the product to be produced.
Activate the availability check and assign a checking rule to the work center
operation to be checked.

Score 0 of 1
Question:

Which of the following properties applies to multi-site planning in SAP ECC?


Please choose the correct answer.

Response:

Both withdrawal from an alternative plant and stock transfer from another p
defined via special procurement keys.

The use of "scope of planning" is always mandatory for multi-site planning.

Multi-site planning can be activated using the corresponding planning strate

When using one-step stock transfer posting, transfer stock is created in the
plant.

Score 0 of 1
Question:

A customer wishes to only produce a finished product when customer orders


for it are present. Final assembly should then be carried out at short notice in
make-to-order production.

Up until this point, the important assemblies needed in final assembly should
already be available in stock. Provision of these assemblies should therefore be
triggered by planning.

Which options could you offer the customer as useful alternatives in SAP ECC?

There are 2 correct answers to this question.

Response:

The finished product uses strategy 40 (planning with final assembly) and al
important assemblies in the bill of material for the finished product should h
strategy 70 (planning at the assembly level).

The finished product uses strategy 20 (make-to-order production) and all th


important assemblies in the bill of material for the finished product should h
strategy 70 (planning at the assembly level).
The finished product uses strategy 30 (production by lots) and all the impor
assemblies in the bill of material for the finished product should have strate
(planning at the assembly level).

The finished product uses strategy 50 (planning without final assembly) and
assemblies in the bill of material for the finished product have no strategy.

Score 1 of 1
Question:

What does SAP ERP mean?


Please choose the correct answer.

Response:

SAP ERP is a technological platform, on the basis of which customer-specific


extensions can be imported.

SAP ERP is a system hardware that includes modules for purchasing, sales a
distribution, materials management, production and so on.

SAP ERP is an application that an enterprise can use to manage its business
processes efficiently.

SAP ERP is a planning system in which extended planning processes can be

Score 0 of 1
Question:

Which of the following are characteristics of ECC master production scheduling


(MPS)?
There are 3 correct answers to this question.

Response:

MPS items are planned in a standard MRP run.

Non-MPS items can be taken into consideration by an MPS run.

The planning of MPS and non-MPS items is always carried out in one planni

MPS items can be defined on plant level.


MPS items can be defined on MRP area level.

Score 1 of 1
Question:

In which master data object do you set the standard values for an operation?
Please choose the correct answer.

Response:

Work Center

Material Master

Routing

Production Resource/Tool (PRT)

Score 1 of 1
Question:

You want to create a new material that - is kept in stock- is externally


procured- is used as a component in the bills of material for various final
products- must not be sold directly.
Which standard SAP material type do you use?
Please choose the correct answer.

Response:

HAWA (trading good)

FERT (finished product)

ROH (raw material)

NLAG (non-stock material)

Score 0 of 1
Question:

In SAP ECC, a customer tests the firming options for planned orders. The
customer first sets the manual firming date from the stock/requirements list to
firm planned orders that shall occur in the short term.

In the material master, a rolling planning time horizon with firming type 1 is
active. Some planned orders have also been firmed manually already.
Which statement applies for the resultant firming situation?

Please choose the correct answer.

Response:

The firming interval is specified by the firming mechanism that currently str
further into the future and which firms planned orders that are within it; all
manually firmed planned orders are firmed independently of this.

The firming interval is specified by the firming mechanism that currently str
further into the future; all the planned orders within this horizon are firmed
they were previously firmed manually.

The firming interval is specified by the planning time fence from the materi
because this always overrides the manual firming date; all the manually firm
planned orders are firmed independently of this.

The firming interval is specified by the manual firming date because it alwa
overrides the planning time fence from the material master; all the manual
planned orders are firmed independently of this.

Score 0 of 1
Question:

For a specific end product, you want to use a planning time fence and fixing
type 1 to ensure that the planning situation in SAP ECC calms down in a short-
term time window. Two customer orders arrive at short notice and their
receipts should really be within the planning time fence, due to their date/time.
Which statement is true with this scenario?
Please choose the correct answer.

Response:

Newly created planned orders cannot be created by requirements planning


the end of the planning time fence, at the earliest.

Within the planning time fence, the newly created planned orders are autom
frozen by requirements planning (roll forward).

The MRP controller has no possibility of creating planned orders within the p
time fence.

Requirements planning only examines changes that are relevant to schedul


the planning time fence; the customer orders are covered in time.

Score 1 of 1
Question:

The master data for a logistical process is to be stored in the SAP ECC system.
In this context, you require the production versions for subsequent planning
and production. You know a mass maintenance transaction that you could use
here. Where else in the SAP ECC system could you define production versions?
Please choose the correct answer.

Response:

In the line routing.

In the repetitive manufacturing profile in Customizing.

In the material master.

In the work center.

Score 1 of 1
Question:

What are characteristics of repetitive manufacturing?


There are 3 correct answers to this question.

Response:

Automatic line loading based on capacity limits across all production lines

Period-based planning of the quantities to be produced

Shop fabrication

Production without using production orders and without status management

Continuous material consumption, production flow and output

Score 1 of 1
Question:

What do you have to consider, when you use the ATP (Available To Promise)
checks for material?
There are 2 correct answers to this question.
Response:

ATP checks are automatically performed during Material Requirements Plann


(MRP) runs.

ATP checks can be adjusted to also consider future requirements and receip

ATP checks are mandatory for lead-time scheduling.

ATP checks are used to evaluate the free capacity on a certain work center.

ATP checks can be carried out automatically when releasing a production or

Score 0 of 1
Question:

What do you have to consider regarding lot size procedures?


Please choose the correct answer.

Response:

If a make-to-order production strategy is used, only the lot-for-lot (exact) l


can be applied.

The procurement quantity of a lot size procedure can be specified using a s


period profile.

The lot size quantity can be influenced using a minimum lot size and the ro
profile.

If a long-term lot size is used, procurement is conducted with a long-term


perspective.

Score 1 of 1
Question:

What is SAP Solution Manager?


Please choose the correct answer.

Response:

An add-on industry solution


A standalone system that communicates with other systems in a system lan

A managed system in a system landscape

A transaction in the SAP ECC system

Score 1 of 1
Question:

Which of the following organizational units does the manufacturing, planning,


and execution process use?
There are 2 correct answers to this question.

Response:

Plant

Purchase Organization

Storage Location

Sales Area

Score 1 of 1
Question:

A supply chain planning run is to be carried out in the SAP ECC system as an
example.
What would be the most effective sequence in which to run through the
planning modules?
Please choose the correct answer.

Response:

1. Capacity planning
2. Sales and OperationsPlanning
3. Demand management
4. Long-term planning
5. Requirements planning

1.Sales and Operations Planning


2. Demand management
3. Long-term planning
4. Requirements planning
5. Capacity planning

1. Demand management
2. Sales and Operations Planning
3. Capacity planning
4. Long-term planning
5. Requirements planning

1. Long-term planning
2.Sales and Operations Planning
3. Demand management
4. Requirements planning
5. Capacity planning

Score 0 of 1
Question:

Which of the following requirements for a manufacturing plant can be


supported by using production orders?
There are 3 correct answers to this question.

Response:

Integrated display of documents (drawings, texts) in the production proces

Customer requirements-dependent production.

Orderless production.

Variable calculation of material quantities (production output, material usag


operation quantities.

Make-to-stock production.

Score 0 of 1
Question:

In the Customizing for requirements planning, a project team notices that the
alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP
type PD. The number in each of these alternatives represents a firming type.
What does a firming type define?
There are 2 correct answers to this question.

Response:
Handling existing procurement proposals outside the planning time fence.

Handling existing procurement proposals within a planning time fence.

Handling new requirements within the planning time fence.

Handling new procurement proposals that need to be created due to new


requirements within the planning time fence.

Score 1 of 1
Question:

Which of the following master data do you need to provide for process
manufacturing?
There are 3 correct answers to this question.

Response:

Resources

Master recipe

Serial numbers

Product cost collector

Production versions

Score 1 of 1
Question:

In the SAP ECC system, you interpret the result of a routing schedule.
When scheduling a routing in the SAP ECC system which of the following time
elements are interoperation times?
There are 2 correct answers to this question.

Response:

Move time

Floats before and after production


Safety time

Processing time

Score 1 of 1
Question:

What options does the SAP ECC system offer to retrieve the available capacity
for work centers?
There are 3 correct answers to this question.

Response:

Shift plan

Interval of available capacity

Standard available capacity

Attendance list

Shift sequence

Score 1 of 1
Question:

Which of the following master data do you need to make available for repetitive
manufacturing?
There are 3 correct answers to this question.

Response:

Production supply area

Repetitive manufacturing profile

Production versions

Product cost collector

Master records for serial numbers


Score 1 of 1
Question:

Which of the following scheduling types can only be used in capacity planning?
Please choose the correct answer.

Response:

Forward

Only capacity requirements

Midpoint

Backward

Score 1 of 1
Question:

What do you have to consider regarding consumption?


There are 2 correct answers to this question.

Response:

Consumption can take place between order reservations and planned indepe
requirements, depending on the strategy.

Consumption is restructured with the planning run.

Consumption parameters (consumption mode and consumption interval) can


in the material master or in the MRP group.

Consumption takes place on the material level between the planned indepen
requirements and the planned orders.

Score 0 of 1
Question:

Which of the following functions occur when a production order is created?


There are 3 correct answers to this question.

Response:

Calculating the lead time for the production order


Copying a document that is assigned to the material master for the product
produced

Calculating the quantity to be produced on the basis of the available materi

Selecting and copying a bill of material

Selecting and copying a routing

Score 1 of 1
Question:

Which repetitive manufacturing options can you use to carry out line loading in
the SAP ECC system, and thus generate run schedule quantities (RSQ) from
normal planned orders?
There are 3 correct answers to this question.

Response:

A planning algorithm from capacity planning

Automatic selection of the production version by applying quota arrangemen


in material requirements planning (MRP)

Manual assignment of planned production quantities in a planning table

Automatic selection of the production version in material requirements plann


(MRP) using the selection methods setting

Automatic selection of the production line assigned to the MRP group used d
material requirements planning (MRP)

Score 0 of 1
Question:

A customer has been using planning strategies 30 (production by lots) and 10


(anonymous make-to-stock production) in SAP ECC. The customer wishes to
move in part to planning strategy 40 (planning with final assembly). The issue
of consumption has an effect here for the first time.
Which properties apply for consumption with planning strategy 40?
There are 2 correct answers to this question.

Response:
Consumption can lead to an increase of the originally planned overall produ
quantity.

Consumption can result in the subsequent specification and adjustment of p


elements in terms of quantity and date, by means of customer orders that a

Consumption creates a static and binding assignment, between the planned


independent requirements recorded in advance and the customer requirem
arrive, for the entire procurement process.

Consumption can reduce the originally planned production quantity.

Score 1 of 1
Question:

A user you advise wishes to transfer variable process instructions for


automated processing directly to certain work centers and machines in the
production department (for example, feed speed, pressing pressure, dry
temperature).

The user also wishes to receive variable as-is messages (such as actual
quantities, actual times) from these work centers and machines and to process
these messages for feedback concerning production orders.

Which of the following options would you recommend to implement these


requirements?

Please choose the correct answer.

Response:

Execution Steps (XSteps) and process messages

SAP Application Link Enabling (ALE)

Plant data collection (PP-PDC) interface

SAP Business Intelligence (BI)

Score 1 of 1
Question:

You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message. What could
be the reason?
Please choose the correct answer.
Response:

Order papers have been printed.

Goods movements have been posted.

The material availability check has been performed.

The production order has been released.

Score 0 of 1
Question:

Which of the following statements is true for the ATP (available to promise)
availability check in SAP ECC that is triggered from a customer order?
Please choose the correct answer.

Response:

If the ATP check establishes non-availability, it checks whether it is still pos


procure or produce in time.

The ATP check does not confirm against stocks and receipts, it checks cons
against planning requirements.

The ATP quantity is the quantity still available that can be used to confirm i
customer orders.

An availability check by means of ATP creates fixed links between customer


and their confirmed receipts.

Score 0 of 1
Question:

Which of the following statements about ATP (Available To Promise) checks for
material components are correct?
There are 2 correct answers to this question.

Response:

ATP checks are mandatory for lead-time scheduling.

ATP checks are automatically performed during MRP (Material Requirement


Planning) runs.

ATP checks are used to evaluate the free capacity on a certain work center.

ATP checks can be adjusted to also consider future requirements and receip

ATP checks can be carried out automatically when releasing a production or

Score 1 of 1
Question:

The company you are advising uses a plant data collection system from
company XYZ and would like to distribute production orders to the terminals on
this system and enter feedback using these terminals.
Which integration possibilities would you recommend so that as little work as
possible is required for the customer to implement this?
Please choose the correct answer.

Response:

The plant data collection interface (PP-PDC)

Execution Steps (XSteps)

The process control system interface PI-PCS

SAP Manufacturing Integration and Intelligence (SAP MII)

Score 1 of 1
Question:

Which information is contained in production versions for selecting routings


and bills of material?
Please choose the correct answer.

Response:

The explosion date on which the validity of the routing and bill of material is

All the control parameters for selecting routings and bills of material

The routing and BOM alternatives to be used for production


The plant for which the routing and BOM have to be created

Score 0 of 1
Question:

An enterprise based in the US produces an end product that is used with the
unit of measure "pound" (LB). The material is now to be marketed in the EU. A
prerequisite for this is that the material can be sold with the unit "kilogram"
(KG).
What is the easiest way to fulfill this requirement?
Please choose the correct answer.

Response:

Define a unit of measure group that converts pounds to kilograms in the ba


customizing and assign it to the material master on basic data view 1.

Create a new material with a reference to the original material and assign t
unit of measure to the new material master.

There is no need to take any action. In this scenario, the conversion of unit
measurements is done automatically.

Add a conversion factor for converting pounds to kilograms on basic data vi


the material master.

Score 1 of 1
Question:

You set a rolling planning time fence (firming type = 1) for a material in an SAP
ECC system. When an unforeseen production failure occurs, firmed planned
orders might fall into the past.
How can these firmed planned orders be deleted automatically?
Please choose the correct answer.

Response:

Use reorganization.

Use an MRP type in which the roll-forward.

Use an MRP type in which the roll-backwards mechanism is activated.

Activate demand adjustment in Customizing.