You are on page 1of 1

n NOTES & LEGEND

DOOR SCHEDULE
CONSTRUCTION NOTES (All work to be in accordance with SABS 0400)
ROOF TRUSS
Roof pitch 3°

INDEX FILE NO.


Prefabricated pitched steel roof trusses at maximum 1000mm centres
designed and executed by an approved specialist fabricator and including
bracing and detail shop drawings. Roof plan to be used as a guide only.
D1 D2
TYPE

TYPE

TYPE

TYPE

TYPE
3 000 ROOF FINISH
650 1 700 650 1 500
D3 1 800 D4 900 3 100
D5 900
0.6mm KlipLok 700 steel roof sheeting klipped to 75x150mm C-chanel
steel purlins at 1.1m c/c on D10 Bubble foil sasilaltion insulation on

350
350

350
straining wires at 1m c/c nailed to steel trusses/rafters at 1.1m c/c
secured to wall by anchor bolts (to suite). Provision made for Pink Aerolite
blanket insulation in-between purlins.

1 075
FLAT ROOF

1 500
2 400

2 400
R.c. slab (to Eng's det) with DERBIGUM (Duram 195) waterproofing on

2 100

2 100
2 050

2 050

2 100
25mm min. screed to fall discharging to Ø110mm down pipes with Fulbore

150
heads
ROOF FLASHING

825

600
FFL FFL FFL FFL Approved durable GSI or other flashing and counter-flashing where roof
FFL
abuts against wall and around any projection through the roof covering.
WALLS
Well burnt clay bricks of minimum 10Mpa nominal unit strength and class
SUPERVISER OFFICE OFFICES, BATHROOMS 2 mortar and comply with the national building regulations and 230mm
LOCATION: MAIN ENTRANCE LOCATION: RECEPTION LOCATION: CONFERENCE ROOM LOCATION: LOCATION:
thick concrete blockwork. For effective lateral support brickforce above
LOCATION

LOCATION

LOCATION

LOCATION

LOCATION
and below window openings and at wallplate level and at every 3 courses.
DOOR NUMBER: Door No.01 QUANTITY REQUIRED: 01 DOUBLE ALUMINIUM & GLASS DOOR NUMBER: Door No.02 QUANTITY REQUIRED: 01 DOUBLE ALUMINIUM & GLASS DOOR NUMBER: Door No.03 QUANTITY REQUIRED: 01 DOUBLE TIMBER & DOOR NUMBER: Door No.04 QUANTITY REQUIRED: 01 SINGLE ALUNIMIUM & DOOR NUMBER: Door No.05 QUANTITY REQUIRED: 09 SINGLE DOOR All external walls to be plastered blockwork and vanished brickwork.
DOOR WITH DOUBLE SIDE LIGHTS DOOR GLASS DOOR GLASS DOOR WATERPROOFING
375 Micron gunplas brickgrip dampproof coursing extending over the full
WALL

WALL

WALL

WALL

WALL
CONSTRUCTION: 230mm MASONRY CONSTRUCTION CONSTRUCTION: 230mm MASONRY CONSTRUCTION CONSTRUCTION: 230mm MASONRY CONSTRUCTION CONSTRUCTION: 230mm MASONRY CONSTRUCTION CONSTRUCTION: 150mm MASONRY CONSTRUCTION
thickness of the wall to be installed at all window cills and at the level of
CONSTRUCTION: ALUMINIUM AND GLASS FOLDING DOOR FRAME. CONSTRUCTION: ALUMINIUM AND GLASS FOLDING DOOR FRAME. CONSTRUCTION: MACHINE CARVED RED HARDWOOD PANELED SWING DOOR FRAME. CONSTRUCTION: ALUMINIUM AND GLASS FOLDING DOOR FRAME. CONSTRUCTION: GALVANISED STEEL SINGLE DOOR FRAME. the top of the surface bed at least 170mm above the adjoining ground.
Vertical waterproofing membrane to be installed where any wall of a
FRAME

FRAME

FRAME

FRAME

FRAME
EPOXY POWDER COATED ALUMINIUM EPOXY POWDER COATED ALUMINIUM 1 COAT UNDER COAT PRIMER EPOXY POWDER COATED ALUMINIUM room is in contract with the ground
FINISH: FINISH: FINISH: FINISH: FINISH: 1 COAT UNDER COAT PRIMER
6mm THICK CLEAR SAFETY GLASS 6mm THICK CLEAR SAFETY GLASS 2 COATS CLEAR VANISH 6mm THICK CLEAR SAFETY GLASS
NATURAL LIGHT AND VENTILATION
CONSTRUCTION: FOLDING DOOR TO MANUFACTURER'S DETAILS CONSTRUCTION: DOUBLE SWING DOOR TO MANUFACTURER'S DETAILS CONSTRUCTION: DOUBLE SWING DOOR TO MANUFACTURER'S DETAILS CONSTRUCTION: SINGLE SWING DOOR TO MANUFACTURER'S DETAILS CONSTRUCTION: 813x2032X40 "LOTUS AMORETTI" OR EQUAL APPROVED MERANTI RRV DOUBLE All habitable rooms, bathrooms and toiletsare to be provided with
DOOR

DOOR

DOOR

DOOR

DOOR
SIDED DOOR
windows for the purposes of natural light and ventilation the total area of
FINISH: EPOXY POWDER COATED ALUMINIUM FINISH: EPOXY POWDER COATED ALUMINIUM FINISH: 2 COATS CLEAR VANISH FINISH: EPOXY POWDER COATED ALUMINIUM FINISH: 2 COATS POLYURETHANE - FINISH SUEDE any such window is to be not less than 10% of the floor area of the room
CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY
served by it (with a min of 0.2sqm) For natural light , and such window will
NOTE: NOTE: NOTE: NOTE: CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY NOTE: CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY
CONTRACTOR ON GA DRAWINGS CONTRACTOR ON GA DRAWINGS CONTRACTOR ON GA DRAWINGS CONTRACTOR ON GA DRAWINGS CONTRACTOR ON GA DRAWINGS be provided with opeing for natural ventilation. The total area of which
HINGES: HINGES: HINGES: HINGES: 1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS HINGES: 1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS
will be not less than 5% of the floor area of the room.
WINDOWS
PULL HANDLES: PULL HANDLES: PULL HANDLES: PULL HANDLES: PULL HANDLES: Windows to be standard as manufactured by or similiar approved
IRONMONGERY

IRONMONGERY

IRONMONGERY

IRONMONGERY

IRONMONGERY
LOCK SET: LOCK SET: LOCK SET: LOCK SET: LOCK SET: GLAZING
Glazing to comply with clause NN2,1 of the NBR All sliding doors to be
DOOR STOP: DOOR STOP: DOOR STOP: DOOR STOP: DOOR STOP:
fitted with safety glass
FLUSH BOLTS: FLUSH BOLTS: FLUSH BOLTS: FLUSH BOLTS: FLUSH BOLTS: SURFACE BED
DOOR CLOSER: DOOR CLOSER: DOOR CLOSER: DOOR CLOSER: DOOR CLOSER:
200mm 20Mpa concrete on 150m layers of well compacted approved
suitable material.
DOOR SPRINGS: DOOR SPRINGS: DOOR SPRINGS: DOOR SPRINGS: DOOR SPRINGS: WORK BELOW GROUND
All work below ground including foundations to engineers detail,
foundation sizes and depths to be finalised on site to the satisfaction of
the local authority and the structural engineer and as part of the NBR but
in any case to be not less than 700 x 250
GENERAL NOTES DRAINAGE
(in accordance with PART P of SABS 0400)
· All installation procedures to
75mm deep seal traps used with all waste fittings. All i.e's to be marked
comply with good building
at the surface and sealed. WC's to have "S" or "P" traps with side access
TYPE

TYPE

practice and deemed to cleaning eyes. All WHB"s to have Ø32mm waste pipes and Ø40mm. waste
satisfy the Architect's requirements.
D6 850 D7 1 000
· This drawing to be read in
pipes. No drainage bends or junctions in or under building. Reseal traps to
all waste fittings.
conjunction with GA-layouts and Pipes Sizes:
all dimensions to be checked wc: Ø100mm, whb: Ø40mm, bath: Ø40mm, shw: Ø50mm,
on site. bt: Ø50mm, sink: Ø40mm, uri: Ø40mm, jac: Ø50mm.
· Refer any discrepancies to Wc soil pipes having a greater drop than 1:20 must be antisyphoned
2 100
2 100

the Architect in writing. Ø100mm pvc drain pipes laid to fall 1:40 min. Drains under buildings to

WINDOW SCHEDULE
be protected against load by being encased in concrete.
NOTE: CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE
FFL FFL CHECKED AND CONFIRMED BY CONTRACTOR ON GA DRAWINGS

REVISIONS
TYPE

TYPE

TYPE

TYPE

TYPE
NO. DATE INITIAL REVISION DETAILS
LOCATION: TOILETS LOCATION: GENERATOR ROOM W1 W2 W3 W4 W5
LOCATION

LOCATION

2 400
2 000 533
DOOR NUMBER: Door No.06 QUANTITY REQUIRED: 03 SINGLE TIMBER DOOR DOOR NUMBER: Door No.07 QUANTITY REQUIRED: 01 STEEL DOOR 600
2 000
WALL

WALL

CONSTRUCTION: 115mm MASONRY CONSTRUCTION CONSTRUCTION: 230mm MASONRY CONSTRUCTION

949
300
600
1 800

1 500
CONSTRUCTION: GALVANISED STEEL SINGLE DOOR FRAME. CONSTRUCTION: GALVANISED STEEL SINGLE DOOR FRAME.
FRAME

FRAME

NCT1S
FINISH: 1 COAT UNDER COAT PRIMER FINISH: 1 COAT UNDER COAT PRIMER

CONSTRUCTION: 813x2032X40 "LOTUS AMORETTI" OR EQUAL APPROVED MERANTI RRV DOUBLE CONSTRUCTION: STEEL "SHAWL" DOOR
DOOR

DOOR

SIDED DOOR FFL FFL FFL FFL FFL

FINISH: 2 COATS POLYURETHANE - FINISH SUEDE FINISH: 2 COATS GLOSS ENAMEL PAINT KITCHEN KITCHEN SCULLERY/LAUNDRY - BATHROOM - ENSUITE GARAGE LOUNGE - MASTER BEDROOM & BEDROOM 2 - DRESSING ROOM
6mm THICK TOUGHENED GLASS - FROSTED
LOCATION

LOCATION

LOCATION

LOCATION

LOCATION
NOTE: CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY
CONTRACTOR ON GA DRAWINGS
NOTE: CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY
CONTRACTOR ON GA DRAWINGS
WINDOW NUMBER: W1 REQUIRED 06 WINDOW NUMBER: W2 REQUIRED 01 WINDOW NUMBER: W3 REQUIRED 06 WINDOW NUMBER: W4 REQUIRED 14 WINDOW NUMBER: W5 REQUIRED 06
ARCHITECTURAL
HINGES: 1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS HINGES: 1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS DESIGN OFFICE
PULL HANDLES: PULL HANDLES: CONSTRUCTION: ALUMINIUM WINDOW FRAMES CONSTRUCTION: ALUMINIUM WINDOW FRAMES CONSTRUCTION: ALUMINIUM WINDOW FRAMES CONSTRUCTION: ALUMINIUM WINDOW FRAMES CONSTRUCTION: ALUMINIUM WINDOW FRAMES GOVERNMENT OF SWAZILAND
IRONMONGERY

IRONMONGERY

LOCK SET: LOCK SET:


MINISTRY OF PUBLIC WORKS & TRANSPORT
FINISH: EPOXY PODER COATED ALUMINIUM FINISH: EPOXY PODER COATED ALUMINIUM FINISH: EPOXY PODER COATED ALUMINIUM FINISH: EPOXY PODER COATED ALUMINIUM FINISH: EPOXY PODER COATED ALUMINIUM PO BOX 58, MBABANE.
FRAME

FRAME

FRAME

FRAME

FRAME
BRONZE FINISH BRONZE FINISH BRONZE FINISH BRONZE FINISH BRONZE FINISH
DOOR STOP: DOOR STOP:
PHONE: 2409 9000
FLUSH BOLTS: FLUSH BOLTS: FAX: 2404 2321
GLAZING

GLAZING

GLAZING

GLAZING

GLAZING
DOOR CLOSER: DOOR CLOSER: 6mm SAFETY SOLAR SHIELD S10 BRONZE 6mm SAFETY SOLAR SHIELD S10 BRONZE 6mm SAFETY SOLAR SHIELD S10 BRONZE 6mm SAFETY SOLAR SHIELD S10 BRONZE 6mm SAFETY SOLAR SHIELD S10 BRONZE

DOOR SPRINGS: DOOR SPRINGS:


TRANSLUSCENT TRANSLUSCENT TRANSLUSCENT TRANSLUSCENT TRANSLUSCENT PROJECT

PROPOSED NEW NATIONAL


DISASTER EARLY WARNING
CENTRE AT MBABANE-
TYPE

TYPE

TYPE
W6 W7 W8 GOVERNMENT COMPLEX
15 160 10 000 4 580
TITLE

DOOR & WINDOW SCHEDULES


1 000

1 000

1 000
LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE LOUVRE

FFL FFL FFL


DESIGN GROUP
HIGHRISE WINDOW HIGHRISE WINDOW HIGHRISE WINDOW DESIGNATION NAME SIGNATURE DATE
SR. ARCHITECT T. Qwabe
LOCATION

LOCATION

LOCATION
WINDOW NUMBER: W6 REQUIRED 01 WINDOW NUMBER: W7 REQUIRED 01 WINDOW NUMBER: W8 REQUIRED 01

PROJECT ARCH. N. Buthelezi

ALUMINIUM WINDOW FRAMES ALUMINIUM WINDOW FRAMES ALUMINIUM WINDOW FRAMES


DESIGNED P.S. Dlamini
CONSTRUCTION: CONSTRUCTION: CONSTRUCTION:
DRAWN P.S. Dlamini
FINISH: EPOXY PODER COATED ALUMINIUM FINISH: EPOXY PODER COATED ALUMINIUM FINISH: EPOXY PODER COATED ALUMINIUM
FRAME

FRAME

FRAME
BRONZE FINISH BRONZE FINISH BRONZE FINISH ENGINEER
SCALE: NTS
DATE: Febuary 2014
GLAZING

GLAZING

GLAZING
6mm SAFETY SOLAR SHIELD S10 BRONZE 6mm SAFETY SOLAR SHIELD S10 BRONZE 6mm SAFETY SOLAR SHIELD S10 BRONZE
TRANSLUSCENT TRANSLUSCENT TRANSLUSCENT
DRAWING NO. CONTRACT NO. CHKD REV.

WT/53/14/004